US10337778B2 - Economizer component and refrigeration system thereof - Google Patents

Economizer component and refrigeration system thereof Download PDF

Info

Publication number
US10337778B2
US10337778B2 US15/743,889 US201615743889A US10337778B2 US 10337778 B2 US10337778 B2 US 10337778B2 US 201615743889 A US201615743889 A US 201615743889A US 10337778 B2 US10337778 B2 US 10337778B2
Authority
US
United States
Prior art keywords
economizer
chamber
housing
inter
component according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
US15/743,889
Other versions
US20180209705A1 (en
Inventor
Haiping Ding
Yuequn Ge
Haitao Zhang
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Carrier Corp
Original Assignee
Carrier Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Carrier Corp filed Critical Carrier Corp
Assigned to CARRIER AIR CONDITIONING AND REFRIGERATION R&D MANAGEMENT (SHANGHAI) CO., LTD reassignment CARRIER AIR CONDITIONING AND REFRIGERATION R&D MANAGEMENT (SHANGHAI) CO., LTD ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: GE, Yuequn, DING, HAIPING, ZHANG, HAITAO
Assigned to CARRIER CORPORATION reassignment CARRIER CORPORATION ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: CARRIER AIR CONDITIONING AND REFRIGERATION R&D MANAGEMENT (SHANGHAI) CO., LTD.
Publication of US20180209705A1 publication Critical patent/US20180209705A1/en
Application granted granted Critical
Publication of US10337778B2 publication Critical patent/US10337778B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B43/00Arrangements for separating or purifying gases or liquids; Arrangements for vaporising the residuum of liquid refrigerant, e.g. by heat
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B1/00Compression machines, plants or systems with non-reversible cycle
    • F25B1/10Compression machines, plants or systems with non-reversible cycle with multi-stage compression
    • F25B41/065
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B41/00Fluid-circulation arrangements
    • F25B41/30Expansion means; Dispositions thereof
    • F25B41/31Expansion valves
    • F25B41/315Expansion valves actuated by floats
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2400/00General features or devices for refrigeration machines, plants or systems, combined heating and refrigeration systems or heat-pump systems, i.e. not limited to a particular subgroup of F25B
    • F25B2400/13Economisers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2500/00Problems to be solved
    • F25B2500/18Optimization, e.g. high integration of refrigeration components

Definitions

  • the present invention relates to a refrigeration system, and more particularly, the present invention relates to an improved economizer component in a refrigeration system.
  • An economizer is a common member in a large-scale refrigeration system and is used to enable throttling and evaporation of a part of a refrigerant to absorb heat, so as to enable another part of the refrigerant to achieve super-cooling.
  • the economizer may be used in a refrigeration system having a multi-stage compressor unit. In a working condition in which evaporation temperature is relatively low, a normal multi-stage compressor unit has various defects such as reduced efficiency, reduced refrigerating capacity, and relatively high exhaust temperature. If the economizer is used to perform air supplementation between compression stages of the multi-stage compressor unit, efficiency of refrigeration cycles can be improved, refrigerating capacity can be improved, and exhaust temperature of a compressor can be reduced.
  • An economizer is an essential member in a large-scale refrigeration system, and in the overall design of the refrigeration system, inevitably, an overall layout of the refrigeration system after the economizer is applied needs to be considered.
  • the connecting pipe passages between the economizer and other members also need to be designed together.
  • an overall layout of a large-scale refrigeration unit becomes troublesome and complex.
  • complexity of disposing of pipe passages also indirectly affects running efficiency and reliability of the system.
  • An objective of the present invention is to provide an economizer component, so as to simplify complexity of pipe passages of a refrigeration system in which the economizer component is applied.
  • An objective of the present invention is to further provide a refrigeration system having the economizer component, so as to simplify complexity of an overall layout of a refrigeration unit, thereby ensuring running efficiency and reliability of the system.
  • the present invention provides the following technical solutions.
  • an economizer component including: a housing; an economizer chamber and an inter-stage flow path chamber, formed inside the housing by using a separator; a condenser connecting port and an evaporator connecting port, disposed on the economizer chamber; a first connecting port and a second connecting port, connected in a multi-stage compressor unit and disposed on the inter-stage flow path chamber; and the economizer chamber being in fluid connection with the inter-stage flow path chamber.
  • a refrigeration system including: the economizer component described above and a multi-stage compressor unit, where the inter-stage flow path chamber is connected in the multi-stage compressor unit by using the first connecting port and the second connecting port.
  • FIG. 1 is a schematic diagram of an embodiment of an economizer component of the present invention.
  • the economizer component 100 has an external structure similar to that of a conventional economizer, that is, has a cylindrical housing 110 made of corrosion-resistant metal. Two internal spaces are formed inside the housing 110 by using a separator 140 : an economizer chamber 120 and an inter-stage flow path chamber 130 .
  • a condenser connecting port 111 , an evaporator connecting port 112 , a first connecting port 113 , and a second connecting port 114 are disposed on the housing 110 .
  • the condenser connecting port 111 and the evaporator connecting port 112 are in fluid connection with the economizer chamber 120 .
  • the first connecting port 113 and the second connecting port 114 are in fluid connection with the inter-stage flow path chamber 130 .
  • the economizer chamber 120 should further be in fluid connection with the inter-stage flow path chamber 130 .
  • the economizer chamber 120 is further provided with a float chamber 150 upstream of the evaporator connecting port 112 , and a float valve 151 is provided in the float chamber 150 to control on/off and an opening degree according to a liquid level in the float chamber 150 .
  • a refrigerant that flows into the economizer chamber 120 from a condenser is throttled into a gas-phase state and a liquid-phase state.
  • the gas-phase refrigerant may directly flow into the inter-stage flow path chamber 130 , to implement inter-stage air supplementation of a multi-stage compressor unit, so as to achieve effects of reducing exhaust temperature of the multi-stage compressor unit and improving quality.
  • inter-stage pipe passages specially used for the multi-stage compressor unit are no longer needed, thereby avoiding a problem of complex design of pipe passages, so that large-scale bent connecting pipe passages no longer exist, and an overall structure becomes more compact and simplified.
  • design positions of structural features are also very important.
  • the economizer chamber 120 is optionally located at a lower portion of the housing 110
  • the inter-stage flow path chamber 130 is located at an upper portion of the housing 110 . In this way, it facilitates the refrigerant in two phases to complete separation of the gas-phase refrigerant and the liquid-phase refrigerant in the economizer chamber 120 , and it further facilitates the gas-phase refrigerant floating above the liquid-phase refrigerant to be sucked into the inter-stage flow path chamber 130 , thereby facilitating inter-stage air supplementation of the multi-stage compressor unit.
  • the so-called economizer chamber 120 and the so-called inter-stage flow path chamber 130 are two spaces that are defined according to the effects of the two chambers in the unit, and the two chambers are not completely isolated, and instead a structure of fluid connection is provided.
  • an end of the separator 140 near the second connecting port 114 and an end portion or a bottom portion of the housing 110 are substantially sealed (except for a liquid discharge hole that is described hereinafter), a compensation port 131 may be formed at an end of the separator 140 near the evaporator connecting port 112 , and fluid connection between the economizer chamber 120 and the inter-stage flow path chamber 130 is implemented by using the compensation port 131 .
  • the compensation port 131 may be directly formed to have a half-moon shape.
  • the refrigerant in two phases may be throttled and separated into the gas-phase refrigerant and the liquid-phase refrigerant in the economizer chamber 120 , such separation is not thorough or absolute. That is, the gas-phase refrigerant may be mixed with tiny liquid drops, and the liquid-phase refrigerant may be mixed with gas.
  • a demisting member upstream of the compensation port may be further provided to effectively filter out the liquid-phase refrigerant, thereby preventing an excessive amount of the liquid-phase refrigerant from entering a compressor to cause a fluid hammer phenomenon.
  • a demister member may be disposed at a position higher than that of the separator 140 .
  • Such an arrangement considers the following: Because of an effect of gas-liquid separation of the economizer chamber 120 , more of the liquid-phase refrigerant usually exists in a lower-portion space, and more of the gas-phase refrigerant usually exists in an upper-portion space. Therefore, even if assuming there is no demister member, a proportion of the liquid-phase refrigerant is lower at a higher position of the economizer chamber 120 . Therefore, the demister member is disposed higher than the separator 140 , which helps to improve an effect of demisting the liquid-phase refrigerant.
  • the separator 140 needs to be redesigned with a bend that goes upward, so as to seal a gap that exists because of a height difference between the separator 140 and the demister member, thereby preventing the liquid-phase refrigerant from directly entering the inter-stage flow path chamber 130 via the gap.
  • the demister member herein is required to have an effect of adsorbing or separating misty liquid drops.
  • the present invention provides a specific embodiment of a demister member, i.e., a wire-mesh demister 121 .
  • insertion slots 122 may be further disposed on two sides inside the housing 110 , and a filtering member is disposed in the housing 110 in a manner of being inserted in the insertion slot 122 .
  • an intermediate-level guide vane of the multi-stage compressor unit is required to control the pressure in the economizer chamber 120 , and maintain a pressure difference between the economizer chamber 120 and an evaporator, thereby ensuring that the refrigerant effectively flows from the economizer chamber 120 to the evaporator.
  • the compensation port 131 may be sealed, and instead a damping valve port 115 is disposed on the housing 110 of the economizer component. An end of the damping valve port 115 is connected to the economizer chamber 120 , and the other end of the damping valve port 115 is joined with the inter-stage flow path chamber 130 outside the housing 110 .
  • the pressure in the economizer chamber 120 may be adjusted by using a damping valve, so as to maintain a pressure difference between the economizer chamber 120 and the evaporator, thereby ensuring that the refrigerant effectively flows from the economizer chamber 120 to the evaporator. Similar to an intermediate-level guide vane, the objective of adjusting the pressure in the economizer chamber 120 can also be implemented.
  • the condenser connecting port 111 is disposed on a lower right side of the economizer component 100 ; the evaporator connecting port 112 is disposed on a lower left side of the economizer component 100 ; the first connecting port 113 is disposed on an upper side of the economizer component 100 and near the compensation port 131 ; and the second connecting port 114 is disposed at a right end portion of the economizer component 100 .
  • gas-liquid separation is gradually implemented in the process that the refrigerant flows from right to left.
  • the liquid-phase refrigerant goes to the evaporator from the evaporator connecting port 112 at a lower left corner.
  • the gas-phase refrigerant flows into the inter-stage flow path chamber 130 from an upper left corner to the right via the compensation port 131 , and is mixed with the gas-phase refrigerant that is sucked into the inter-stage flow path chamber 130 via the first connecting port 113 and that undergoes first-stage compression.
  • the mixed gas-phase refrigerant enters the compressor via the second connecting port 114 .
  • the entire flowing process is very stable, and unnecessary turnings or loops do not exist.
  • the design of the separator is particularly important.
  • the separator 140 is generally includes two sections, that is: a first section 141 extending along a longitudinal direction of the housing 110 and a second section 142 that leaves space for the second connecting port 114 .
  • the first section 141 has a main effect of forming the economizer chamber 120 and the inter-stage flow path chamber 130 inside the housing 110 .
  • the second section 142 is mainly used to enable the gas-phase refrigerant to stably flow into a second stage of the multi-stage compressor unit by providing space, to further reduce a flowing resistance of the gas-phase refrigerant.
  • the first section 141 may be directly disposed as a straight plate.
  • a bend can be directly formed between the first section 141 and the second section 142 .
  • the bend may have a rounded transitional portion.
  • the second section 142 may be disposed on a side near the condenser connecting port 111 inside the housing 110 .
  • a liquid discharge hole 143 may be further disposed at a lowest point of the inter-stage flow path chamber 130 .
  • the liquid discharge hole 143 may be disposed at the bottom of the second section 142 , and opening and closing of the liquid discharge hole 143 is controlled by using an electromagnetic valve.
  • the present invention further provides an embodiment of a refrigeration system, in which the foregoing economizer component 100 of the present invention is applied, and a multi-stage compressor unit is also included.
  • the inter-stage flow path chamber 130 is connected to a discharge port of a first stage compressor 160 in the multi-stage compressor unit by using the first connecting port 113 , and is connected to a suction port of a second stage compressor 162 in the multi-stage compressor unit by using the second connecting port 114 .
  • the refrigeration system no longer needs inter-stage pipe passages specially used for the multi-stage compressor unit, thereby avoiding a problem of complex design of pipe passages, so that a refrigeration unit has only three housing layouts (that is, an evaporator, a condenser, and an economizer), and the overall structure is more compact and simplified.
  • FIG. 1 A working process of the refrigeration system in an embodiment of the present invention is described below with reference to FIG. 1 and other members of the refrigeration system that are not shown.
  • the refrigerant that flows out from the condenser enters the economizer chamber 120 from lower right via the condenser connecting port 111 ; and flows from right to left inside the economizer chamber 120 , where in the process of flowing, separation of a gas phase and a liquid phase is performed at the same time.
  • the liquid-phase refrigerant flows into the float chamber 150 at a lower left corner.
  • the float valve 151 is opened, and the liquid-phase refrigerant flows into the evaporator via the evaporator connecting port 112 to perform heat exchange, and subsequently returns to the compressor.
  • the gas-phase refrigerant goes to the right via the compensation port 131 and is sucked into the inter-stage flow path chamber 130 , and is mixed with the gas-phase refrigerant that is sucked into the inter-stage flow path chamber 130 via the first connecting port 113 and that undergoes first-stage compression.
  • the mixed gas-phase refrigerant is sucked into the compressor via the second connecting port 114 .
  • Such a cycle is repeated over and over again.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Power Engineering (AREA)
  • Applications Or Details Of Rotary Compressors (AREA)
  • Compressor (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The present invention provides an economizer component, including: a housing; an economizer chamber and an inter-stage flow path chamber, formed inside the housing by using a separator; a condenser connecting port and an evaporator connecting port, disposed on the economizer chamber; a first connecting port and a second connecting port, connected in a multi-stage compressor unit and disposed on the inter-stage flow path chamber; and the economizer chamber being in fluid connection with the inter-stage flow path chamber inside the housing. The economizer component provided in the present invention can reduce complexity of pipe passages of a refrigeration system in which the economizer component is applied.

Description

TECHNICAL FIELD
The present invention relates to a refrigeration system, and more particularly, the present invention relates to an improved economizer component in a refrigeration system.
BACKGROUND
An economizer is a common member in a large-scale refrigeration system and is used to enable throttling and evaporation of a part of a refrigerant to absorb heat, so as to enable another part of the refrigerant to achieve super-cooling. In many cases, the economizer may be used in a refrigeration system having a multi-stage compressor unit. In a working condition in which evaporation temperature is relatively low, a normal multi-stage compressor unit has various defects such as reduced efficiency, reduced refrigerating capacity, and relatively high exhaust temperature. If the economizer is used to perform air supplementation between compression stages of the multi-stage compressor unit, efficiency of refrigeration cycles can be improved, refrigerating capacity can be improved, and exhaust temperature of a compressor can be reduced.
An economizer is an essential member in a large-scale refrigeration system, and in the overall design of the refrigeration system, inevitably, an overall layout of the refrigeration system after the economizer is applied needs to be considered. The connecting pipe passages between the economizer and other members also need to be designed together. As a result, an overall layout of a large-scale refrigeration unit becomes troublesome and complex. In addition, complexity of disposing of pipe passages also indirectly affects running efficiency and reliability of the system.
SUMMARY
An objective of the present invention is to provide an economizer component, so as to simplify complexity of pipe passages of a refrigeration system in which the economizer component is applied.
An objective of the present invention is to further provide a refrigeration system having the economizer component, so as to simplify complexity of an overall layout of a refrigeration unit, thereby ensuring running efficiency and reliability of the system.
To implement the foregoing objectives or other objectives, the present invention provides the following technical solutions.
According to an aspect of the present invention, an economizer component is provided, including: a housing; an economizer chamber and an inter-stage flow path chamber, formed inside the housing by using a separator; a condenser connecting port and an evaporator connecting port, disposed on the economizer chamber; a first connecting port and a second connecting port, connected in a multi-stage compressor unit and disposed on the inter-stage flow path chamber; and the economizer chamber being in fluid connection with the inter-stage flow path chamber.
According to another aspect of the present invention, a refrigeration system is further provided, including: the economizer component described above and a multi-stage compressor unit, where the inter-stage flow path chamber is connected in the multi-stage compressor unit by using the first connecting port and the second connecting port.
BRIEF DESCRIPTION OF THE DRAWINGS
FIG. 1 is a schematic diagram of an embodiment of an economizer component of the present invention.
DETAILED DESCRIPTION
Referring to FIG. 1, an embodiment of an economizer component 100 of the present invention is provided. The economizer component 100 has an external structure similar to that of a conventional economizer, that is, has a cylindrical housing 110 made of corrosion-resistant metal. Two internal spaces are formed inside the housing 110 by using a separator 140: an economizer chamber 120 and an inter-stage flow path chamber 130. A condenser connecting port 111, an evaporator connecting port 112, a first connecting port 113, and a second connecting port 114 are disposed on the housing 110. The condenser connecting port 111 and the evaporator connecting port 112 are in fluid connection with the economizer chamber 120. The first connecting port 113 and the second connecting port 114 are in fluid connection with the inter-stage flow path chamber 130. In addition, it should be known that, in order to implement a conventional air supplementation function of an economizer, the economizer chamber 120 should further be in fluid connection with the inter-stage flow path chamber 130. The economizer chamber 120 is further provided with a float chamber 150 upstream of the evaporator connecting port 112, and a float valve 151 is provided in the float chamber 150 to control on/off and an opening degree according to a liquid level in the float chamber 150.
In such an arrangement, a refrigerant that flows into the economizer chamber 120 from a condenser is throttled into a gas-phase state and a liquid-phase state. The gas-phase refrigerant may directly flow into the inter-stage flow path chamber 130, to implement inter-stage air supplementation of a multi-stage compressor unit, so as to achieve effects of reducing exhaust temperature of the multi-stage compressor unit and improving quality. Moreover, inter-stage pipe passages specially used for the multi-stage compressor unit are no longer needed, thereby avoiding a problem of complex design of pipe passages, so that large-scale bent connecting pipe passages no longer exist, and an overall structure becomes more compact and simplified.
To better implement the objectives of the present invention, design positions of structural features are also very important.
For the two chambers formed inside the housing 110 by using the separator 140, the economizer chamber 120 is optionally located at a lower portion of the housing 110, and the inter-stage flow path chamber 130 is located at an upper portion of the housing 110. In this way, it facilitates the refrigerant in two phases to complete separation of the gas-phase refrigerant and the liquid-phase refrigerant in the economizer chamber 120, and it further facilitates the gas-phase refrigerant floating above the liquid-phase refrigerant to be sucked into the inter-stage flow path chamber 130, thereby facilitating inter-stage air supplementation of the multi-stage compressor unit.
In addition, it can be known according to the foregoing description that the so-called economizer chamber 120 and the so-called inter-stage flow path chamber 130 are two spaces that are defined according to the effects of the two chambers in the unit, and the two chambers are not completely isolated, and instead a structure of fluid connection is provided. Specifically, an end of the separator 140 near the second connecting port 114 and an end portion or a bottom portion of the housing 110 are substantially sealed (except for a liquid discharge hole that is described hereinafter), a compensation port 131 may be formed at an end of the separator 140 near the evaporator connecting port 112, and fluid connection between the economizer chamber 120 and the inter-stage flow path chamber 130 is implemented by using the compensation port 131.
Optionally, for ease of formation, the compensation port 131 may be directly formed to have a half-moon shape.
In addition, although the refrigerant in two phases may be throttled and separated into the gas-phase refrigerant and the liquid-phase refrigerant in the economizer chamber 120, such separation is not thorough or absolute. That is, the gas-phase refrigerant may be mixed with tiny liquid drops, and the liquid-phase refrigerant may be mixed with gas. In such a case, to ensure the purity of the gas-phase refrigerant sucked into the inter-stage flow path chamber 130, a demisting member upstream of the compensation port may be further provided to effectively filter out the liquid-phase refrigerant, thereby preventing an excessive amount of the liquid-phase refrigerant from entering a compressor to cause a fluid hammer phenomenon.
Optionally, a demister member may be disposed at a position higher than that of the separator 140. Such an arrangement considers the following: Because of an effect of gas-liquid separation of the economizer chamber 120, more of the liquid-phase refrigerant usually exists in a lower-portion space, and more of the gas-phase refrigerant usually exists in an upper-portion space. Therefore, even if assuming there is no demister member, a proportion of the liquid-phase refrigerant is lower at a higher position of the economizer chamber 120. Therefore, the demister member is disposed higher than the separator 140, which helps to improve an effect of demisting the liquid-phase refrigerant. Certainly, in this case, the separator 140 needs to be redesigned with a bend that goes upward, so as to seal a gap that exists because of a height difference between the separator 140 and the demister member, thereby preventing the liquid-phase refrigerant from directly entering the inter-stage flow path chamber 130 via the gap.
The demister member herein is required to have an effect of adsorbing or separating misty liquid drops. To implement a relatively more desirable filtering effect, the present invention provides a specific embodiment of a demister member, i.e., a wire-mesh demister 121.
To facilitate installation of the wire-mesh demister 121, in the present invention, insertion slots 122 may be further disposed on two sides inside the housing 110, and a filtering member is disposed in the housing 110 in a manner of being inserted in the insertion slot 122.
It should be noted that when the fluid connection between the economizer chamber 120 and the inter-stage flow path chamber 130 is implemented by using the compensation port 131, an intermediate-level guide vane of the multi-stage compressor unit is required to control the pressure in the economizer chamber 120, and maintain a pressure difference between the economizer chamber 120 and an evaporator, thereby ensuring that the refrigerant effectively flows from the economizer chamber 120 to the evaporator.
In addition, optionally, if a multi-stage compressor unit without an intermediate-level guide vane is applied in the economizer component, the compensation port 131 may be sealed, and instead a damping valve port 115 is disposed on the housing 110 of the economizer component. An end of the damping valve port 115 is connected to the economizer chamber 120, and the other end of the damping valve port 115 is joined with the inter-stage flow path chamber 130 outside the housing 110. In this case, the pressure in the economizer chamber 120 may be adjusted by using a damping valve, so as to maintain a pressure difference between the economizer chamber 120 and the evaporator, thereby ensuring that the refrigerant effectively flows from the economizer chamber 120 to the evaporator. Similar to an intermediate-level guide vane, the objective of adjusting the pressure in the economizer chamber 120 can also be implemented.
In addition, specific position design of several ports also plays an important role for improving the smoothness of flowing of the refrigerant inside the entire economizer component 100. For example, in this embodiment, the condenser connecting port 111 is disposed on a lower right side of the economizer component 100; the evaporator connecting port 112 is disposed on a lower left side of the economizer component 100; the first connecting port 113 is disposed on an upper side of the economizer component 100 and near the compensation port 131; and the second connecting port 114 is disposed at a right end portion of the economizer component 100. In this way, for the refrigerant in two phases that enters the economizer chamber 120 from lower right via the condenser connecting port 111, gas-liquid separation is gradually implemented in the process that the refrigerant flows from right to left. After reaching a left end, the liquid-phase refrigerant goes to the evaporator from the evaporator connecting port 112 at a lower left corner. The gas-phase refrigerant flows into the inter-stage flow path chamber 130 from an upper left corner to the right via the compensation port 131, and is mixed with the gas-phase refrigerant that is sucked into the inter-stage flow path chamber 130 via the first connecting port 113 and that undergoes first-stage compression. Subsequently, the mixed gas-phase refrigerant enters the compressor via the second connecting port 114. The entire flowing process is very stable, and unnecessary turnings or loops do not exist.
In addition, to implement the objective of forming the economizer chamber 120 and the inter-stage flow path chamber 130 inside a cylindrical housing, the design of the separator is particularly important.
As shown in FIG. 1, the separator 140 is generally includes two sections, that is: a first section 141 extending along a longitudinal direction of the housing 110 and a second section 142 that leaves space for the second connecting port 114. The first section 141 has a main effect of forming the economizer chamber 120 and the inter-stage flow path chamber 130 inside the housing 110. The second section 142 is mainly used to enable the gas-phase refrigerant to stably flow into a second stage of the multi-stage compressor unit by providing space, to further reduce a flowing resistance of the gas-phase refrigerant.
Optionally, for the purpose of convenient installation/welding, the first section 141 may be directly disposed as a straight plate.
Optionally, a bend can be directly formed between the first section 141 and the second section 142. To improve the smoothness of flowing, the bend may have a rounded transitional portion.
To simplify the structural design inside the housing 110 and make the refrigerant to flow inside the housing 110 as smooth as possible, the second section 142 may be disposed on a side near the condenser connecting port 111 inside the housing 110.
When the unit stops running, because a bend exists, a part of the liquid-phase refrigerant may accumulate at a bending portion at the second section 142. Therefore, for the objective of preventing liquid accumulation, a liquid discharge hole 143 may be further disposed at a lowest point of the inter-stage flow path chamber 130. For example, the liquid discharge hole 143 may be disposed at the bottom of the second section 142, and opening and closing of the liquid discharge hole 143 is controlled by using an electromagnetic valve. By means of such design, when the unit stops running, the electromagnetic valve is opened to enable the liquid-phase refrigerant to flow into the economizer chamber 120 via the liquid discharge hole 143, and further return to the condenser.
Moreover, the present invention further provides an embodiment of a refrigeration system, in which the foregoing economizer component 100 of the present invention is applied, and a multi-stage compressor unit is also included. The inter-stage flow path chamber 130 is connected to a discharge port of a first stage compressor 160 in the multi-stage compressor unit by using the first connecting port 113, and is connected to a suction port of a second stage compressor 162 in the multi-stage compressor unit by using the second connecting port 114.
In such an arrangement, the refrigeration system no longer needs inter-stage pipe passages specially used for the multi-stage compressor unit, thereby avoiding a problem of complex design of pipe passages, so that a refrigeration unit has only three housing layouts (that is, an evaporator, a condenser, and an economizer), and the overall structure is more compact and simplified.
A working process of the refrigeration system in an embodiment of the present invention is described below with reference to FIG. 1 and other members of the refrigeration system that are not shown.
When the refrigeration system starts to work, the refrigerant that flows out from the condenser enters the economizer chamber 120 from lower right via the condenser connecting port 111; and flows from right to left inside the economizer chamber 120, where in the process of flowing, separation of a gas phase and a liquid phase is performed at the same time. After reaching a left end of the economizer chamber 120, on the one hand, the liquid-phase refrigerant flows into the float chamber 150 at a lower left corner. After a certain amount of the liquid-phase refrigerant is accumulated in the float chamber 150, the float valve 151 is opened, and the liquid-phase refrigerant flows into the evaporator via the evaporator connecting port 112 to perform heat exchange, and subsequently returns to the compressor. On the other hand, after the wire-mesh demister 121 on an upper left side filters out a part of misty liquid drops of the refrigerant that are mixed in the gas-phase refrigerant, the gas-phase refrigerant goes to the right via the compensation port 131 and is sucked into the inter-stage flow path chamber 130, and is mixed with the gas-phase refrigerant that is sucked into the inter-stage flow path chamber 130 via the first connecting port 113 and that undergoes first-stage compression. The mixed gas-phase refrigerant is sucked into the compressor via the second connecting port 114. Such a cycle is repeated over and over again.
In the description of the present invention, it needs to be understood that direction or position relationships indicated by “on”, “under”, “front”, “rear”, “left”, “right”, and the like are direction or position relationships based on the accompanying drawings, and are only used to facilitate description of the present invention and to simplify description, rather than to indicate or imply that the discussed apparatuses or features must be in specific directions and be configured and operated in specific directions. Therefore, the direction or position relationships should not be construed as a limitation to the present invention.
The economizer component and the refrigeration system having the economizer component of the present invention are mainly described by using the foregoing examples. Although only some implementation manners of the present invention are described, a person of ordinary skill in the art should understand that the present invention may be implemented in many other forms without departing from the spirit and scope of the present invention. Therefore, the presented examples and implementation manners are regarded to be schematic rather than limitative, and the present invention may cover various changes and replacements without departing from the spirit and scope of the present invention that are defined in the appended claims.

Claims (17)

The invention claimed is:
1. An economizer component, comprising: a housing; an economizer chamber and an inter-stage flow path chamber, formed inside the housing by using a separator; a condenser connecting port and an evaporator connecting port, disposed on the economizer chamber; a first connecting port and a second connecting port, connected in a multi-stage compressor unit and disposed on the inter-stage flow path chamber; and the economizer chamber being in fluid connection with the inter-stage flow path chamber.
2. The economizer component according to claim 1, wherein the separator comprises a first section extending along a longitudinal direction of the housing.
3. The economizer component according to claim 2, wherein the first section is a straight plate.
4. The economizer component according to claim 2, wherein the separator further comprises a second section that leaves space for the second connecting port, and a bend is formed between the first section and the second section.
5. The economizer component according to claim 4, wherein the second section is disposed on a side near the condenser connecting port inside the housing.
6. The economizer component according to claim 1, wherein a liquid discharge hole is provided at a lowest point inside the inter-stage flow path chamber, and opening and closing of the liquid discharge hole are controlled by an electromagnetic valve.
7. The economizer component according to claim 1, wherein, when the economizer component is in a running state, the economizer chamber is located at a lower portion of the housing, and the inter-stage flow path chamber is located at an upper portion of the housing.
8. The economizer component according to claim 1, wherein the separator forms a compensation port inside the housing, and the economizer chamber is in fluid connection with the inter-stage flow path chamber by using the compensation port.
9. The economizer component according to claim 8, wherein the compensation port is disposed on a side near the evaporator connecting port inside the housing.
10. The economizer component according to claim 8, wherein the compensation port has a half-moon shape.
11. The economizer component according to claim 8, further comprising: a demister member upstream of the compensation port, and when the economizer component is in a running state, the demister member being used to filter out a liquid-phase refrigerant that flows via the economizer chamber to the inter-stage flow path chamber.
12. The economizer component according to claim 11, wherein when the economizer component is in a running state, the demister member is disposed at a position higher than that of the separator.
13. The economizer component according to claim 11, wherein a filtering member is a wire-mesh demister.
14. The economizer component according to claim 11, wherein an insertion slot is disposed on an inner side of the housing, and the demister member is placed inside the housing by using the insertion slot.
15. The economizer component according to claim 1, wherein a damping valve port is further disposed on the housing, wherein an end of the damping valve port is connected to the economizer chamber, and the other end of the damping valve port is joined with the inter-stage flow path chamber outside the housing; and the economizer chamber is in fluid connection with the inter-stage flow path chamber by using the damping valve port.
16. The economizer component according to claim 1, wherein the economizer chamber is further provided with a float chamber upstream of the evaporator connecting port.
17. A refrigeration system, comprising: the economizer component according to claim 1 and the multi-stage compressor unit, wherein the inter-stage flow path chamber is connected in the multi-stage compressor unit by using the first connecting port and the second connecting port.
US15/743,889 2015-07-13 2016-07-12 Economizer component and refrigeration system thereof Active US10337778B2 (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
CN201510406087.7 2015-07-13
CN201510406087.7A CN106352608B (en) 2015-07-13 2015-07-13 Economizer component and refrigerating system with same
CN201510406087 2015-07-13
PCT/US2016/041853 WO2017011437A1 (en) 2015-07-13 2016-07-12 Economizer component and refrigeration system thereof

Publications (2)

Publication Number Publication Date
US20180209705A1 US20180209705A1 (en) 2018-07-26
US10337778B2 true US10337778B2 (en) 2019-07-02

Family

ID=56497910

Family Applications (1)

Application Number Title Priority Date Filing Date
US15/743,889 Active US10337778B2 (en) 2015-07-13 2016-07-12 Economizer component and refrigeration system thereof

Country Status (4)

Country Link
US (1) US10337778B2 (en)
EP (1) EP3322944A1 (en)
CN (1) CN106352608B (en)
WO (1) WO2017011437A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117366922A (en) * 2015-12-10 2024-01-09 开利公司 Economizer and refrigerating system with same
CN113819684B (en) * 2021-09-28 2022-12-02 约克(无锡)空调冷冻设备有限公司 Economizer and refrigerating system comprising same
CN115143669B (en) * 2022-06-29 2024-06-04 浙江国祥股份有限公司 Flash type economizer with float valve and control method thereof
CN115342544B (en) * 2022-08-11 2024-10-18 青岛海尔空调电子有限公司 Economizer and air conditioner refrigerating system

Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3553974A (en) * 1968-11-29 1971-01-12 Carrier Corp Refrigeration system
US4232533A (en) * 1979-06-29 1980-11-11 The Trane Company Multi-stage economizer
US4476695A (en) * 1983-12-15 1984-10-16 Tim Epps Refrigerator condensation apparatus
US5692389A (en) * 1996-06-28 1997-12-02 Carrier Corporation Flash tank economizer
US5806327A (en) 1996-06-28 1998-09-15 Lord; Richard G. Compressor capacity reduction
US6851277B1 (en) * 2003-08-27 2005-02-08 Carrier Corporation Economizer chamber for minimizing pressure pulsations
US20090205361A1 (en) * 2008-02-20 2009-08-20 James Rick T Coaxial economizer assembly and method
US20100043475A1 (en) 2007-04-23 2010-02-25 Taras Michael F Co2 refrigerant system with booster circuit
US20100058781A1 (en) 2006-12-26 2010-03-11 Alexander Lifson Refrigerant system with economizer, intercooler and multi-stage compressor
US7856834B2 (en) 2008-02-20 2010-12-28 Trane International Inc. Centrifugal compressor assembly and method
US20100326100A1 (en) 2008-02-19 2010-12-30 Carrier Corporation Refrigerant vapor compression system
US20110036110A1 (en) 2008-05-02 2011-02-17 Daikin Industries, Ltd. Refrigeration apparatus
US20120285185A1 (en) 2010-01-20 2012-11-15 Hans-Joachim Huff Refrigeration storage in a refrigerant vapor compression system
US8356491B2 (en) 2006-12-21 2013-01-22 Carrier Corporation Refrigerant system with intercooler utilized for reheat function
US8375741B2 (en) 2007-12-26 2013-02-19 Carrier Corporation Refrigerant system with intercooler and liquid/vapor injection
CN202928188U (en) 2012-10-29 2013-05-08 武汉新世界制冷工业有限公司 Integral heat exchanging type double-unit double-level screw refrigeration compression system
KR20130097867A (en) 2012-02-27 2013-09-04 마에카와 매뉴팩쳐링 캄파니 리미티드 Flash tank, refrigeration apparatus including the same, and method for operating the refrigeration apparatus
US8627680B2 (en) 2008-02-20 2014-01-14 Trane International, Inc. Centrifugal compressor assembly and method
US20140151015A1 (en) 2011-07-26 2014-06-05 Carrier Corporation Termperature Control Logic For Refrigeration System
WO2014092850A1 (en) 2012-12-13 2014-06-19 Carrier Corporation Low pressure chiller
US9890977B2 (en) * 2013-10-03 2018-02-13 Carrier Corporation Flash tank economizer for two stage centrifugal water chillers

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5095712A (en) * 1991-05-03 1992-03-17 Carrier Corporation Economizer control with variable capacity
JP4404148B2 (en) * 2008-02-01 2010-01-27 ダイキン工業株式会社 Economizer
CN201794744U (en) * 2010-08-19 2011-04-13 大连冷星企业有限公司 Screw type and piston type mixed two-stage compressor set and intermediate container
CN102374153B (en) * 2010-08-19 2014-04-02 大连冷星企业有限公司 Screw-type and piston-type combined double-stage compressor set and intermediate container
CN102914101B (en) * 2012-10-24 2015-01-21 重庆美的通用制冷设备有限公司 Flash type economizer
CN203501743U (en) * 2013-07-29 2014-03-26 武汉新世界制冷工业有限公司 Compact type double-machine two-stage-screw refrigeration compression system
CN104567124A (en) * 2014-12-26 2015-04-29 珠海格力电器股份有限公司 Condensing unit

Patent Citations (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3553974A (en) * 1968-11-29 1971-01-12 Carrier Corp Refrigeration system
US4232533A (en) * 1979-06-29 1980-11-11 The Trane Company Multi-stage economizer
US4476695A (en) * 1983-12-15 1984-10-16 Tim Epps Refrigerator condensation apparatus
US5692389A (en) * 1996-06-28 1997-12-02 Carrier Corporation Flash tank economizer
US5806327A (en) 1996-06-28 1998-09-15 Lord; Richard G. Compressor capacity reduction
US6851277B1 (en) * 2003-08-27 2005-02-08 Carrier Corporation Economizer chamber for minimizing pressure pulsations
US8356491B2 (en) 2006-12-21 2013-01-22 Carrier Corporation Refrigerant system with intercooler utilized for reheat function
US20100058781A1 (en) 2006-12-26 2010-03-11 Alexander Lifson Refrigerant system with economizer, intercooler and multi-stage compressor
US20100043475A1 (en) 2007-04-23 2010-02-25 Taras Michael F Co2 refrigerant system with booster circuit
US8375741B2 (en) 2007-12-26 2013-02-19 Carrier Corporation Refrigerant system with intercooler and liquid/vapor injection
US20100326100A1 (en) 2008-02-19 2010-12-30 Carrier Corporation Refrigerant vapor compression system
US7856834B2 (en) 2008-02-20 2010-12-28 Trane International Inc. Centrifugal compressor assembly and method
US20090205361A1 (en) * 2008-02-20 2009-08-20 James Rick T Coaxial economizer assembly and method
US8627680B2 (en) 2008-02-20 2014-01-14 Trane International, Inc. Centrifugal compressor assembly and method
US8844318B2 (en) 2008-02-20 2014-09-30 Trane International Inc. Coaxial economizer assembly and method
US20110036110A1 (en) 2008-05-02 2011-02-17 Daikin Industries, Ltd. Refrigeration apparatus
US20120285185A1 (en) 2010-01-20 2012-11-15 Hans-Joachim Huff Refrigeration storage in a refrigerant vapor compression system
US20140151015A1 (en) 2011-07-26 2014-06-05 Carrier Corporation Termperature Control Logic For Refrigeration System
KR20130097867A (en) 2012-02-27 2013-09-04 마에카와 매뉴팩쳐링 캄파니 리미티드 Flash tank, refrigeration apparatus including the same, and method for operating the refrigeration apparatus
CN202928188U (en) 2012-10-29 2013-05-08 武汉新世界制冷工业有限公司 Integral heat exchanging type double-unit double-level screw refrigeration compression system
WO2014092850A1 (en) 2012-12-13 2014-06-19 Carrier Corporation Low pressure chiller
US9890977B2 (en) * 2013-10-03 2018-02-13 Carrier Corporation Flash tank economizer for two stage centrifugal water chillers

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
International Search Report and Written Opinion for application PCT/US2016/041853, dated Oct. 4, 2016, 10 pages.

Also Published As

Publication number Publication date
CN106352608B (en) 2021-06-15
CN106352608A (en) 2017-01-25
US20180209705A1 (en) 2018-07-26
WO2017011437A1 (en) 2017-01-19
EP3322944A1 (en) 2018-05-23

Similar Documents

Publication Publication Date Title
US10337778B2 (en) Economizer component and refrigeration system thereof
JP6301101B2 (en) Two-stage compression cycle
US9027363B2 (en) Economizer having multiple liquid outlets and multiple float expansion valves
AU2014371155B2 (en) Heat exchanger and air conditioning device
JP5632963B2 (en) Refrigeration compressor suction mechanism
WO2013073064A1 (en) Refrigeration unit
JP2007155230A (en) Air conditioner
US20150345842A1 (en) Air conditioner
US20080190122A1 (en) Accumulator Integration with Heat Exchanger Header
JP5586880B2 (en) Refrigeration equipment
JP5757415B2 (en) Refrigeration equipment such as air conditioners
WO2015029204A1 (en) Air conditioner
JP6456089B2 (en) Oil separator and refrigeration cycle equipment
KR20080004857A (en) Condensor with receiver dryer
JP2016138677A (en) Refrigeration cycle apparatus
WO2019021431A1 (en) Refrigeration cycle apparatus
WO2019097612A1 (en) Oil separator and refrigeration cycle device
CN107421179B (en) Flash device
JP2017053522A (en) Cyclone type oil separator and refrigeration system
JP2007285591A (en) Refrigerating cycle device
JP2002081803A (en) Air conditioner
KR101450546B1 (en) Air conditioning system
CN218915481U (en) Flash evaporator, air supplementing and enthalpy increasing system and air conditioning equipment
KR101000054B1 (en) Variable capacity Accumulator of a air conditioner
JP2002350013A (en) Accumulator

Legal Events

Date Code Title Description
AS Assignment

Owner name: CARRIER AIR CONDITIONING AND REFRIGERATION R&D MAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:DING, HAIPING;GE, YUEQUN;ZHANG, HAITAO;SIGNING DATES FROM 20150907 TO 20150908;REEL/FRAME:044601/0316

Owner name: CARRIER CORPORATION, CONNECTICUT

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:CARRIER AIR CONDITIONING AND REFRIGERATION R&D MANAGEMENT (SHANGHAI) CO., LTD.;REEL/FRAME:044601/0352

Effective date: 20150925

FEPP Fee payment procedure

Free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

STPP Information on status: patent application and granting procedure in general

Free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS

STPP Information on status: patent application and granting procedure in general

Free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED

STCF Information on status: patent grant

Free format text: PATENTED CASE

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1551); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 4