TWM330331U - Sleeve triangle staff for scaffold - Google Patents

Sleeve triangle staff for scaffold Download PDF

Info

Publication number
TWM330331U
TWM330331U TW96218222U TW96218222U TWM330331U TW M330331 U TWM330331 U TW M330331U TW 96218222 U TW96218222 U TW 96218222U TW 96218222 U TW96218222 U TW 96218222U TW M330331 U TWM330331 U TW M330331U
Authority
TW
Taiwan
Prior art keywords
rod
frame
extension rod
creation
work
Prior art date
Application number
TW96218222U
Other languages
Chinese (zh)
Inventor
zheng-wen Huang
Original Assignee
Gee Tai Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gee Tai Co Ltd filed Critical Gee Tai Co Ltd
Priority to TW96218222U priority Critical patent/TWM330331U/en
Publication of TWM330331U publication Critical patent/TWM330331U/en

Links

Landscapes

  • Ladders (AREA)

Description

M330331 八、新型說明: 【新型所屬之技術領域】 本創作係屬力建築&術領i或,尤指一冑組構鹰架的金 屬架體。 【先前技術】 "不論是橋樑、大樓之建築工地,均可能設有突出於建 ,物表面的大出# ’以住豕大樓為例,幾乎都設有突出的 陽台,於建築工地外側需要以多數個工作架、腳踏架等組 構成鷹架,以在施工其間作為進出樓層、吊起建材、外於 粉刷或者貼附磁磚等作業。倘若建築工地具有陽台時,: 工作架需要隨著往外架構,亦即,鷹架相應於陽台處亦整 個由地面往上延伸而設為突出狀。如此一來,位於上下芦 ”之間的外牆距離鹰架甚遠,施工者無法直接站在㈣ ::::外以工作梯才能在該段外牆粉刷或者貼磁 【新型内容】 可以ϋ善上述缺失,本創作之主要目的在於提供一種 架之套管三角標架。 卜ι卞構,以方便施工的魔 鷹架之套管二!:本創作之主要技術手段在於提供-種 其中—端 ^ ’係包括—頂延伸桿、-由頂延伸桿 而朝下延伸之縱桿、一 于 自由端底部之支俨ρ 桿底端至頂延伸桿 側,設有’於該縱桿相對於頂延伸桿的另-、’、"片及一扣具,該結合片係設於頂部,且結 M330331 合片上設有-穿孔,另於頂延伸桿頂面中段,以及遠離縱 桿該端分別設有一朝上突出的插桿。 實施上述技術手段以後’本創作可獲得之具體效益 為: 本創作可以藉由穿孔及扣具穿置固定於工作架,而其 突出:頂部的二插桿亦可供工作架的二主桿底部插置,因 此,藉由本創作之設計,♦ v T 田乂工作木組構鷹架,並且建築 物具有凸出部時,可以佶 你加 使作木保持沿著建築物外牆及凸 ^部架構成鷹架,縱使位於上下層之二凸出物之間的外 :,仍然可以立於鹰架上施作’以改善現有鹰架距離太遠, 而要另以工作梯施工外牆的缺失。 【實施方式】 加/月參閱弟一圖所示’本創作所提供鷹架之套管三角標 21〇)係以數段條狀金屬所焊接而成,其具有-橫向 延伸之頂延伸桿(1 Ί彳 # 端朝下Μ抽 1 1 )、—於頂延伸桿(i丄)其中一 文而朝下延伸之縱桿(]9、 至頂征袖π r , 連接於縱桿(1 2 )底端 卜、查 (11)自由端底部之支撐桿(13)、-支 上連接於支撑桿(1 ^彳纺 4 ) μ )與頂延伸桿(1 1 )的補強桿(1 # r Τ 9 , ^ 1 )頂面中段及自由端〔即遠離縱 才干(1 2 )該端〕分別固 另於縱桿(12)相對二出的插桿(15), 底部分別設有一结人 干(1 1 )另-側的頂部、 合片⑴)上::有? 6)、一扣具(”),該結 )上6又有—穿孔(1 6 0 )。 請參閱第二圖所干 士 所不,本創作套接於工作架(2 〇 )的 M330331 情形,工作架(2 ◦)係包括二支縱向延伸的主桿(2工)、 一連接於二主桿(2 1 )頂部的橫桿(2 2 ),二主桿(2 1 )頂端分別設有一段突出於橫桿(2 2 )的突桿(2 =), 突桿(2 3 )的外徑小於主桿(2丄),以供另—工作架 (20)由上方插置套接。而本創作套管三角標架(1〇) 之穿孔(1 6 0 )係穿套於工作架(2 〇 )頂部的凸桿(2 工)上,結合片(1 6 )則擇持於工作架(2 0)的干橫桿 (2 2 ) 了頁面,再藉由扣具(1 7 )包覆固定於主桿(2 1 )上,而本創作設於頂延伸桿(丄丄)頂面的二插桿(工 5 )亦可供工作架(2 0 )的二主桿(2 1 )插置。 請參閱第三圖所示,係本創作應用於建築工地的情 形,當工作架(2 〇 )架構至建築物(3 〇 )突出部(3 1 )(如大樓之陽台,或者橋墩至橋面)時,可以利用本 創作套管三角標架(1 〇 ) #置於工作架(2 〇 )位於外 側該突桿(2 3 ),並且以扣具(丄7 )扣結固定,使套 官二角標架(10)往外延伸而突出於突出部(3丄), 再以工作木(20B)插置於套管三角標架(1〇)頂 部,當工作架(2 0 A )頂部超出於突出部(3丄)頂部 以後’即可再以另-套管三角標架(丄〇 A )插置於該工 作架(2 0 A ),並且使套管三角標架(丄〇 A )朝向建 築物(3 0 )該側延伸,再以另一工作架(2 〇 B )插接 於該套管三角標架(1 〇 A )頂冑,繼續向上延伸,組構 成整個鷹架。 故本創作之設計,可以使工作架(2 〇 )沿著建築物 M330331 (3 Ο )的凹凸部位組裝架構,以利施工。 【圖式簡單說明】 第一圖係本創作之立體外觀示意圖。 第二圖係本創作與工作架之局部立體組合示意圖 第三圖係本創作應用於建築工地時之平面示意圖 【主要元件符號說明】 (10) ( 1 0 A ) 套管三角標架 (1 1 )頂延伸桿 (12)縱桿 (1 3 )支撐桿 (1 4 )補強桿 (1 5 )插桿 (1 6 )結合片 (1 6 0 )穿孔 (1 7 )扣具 ( 2 0 ) ( 2 0 A ) (2 0 B )工作架 (2 1 )主桿 (2 3 )突桿 (2 2 )橫桿 (3 0 )建築物 (3 1 )突出部 7M330331 VIII. New Description: [New Technology Field] This creation is a building or a collar, or a metal frame of a eagle frame. [Prior Art] " Whether it is a bridge or a building site of a building, it is possible to have a prominent outcrop, and the surface of the object is large. # 'In the case of the Susie Building, almost all have prominent balconies, which are needed outside the construction site. A scaffold is formed by a plurality of work frames, pedals, and the like to perform operations such as entering and leaving floors, lifting building materials, painting outside, or attaching tiles during construction. If the construction site has a balcony, the work frame needs to be framed outwards, that is, the scaffolding is extended from the ground to the top of the balcony and is made to protrude. In this way, the outer wall between the upper and lower reeds is far away from the scaffolding, and the constructor cannot stand directly at (4) :::: outside the work ladder can be painted or magnetized on the outer wall of the section [new content] can be good The above-mentioned deficiency, the main purpose of this creation is to provide a casing triangle frame. Bu Yi structure, to facilitate the construction of the magic eagle frame casing two!: The main technical means of this creation is to provide - kinds of - end ^ 'The system includes a top extension rod, a longitudinal rod extending downward from the top extension rod, a bottom end of the support rod ρ at the bottom of the free end to the top extension rod side, and a 'left side relative to the top rod An additional -, ', " piece and a buckle of the extension rod, the coupling piece is set on the top, and the knot M330331 is provided with a perforation on the piece, and the middle part of the top extension of the top extension rod, and the end away from the longitudinal rod respectively There is a pole that protrudes upwards. After implementing the above technical means, the specific benefits that can be obtained from this creation are: The creation can be fixed to the work frame by perforation and fasteners, and the protrusion: the top two poles are also The bottom of the two main poles of the work frame can be inserted Therefore, with the design of this creation, ♦ v T 乂 乂 working wood frame eagle frame, and the building has a bulge, you can make the wood to keep the eagle along the exterior wall of the building and the convex frame The frame, even if it is located between the two protrusions on the upper and lower layers: it can still be placed on the eagle frame to 'improve the distance of the existing eagle frame too far, and the other is the lack of the outer wall of the work ladder construction. Mode] Add/month to see the picture shown in the figure of the younger brother. The casing triangle of the eagle frame provided by the creation is 21 〇. It is welded with several strips of metal, which has a horizontally extending top extension rod (1 Ί彳# The end of the Μ Μ 1 1 ), - in the top extension rod (i 丄) one of the text and the downward extension of the longitudinal rod (] 9, to the top of the sleeve π r , connected to the bottom of the longitudinal rod (1 2) Bu, check (11) the support rod (13) at the bottom of the free end, the support rod connected to the support rod (1 ^彳4) μ) and the top extension rod (1 1 ) (1 # r Τ 9 , ^ 1) The middle section of the top surface and the free end (ie, the end away from the longitudinal direction (1 2 )) are respectively fixed to the opposite poles (15) of the longitudinal rod (12), and the bottom is respectively provided A junction human stem (11) the other - the top side of the engagement piece ⑴) on :: 6), a buckle ( "), but also on the junction 6) -? Perforations (160). Please refer to the figure in the second figure. The creation is sleeved in the M330331 case of the work frame (2 〇). The work frame (2 ◦) consists of two longitudinally extending main poles (2 workers), one connected to the second. a cross bar (2 2 ) at the top of the main pole (2 1 ), and a top end (2 = ) protruding from the cross bar (2 2 ), respectively, at the top end of the two main rods (2 1 ), the protruding rod (2 3 ) The outer diameter is smaller than the main rod (2丄), so that the other work frame (20) is inserted and socketed from above. The perforation (1 60) of the creation of the casing triangle frame (1〇) is put on the protrusion (2 work) on the top of the work frame (2 〇), and the joint piece (1 6 ) is selected to work. The dry crossbar (2 2) of the frame (2 0) is attached to the main pole (2 1 ) by means of a buckle (1 7 ), and the creation is placed on the top extension rod (丄丄) top. The two poles (Work 5) of the surface are also inserted into the two main poles (2 1 ) of the work frame (20). Please refer to the third figure for the application of this creation to a construction site, when the work frame (2 〇) is constructed to the building (3 〇) protrusion (3 1 ) (such as the balcony of the building, or the pier to the deck) When you can use the creation of the casing triangle frame (1 〇) # placed on the work frame (2 〇) on the outside of the protrusion (2 3), and the buckle (丄7) buckle fixed, so that the official The two-point frame (10) extends outwardly and protrudes from the protrusion (3丄), and then the working wood (20B) is inserted on the top of the casing triangle frame (1〇) when the top of the work frame (20 A) exceeds After the top of the protrusion (3丄), the other-sleeve triangular frame (丄〇A) can be inserted into the work frame (20 A), and the casing triangle frame (丄〇A) The side of the building (30) extends, and the other work frame (2 〇B) is inserted into the top frame of the casing triangle frame (1 〇A), and continues to extend upward to form the entire eagle frame. Therefore, the design of this creation can make the work frame (2 〇) assemble the structure along the concave and convex parts of the building M330331 (3 Ο) to facilitate construction. [Simple description of the diagram] The first picture is a three-dimensional appearance of the creation. The second picture is a partial three-dimensional combination diagram of the creation and the work frame. The third picture is a schematic diagram of the application when the creation is applied to the construction site. [Main component symbol description] (10) (1 0 A) Casing triangle frame (1 1 Top extension rod (12) longitudinal rod (1 3 ) support rod (1 4 ) reinforcing rod (1 5 ) plunger (16) joint piece (1 60 0) perforation (1 7) buckle (20) 2 0 A ) (2 0 B ) Work frame (2 1 ) Main pole (2 3 ) Strut (2 2 ) Crossbar (3 0 ) Building (3 1 ) Projection 7

Claims (1)

M330331 九、申請專利範圍: :罵木奮管三角標架’係包括-頂延伸桿、 丁、延伸桿其中—端朝下延伸之縱桿、-連接於縱尸底 端至頂延伸桿自由端底部之支推桿,於該縱桿相對於頂延 伸桿的另-側,設有-結合片及—扣纟,該結合片係設於 頂部,且結合片上設有一穿孔,另於頂延伸桿頂面中段, 以及遠離縱桿該端分別設有一朝上突出的插桿。M330331 Nine, the scope of application for patents: : The 骂木奋管三角三角架' includes the top extension rod, the dent, the extension rod, the longitudinal rod extending downward, and the bottom end of the vertical extension rod. a bottom push rod, on the other side of the longitudinal rod relative to the top extension rod, a binding piece and a buckle, the binding piece is arranged on the top, and the coupling piece is provided with a perforation, and the top extension rod The top midsection, and the end away from the longitudinal rod are respectively provided with an upwardly projecting plunger. 2 ·如申請專利範圍第1項所述之鷹架之套管三角標 架’其中,於頂延伸桿與支撐桿之間以一支以上的補強桿 連接。 十、圖式·· 如次頁2. The casing triangle frame of the eagle frame as described in claim 1 wherein more than one reinforcing rod is connected between the top extension rod and the support rod. X. Schema·· as the next page 88
TW96218222U 2007-10-30 2007-10-30 Sleeve triangle staff for scaffold TWM330331U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW96218222U TWM330331U (en) 2007-10-30 2007-10-30 Sleeve triangle staff for scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW96218222U TWM330331U (en) 2007-10-30 2007-10-30 Sleeve triangle staff for scaffold

Publications (1)

Publication Number Publication Date
TWM330331U true TWM330331U (en) 2008-04-11

Family

ID=44323751

Family Applications (1)

Application Number Title Priority Date Filing Date
TW96218222U TWM330331U (en) 2007-10-30 2007-10-30 Sleeve triangle staff for scaffold

Country Status (1)

Country Link
TW (1) TWM330331U (en)

Similar Documents

Publication Publication Date Title
CN104060825B (en) Adjustable general stair template
CN103206074B (en) Elevator shaft template construction method, platform and support
Chilton Heinz Isler's Infinite Spectrum: Form‐Finding in Design
CN201169908Y (en) Inclined pull type suspension supporting rack
CN101624871A (en) Instrumental operation platform for shear wall formwork of elevator shaft
CN201695660U (en) Miniature multi-functional interior decoration scaffold
CN104372923B (en) Scaffolding
CN201517282U (en) Overhang scaffold
TWM330331U (en) Sleeve triangle staff for scaffold
CN205421644U (en) Building floor prefab that 3D printed
CN207228674U (en) Movable municipal administration open caisson ramp-type platform
CN207553449U (en) Floor and plate tendon protective layer thickness Comprehensive Control part
CN204174915U (en) Scaffold
CN203701320U (en) Locally-split frame of floor plate
CN104372922A (en) Scaffold
TWM435491U (en) Horizontal stopping and positioning device for concrete
CN207526076U (en) A kind of building scaffold easy to use
CN207513146U (en) Shear wall outrigger drawknot structure
CN201133072Y (en) Eagle frame casing tube triangular rack
CN205677228U (en) A kind of xoncrete structure hoistway scaffold
CN204531362U (en) Scaffold
CN203808242U (en) Quick combined house
CN210857972U (en) A can dismantle guardrail structure for scaffold
CN213805808U (en) Concrete structure component formwork device of encorbelmenting
CN204754162U (en) Can have enough to meet need construction, telescopic operation platform of protection integration

Legal Events

Date Code Title Description
MM4K Annulment or lapse of a utility model due to non-payment of fees