CN203160662U - Lifting operation frame of elevator shaft structural construction - Google Patents
Lifting operation frame of elevator shaft structural construction Download PDFInfo
- Publication number
- CN203160662U CN203160662U CN 201320125699 CN201320125699U CN203160662U CN 203160662 U CN203160662 U CN 203160662U CN 201320125699 CN201320125699 CN 201320125699 CN 201320125699 U CN201320125699 U CN 201320125699U CN 203160662 U CN203160662 U CN 203160662U
- Authority
- CN
- China
- Prior art keywords
- frame
- lifting operation
- operation frame
- elevator shaft
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
The utility model discloses a lifting operation frame of an elevator shaft structural construction, and relates to the technical field of constructing working platforms in elevator shafts of high-rise buildings. At least two layers of operating platform frames are arranged in a main frame body, and the lower end of the main frame body is fixedly connected with an inclined supporting frame. By the adoption of the lifting operation frame, many frames and pipes do not need to be installed in an erected mode from bottom to top for supporting, and holes do not need to be reserved in a shear wall for the installation of formwork steel tube frames. The lifting operation frame is simple in structure, and convenient to manufacture and use. The lifting operation frame is used for constructing, project template construction quality and safety are guaranteed, time of setting up frame bodies is reduced, a large number of frame and pipe materials can be saved, and construction cost can be reduced.
Description
Technical field
The utility model relates to the technical field of building of job platform in the elevator shaft in architectural engineering construction technique field, particularly highrise building.
Background technology
Because hoistway space is narrow and small and highly big, when construction, adopts full hall to set up the frame pipe from the bottom to top and support, or reserve the job practices that the formwork steel pipe frame is set up at the hole at shear wall.
When construction, adopting full hall to set up the support of frame pipe from the bottom to top, need to consume more steel pipe, also can to consume more labour and duty cycle when removing long setting up, this way not only can increase the construction cost while and also exist certain potential safety hazard; Can stay a lot of reservation holes and adopt shear wall to reserve at shear wall when the formwork steel pipe frame is set up at the hole, this not only can weaken the holding capacity of shear wall but also can make the surface of shear wall not attractive in appearance.
Summary of the invention
The utility model purpose is to propose a kind of convenient construction, can overcome the lifting handling frame of the elevator shaft structure construction of above defective.
The utility model comprises the body frame body, and two-layer at least operating platform frame, the fixedly connected oblique bracing frame in the lower end of body frame body are set in the body frame body.
In the construction of lift well process, by boom hoisting the utility model is mentioned, by oblique bracing frame the utility model stably is placed on constructed lower floor's platform and the lower floor's elevator shaft sidewall, the constructor then can stand on each operating platform frame the upper strata elevator shaft is constructed.After this upper strata construction of lift well finishes, the constructor leaves the utility model, by boom hoisting the utility model is mentioned again again, by oblique bracing frame the utility model stably is placed on this constructed upper platform and the upper strata elevator shaft sidewall then, the constructor then can continue the elevator shaft of last layer is more constructed.With this cycle operation, finish until the whole constructions of this elevator shaft.
Adopt the utility model to need not full hall and set up the support of frame pipe from the bottom to top, also need not to reserve the hole at shear wall and set up the formwork steel pipe frame, the utility model is simple in structure, the convenient making, convenient use.Adopt the utility model to construct, both guaranteed the engineering template construction quality, ensure safety, reduce support body and set up the time, can also save the consumption of a large amount of frame tube materials, reduce construction cost.
Description of drawings
Fig. 1 is a kind of structural representation of the present utility model.
The specific embodiment
As shown in Figure 1, body frame body 1 of the present utility model is made up of four vertical main steel pipes of arranging, is divided into three layers by 12 horizontal steel tubes on body frame body 1, and four every layer, form the two-layer operating platform frame 2 in upper, middle and lower, 3,4, each steel pipe is welded to each other firmly.Be welded into the right oblique bracing frame 5 of triangle that is formed by three steel pipes respectively in body frame body 1 lower end, form rational triangle stress system.
Claims (1)
1. the lifting handling frame of elevator shaft structure construction comprises the body frame body, and two-layer at least operating platform frame, the fixedly connected oblique bracing frame in the lower end of body frame body are set in the body frame body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320125699 CN203160662U (en) | 2013-03-20 | 2013-03-20 | Lifting operation frame of elevator shaft structural construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320125699 CN203160662U (en) | 2013-03-20 | 2013-03-20 | Lifting operation frame of elevator shaft structural construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203160662U true CN203160662U (en) | 2013-08-28 |
Family
ID=49021857
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320125699 Expired - Fee Related CN203160662U (en) | 2013-03-20 | 2013-03-20 | Lifting operation frame of elevator shaft structural construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203160662U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103174284A (en) * | 2013-03-20 | 2013-06-26 | 江苏扬州建工建设集团有限公司 | Lifting handling frame of construction of elevator shaft structure |
-
2013
- 2013-03-20 CN CN 201320125699 patent/CN203160662U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103174284A (en) * | 2013-03-20 | 2013-06-26 | 江苏扬州建工建设集团有限公司 | Lifting handling frame of construction of elevator shaft structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106065661A (en) | Large span unsettled steel corridor construction engineering method | |
CN101413341B (en) | Elevator well internal formwork construction method and elevator well internal formwork construction support | |
CN105201195A (en) | Liftable supporting leg type elevator shaft construction platform and method | |
CN103206074A (en) | Elevator shaft template construction method, platform and support | |
CN204781927U (en) | Elevartor shaft formwork and elevartor shaft concrete placement operation platform | |
CN202370234U (en) | Tool type elevator hoistway construction platform | |
CN103122691A (en) | Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method | |
CN102561689B (en) | Construction method for cantilever lifting scaffold | |
CN102966240B (en) | Construction method for high-altitude reinforced concrete outer cantilevered structure | |
CN102888894A (en) | Structure and construction method for steel frame building with inner cylinder, outer frame and shape like Chinese character 'hui' | |
CN202483154U (en) | High bearing capacity suspending scaffold | |
CN202882376U (en) | Elevator shaft template support platform | |
CN203160662U (en) | Lifting operation frame of elevator shaft structural construction | |
CN202731276U (en) | Independent discharge platform capable of synchronously lifting with external lifting scaffold | |
CN204252083U (en) | Arch dam bracket hangs plate device by the feet entirely | |
CN204456816U (en) | One can promote supporting leg type elevator hoistway construction platform | |
CN206769351U (en) | A kind of regularization hoistway operation platform hoisting frame | |
CN203755173U (en) | Formwork device used for hydraulic climbing of bridge high pier | |
CN203320922U (en) | Supporting device for forming of elevator shaft template | |
CN212743356U (en) | Reverse construction method hangs mould system | |
CN204456813U (en) | A kind of single support operation platform for elevator hoistways | |
CN202787956U (en) | Multifunctional outer wall large panel | |
CN204754150U (en) | Dish -type node formula scaffold | |
CN103352579A (en) | Reinforcement and reconstruction masonry structure using externally-added gallery bridge and externally-added elevator and construction method | |
CN103174284A (en) | Lifting handling frame of construction of elevator shaft structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130828 Termination date: 20160320 |
|
CF01 | Termination of patent right due to non-payment of annual fee |