TWM423582U - Equipment for processing exhaust gas - Google Patents

Equipment for processing exhaust gas Download PDF

Info

Publication number
TWM423582U
TWM423582U TW100214375U TW100214375U TWM423582U TW M423582 U TWM423582 U TW M423582U TW 100214375 U TW100214375 U TW 100214375U TW 100214375 U TW100214375 U TW 100214375U TW M423582 U TWM423582 U TW M423582U
Authority
TW
Taiwan
Prior art keywords
inlet
outlet
heat exchanger
pipeline
population
Prior art date
Application number
TW100214375U
Other languages
Chinese (zh)
Inventor
Shih-Yuan Ke
Original Assignee
Shih-Yuan Ke
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shih-Yuan Ke filed Critical Shih-Yuan Ke
Priority to TW100214375U priority Critical patent/TWM423582U/en
Publication of TWM423582U publication Critical patent/TWM423582U/en

Links

Landscapes

  • Treating Waste Gases (AREA)

Description

M423582 五、新型說明: 【新型所屬之技術領域】 本創作係關於一種用於處理某些特定環境場所的廢氣之廢氣 處理設備者。 【先前技術】 某些特定的環境場所,例如加油站_油槽、煉峽、輕油練 解廠半導體業、膠帶業、人纖業、電子業、輪胎製造業、橡 ’業及人合成皮革業等王廠的儲氣槽,所排放的廢氣大多含 有酸性廢氣和揮發性有機氣體。這些廢氣,對人體健康造成極 =危D ’產生惡臭或敍過高時有爆炸、燃燒的危險,行政院 衣祕。蒦署規定必須先處理,才可以直接排放到大氣中。對於 此種廢氣,目前主要處理設備如第三圖所示,是將儲氣槽r、 二的廢氣以-第一管路u,與一第一過遽器2,的入口端 相通’第-過濾器2,的出口端22,以一第二管路汉 ”第抽适風機3,的入口端31,相通,第一抽送風機3, 糾口端32,以一第三管路33,與一水洗機組4,的入口端 相通’水洗機組4’的的出口端42’以-第四管路43, 與第—抽送風機5,的入口端51,相通,第二抽送風機5, 灿口端於,以-第五管路53,與一第二過遽器6,的機入5口 如61 相通,第—讲、请$ m… 慮 的出口端62’以一第六管路63, ”抓里益7的入口端71,相通,流量器了,的 以一第七管路73,與一三通管8,的第一端81,相通,三2通 4 M423582 官8’的第二端82’與一第一閥件9,相通,三通管8, :端83’與一第二間件10,的入口端101,相通,第二閱件 〇的出口端1〇2,以一第八管路103,與—燃燒裝置财 相通。藉由上述設備,使廢氣依序經由第一過 抽送風機3,、水洗機組4,、第二抽送風機5:。:第; 質、¥ 7 —1 8、第二閥件10’後將酸性物 =除,、錢而使含有揮發財魏體的尾氣於燃燒裝置 产有宝内^至少為76GC左右的高溫燃燒方式來處理這些高濃 f害氣體。如此以峨方式進行,除耗大量簡之外, 並需要注意許多燃燒的安全顧慮如爆炸上下限等,而雜 所排放的煙灰和二氧化碳仍會對環境造成極大的料。因 t果能夠減—料需魏辦卩㈣赵錢並符合國家法 令標準的廢輸•在此—謝妓-觀善。 【新型内容】 創作人有鑑於此,乃積極思考, 廢氣處理称 彳叫供有下列優點的 一、使用梢倾理敎魏衫魏燒即騎合概至空氣 之國豕法令標準,如此不會消耗大量燃料而可以節省生產 成本,具有節省成本之功效; 本創作處理廢氣不需要藉由燃燒方式進行,如此沒有 排餘灰和一魏碳等對環境造成傷害的疑慮,具有節能 減碳之功效; 5 =用本創倾賴,掏咖物㈣回收再利 用,除了避免對環境造成丨 具 有多重效益。仏降咖增加利潤, 為達成上述目的,本創作所採行峨術方案是: 一種廢氣處理設備包括—可以儲存氣體賴氣槽、—可 除廢氣中輸罐導咖、,概抽送的第 -抽达風機、-可以去除廢氣中的水氣或油氣的第二過遽 =一可崎數流量的流量^、—可⑽行溫度交換的第一 熱乂換器、—可以將廢氣抽送的第二抽送風機、—容器、— 2断溫度交換的第二熱交換器、—可以進行溫度:換的 第,、、、又換器可以進行溫度交換的第四熱交換器、一風 量調節器、-可以收集液體的收集桶和一冷媒桶,其中: 該儲氣槽有一入口端、一出口端和一控制閥;該第一過濾器 有-入口端和-出口端,第器的人口端與—第一管路 之另-端相通,第-過衫的出口端以—第二管路與第—柄 送風機的人口端相通,使來自儲氣_廢驗過第—過據器 可以去除廢氣中的粒狀雜·進人第—抽送風機;該第_抽 送風機有-人口端和-出口端,第—抽送風機的出σ端以一 第三管路與第二過遽ϋ的人π端相通,使經過第—抽送風機 的廢氣被抽送進人第二過絲;該第二過濾^有—入口端和 一出口端,第二過濾器的的出口端以一第四管路與一流量哭 的入口端相通,使銳經過第:過濾器可以去除廢氣中的水 =、油氣進入流量器;該流量器有-入口端和-出口端,流 里盗的出口端以—第五管路與—第一熱交換器的第—入口端 相通:使廢氣㈣流量器的流量可以計數;該第_熱交換器 有=第—人〇端、-第—出Π端…第二入π端、—第二出 ^第熱父換器的第一出口端以一第六管路與一第二抽 送風機的入口相通,第二入口端與一第七管路連通;第一 出口端與—第八管路連通;使廢氣經過第—熱交換器可以與 〃貧路内的冷氣戶斤提供的低溫進行熱交換而第-階段降低 / 皿度後進人第二柄送風機;該第二抽送風機有―人口端和— 出鳊第—抽送風機的出口端以一第九管路與一第二熱交 換盗的第—入口端相通,使廢氣經過第二抽送風機進入第二 熱交換器;該第-刼„„ ^ 弟—熱父換斋有一第〆入口端、一第一出口端、M423582 V. New description: [New technical field] This creation is about an exhaust gas treatment equipment for treating exhaust gas in certain environmental places. [Prior Art] Certain specific environmental sites, such as gas stations _ oil tank, refining gorge, light oil training factory semiconductor industry, tape industry, human fiber industry, electronics industry, tire manufacturing industry, rubber industry and human synthetic leather industry In the gas storage tanks of the Wang factory, most of the exhaust gas emitted contains acid waste gas and volatile organic gases. These exhaust gases cause extreme dangers to human health. They produce stench or a high risk of explosion and burning when they are too high. The regulations must be dealt with before they can be directly discharged into the atmosphere. For this kind of exhaust gas, the main processing equipment is as shown in the third figure, the exhaust gas of the gas storage tanks r and 2 is connected to the inlet end of a first damper 2 by the first pipeline u. The outlet end 22 of the filter 2, with a second pipe, the inlet end 31 of the suction fan 3, the communication, the first pumping fan 3, the correcting end 32, and a third pipe 33, The inlet end of a water washing unit 4 communicates with the outlet end 42' of the 'washing unit 4' with a fourth line 43, communicating with the inlet end 51 of the first pumping fan 5, and the second pumping fan 5, the port End, the fifth line 53 is connected to the fifth port of the second damper 6, such as 61, and the outlet end 62' is a sixth line 63. , "The entrance end 71 of the catching 7 is connected, the flow meter is, and the seventh line 73 is connected to the first end 81 of the three-way pipe 8, and the three-way 4 M423582 is 8' The second end 82' is in communication with a first valve member 9, the tee tube 8, the end 83' is in communication with the inlet end 101 of the second partition member 10, and the outlet end of the second reading member is 1〇2 With an eighth line 103, with the burning device . With the above apparatus, the exhaust gas is sequentially passed through the first over-pumping fan 3, the water washing unit 4, and the second pumping fan 5:. : Quality; ¥7 - 18, after the second valve member 10', the acid is replaced by the acid, and the exhaust gas containing the volatile chemical body is produced in the combustion device and is burned at a high temperature of at least 76GC. Ways to deal with these high concentrations of gas. In this way, in addition to a large amount of simplicity, it is necessary to pay attention to many safety concerns of combustion such as the upper and lower limits of the explosion, and the soot and carbon dioxide emitted by the miscellaneous still cause great environmental impact. Because of the fact that t can be reduced, it is necessary to Wei Wei (4) Zhao Qian and meet the national legal standards of the waste • here - Xie Wei - Guan Shan. [New content] The creators have been thinking about this, and they are actively thinking about it. The exhaust gas treatment is called the first advantage. The use of the tipping 敎 敎 Wei 魏 Wei 即 即 即 骑 至 至 至 至 至 至 至 空气 空气 空气 空气 空气 空气It consumes a large amount of fuel and can save production costs, and has the effect of cost saving. The waste gas of this creation does not need to be carried out by means of combustion, so there is no doubt that environmental pollution is caused by waste ash and a Wei carbon, and the effect of energy saving and carbon reduction is achieved. 5 = Recycling with the creator, 掏 物 (4) recycling, in addition to avoiding the environment caused by multiple benefits. In order to achieve the above objectives, the creative scheme adopted by this creation is: An exhaust gas treatment equipment includes: a gas storage tank that can store gas, a canister that can be removed from the exhaust gas, and a pumped one - Pumping fan, the second pass that can remove the water vapor or oil and gas in the exhaust gas = the flow rate of the Kawasaki flow rate, the first heat exchanger that can exchange the temperature of (10), the first pump that can pump the exhaust gas The second pump, the container, the second heat exchanger for the temperature exchange, the fourth heat exchanger capable of temperature exchange, the air conditioner, and the air conditioner a collecting bucket for collecting liquid and a refrigerant tank, wherein: the gas storage tank has an inlet end, an outlet end and a control valve; the first filter has an inlet end and an outlet end, and the population end of the first - the other end of the first pipe is connected, and the outlet end of the first-through shirt is connected to the population end of the first-handle blower by the second pipe, so that the exhaust gas from the gas storage_discharged the first-passer can remove the exhaust gas In the granular impurity · enter the first - pumping fan; the first _ pumping The blower has a population end and an outlet end, and the σ end of the first pumping fan communicates with the π end of the second passing person by a third line, so that the exhaust gas passing through the first pumping fan is pumped into the second The second filter has an inlet end and an outlet end, and the outlet end of the second filter is connected to the inlet end of a flow crying by a fourth pipe, so that the filter can be removed by the filter: The water in the water = oil and gas enters the flow vessel; the flow vessel has an inlet end and an outlet end, and the outlet end of the flow is in communication with the fifth conduit and the first inlet end of the first heat exchanger: (4) The flow rate of the flow meter can be counted; the first_end heat exchanger has a first-end end, a - first-out end, a second-input π-end, and a second-out-first heat-replacer first outlet end a sixth pipeline is connected to the inlet of a second pumping fan, and the second inlet end is connected to a seventh pipeline; the first outlet end is connected to the eighth pipeline; and the exhaust gas is passed through the first heat exchanger The low temperature provided by the cold gas in the poor road is exchanged for heat at the low temperature and the second stage is lowered. a blower; the second pumping fan has a "population end" and an outlet end of the pumping fan, and a ninth line communicates with a first inlet end of the second heat exchange thief to allow the exhaust gas to enter through the second pumping fan a second heat exchanger; the first - 刼 „ „ ^ brother - hot father for the fasting has a first entrance end, a first exit end,

第了入口端、-第二出口端;第二熱交換器的第—出口端 2第十s路與—第三熱交換㈣人口端相通,第二入口端 二第十s路的下游端連通,第十一管路的上游端與一A 水:連通;第二出口端與一第十二管路的上游端 ^ —官路的下游端與一冷卻水塔的 廢氣經過第二執交拖。。7 运叫連通,使 …、父換态可以與第十一管路的冷 溫進行熱交換而第一购机 尺所k供的低 弟一心段降低溫度後進入第二 第三熱交換器有—M 熱乂換益,a亥 端、-第-出!/—入口端、—第一出口端、-第二入口 %弟一出口端;第三熱 管路輿第四無交摸 、。°、 &口端以一第十三 、-的入口端相通,第三熱交換器的第二入 M423582 口端與第十四管路的下游端連通,第十四管路社游端與第 四熱父換器的第二出口端連通;第三熱交換ϋ的第二出口端 與一第十五管路的上游端連通,第十五管柄下游端與冷媒 桶的進口端連通,經過熱交換後的冷媒可朗流進入冷媒桶 内’而經過第三熱交換器的廢氣可以與第十四管路的冷媒所 提供的低溫進行缺換*第三階段降低溫度躺人第四熱交 換器;該第四熱交換器有-第—人口端、-第-出Π端Γ一 第入σ^、—第二出σ端;第四熱交換器的第—出口端以 奸第十六官路與-第—三通管的第—端相通,第—三通管的 第二端與—風量調節器的入口端相通’第-三通管的第三端 與收集桶的入口端相通;第四熱交換器的第二入口端與— 第十七管路的下游端連通,第十七管路的上游端與能夠製冷 的^東機組的冷媒桶的出σ端連通,第四熱交換器的第二出 ,端”第十四6路的上游端連通,使廢氣因風量調節器的通 道變小而於進人風量調㈣之前密度變小、勤增加和流速 減緩而延絲冷時間,以及使廢㈣已魅三個階段的降溫 7部,域與第十七管路的冷媒所提供的冷祕溫進行熱交 換而第四階段降低溫度並使廢氣中的水份及高沸點物質等被 冷凝而轉變為液滴經由第一三通管的第三端進入收集桶中。 風量調節器的出口端與第七管路相通,使經過第四熱交換器 Γ較低溫的冷氣可以經由第七管路進入第一熱交換器進行熱 父換後再經由第二出口端與第八管路至第二三通管的第一 8 M423582 端,第二三通管的第二端與一第三閥件之入口端相通,第三 閥件之出口端以一第二十管路與儲氣槽的入口端相通,使被 處理後的氣體可以進入儲氣槽内;第二三通管的第三端與一 第四閥件之入口端相通,第四閥件之出口端以一第二十一管 路與-容H相通,使被處理後的廢氣不進人儲氣槽内時,可 以儲存於此容糾,便於儲氣槽的歲修或平日檢修時不影響 整個系統的正常操作^收集財—與收集桶内部相通並適The first inlet end and the second outlet end; the tenth s road of the first outlet end of the second heat exchanger is in communication with the third heat exchange (four) population end, and the second inlet end is connected to the downstream end of the tenth s road The upstream end of the eleventh pipeline is connected to an A water; the second outlet end is connected to the upstream end of the twelfth pipeline, the downstream end of the official road, and the exhaust gas of a cooling water tower. . 7 The call is connected, so that the parent shift can be exchanged with the cold temperature of the eleventh pipeline, and the first brother of the first purchaser is cooled to lower the temperature and then enters the second and third heat exchangers. —M enthusiasm for change, a Hai end, - first - out! / - inlet end, - first outlet end, - second inlet % brother one outlet end; third heat pipeline 舆 fourth no intersection, . °, & the mouth end is connected to the inlet end of a thirteenth, -, the second end of the third heat exchanger is connected to the downstream end of the fourteenth pipeline, and the fourth end of the fourth pipeline The second outlet end of the fourth hot parent exchanger is in communication; the second outlet end of the third heat exchange port is in communication with the upstream end of the fifteenth pipe, and the downstream end of the fifteenth pipe handle is in communication with the inlet end of the refrigerant tank. After the heat exchange, the refrigerant can flow into the refrigerant tank, and the exhaust gas passing through the third heat exchanger can be replaced with the low temperature provided by the refrigerant of the fourteenth pipeline. The fourth heat exchanger has a -th-population end, a -th-exit end, an first σ^, a second σ end; and a fourth heat exchanger The six-legged road communicates with the first end of the -three-way pipe, and the second end of the third-way pipe communicates with the inlet end of the air volume regulator, the third end of the third-way pipe and the inlet end of the collecting bucket The second inlet end of the fourth heat exchanger is in communication with the downstream end of the seventeenth pipeline, and the upstream end of the seventeenth pipeline is capable of The σ end of the refrigerant tank of the cold ^dong unit is connected, and the second end of the fourth heat exchanger is connected to the upstream end of the 14th 6th passage, so that the exhaust gas becomes smaller due to the passage of the air volume regulator. Before the air volume adjustment (4), the density becomes smaller, the frequency increases and the flow rate slows down, and the cooling time of the wire is extended, and the cooling (the fourth) has three stages of cooling, and the cold and cold temperature provided by the refrigerant of the seventeenth pipeline is hot. In the fourth stage, the temperature is lowered and the moisture and high-boiling substances in the exhaust gas are condensed to be converted into droplets and enter the collecting barrel through the third end of the first tee. The outlet end of the air volume regulator and the seventh The pipeline communicates, so that the cold air passing through the fourth heat exchanger and lower temperature can enter the first heat exchanger via the seventh pipeline for hot father exchange, and then through the second outlet end and the eighth pipeline to the second tee pipe. The first 8 M423582 end, the second end of the second tee is in communication with the inlet end of the third valve member, and the outlet end of the third valve member is connected to the inlet end of the gas storage tank by a twentieth conduit. The treated gas can enter the gas storage tank; the third of the second three-way pipe The end of the fourth valve member communicates with the inlet end of the fourth valve member, and the outlet end of the fourth valve member communicates with the capacitor H through a twenty-first conduit, so that the treated exhaust gas can be stored when not entering the human gas storage tank. In this case, it is convenient for the old repair or normal maintenance of the gas storage tank without affecting the normal operation of the whole system.

於使被冷凝液態物質可以進入收翻之入口端、一出口端和 —與—第十人f路之—端連通之排氣口;第十人管路之另一 =與-第二閥件之—端連通,第二閥件之另—端以一第十九 吕路與第六管路連通’使回收的氣翻第二抽送風機的抽送 而流向第九管路再循環回收;收集桶的出口端與—第一間件 連通,使收細_被冷凝液態物質可以經由第—閥件回收 再利用。So that the condensed liquid substance can enter the inlet end of the turn-up, an outlet end and the exhaust port that communicates with the end of the tenth person; the other one of the tenth line and the second valve The other end is connected, and the other end of the second valve member is connected to the sixth pipeline by a nineteenth Lulu road, so that the recovered gas is pumped to the second pumping fan and flows to the ninth pipeline for recycling and recycling; The outlet end is in communication with the first member such that the condensed condensed liquid material can be recovered and reused via the first valve member.

’本創作亦可依序增設-水洗機組、—第二十二管路、一第 =送風機和-第二十三管路於第—料風機和第二過遽器 、該水洗额有—人σ端和1 口端,水洗機組的入口端 二-第三管路與第—抽送風機相通,水洗機組的出口端以 一十二管路與一第三抽送風機的 出口 口―通’弟二抽送風機的 紅十三管路與第二彻器相通,使經過第三抽送 4機的廢氣_酸性物質被抽送進人第二過滤哭。 【實施方式】 9 M423582 為了讓本餅之前述及其他目的、特徵與優 解’下文特舉本創作之較佳,;丨# X ^'4被了 隹男鈿例,並配合所附圖式,作詳 細說明。 清參閱第,标,其係本創作之第—健實施例,一種廢 乳處理設備包括一可以儲存氣體的儲氣槽1、-可以去除廢氣 中的粒狀雜質的第-過心2、—可以將廢氣抽送的第一抽送'This creation can also be added in sequence - washing unit, - twenty-two pipeline, one = blower and - twenty-third pipeline in the first - material fan and second filter, the water wash amount has - people σ end and 1 port end, the second-third pipeline of the inlet end of the water washing unit is connected with the first pumping fan, and the outlet end of the water washing unit is connected with the outlet port of the third pumping fan The red thirteen pipeline of the pumping fan communicates with the second nozzle, so that the exhaust gas_acid which has passed through the third pumping machine is pumped into the second filter to cry. [Embodiment] 9 M423582 In order to make the above-mentioned and other purposes, features and advantages of the present cake, the following is a better example of the present invention; 丨# X ^'4 was taken as an example of a man, and with the accompanying drawings For detailed explanation. For reference, the first and second standards are the first embodiment of the present invention. A waste milk treatment device includes a gas storage tank 1 for storing gas, and a first-passing core 2 for removing particulate impurities in the exhaust gas. First pumping of exhaust gas

風機3、一可以去除廢氣中的水氣或油氣的第二過朗4、一 可以計數流量的流量器5、—可以進行溫度交換的第-献交換 別、-可以將廢氣抽送的第二抽送風機7、一容器8、一可以 進行溫度交換的第二熱交換器9、一可以進行溫度交換的第三 熱交換器1〇、一可以進行溫度交換的第四熱交換器20、-風 量調節、-可財驗體的收集_和—冷媒獅,直 中: '、The fan 3, a second over-range 4 that can remove water vapor or oil and gas in the exhaust gas, a flow meter 5 that can count the flow rate, a first-sale exchange that can exchange temperature, and a second pump that can pump the exhaust gas a blower 7, a container 8, a second heat exchanger 9 capable of temperature exchange, a third heat exchanger 1 that can exchange temperature, a fourth heat exchanger 20 that can exchange temperature, and an air volume adjustment , - the collection of the financial body _ and - cold lion, straight: ',

該儲氣槽1有-與峨槽娜麵並適於使氣體可以進入儲 氣槽1的入口、一與儲氣槽1内部和-第-管路13之-端 相通並適於使廢氣可以自儲氣槽1流向第-管路的出口端 ^和—用以控制外部的廢氣進出儲氣槽1的控制閥14 ; 肩第-過遽器2有-與第-過遽器2内部相通並適於使儲氣槽 1内部的廢氣可以進人第—猶器2之人口端21和—與第一過 濾器2内部和一第二管路23相通並適於使廢氣可以自第一過 =2流向第二管路23之出口端没,第一過遽㈤的入口賴 與一第-管路13之另-端相通,第一過濾器2的出口端四以一 M423582 第一管路23與第一抽送風機3的入口端31相通,使來自儲氣槽 1的廢氣經過第一過濾器2可以去除廢氣中的粒狀雜質後進入 第一抽送風機3 ;The gas storage tank 1 has a grooved surface and is adapted to allow gas to enter the inlet of the gas storage tank 1, communicate with the interior of the gas storage tank 1 and the end of the first-line 13 and is adapted to allow the exhaust gas to From the gas storage tank 1 to the outlet end of the first line and the control valve 14 for controlling the external exhaust gas to enter and exit the gas storage tank 1; the shoulder-passing device 2 has - communicates with the inside of the first-passing device 2 And is adapted to allow the exhaust gas inside the gas storage tank 1 to enter the population end 21 of the first tank 2 and to communicate with the interior of the first filter 2 and a second conduit 23 and is adapted to allow the exhaust gas to pass the first =2 flows to the outlet end of the second conduit 23, the inlet of the first passage (5) is connected to the other end of the first conduit 13, and the outlet end of the first filter 2 is connected to the first conduit of M423582. 23 is in communication with the inlet end 31 of the first pumping fan 3, so that the exhaust gas from the gas storage tank 1 passes through the first filter 2 to remove particulate impurities in the exhaust gas and then enters the first pumping fan 3;

該第一抽送風機3有一與第一抽送風機3内部相通並適於使廢 氣可以進入第一抽送風機3之入口端31和一與第一抽送風機3 内部和一第三管路33相通並適於使廢氣可以自第一抽送風機 3流向第三管路33之出口端32,第一抽送風機3的出口端32以 一第二管路33與第二過濾器4的入口端41相通,使經過第一抽 送風機3的廢氣被抽送進入第二過濾器4 ;The first pumping fan 3 has an internal communication with the first pumping fan 3 and is adapted to allow the exhaust gas to enter the inlet end 31 of the first pumping fan 3 and to communicate with the interior of the first pumping fan 3 and a third line 33. The exhaust gas can flow from the first pumping fan 3 to the outlet end 32 of the third line 33, and the outlet end 32 of the first pumping fan 3 communicates with the inlet end 41 of the second filter 4 by a second line 33, so that The exhaust gas passing through the first pumping fan 3 is pumped into the second filter 4;

該第二過濾器4有一與第二過濾器4内部相通並適於使廢氣可 以進入第二過滤器4之入口端41和一與第二過滤器納部和一 第四管路43相通並適於使廢氣可以自第二過濾器4流向第四 管路43之出口端42,第二猶器4的的出口·以—第四管路 43與-流量器5的入口端51相通,使廢氣經過第二過滤器何 以去除廢氣中的水氣、油氣進入流量器5 ; 該流量器5有-與流量器5内部相通並適於使廢氣可以進入流 量器5之入口端51和-與流量器5内部和一第五管路53相通並 適於使廢氣可以自流量H5流向第五_3之出口卿,流量 器5的出π端52以-第五管路53與—第―熱交細的第一入 口端61相通’使廢氣經過流量器5的流量可以計數; 該第一熱交魅6,相_日本_式餘島麵工所的板 式熱交換H’有與第—人口額連通的The second filter 4 has a communication with the inside of the second filter 4 and is adapted to allow the exhaust gas to enter the inlet end 41 of the second filter 4 and to communicate with the second filter portion and the fourth conduit 43. The exhaust gas can be made to flow from the second filter 4 to the outlet end 42 of the fourth conduit 43, and the outlet of the second sluice 4 is connected to the inlet end 51 of the flow vessel 5 by the fourth conduit 43 to exhaust the exhaust gas. After the second filter removes the moisture in the exhaust gas, the oil and gas enters the flow vessel 5; the flow vessel 5 has - communicates with the interior of the flow vessel 5 and is adapted to allow the exhaust gas to enter the inlet end 51 of the flow vessel 5 and - with the flow vessel 5 is internally connected to a fifth line 53 and is adapted to allow exhaust gas to flow from the flow rate H5 to the fifth _3 outlet, the outlet π end 52 of the flow meter 5, the - fifth line 53 and the - the first heat exchange The first inlet end 61 communicates with the 'flow rate of the exhaust gas passing through the flow meter 5; the first heat exchange spirit 6, the phase_Japan _ type Yudao noodle factory plate heat exchange H' has a connection with the first population of

II M423582 . 不與第―入口端61和第In端62連通的 弟一;^端63、—與第二人口賴連通的第二出口端64 ;第 -熱交換H6的第-出口·以—第六管路_ =機7的人口相通,第二人_與—第七管雜連通; 第-出口賴與-第人管騎連通’·使廢氣經過第一敎交換 ^可rf第t管路66内的冷氣所提供的低溫進行熱交換而 弟^^又降低溫度後進入第二抽送風機7 ; 該第二抽送風機7有-與第二抽送風機7内部相通並適於使廢 乳可以進入第二抽送風機7之入口·和—與第二抽送風機7 内部和-第九管路73相通並適於使廢氣可以自第二抽送 7流向第九管簡之出口·,第二抽送風機7的出口·以 第九官路73與-第二熱交換器9的第一入口端91相通 氣經過第二抽送風機7進入第二熱交換器9; ' 該第二熱交換器9與第—熱交換器6同樣是板式熱交換器’有 —第—入,9卜—與第-入口端91連通的第-出口端92、 一不與第一入口端91和第-出口連通的第二入口端93、 一與第二人口端93連通的第二出口賴;第二熱交換器9的第 -出口端92以-第十管與一第三熱交換器_入口端 101相通’第一入口端93與—第十一管路96的下游端連通,第 十-官路96的上游端與—冷卻水塔_出水端肌連通;第二 出口端94與-第十二官路97的上游端連通,第十二管路97的 下游端與-冷部水塔9〇的進水端爬連通;使廢氣經過第二敎 / »*> 12 M423582 交換器9可以與第十一管路96的冷水所提供的低溫進行熱交 換而第__P娘降低溫度後進入第三熱交換㈣;較好的,可 於第十-管路96上[幫麵3連通,以增強第十—管路 冷水流速; 該第三熱雑㈣與第—鼓換别同樣是板式齡換器有 一第一入口端ΗΠ、一與第一入口端1〇1連通的第一出口端 102、一不與第一入口端1〇1和第一出口端1〇2連通的第二入口 端103、一與第二入口端⑽連通的第二出口端⑽;第三熱交 換器10的第-出σ⑽—第十三f路⑽與第四熱交換器 20的入口端201相通’第三熱交換器1〇的第二入口端1〇3與第 十四管路1_下_,料四管路丨_上游端與第四 熱父換器20的第二出口端2G4連通;第三熱交換㈣的第二出 口端104與一第十五管路1_上游端連通,第十五管路107的 下游端與冷媒桶5Q的進口端弧連通,經過熱交換後的冷媒可 以回流進人冷媒桶5G内;而經過第三熱交換謂的廢氣可以 與第十四管路106的冷媒所提供的低溫進行熱交換而第三階 段降低溫度後進入第四熱交換器2〇 ; 该第四熱交換器2〇是可以提供冷凍低溫的管式熱交換器,有 一第一入口端201、一與第一入口端2〇1連通的第一出口端 202、-不與第-入口端2G1和第一出σ端搬連通的第二入口 端203、-與第二入口端203連通的第二出口端2〇4 ;第四熱交 換器20的第一出口端202以一第十六管路2〇5與一第一三通管 13 60的第一端601相通,第一三通管6〇的第二端^⑽與一風量調 節态30的入口端301相通,第一三通管的第三端與一收 集桶40的入口端401相通;第四熱交換器2〇的第二入口端2〇3 與一第十七管路206的下游端連通,第十七管路2〇6的上游端 與能夠製冷的冷凍機組503的冷媒桶50的出口端5〇1連通,第 四熱交換器20的第二出口端204與第十四管路106的上游端連 通,使廢氣因風量調節器30的通道變小而於進入風量調節器 30之洳密度變小、壓力增加和流速減緩而延長製冷時間,以 及使廢氣因已歷經三個階段的降溫冷卻過程後與第十七管路 206的冷媒所提供的冷凍低溫進行熱交換而第四階段降低溫 度並使廢氣巾的水份及料點物f 冷凝而觀為液滴經 由第-二通細的第三端603進人收集桶辦。風量調節器3〇 的出口端302與第七官路66相通,使經過第四熱交換器2〇的較 低溫的冷氣可以經由第七管路66進入第一熱交換器6進行熱 父換後再㈣第-熱交換的第二出口賴與第八管騎 至第一二通管68的第一端681,第二三通管68的第二端682與 一第三間件70之入口端701相通’第三閥件7()之出口端7〇2以 :第二十管路703與儲氣制的人σ相通,使被處理後的 氣體可以進入儲氣槽1内;第二三通管68的第三端哪與一第 四閥件8G之入口端8_通,第四閥件8()之出口端觀以一第 二十—管_3與-容_目通,使被處理後的聽不進入儲 氣槽1内時’可靖存於此容糊,便於儲娜的歲修或平 M423582 曰檢修時不影響整個系統的正常操作。 較好的,可於第十七管路206上與一幫浦504連通,以增強第 十七管路206的冰水流速。 該收集桶40有一與收集桶40内部相通並適於使被冷凝液態物 質可以進入收集桶40之入口端401、一與收集桶4〇内部和一用 以控制被冷凝液態物質流出的第一閥件4〇4相通之出口端4〇2 和-與-第十人管路4G5之-端連通並適於使收集桶4〇内的 氣體流向第十八管路405之排氣口4〇3 ;第十八管路4〇5之另一 端與一第二閥件407之一端連通,第二閥件4〇7之另一端以一 第十九管路4G8與第六管祕連通,使回收的氣體@第二抽送 風機7的抽送而流向第九管路73再循環回收;收集桶4〇的出口 端402與一第一閥件404連通,使收集桶4〇内的被冷凝液態物 質可以經由第一閥件404回收再利用。較好的,第一閥件4〇4 可與一幫浦406連通,以增強被冷凝液態物質的流速。 再請參閱第二圖所示,其係本創作之第二較佳實施例,其與 第一較佳實施例之不同處僅是依序增設一可以吸收酸性物質 等的水洗機組34、-第二十二管路35、―可以抽送廢氣的第 二抽送風機36和-第二十三管路37於第一抽送風機3和第二 過;慮器4之間,該水洗機組34有-與水洗機組34内部相通並適 於使廢氣可以進入水洗機組34内部之入口端34丨和一與水洗 機組34内部和-第二十二管路35相通並適於使廢氣可以自水 洗機組34流向第二十二^•路35之出口端342,水洗機組34的入 15 口端341以一第三管路33與第-抽送風機3之出口相通, 水洗細4的出口端342以—第二十二管路财—第三 風機36的^端361相通,第三柚送風鄕的出〇端她以一 第一十一 e路37與第—顧器4相通’使經過第三抽送風機% 的廢氣雜物將被抽送進入第二過渡器4。 本創作之構造為前耻有,具麵碰,魏傳_處理方式 要,郎钱_· ’而且揮發財機聽可視回收 用,亦具魏频,且具有產紅_倾,符麵型專利要 件,尚祈賜新型專利權為禱。 賴作可林偏魅要的精神及特徵下以其他不同的 %。因此’上義較佳實施例只是以舉例的方式被舉出,^ 創作之限制。本創作的範岐^ 界疋’而_說明書的内容所定義。甚者,屬射 之等效的變化或修改都是落於本創作的範圍。 【圖式簡單說明】 第i :係本創作第—較佳實_之系統配置圖; 第U本創作第二較佳實酬之系統配置圖; 第三圖:係習知廢氣處理設備之系統配置圖。 【主要元件符號說明】 1 儲氣槽 13第一管路 21入口端 U入口端 12出口端II M423582. The first end 63 that is not in communication with the first inlet end 61 and the In end 62; the second end 63 that is in communication with the second population; the first outlet of the first heat exchange H6. The sixth pipeline _ = the population of the machine 7 is connected, the second person _ is connected with the seventh tube; the first-outlet is connected with the - the first person riding the vehicle'. The exhaust gas is exchanged through the first ^ ^ rf t-tube The low temperature provided by the cold air in the road 66 performs heat exchange, and the lower temperature is lowered to enter the second pumping fan 7; the second pumping fan 7 has - communicates with the inside of the second pumping fan 7 and is adapted to make the waste milk Entering the inlet of the second pumping fan 7 and communicating with the interior of the second pumping fan 7 and the ninth line 73 and adapted to allow the exhaust gas to flow from the second pumping 7 to the outlet of the ninth tube, the second pumping fan The outlet of 7 is ventilated by the ninth official road 73 and the first inlet end 91 of the second heat exchanger 9 through the second pumping fan 7 into the second heat exchanger 9; 'the second heat exchanger 9 and the - the heat exchanger 6 is also a plate heat exchanger 'having - first, 9 - the first outlet end 92 communicating with the first inlet end 91, one not with the first inlet The second inlet end 93 communicating with the end 91 and the first outlet is a second outlet connected to the second population end 93; the first outlet end 92 of the second heat exchanger 9 is a tenth tube and a third heat The exchanger_inlet end 101 communicates with the first inlet end 93 communicating with the downstream end of the eleventh line 96, the upstream end of the tenth-official path 96 being in fluid communication with the cooling tower-water outlet end, and the second outlet end 94. Communicating with the upstream end of the twelfth official road 97, the downstream end of the twelfth conduit 97 is in creep communication with the inlet end of the cold water tower 9〇; the exhaust gas is exchanged through the second crucible / »*> 12 M423582 The device 9 can exchange heat with the low temperature provided by the cold water of the eleventh line 96, and then enter the third heat exchange (4) after lowering the temperature; preferably, the tenth line 96 can be used. 3 connected to enhance the tenth-line cold water flow rate; the third heat 雑 (four) and the first drum change are the same as the plate-type changer having a first inlet end ΗΠ and a first inlet end 〇1 An outlet end 102, a second inlet end 103 not communicating with the first inlet end 1〇1 and the first outlet end 1〇2, and a second inlet end (10) The outlet end (10); the first-out σ(10)-thirteenth-th road (10) of the third heat exchanger 10 is in communication with the inlet end 201 of the fourth heat exchanger 20, and the second inlet end 1〇3 of the third heat exchanger 1〇 And the fourteenth pipeline 1_lower_, the fourth pipeline 丨 upstream end is connected with the second outlet end 2G4 of the fourth hot parent exchanger 20; the third heat exchange (four) second outlet end 104 and a tenth The fifth line 1_ upstream end is connected, the downstream end of the fifteenth line 107 is in arc communication with the inlet end of the refrigerant tank 5Q, and the refrigerant after the heat exchange can be returned into the refrigerant tank 5G; and after the third heat exchange The exhaust gas may be heat exchanged with the low temperature provided by the refrigerant of the fourteenth line 106, and the third stage is lowered to enter the fourth heat exchanger 2; the fourth heat exchanger 2 is a tube capable of providing freezing and low temperature. The heat exchanger has a first inlet end 201, a first outlet end 202 communicating with the first inlet end 2〇1, and a second inlet end not communicating with the first inlet end 2G1 and the first outlet σ end. 203, a second outlet end 2〇 communicating with the second inlet end 203; the first outlet end 202 of the fourth heat exchanger 20 is a 16th tube The second end of the first three-way tube (6) is in communication with the first end 601 of the first three-way tube (13), and the second end (10) of the first three-way tube (6) is in communication with the inlet end 301 of an air volume adjustment state 30, the first three-way tube The third end communicates with the inlet end 401 of a collection tank 40; the second inlet end 2〇3 of the fourth heat exchanger 2〇 communicates with the downstream end of a seventeenth line 206, and the seventeenth line 2〇 The upstream end of 6 communicates with the outlet end 5〇1 of the refrigerant tank 50 of the refrigeration unit 503 capable of cooling, and the second outlet end 204 of the fourth heat exchanger 20 communicates with the upstream end of the fourteenth line 106 to cause exhaust gas The passage of the air volume regulator 30 becomes smaller, and the density becomes smaller as the air volume regulator 30 enters, the pressure increases and the flow rate is slowed to extend the cooling time, and the exhaust gas is subjected to the three-stage cooling and cooling process and the seventeenth tube. The cold water provided by the refrigerant of the road 206 performs heat exchange while the fourth stage lowers the temperature and condenses the moisture and the material f of the exhaust towel to observe that the liquid droplets are collected through the third end 603 of the second-pass thin Bucket. The outlet end 302 of the air volume regulator 3 is in communication with the seventh official road 66, so that the cooler air passing through the fourth heat exchanger 2〇 can enter the first heat exchanger 6 via the seventh conduit 66 for hot parent exchange. And (4) the second outlet of the first heat exchange and the eighth tube ride to the first end 681 of the first two-way tube 68, the second end 682 of the second three-way tube 68 and the inlet end of a third partition 70 701 communicates with the outlet end 7〇2 of the 'third valve member 7() to: the twentieth line 703 communicates with the person σ of the gas storage system, so that the treated gas can enter the gas storage tank 1; The third end of the through pipe 68 is connected to the inlet end 8_ of the fourth valve member 8G, and the outlet end of the fourth valve member 8() is viewed by a second ten-tube_3 and a capacitor. When it is not heard into the gas storage tank 1 after being treated, it can be stored in this volume, which is convenient for the repair of the old or flat M423582. The maintenance of the whole system does not affect the normal operation of the whole system. Preferably, a pump 504 is connected to the seventeenth conduit 206 to enhance the ice water flow rate of the seventeenth conduit 206. The collection tank 40 has a first valve that communicates with the interior of the collection tank 40 and is adapted to allow the condensed liquid material to enter the inlet end 401 of the collection tank 40, an interior of the collection tank 4, and a first valve for controlling the flow of condensed liquid material. The outlet end 4〇2 of the member 4〇4 is connected to the end of the tenth person line 4G5 and is adapted to flow the gas in the collection tank 4〇 to the exhaust port 4〇3 of the eighteenth line 405. The other end of the eighteenth pipe 4〇5 is in communication with one end of a second valve member 407, and the other end of the second valve member 4〇7 is connected to the sixth pipe by a nineteenth pipe 4G8 for recycling The gas of the second pumping fan 7 is pumped to the ninth line 73 for recycling; the outlet end 402 of the collecting tank 4 is in communication with a first valve member 404, so that the condensed liquid substance in the collecting barrel 4〇 can be Recycling is recovered via the first valve member 404. Preferably, the first valve member 4〇4 is in communication with a pump 406 to enhance the flow rate of the condensed liquid material. Referring to the second embodiment, it is a second preferred embodiment of the present invention. The difference from the first preferred embodiment is that only a water washing unit 34 capable of absorbing acidic substances and the like is added in sequence. Twenty-two lines 35, a second pumping fan 36 that can pump exhaust gas, and a twenty-third line 37 between the first pumping fan 3 and the second controller 4, the water washing unit 34 has - and The water washing unit 34 is internally connected and adapted to allow the exhaust gas to enter the inlet end 34 of the interior of the water washing unit 34 and to communicate with the interior of the water washing unit 34 and the twenty-second line 35 and is adapted to allow the exhaust gas to flow from the water washing unit 34 to the first The outlet end 342 of the twenty-two ^ road 35, the inlet end 341 of the water washing unit 34 is connected to the outlet of the first pumping fan 3 by a third line 33, and the outlet end 342 of the water washing unit 4 is - twentieth The second pipeline finances - the third end of the third fan 36 is connected, the third teafruit is sent to the outlet of the wind, and she uses a first eleventh road 37 to communicate with the first device 4 to make the third pumping fan Exhaust gas debris will be pumped into the second transition unit 4. The structure of this creation is pre-shameful, with face touch, Wei Chuan _ processing method, Lang Qian _· 'and the volatilizing machine to listen to visual recycling, also has Wei frequency, and has a red-producing, fancy-type patent The key element is to pray for a new patent right. Lai Zuo Ke Lin's spirit and characteristics are different from others. Therefore, the preferred embodiment is merely by way of example, and is limited by the creation. The scope of this creation is defined by the content of the specification. Moreover, the equivalent changes or modifications of the genus are within the scope of this creation. [Simple description of the diagram] i: the system configuration diagram of the first creation of the creation - the second system of the second preferred remuneration; the third diagram: the system of the conventional exhaust gas treatment equipment Configuration diagram. [Main component symbol description] 1 Gas storage tank 13 First pipeline 21 Inlet end U inlet end 12 Outlet end

14控觸 2帛一過it H 22出口端 23第二管路 16 M42358214 control touch 2 帛 one over it H 22 outlet end 23 second line 16 M423582

3 第一抽送風機 31 入口端 32 出口端 33 第三管路 34 水洗機組 341 入口端 342 出口端 35 第二十二管路36 第三抽送風機 361 入口端 362 出口端 37 第二十三管路 4 第二過濾器 41 入口端 42 出口端 43 第四管路 5 流量器 51 入口端 52 出口端 53 第五管路 6 第一熱交換器 61 第一入口端 62 第一出口端 63 第二入口端 64 第二出口端 65 第六管路 66 第七管路 67 第八管路 68 第二三通管 681 第一端 682 第二端 683 第三端 7 第二抽送風機 71 入口端 72 出口端 73 第九管路 8 容器 9 第二熱交換器91 第一入口端 92 第一出口端 93 第二入口端 94 第二出口端 95 第十管路 96 第十一管路 97 第十二管路 10 第三熱交換器 101 第一入口端 102 第一出口端 103 第二入口端 104 第二出口端 105 第十三管路 106 第十四管路 107 第十五管路 20 第四熱交換器 201 第一入口端 202 第一出口端 203 第二入口端 204 第二出口端 205 第十六管路 206 第十七管路 30 風量調節器 301 入口端 302 出口端 40 收集桶 401 入口端 402 出口端 M423582 403排氣口 404第一閥件 405 第十八管路 406 幫浦 407第二閥件 408 第十九管路 50 冷媒桶 501出口端 502 進口端 503冷凍機組 504幫浦 60 第一三通管 601 第一端 602第二端 603 第三端 70 第三閥件 701入口端 702 出口端 703 第二十管路 80第四閥件 801 入口端 802 出口端 803第二十一管路90 冷卻水塔 901 出水端 901出水端 902 進水端 903 幫浦3 First pumping fan 31 Inlet end 32 Outlet end 33 Third line 34 Washing unit 341 Inlet end 342 Outlet end 35 Twenty-second line 36 Third pumping fan 361 Inlet end 362 Outlet end 37 Twenty-third line 4 second filter 41 inlet end 42 outlet end 43 fourth line 5 flow meter 51 inlet end 52 outlet end 53 fifth line 6 first heat exchanger 61 first inlet end 62 first outlet end 63 second inlet End 64 second outlet end 65 sixth line 66 seventh line 67 eighth line 68 second three way tube 681 first end 682 second end 683 third end 7 second pumping fan 71 inlet end 72 outlet end 73 ninth line 8 container 9 second heat exchanger 91 first inlet end 92 first outlet end 93 second inlet end 94 second outlet end 95 tenth line 96 eleventh line 97 twelfth line 10 third heat exchanger 101 first inlet end 102 first outlet end 103 second inlet end 104 second outlet end 105 thirteenth conduit 106 fourteen conduit 107 fifteen conduit 20 fourth heat exchanger 201 first inlet end 202 first outlet end 203 second inlet End 204 second outlet end 205 sixteen conduit 206 seventeen conduit 30 air volume regulator 301 inlet end 302 outlet end 40 collection bucket 401 inlet end 402 outlet end M423582 403 exhaust port 404 first valve member 405 tenth Eight pipe 406 pump 407 second valve member 408 nineteenth pipe 50 refrigerant drum 501 outlet end 502 inlet end 503 refrigeration unit 504 pump 60 first three-way pipe 601 first end 602 second end 603 third end 70 third valve member 701 inlet end 702 outlet end 703 twentieth line 80 fourth valve member 801 inlet end 802 outlet end 803 twenty-first line 90 cooling water tower 901 water outlet end 901 water outlet end 902 water inlet end 903 gang Pu

Claims (1)

v、、申請專利範圍: ;·種廢乳處理設備,包括一儲氣槽、一第〆過遽器、一第— =送風機、1二職器…流量器、U交換器、一 送風機' —容器、—第二熱交換器、,第三熱交換器、 第四熱交接^ 、俠态、一風量調節器、一收集桶和一冷媒桶,其 h儲氣乜有一入口端、一與一第一管路之一端相通的出口端 和一控制閥; °亥第—過濾器有—入口端和一出口端,第一過濾器的入口 與一第_營敗 ^ ^ 之另一端相通,第一過濾器的出口端以一第二 官路與第—插送風機的入Π端相通; 抽贱機有—人σ端和—出口端,第—抽送風機的出 :端以-第三管路與第二過魅的人口端相通; :第-過濾盗有-入口端和—出口端,第二過濾器的的出口 '弟四言路與一流量器的入口端相通; 二机里$有-人口端和—出口端,流量器的出口端以—第五 官路與—第—熱交換器的第-人口端相通; 料-熱交換器有—第_人口端…與第—人口端連 —出口端、—尤彻铱 , 币 山 不與第一入口端和第一出口端連通的第二入口 與第二人口端連通的第二出口端;第—熱交換器的第 —端以—第六管路與1二抽送風機的人口端相通,第 熱父換器的第二入口端與—第七管路連通;第—熱交換器 19 端以—第八管路與—第二三通管的第-端相通’ 之二Π二端與一第·之入。端相通,第三閥件 管二: 與儲氣槽的入。端相通,第二三通 的弟一鸲與_第四間件之入口端相 二-第二卜狄與_細目通;蝴件之出口端 该第二抽送風機有一入口 口端以-第九管路與一第二熱交二:第弟二抽送風機的出 該第二熱交換器有一第一入口端換:弟-入口端相通; -出口端、,第一入口端和第'屮弟—入口端連通的第 臨一㈣^入口化和第一出口端連通的第二入口 ^一^二入口端連通的第二出口端;第二熱交換器的第 =口端以-第十管路與1三熱交換器的人口端相通第 j交換器的第二人口端與—第十—管路的下游端連通,第 游端與一冷卻水塔的出水端連通;第二熱交換 °。的第二出π續-軒二管路的场端連通,第十二管路 的下游h與一冷卻水塔的進水端連通; 該第三熱交換器有―第―人口端、—與第_人口端連通的第 山出口端、不與第一入口端和第一出口端連通的第二入口 端、-與第二人π端連通的L端;第三熱交換器的第 =出:端以—第十三管路與第四熱交換ϋ的人口端相通,第 -熱父換ϋ的第二人口端與第十四管路的下游端連通,第十 四管路的上游端與第四熱交換器的第二出口端連通;第三熱 交換器的第二出Π端與—第十五管路的上游端連通,第十五 嘗路的下游端與冷媒桶的進口端連通; 該第四熱交換器有一第一入口端、一盥 -出㈣士 ^遥的第 總、..^ 連通的第二入口 二::端連通的第二出口端;第四熱交換器的第 出^以一斜六管路與一第一三通管的第1相通,第 的第二端與—風量調節器的切端相通,風量調節 1 的出口端與第七管路相通’第—三通管的第三端與-收华 端相通;第四熱交換器的第二入口端與-第十七其 :的下_,第十七管路的上游端與冷媒桶的出心 k四熱父換斋的第二出口端與第十四管路 該收集桶有一入D唑 山 好知運通’ 、击、 Μ、一出口端和一與—第十八管路之-端 、通之排氣卩;第十崎路之另—端與—第二·之一端連 ^第二閥件之另—端以—第十九管路與第六管路連通;收 木桶的出口端與一第一閥件連通。 2.如申請專利範_丨項所述之廢氣處理設備,其中於第— 風機和第—過之間依序增設—水洗機組、一第 Si洗機送風機和—第二十三管路;該水洗_ 一:一 ^相通之入口端和-與水洗機組内部和-第 路相通之出口端,水洗機組的入口端以—第三管路 ^路風機之^ 口端相通,水洗機組的^ 口端一第二十 端相通,第三抽送風機的出 g路與第—過遽器相通。 21v,, the scope of application for patents: ; · waste milk processing equipment, including a gas storage tank, a first pass, a first - = blower, 1 second server ... flow, U exchanger, a blower ' — a container, a second heat exchanger, a third heat exchanger, a fourth heat transfer, a chimerity, an air volume regulator, a collection bin and a refrigerant tank, wherein the h gas storage port has an inlet end, one and one An outlet end communicating with one end of the first line and a control valve; the °-the filter has an inlet end and an outlet end, and the inlet of the first filter is in communication with the other end of the first The outlet end of a filter is connected to the inlet end of the first-type insertion fan by a second official road; the pumping machine has a human σ end and an outlet end, and the first - pumping fan is out: the end is - the third line The second end of the population end of the communication;: the first - filter stolen - the entrance end and the - exit end, the outlet of the second filter 'different four words and the entrance end of a flow device; - the population end and the - export end, the outlet end of the flow device is - the fifth official road and the - the first - the population of the heat exchanger The material-heat exchanger has - the first population end ... and the first - population end - the outlet end, - the Uche, the second inlet and the second that the coin mountain does not communicate with the first inlet end and the first outlet end a second outlet end connected to the population end; the first end of the first heat exchanger is connected to the population end of the first two pumping fan by the sixth pipeline, and the second inlet end and the seventh pipeline of the first heat exchanger Connected; the first heat exchanger 19 end is connected to the second end of the second conduit and the first end of the second tee. The end is connected, the third valve member is two: with the inlet of the gas storage tank. The end is connected, the second three-way brother and the fourth end of the fourth end of the second end - the second bdi and the _ fine eye; the outlet end of the butterfly, the second pumping fan has an inlet end to - the ninth The pipeline and a second heat exchange two: the second brother of the second pump blows out the second heat exchanger has a first inlet end exchange: the brother-inlet end communicates; - the outlet end, the first inlet end and the first 'brother - the first outlet of the inlet end is connected to the second inlet end of the second inlet and the second inlet end of the first outlet end; the second outlet end of the second heat exchanger is - the tenth tube The road is connected to the population end of the third heat exchanger. The second population end of the jth exchanger is connected to the downstream end of the tenth pipeline, and the first end is connected to the outlet end of a cooling water tower; the second heat exchange is °. The second end of the π continuation- Xuan second pipeline is connected, and the downstream h of the twelfth pipeline is connected with the inlet end of a cooling water tower; the third heat exchanger has a "first" population end, - and a second mountain inlet end connected to the population end, a second inlet end not communicating with the first inlet end and the first outlet end, and an L end connected to the second person π end; the third heat exchanger is output: The end of the thirteenth pipeline communicates with the population end of the fourth heat exchange crucible, and the second population end of the first hot father exchanges with the downstream end of the fourteenth pipeline, and the upstream end of the fourteenth pipeline The second outlet end of the fourth heat exchanger is in communication; the second outlet end of the third heat exchanger is in communication with the upstream end of the fifteenth pipeline, and the downstream end of the fifteenth taste passage is connected to the inlet end of the refrigerant tank The fourth heat exchanger has a first inlet end, a 盥-out (four) 士^^, a second inlet 2: a second outlet end connected to the end: a fourth heat exchanger The first outlet is connected to the first passage of the first three-way pipe by a diagonal six-pipe, and the second end is connected to the cut end of the air volume regulator, and the air volume adjustment 1 is The mouth end communicates with the seventh pipeline; the third end of the third tee pipe communicates with the end of the third end; the second inlet end of the fourth heat exchanger and the lower end of the seventh heat exchanger: the seventeenth tube The upstream end of the road and the outlet of the refrigerant tank k four hot fathers for the second exit end of the fast and the fourteenth pipeline, the collection bucket has a Dzoshan good knowledge of the transport, hit, Μ, an exit end and a - the thirteenth pipeline - the end, the exhaust enthalpy; the other end of the tenth saki road and the second one - the end of the second valve - the other end of the second valve - the nineteenth pipeline and the first The six pipelines are connected; the outlet end of the receiving bucket is in communication with a first valve member. 2. The exhaust gas treatment device according to the application of the patent specification, wherein the first step is to add a water washing unit, a first Si washing machine blower and a twenty-third line; Washing _ a: the inlet end of the ^ and the outlet end of the water washing unit and the - the intersection of the road, the inlet end of the washing unit is connected with the mouth of the third pipeline, the mouth of the washing unit The twentieth end of the end is connected, and the outgoing path of the third pumping fan is in communication with the first passer. twenty one
TW100214375U 2011-08-04 2011-08-04 Equipment for processing exhaust gas TWM423582U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW100214375U TWM423582U (en) 2011-08-04 2011-08-04 Equipment for processing exhaust gas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW100214375U TWM423582U (en) 2011-08-04 2011-08-04 Equipment for processing exhaust gas

Publications (1)

Publication Number Publication Date
TWM423582U true TWM423582U (en) 2012-03-01

Family

ID=46460800

Family Applications (1)

Application Number Title Priority Date Filing Date
TW100214375U TWM423582U (en) 2011-08-04 2011-08-04 Equipment for processing exhaust gas

Country Status (1)

Country Link
TW (1) TWM423582U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI570320B (en) * 2014-03-27 2017-02-11 Jian-Zhi Chen An exhaust gas detection system with a filter
CN108758342A (en) * 2018-08-17 2018-11-06 华能国际电力股份有限公司玉环电厂 The flushing line of pyrolysis oven in a kind of denitrating system
TWI656908B (en) * 2016-12-08 2019-04-21 大陸商青島雙瑞海洋環境工程股份有限公司 Ship exhaust gas denitration system
CN114806613A (en) * 2021-01-28 2022-07-29 柯世苑 Waste treatment furnace and treatment equipment with same

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI570320B (en) * 2014-03-27 2017-02-11 Jian-Zhi Chen An exhaust gas detection system with a filter
TWI656908B (en) * 2016-12-08 2019-04-21 大陸商青島雙瑞海洋環境工程股份有限公司 Ship exhaust gas denitration system
CN108758342A (en) * 2018-08-17 2018-11-06 华能国际电力股份有限公司玉环电厂 The flushing line of pyrolysis oven in a kind of denitrating system
CN114806613A (en) * 2021-01-28 2022-07-29 柯世苑 Waste treatment furnace and treatment equipment with same
CN114806613B (en) * 2021-01-28 2024-03-15 柯世苑 Waste treatment furnace and treatment equipment with same

Similar Documents

Publication Publication Date Title
CN106178807B (en) A kind of gas recovery system for oil of " double condensation-absorption " integrated technology
TWM423582U (en) Equipment for processing exhaust gas
WO2013117067A1 (en) Method and device for preparing protective gas by using air through oxygen removal and sterilization
CN208223907U (en) A kind of gas sampling device suitable for high temperature and pressure
CN105771300B (en) A kind of gas recovery system for oil
CN109731446A (en) A kind of VOCs gas recycling and processing device
CN207493402U (en) A kind of emission-control equipment
CN109999601A (en) A kind of processing unit and processing method of aviation kerosine VOCs
CN202693448U (en) Potassium chloride aerosol generator
CN209411916U (en) A kind of DMF waste-water recovering treater
CN206543508U (en) It is a kind of using liquid nitrogen as low-temperature receiver and the vehicular VOCs condensate recovery systems of nitrogen source
CN213132590U (en) High-temperature high-humidity gas de-whitening assembly and DMF (dimethyl formamide) and methylbenzene recovery device
CN104923040B (en) Embrane method petroleum vapor recovery group control device and its application method
CN104964547B (en) It is a kind of can sterilize online dry cooling system
CN205747180U (en) A kind of industrial air cleaner
CN206056036U (en) A kind of graphite condenser
CN212548962U (en) Light oxygen purifies biological feed exhaust treatment device
CN206444359U (en) A kind of waste gas purification apparatus
CN105771299B (en) A kind of oil gas pretreatment unit
CN105597506A (en) Waste gas treatment system
CN206762662U (en) A kind of hydrogen isotope cryogenic rectification evaporates the system of washing
CN206111285U (en) Explosion -proof tail gas treatment case for diesel engine
CN105771298B (en) One kind condensation flow controller
CN104729312A (en) Device for improving condensation effect of barrier wall type condenser based on partial reflux circulation
CN205760469U (en) A kind of secondary absorption retracting device of entrucking tail gas

Legal Events

Date Code Title Description
MM4K Annulment or lapse of a utility model due to non-payment of fees