CN201517282U - Overhang scaffold - Google Patents

Overhang scaffold Download PDF

Info

Publication number
CN201517282U
CN201517282U CN2009201624740U CN200920162474U CN201517282U CN 201517282 U CN201517282 U CN 201517282U CN 2009201624740 U CN2009201624740 U CN 2009201624740U CN 200920162474 U CN200920162474 U CN 200920162474U CN 201517282 U CN201517282 U CN 201517282U
Authority
CN
China
Prior art keywords
channel
wire rope
section steel
steel
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201624740U
Other languages
Chinese (zh)
Inventor
叶香竹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009201624740U priority Critical patent/CN201517282U/en
Application granted granted Critical
Publication of CN201517282U publication Critical patent/CN201517282U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses an overhang scaffold, which is characterized in that a channel steel is fixed on a floor plate through an embedded reinforcing steel bar ring, gap between the embedded reinforcing steel bar ring and the channel steel is 2-3cm, a triangular wood block is knocked into the gap for fixation by the channel steel after the channel steel extends into the reinforcing steel bar ring, a cross bar is placed on the channel steel, a scaffold plate is arranged on the cross bar, a bearing upright rod is directly placed on the channel steel, the bottom of the upright rod is provided with a skirting board, a safety net is hung on the outer side of the bearing upright rod, the channel steel is suspended by a steel wire rope near the portion of the bearing upright rod, the upper side of the steel wire rope is fixed inside an embedded element of a concrete component, and unloaded is performed through pull force of the steel wire rope, and the tightening degree of the steel wire rope is adjusted by a skeleton cylinder button. The overhang scaffold has convenient construction and high operability.

Description

Builder's jack
Technical field
The utility model relates to builder's jack, is applicable to the realm of building construction.
Background technology
Than higher, for the higher area of groundwater table, the exterior wall of basement is provided with additional waterproofing layer to the console mode external scaffolding to foundation requirement, does not possess the condition of work of setting up the console mode external scaffolding when the construction superstructure.In this case, can adopt builder's jack, traditional overhanging component generally adopts channel-section steel.But when the top working load was big, the simple channel-section steel bearing capacity of encorbelmenting that relies on may not reach requirement, need improve traditional builder's jack, improves the supporting capacity of builder's jack.
The utility model content
The utility model provides a kind of builder's jack, solves the not high problem of traditional builder's jack bearing capacity, guarantees construction safety.
The structure that the utility model provides adopts the load mode that drawknot closes of choosing, and by the channel-section steel carrying of encorbelmenting, unloads by wire rope inclined-pulling on the other hand on the one hand.For the bar that baroclines, diagonal member does not have the strut stability problem, thereby chooses pull-up structure and have higher capacity as the load-carrying construction of external scaffolding of encorbelmenting.Channel-section steel is fixed on the floor by the embedded bar ring, and embedded bar ring and channel-section steel space are 2~3cm, and channel-section steel stretches into to be squeezed into the gap with the triangle wooden unit behind the reinforced steel bar ring and fix.Cross bar is shelved on the channel-section steel, and pin hand sheet is set on the cross bar.The load-bearing vertical rod directly is shelved on the channel-section steel, and the vertical rod bottom is provided with baseboard.Safety net hangs over the load-bearing vertical rod outside.Channel-section steel hangs with wire rope near the position is shelved in the load-bearing vertical rod and draws, and the wire rope upside is fixed in the concrete component in the built-in fitting, comes off-load by lineoutofservice signal pull.The tightness of wire rope is buckled by the gaily decorated basket and is regulated, and helps wire rope and the channel-section steel acting in conjunction of encorbelmenting.
The utility model easy construction, strong operability.
Description of drawings
Fig. 1 builder's jack schematic diagram
1, floor, 2, channel-section steel, 3 wire rope, 4, the gaily decorated basket buckles, 5, built-in fitting, 6, cross bar, 7, pin hand sheet, 8, baseboard, 9, safety net, 10, the load-bearing vertical rod, 11, the embedded bar ring
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described in detail.
Embodiment
Fig. 1 is the builder's jack schematic diagram.The utility model comprises channel-section steel 2, and wire rope 3, the gaily decorated basket buckle 4, built-in fitting 5, cross bar 6, pin hand sheet 7, baseboard 8, safety net 9, load-bearing vertical rod 10, embedded bar ring 11.
Channel-section steel 2 is fixed on the floor 1 by embedded bar ring 11, and embedded bar ring 11 is 2~3cm with channel-section steel 2 spaces, and channel-section steel 2 stretches into to be squeezed into the gap with the triangle wooden unit behind the reinforced steel bar ring and fix.Cross bar 6 is shelved on the channel-section steel 2, and pin hand sheet 7 is set on the cross bar 6, the operation of being convenient to plaster.Load-bearing vertical rod 10 directly is shelved on the channel-section steel 2, and vertical rod 10 bottoms are provided with baseboard 8, prevents that object falls on the pin hand sheet 7.Safety net 9 hangs over load-bearing vertical rod 10 outsides, avoids object to fall.Channel-section steel 2 hangs with wire rope 3 near the position is shelved in load-bearing vertical rod 10 and draws, and wire rope 3 upsides are fixed in the concrete component in the built-in fitting 5, come off-load by wire rope 3 pulling force, alleviate the load-bearing of the channel-section steel 2 of encorbelmenting.The tightness of wire rope is buckled 4 by the gaily decorated basket and is regulated.

Claims (1)

1. builder's jack, it is characterized in that channel-section steel is fixed on the floor by the embedded bar ring, embedded bar ring and channel-section steel space are 2~3cm, channel-section steel stretches into to be squeezed into the gap with the triangle wooden unit behind the reinforced steel bar ring and fixes, cross bar is shelved on the channel-section steel, pin hand sheet is set on the cross bar, the load-bearing vertical rod directly is shelved on the channel-section steel, the vertical rod bottom is provided with baseboard, safety net hangs over the load-bearing vertical rod outside, and channel-section steel hangs with wire rope near the position is shelved in the load-bearing vertical rod and draws, and the wire rope upside is fixed in the concrete component in the built-in fitting, come off-load by lineoutofservice signal pull, the tightness of wire rope is buckled by the gaily decorated basket and is regulated.
CN2009201624740U 2009-07-28 2009-07-28 Overhang scaffold Expired - Fee Related CN201517282U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201624740U CN201517282U (en) 2009-07-28 2009-07-28 Overhang scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201624740U CN201517282U (en) 2009-07-28 2009-07-28 Overhang scaffold

Publications (1)

Publication Number Publication Date
CN201517282U true CN201517282U (en) 2010-06-30

Family

ID=42498004

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201624740U Expired - Fee Related CN201517282U (en) 2009-07-28 2009-07-28 Overhang scaffold

Country Status (1)

Country Link
CN (1) CN201517282U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101906870A (en) * 2010-07-29 2010-12-08 正太集团有限公司 Suspended scaffolding
CN102444271A (en) * 2011-11-01 2012-05-09 中建三局建设工程股份有限公司 Suspended scaffolding with cast-in-place concrete structure
CN102777022A (en) * 2012-08-03 2012-11-14 汕头市建筑工程总公司 Postpositional double-steel-channel overhanging scaffold and construction method thereof
CN107473141A (en) * 2016-12-02 2017-12-15 李汉威 A kind of portable high-altitude safe job platform
CN111207872A (en) * 2020-03-12 2020-05-29 淮安市博彦土木工程科学研究院有限公司 Stress monitoring system of overhanging steel wire rope/pull rod system of overhanging scaffold

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101906870A (en) * 2010-07-29 2010-12-08 正太集团有限公司 Suspended scaffolding
CN102444271A (en) * 2011-11-01 2012-05-09 中建三局建设工程股份有限公司 Suspended scaffolding with cast-in-place concrete structure
CN102444271B (en) * 2011-11-01 2015-12-09 中建三局建设工程股份有限公司 Suspended scaffolding
CN102777022A (en) * 2012-08-03 2012-11-14 汕头市建筑工程总公司 Postpositional double-steel-channel overhanging scaffold and construction method thereof
CN107473141A (en) * 2016-12-02 2017-12-15 李汉威 A kind of portable high-altitude safe job platform
CN111207872A (en) * 2020-03-12 2020-05-29 淮安市博彦土木工程科学研究院有限公司 Stress monitoring system of overhanging steel wire rope/pull rod system of overhanging scaffold

Similar Documents

Publication Publication Date Title
CN201517282U (en) Overhang scaffold
CN201169908Y (en) Inclined pull type suspension supporting rack
CN202731104U (en) Novel reinforcing mesh sheet support structure
CN202577925U (en) Lifting type platform in elevator shaft
CN110397259A (en) A kind of hanging basket crossbeam end fixing method
CN202882376U (en) Elevator shaft template support platform
CN201169907Y (en) Inclined strut type suspension supporting rack
CN205224017U (en) Device is prevented floating by bored concrete pile steel reinforcement cage
CN204662488U (en) The bracing members of the basic part of encorbelmenting of a kind of construction elevator
CN206769351U (en) A kind of regularization hoistway operation platform hoisting frame
CN201802059U (en) Overhanging down-stayed scaffold
CN201526152U (en) Small-angle oblique scaffold cantilevered to external wall
CN201778496U (en) Integrated wallboard hoisting structure
CN101435263A (en) Protection rack special for building main body construction
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN206971807U (en) A kind of great-leap-forward shaped steel and the combining structure that returns back to top
CN203008342U (en) Light inclined-pulling type scaffold
CN201883695U (en) Spherical net rack vertical jacking equipment
CN204510768U (en) A kind of without support operation frame
CN202064621U (en) Conventionalized operation platform for construction of elevator shaft
CN201495788U (en) Safety protecting net system
CN105569326A (en) Handling frame without support and exterior wall construction method thereof
CN205875410U (en) A hang module system all for tube structure room panel construction
CN109386125A (en) Attached wall structure for PC component exterior wall crane
CN203160662U (en) Lifting operation frame of elevator shaft structural construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100630

Termination date: 20110728