TWI745151B - Solar panel installation and construction platform construction method - Google Patents

Solar panel installation and construction platform construction method Download PDF

Info

Publication number
TWI745151B
TWI745151B TW109138083A TW109138083A TWI745151B TW I745151 B TWI745151 B TW I745151B TW 109138083 A TW109138083 A TW 109138083A TW 109138083 A TW109138083 A TW 109138083A TW I745151 B TWI745151 B TW I745151B
Authority
TW
Taiwan
Prior art keywords
construction
platform
solar panel
solar panels
unit
Prior art date
Application number
TW109138083A
Other languages
Chinese (zh)
Other versions
TW202220368A (en
Inventor
林宏逸
Original Assignee
林宏逸
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 林宏逸 filed Critical 林宏逸
Priority to TW109138083A priority Critical patent/TWI745151B/en
Application granted granted Critical
Publication of TWI745151B publication Critical patent/TWI745151B/en
Publication of TW202220368A publication Critical patent/TW202220368A/en

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Photovoltaic Devices (AREA)

Abstract

本發明是提供一種太陽能板安裝施工平台工法,主要係藉由固定單元使該承架緊固於該支撐柱,再於各該承架頂端之該承面位置多單位式橫跨式舖排複數活動式施工拼塊,以共構成一施工平台形態,該多單位活動式施工拼塊可快速活動位移至另一施工區域作太陽能板施工安裝,並可因應較佳的施工高度調整承架及該平台的高低位置,該多單位式橫跨式舖排複數活動式施工拼塊可站立多人共同施工使用,以增進施工效率之實用進步性者。The present invention provides a construction method for solar panel installation and construction platform, which is mainly to fasten the supporting frame to the supporting column by a fixing unit, and then arrange multiple activities in a multi-unit cross-spanning manner at the bearing surface position at the top of each supporting frame The multi-unit movable construction block can be quickly moved to another construction area for solar panel construction and installation, and the support frame and the platform can be adjusted to a better construction height. In the high and low positions, the multi-unit horizontal lay-up of multiple movable construction blocks can be used by multiple people standing together to improve the practicality of construction efficiency.

Description

太陽能板安裝施工平台工法Solar panel installation and construction platform construction method

本發明是有關一種太陽能板安裝施工平台工法,尤其是一種以多單位活動式施工拼塊共構成一施工平台,該多單位活動式施工拼塊可快速活動位移至另一施工區域作太陽能板施工安裝,以增進施工效率之創新發明。 The invention relates to a solar panel installation construction platform construction method, in particular to a construction platform composed of multi-unit movable construction blocks, which can be quickly moved and moved to another construction area for solar panel construction Installation is an innovative invention to improve construction efficiency.

按,請參閱第1圖所示,以往太陽能板B施工人員在大面積的施工區域中,尤其是在戶外具有多支撐柱所架設的太陽能板B高度較高,有些支撐柱是立設於土地上,有些支撐柱係立設於水面上,當安裝太陽能板B時,施工人員需藉由一昇降載具A配合一提供施工人員站立的昇降架A1來作太陽能板B的安裝施工,然而習知的太陽能板B施工方式僅能一次站立1~2人進行安裝,如在大面積的施工區域下容易因效率不彰,而增加許多不必要的施工時間成本。 Press, please refer to Figure 1. In the past, solar panel B construction workers used multiple support columns to erect solar panels B in large construction areas, especially outdoors. The height of solar panels B was higher, and some support columns were erected on the ground. Some support columns are erected on the water surface. When installing solar panel B, the construction personnel need to install solar panel B by using a lifting carrier A and a lifting frame A1 for the construction personnel to stand on. The known construction method of solar panel B can only be installed by 1 to 2 people at a time. For example, in a large construction area, it is easy to be inefficient and increase a lot of unnecessary construction time and cost.

即,本發明之主要目的,是在提供一種太陽能板安裝施工平台工法;其所欲解決之問題點,是針對習知的太陽能板施工方式僅能一次站立1~2人進行安裝,如在大面積的施工區域下容易因效率不彰,而增加許多不必要的施工時間成本問題點加以改良突破;而其解決問題之技術特點,主要係包含步驟一:首先製備複數呈矩陣排列之支撐柱,其中該複數支撐柱之排列界定形成複數施工區域;步驟二:令各該支撐柱之一側藉由複數固定單元之一固定架固定複數承架,各該承架為橫置狀,並互呈相同水平高度;步驟三:令其中一施工區域所對位該複數承架 位置,橫跨舖排多單位活動式施工拼塊,其中該多單位係界定為多個單一組活動式施工拼塊,俾使共構成一施工平台形態,該多單位活動式施工拼塊可供施工人員站立施工,藉由施工使各該支撐柱頂端架設複數成列共構的基座,並使各該基座頂端舖排架設複數太陽能板,其中該複數太陽能板之裝設型式係界定為地面型棚架方式架設,且該複數太陽能板的型式係分別界定為300W~330W的高效單晶矽太陽能板;步驟四:令所完成架設複數太陽能板之施工區域所對位的多單位活動式施工拼塊所共構的施工平台,換位至相鄰所預備架設複數太陽能板的施工區域;藉此,本發明藉由固定單元使該承架緊固於該支撐柱,再於各該承架頂端位置多單位式橫跨式舖排多單位活動式施工拼塊,以共構成一施工平台形態,該多單位活動式施工拼塊可快速活動位移至另一施工區域作太陽能板施工安裝,並可因應較佳的施工高度調整承架及該平台的高低位置,且該多單位式橫跨式舖排複數活動式施工拼塊可站立多人共同施工使用,以增進施工效率之實用進步性。 That is, the main purpose of the present invention is to provide a solar panel installation construction platform construction method; the problem to be solved is that the conventional solar panel construction method can only be installed by 1 to 2 people at a time, such as in a large Under the construction area of a large area, it is easy to increase many unnecessary construction time and cost problems for improvement and breakthrough due to inefficiency; and its technical features to solve the problem mainly include step one: first prepare a plurality of support columns arranged in a matrix. The arrangement of the plurality of supporting columns defines a plurality of construction areas; Step 2: Make one side of each of the supporting columns fix the plurality of supporting frames by a fixing frame of the plurality of fixing units, and the supporting frames are horizontally arranged and mutually facing each other Same level; Step 3: Make one of the construction areas align with the plurality of supports Location, across the arrangement of multi-unit movable construction blocks, where the multi-unit system is defined as a single group of movable construction blocks, so as to form a construction platform form, the multi-unit movable construction blocks are available for construction Personnel standing construction. Through construction, a plurality of co-constructed bases are erected on the top of each support column, and a plurality of solar panels are laid on the top of each base. The installation type of the plurality of solar panels is defined as ground type. It is erected in a scaffolding method, and the type of the plural solar panels is defined as 300W~330W high-efficiency monocrystalline silicon solar panels; Step 4: Make the completed multi-unit movable construction assembly in the opposite position of the construction area where the plural solar panels are erected The construction platform co-constructed by the blocks is transposed to the adjacent construction area where the plurality of solar panels are to be erected; thereby, the present invention uses the fixing unit to fasten the supporting frame to the supporting column, and then to the top of each supporting frame The multi-unit movable construction blocks are laid out across multiple units to form a construction platform. The multi-unit movable construction blocks can be quickly moved to another construction area for solar panel construction and installation, and can be adapted accordingly. It is better to adjust the construction height of the supporting frame and the height of the platform, and the multi-unit cross-spanning multiple movable construction blocks can be standing and used by multiple people to jointly construct, so as to improve the practical progress of construction efficiency.

習知部份: Learning part:

A:昇降載具 A: Lifting vehicle

A1:昇降架 A1: Lifting frame

B:太陽能板 B: Solar panel

本發明部份: Part of the invention:

10:固定單元 10: fixed unit

11:固定架 11: fixed frame

12:承架 12: Shelf

121:穿孔 121: Piercing

13:迫緊墊片 13: Tighten the gasket

14:螺帽 14: Nut

20:支撐柱 20: Support column

21:水泥立柱區段 21: Cement column section

22:金屬立柱區段 22: Metal column section

30:活動式施工拼塊 30: Movable construction blocks

31:框座 31: Frame seat

32:網部 32: Net Department

40:太陽能板 40: Solar Panel

41:基座 41: Pedestal

D1:第一施工區域 D1: The first construction area

D2:第二施工區域 D2: The second construction area

第1圖:是習知太陽能板安裝施工之示意圖。 Figure 1: A schematic diagram of the installation and construction of conventional solar panels.

第2圖:是本發明太陽能板安裝施工平台工法之第一施工區域施工正面示體圖。 Figure 2: is a front view of the construction of the first construction area of the solar panel installation construction platform construction method of the present invention.

第3圖:是本發明太陽能板安裝施工平台工法之第一施工區域施工俯視示意圖。 Figure 3 is a top view schematic diagram of the construction of the first construction area of the solar panel installation construction platform construction method of the present invention.

第4圖:是本發明太陽能板安裝施工平台工法之第二施工區域施工正面示體圖。 Figure 4: is a front view of the construction of the second construction area of the solar panel installation construction platform construction method of the present invention.

第5圖:是本發明太陽能板安裝施工平台工法之第二施工區域施工俯視示意圖。 Figure 5: is a schematic top view of the construction of the second construction area of the solar panel installation construction platform construction method of the present invention.

為使 貴審查委員對本發明有進一步之深入了解,茲列舉一較佳實施例,並配合圖式說明如后:請參閱第2~5圖所示,本發明之太陽能板安裝施工平台工法,其步驟包含:步驟一:首先製備複數呈矩陣排列之支撐柱20,其中該複數支撐柱20之排列界定形成複數施工區域,於本實施例係包含有一第一施工區域D1及一第二施工區域D2;其中該支撐柱20包含有一位設於底端的水泥立柱區段21,及一位設於該水泥立柱區段21頂端的金屬立柱區段22;步驟二:令各該支撐柱20之一側藉由複數固定單元10之一固定架11固定複數承架12,各該承架12為橫置狀,並互呈相同水平高度;其中該固定單元10之該承架12對應該固定架11位置設有穿孔121,令該固定架11穿伸於該穿孔121後,再進一步套固連結一迫緊墊片13後再螺設固定一螺帽14,俾使該承架12緊固於該支撐柱20;步驟三:令其中一施工區域所對位該複數承架12位置,橫跨舖排多單位活動式施工拼塊30,其中該多單位係界定為多個單一組活動式施工拼塊30,俾使共構成一施工平台形態,該多單位活動式施工拼塊30可供施工人員站立施工,藉由施工使各該支撐柱20頂端架設複數成列共構的基座41,並使各該基座41頂端舖排架設複數太陽能板40;其中該活動式施工拼塊30包含一設於外圍的框座31,及一設於框座內部的網部32,以減輕重量便利於活動位移換位作業;其中該複數太陽能板40之裝設型式係界定為地面型棚架方式架設,且該複數太陽能板40的型式係分別界定為300W~330W的高效單晶矽太陽能板; 步驟四:令所完成架設複數太陽能板40之施工區域所對位的多單位活動式施工拼塊30所共構的施工平台,換位至相鄰所預備架設複數太陽能板40的施工區域。 In order to enable your reviewer to have a further in-depth understanding of the present invention, a preferred embodiment is listed, and the accompanying drawings are described as follows: Please refer to Figures 2 to 5 for the solar panel installation construction platform construction method of the present invention. The steps include: Step 1: First prepare a plurality of support columns 20 arranged in a matrix, wherein the arrangement of the plurality of support columns 20 defines a plurality of construction areas. In this embodiment, it includes a first construction area D1 and a second construction area D2 ; Wherein the support column 20 includes a cement column section 21 located at the bottom, and a metal column section 22 located at the top of the cement column section 21; Step 2: Make each of the support columns 20 one side A plurality of brackets 12 are fixed by a fixing frame 11 of a plurality of fixing units 10, and the brackets 12 are horizontally arranged and have the same horizontal height; wherein the bracket 12 of the fixing unit 10 corresponds to the position of the fixing frame 11 A perforation 121 is provided to allow the fixing frame 11 to extend through the perforation 121, and then a tightening washer 13 is further fitted and fixed, and then a nut 14 is screwed and fixed so that the support frame 12 is fastened to the support column 20; Step 3: Make one of the construction areas align with the position of the plurality of supporting frames 12 across the arrangement of multi-unit movable construction blocks 30, where the multi-unit system is defined as a single group of movable construction blocks 30, In order to form a construction platform form, the multi-unit movable construction blocks 30 can be used for standing construction by construction personnel. Through construction, a plurality of co-structured bases 41 are erected on the top of each support column 20, and each of the A plurality of solar panels 40 are arranged on the top of the base 41; the movable construction block 30 includes a frame base 31 provided on the periphery and a net portion 32 provided inside the frame base to reduce weight and facilitate movable displacement. Operation; where the installation type of the plurality of solar panels 40 is defined as ground-type scaffolding, and the type of the plurality of solar panels 40 is defined as 300W~330W high-efficiency monocrystalline silicon solar panels; Step 4: Make the construction platform co-constructed by the multi-unit movable construction blocks 30 opposite to the construction area where the multiple solar panels 40 are erected to be transposed to the adjacent construction area where the multiple solar panels 40 are to be erected.

請參閱第2~3圖所示,當複數活動式施工拼塊30以多單位橫跨式舖排於對應第一施工區域D1的各該承架12頂端位置,即共構成一施工平台形態,安裝太陽能板40的施工人員可為8~15人以上在多單位的活動式施工拼塊30所共構的施工平台上站立,並快速完成第一施工區域D1所對應的太陽能板40架設安裝;請參閱第4~5圖所示,當第一施工區域D1所對應的太陽能板40安裝完成後,施工人員需離開多單位的活動式施工拼塊30所共構的施工平台,並將多單位的活動式施工拼塊30所共構的施工平台以滑動位移方式橫跨於第二施工區域D2所對應的承架12上,因活動式施工拼塊30外觀於本實施例係呈長矩形狀,以使各該活動式施工拼塊30在活動滑移時,可於相鄰側邊如同導軌形態滑動移出,並橫跨至對向的第二施工區域D2所配置的承架12上,以進行平台換位動作,待完成平台換位後,施工人員即可站立定位在平台上快速完成第二施工區域D2所對應的太陽能板40架設安裝。 Please refer to Figures 2 to 3, when the multiple movable construction blocks 30 are laid across in multiple units at the top positions of the supporting frames 12 corresponding to the first construction area D1, a construction platform form is formed. The construction personnel of the solar panel 40 can stand on the construction platform co-constructed by the 30 multi-unit movable construction blocks for 8-15 people, and quickly complete the erection and installation of the solar panel 40 corresponding to the first construction area D1; please As shown in Figures 4 to 5, when the solar panel 40 corresponding to the first construction area D1 is installed, the construction personnel need to leave the multi-unit movable construction block 30 co-construction platform, and place the multi-unit The construction platform co-constructed by the movable construction block 30 crosses the supporting frame 12 corresponding to the second construction area D2 in a sliding displacement manner. Because the movable construction block 30 has a long rectangular shape in this embodiment, it is When moving and sliding, each movable construction block 30 can be slid out on the adjacent side like a guide rail, and crossed to the supporting frame 12 arranged in the opposite second construction area D2 for platform The transposition action, after the platform transposition is completed, the construction personnel can stand and position on the platform to quickly complete the erection and installation of the solar panel 40 corresponding to the second construction area D2.

藉此,本發明藉由固定單元10使該承架12緊固於該支撐柱20,再於各該承架12頂端之該承面121位置多單位式橫跨式舖排複數活動式施工拼塊30,以拼接共構成一施工平台,該施工平台可快速活動位移至另一施工區域作太陽能板40施工安裝,並可因應較佳的施工高度調整承架12及該平台的高低位置,且該多單位式橫跨式舖排複數活動式施工拼塊30所共構的施工平台並可站立多人共同施工使用,以增進施工效率之實用進步性。 Therefore, in the present invention, the supporting frame 12 is fastened to the supporting column 20 by the fixing unit 10, and then multiple movable construction blocks are laid out at the position of the supporting surface 121 at the top of each of the supporting frames 12 in a multi-unit type. 30. A construction platform is formed by splicing. The construction platform can be quickly moved to another construction area for solar panel 40 construction and installation. The support frame 12 and the height position of the platform can be adjusted according to a better construction height. Multi-unit cross-spanning arrangement of multiple movable construction blocks 30 co-constructed construction platforms, which can be used by standing multiple people to construct together, in order to improve the practicality of construction efficiency.

據此,本發明實為一深具實用性及進步性之發明,然未見有相同之產品及刊物公開,從而允符發明專利申請要件,爰依法提出申請。 According to this, the present invention is indeed a highly practical and progressive invention, but no identical products and publications have been disclosed, so that the requirements of an invention patent application are met, and an application is filed in accordance with the law.

10:固定單元 10: fixed unit

11:固定架 11: fixed frame

12:承架 12: Shelf

121:穿孔 121: Piercing

13:迫緊墊片 13: Tighten the gasket

14:螺帽 14: Nut

20:支撐柱 20: Support column

21:水泥立柱區段 21: Cement column section

22:金屬立柱區段 22: Metal column section

30:活動式施工拼塊 30: Movable construction blocks

40:太陽能板 40: Solar Panel

41:基座 41: Pedestal

D1:第一施工區域 D1: The first construction area

D2:第二施工區域 D2: The second construction area

Claims (4)

一種太陽能板安裝施工平台工法,其步驟包含:步驟一:首先製備複數呈矩陣排列之支撐柱,其中該複數支撐柱之排列界定形成複數施工區域;步驟二:令各該支撐柱之一側藉由複數固定單元之一固定架固定複數承架,各該承架為橫置狀,並互呈相同水平高度;步驟三:令其中一施工區域所對位該複數承架位置,橫跨舖排多單位活動式施工拼塊,其中該多單位係界定為多個單一組活動式施工拼塊,俾使共構成一施工平台形態,該多單位活動式施工拼塊可供施工人員站立施工,藉由施工使各該支撐柱頂端架設複數成列共構的基座,並使各該基座頂端舖排架設複數太陽能板,其中該複數太陽能板之裝設型式係界定為地面型棚架方式架設,且該複數太陽能板的型式係分別界定為300W~330W的高效單晶矽太陽能板;步驟四:令所完成架設複數太陽能板之施工區域所對位的多單位活動式施工拼塊所共構的施工平台,換位至相鄰所預備架設複數太陽能板的施工區域。 A solar panel installation construction platform construction method, which includes the steps: Step 1: First prepare a plurality of support columns arranged in a matrix, wherein the arrangement of the plurality of support columns defines a complex construction area; Step 2: Make one side of each support column borrow Fix the multiple supports by one of the multiple fixing units, each of the supports is horizontal and has the same level of each other; Step 3: Make the position of the multiple supports in one of the construction areas to be aligned across multiple rows Unit movable construction blocks, where the multi-unit system is defined as multiple single groups of movable construction blocks, so as to form a construction platform form. The multi-unit movable construction blocks can be used for standing construction by construction personnel. During construction, a plurality of co-constructed bases are erected on the top of each support column, and a plurality of solar panels are arranged on the top of each base, and the installation type of the plurality of solar panels is defined as ground-type scaffolding, and The types of the plural solar panels are respectively defined as 300W~330W high-efficiency monocrystalline silicon solar panels; Step 4: Make the completed construction of the multi-unit movable construction blocks opposite to the construction area where the plural solar panels are erected The platform is transposed to the adjacent construction area where multiple solar panels are prepared to be erected. 如請求項1所述之太陽能板安裝施工平台工法,其中該支撐柱包含有一位設於底端的水泥立柱區段,及一位設於該水泥立柱區段頂端的金屬立柱區段。 The solar panel installation construction platform construction method of claim 1, wherein the support column includes a cement column section at the bottom end and a metal column section at the top of the cement column section. 如請求項1所述之太陽能板安裝施工平台工法,其中該固定單元之該承架對應該固定架位置設有穿孔,令該固定架穿伸於該穿孔後,再進一步套固連結一迫緊墊片後再螺設固定一螺帽,俾使該承架緊固於該支撐柱。 The solar panel installation construction platform construction method of claim 1, wherein the supporting frame of the fixing unit is provided with a perforation at a position corresponding to the fixing frame, so that the fixing frame is extended through the perforation, and then a compression pad is further fixed and fixed A nut is screwed and fixed after the sheet, so that the support frame is fastened to the support column. 如請求項1所述之太陽能板安裝施工平台工法,其中該活動式施工拼塊包含一設於外圍的框座,及一設於框座內部的網部。 The solar panel installation construction platform construction method of claim 1, wherein the movable construction block includes a frame base set on the periphery and a net part set inside the frame base.
TW109138083A 2020-11-02 2020-11-02 Solar panel installation and construction platform construction method TWI745151B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW109138083A TWI745151B (en) 2020-11-02 2020-11-02 Solar panel installation and construction platform construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW109138083A TWI745151B (en) 2020-11-02 2020-11-02 Solar panel installation and construction platform construction method

Publications (2)

Publication Number Publication Date
TWI745151B true TWI745151B (en) 2021-11-01
TW202220368A TW202220368A (en) 2022-05-16

Family

ID=79907312

Family Applications (1)

Application Number Title Priority Date Filing Date
TW109138083A TWI745151B (en) 2020-11-02 2020-11-02 Solar panel installation and construction platform construction method

Country Status (1)

Country Link
TW (1) TWI745151B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150372636A1 (en) * 2013-02-05 2015-12-24 Etienne Menard Tracking Photovoltaic Solar System, and Methods for Installing or for Using Such Tracking Photovoltaic Solar System
CN105656406A (en) * 2014-11-10 2016-06-08 西安银河网电智能电气有限公司 Adjustable support for solar photovoltaic panels
CN107453689A (en) * 2016-05-10 2017-12-08 宿州诺亚坚舟光伏科技有限公司 A kind of modularization floatation type photovoltaic array
US20180367090A1 (en) * 2017-06-20 2018-12-20 Watershed Solar LLC Integrated photovoltaic module mounting system for installation on a sloped surface
TW201900998A (en) * 2017-05-26 2019-01-01 日商愛優太陽能股份有限公司 Solar cell panel support bracket, solar cell panel installation structure and installation method thereof
CN209462337U (en) * 2018-12-17 2019-10-01 广州发展集团股份有限公司 Photovoltaic devices
CN209562466U (en) * 2019-01-18 2019-10-29 泰州隆基乐叶光伏科技有限公司 A kind of photovoltaic module installation system
JP6698331B2 (en) * 2015-12-14 2020-05-27 アルファブロス株式会社 Solar panel mount
TWM608122U (en) * 2020-11-02 2021-02-21 林宏逸 Solar panel installation and construction platform structure

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150372636A1 (en) * 2013-02-05 2015-12-24 Etienne Menard Tracking Photovoltaic Solar System, and Methods for Installing or for Using Such Tracking Photovoltaic Solar System
CN105656406A (en) * 2014-11-10 2016-06-08 西安银河网电智能电气有限公司 Adjustable support for solar photovoltaic panels
JP6698331B2 (en) * 2015-12-14 2020-05-27 アルファブロス株式会社 Solar panel mount
CN107453689A (en) * 2016-05-10 2017-12-08 宿州诺亚坚舟光伏科技有限公司 A kind of modularization floatation type photovoltaic array
TW201900998A (en) * 2017-05-26 2019-01-01 日商愛優太陽能股份有限公司 Solar cell panel support bracket, solar cell panel installation structure and installation method thereof
US20180367090A1 (en) * 2017-06-20 2018-12-20 Watershed Solar LLC Integrated photovoltaic module mounting system for installation on a sloped surface
CN111357192A (en) * 2017-06-20 2020-06-30 分水岭太阳能有限责任公司 Integrated solar photovoltaic module mounting system
CN209462337U (en) * 2018-12-17 2019-10-01 广州发展集团股份有限公司 Photovoltaic devices
CN209562466U (en) * 2019-01-18 2019-10-29 泰州隆基乐叶光伏科技有限公司 A kind of photovoltaic module installation system
TWM608122U (en) * 2020-11-02 2021-02-21 林宏逸 Solar panel installation and construction platform structure

Also Published As

Publication number Publication date
TW202220368A (en) 2022-05-16

Similar Documents

Publication Publication Date Title
US20050115176A1 (en) Apparatus and method for mounting photovoltaic power generating systems on buildings
CN107009785A (en) A kind of Art Design multifunctional drawing equipment
TWI745151B (en) Solar panel installation and construction platform construction method
CN206164450U (en) Adjustable photovoltaic support rack
TWM608122U (en) Solar panel installation and construction platform structure
CN107447863B (en) Cantilever structure for steel structure factory building
CN217183215U (en) Photovoltaic support convenient to disassemble
CN207098996U (en) A kind of photovoltaic bracket
CN216553951U (en) Combined variable-size U-shaped steel frame for supporting roadway
CN202415081U (en) Automatic lifting device for color steel coil
JP3195460U (en) Solar panel support structure
CN206035972U (en) Press -fitting equipment
US3010234A (en) Supported vertical display panels
CN210825274U (en) Weather radar overhauls circulation jacking device
KR100928435B1 (en) Solar storehouse module fixation style deferment unit
CN210115636U (en) Elevator segmentation steel construction welding frock
CN209991101U (en) Simple cabinet base for outdoor construction and installation
JP3204348U (en) Solar power panel
CN109743005A (en) The installation method of photovoltaic bracket
CN221911761U (en) Footing installation jig
CN218375375U (en) Whole jacking device of rack suitable for different load requirements
CN219060931U (en) Curved-surface net rack jacking system capable of avoiding horizontal deviation
CN215091617U (en) Welding fixture for main framework of canopy of bus shelter
CN220271002U (en) Solar photovoltaic system bracket type inspection loading counterforce device
CN215318234U (en) Steel pipe positioning tool