This invention relates to building and can be used at reinforcement of basements of existing buildings and structures. Method of reinforcement of basement includes arrangement of reinforced-concrete piles, grillages along the basement with leaving gaps round each pile, transverse overhanging beams in the body of the basement, those are attached with consoles to the grillages, with following monolithing of gaps between the grillages and the piles. The grillages are made with anchor bolts and vertical openings in the places of pile placement, and the piles are made by means of drilling and concrete filling through openings in the grillages, at that after pile concrete comes to design strength those are pressed to soil by jacks that transfer reactive forces to grillages through anchor bolts, and after pressing the gaps between the grillages and the piles are monolithed and jacks are removed.
UA2001021054A2001-02-152001-02-15Method for reinforcement of basements with piles