TWI656351B - Ship power system loss estimation system - Google Patents
Ship power system loss estimation system Download PDFInfo
- Publication number
- TWI656351B TWI656351B TW106132918A TW106132918A TWI656351B TW I656351 B TWI656351 B TW I656351B TW 106132918 A TW106132918 A TW 106132918A TW 106132918 A TW106132918 A TW 106132918A TW I656351 B TWI656351 B TW I656351B
- Authority
- TW
- Taiwan
- Prior art keywords
- power
- data
- feeder
- ship
- transformer
- Prior art date
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本發明創作係關於一種船舶電力系統損失估計系統,其估算電力損失之主要部分係透過將船舶負載之總用電量假設平均分配至各配線,再進行電力潮流之運算,藉此得知各饋線之電力損失,接著再配合變壓器相關參數估算出變壓器之電力損失,透過此二種電力損失之加總,即可得之電力系統之整體電力損失,以令工程師輸入所需之參數,便可得知整體電力系統之電力損失,以做為規劃、設計、及管理船舶電力系統之參考。
Description
本發明創作係關於一種估算系統,尤指一種船舶電力系統損失估計系統。
按,船舶電力系統為獨立系統,大型負載用電容量佔發電量甚大比例且配合航行作業需要,負載變動頻繁,故,系統結構較脆弱,也因此,須透過妥善的供電規劃來減少負載的變動對系統的衝擊,提供負載穩定可靠的電力,即使發生故障,也能因斷路器保護協調的機制,縮小停電範圍,使航行作業不受影響。爰此,在新船電力系統設計時,會透過負載分析來決定主發電站的容量、及發電機組的數量。 而上述發電站的容量大小,係取決於饋線損失量、負載總用電量、變壓器損失量,而上述決定發電站容量大小之參數,僅有該負載總用電量較容易使用偵測儀器得知,其餘需使用其他方式來推知,例如,有人提出一套力用ANN法結合解析法及類神經網路模型的方法來考慮負載變動性,進而估算配電系統損失(即該饋線損失量、該變壓器損失量),儘管ANN法無須網路或饋線等任何技術性資料,然,此種方式高度依賴ANN法所用來訓練之資料數量,不僅費時且麻煩。 又,雖然有人提出以負載潮流模式化之手段取代量測方式,以計算所選擇之饋線之損失量,進而推知其他饋線之損失量,然,此種方式之準確度高度取決於計算時之饋線選擇,使得整體準確度仍顯不足。爰此,本發明創作者認為此種問題實有改善之必要。
有鑑於先前技術所述不足之處,本發明創作提出一種解決之手段,該手段係關於一種船舶電力系統損失估計系統,包括: 一輸入端: 該輸入端可供輸入一船舶負載總用電量資料、一變壓器數量資料、各變壓器容量資料、一變壓器容量因數資料、一船舶之饋線長度資料、一船舶之饋線徑度資料。 一處理器: 該處理器電性連接該輸入端,該處理器寫有一變壓器電力損失估算程式、及一饋線電力損失估算程式,該變壓器電力損失估算程式可供根據該船舶負載總用電量資料、該變壓器數量資料、各變壓器容量資料、該變壓器容量因數資料進行運算,而得到一變壓器電力損失估算值;該饋線電力損失估算程式可供該處理器執行:根據該饋線長度資料、及饋線徑度資料,配合該船舶負載總用電量資料,估算各饋線之平均供電量資料,再根據該平均供電量資料進行電力潮流運算,而得到一饋線電力損失估算值,再將該饋線電力損失估算值、及該變壓器電力損失估算值進行加總,而得到一船舶電力系統電力損失估算值,並由一輸出端輸出該船舶電力系統電力損失估算值。 由於本發明係透過估算各饋線之平均供電量,再進行電力潮流之運算,來得到該饋線電力損失估算值,再配合估算變壓器之電力損失,來得到該船舶電力系統電力損失估算值,不僅具有較佳估算準確度,同時,也無須仰賴ANN之訓練方式。
以下藉由圖式之輔助,說明本發明創作之構造、特點與實施例,俾使貴審查人員對於本發明創作有更進一步之瞭解。 本發明創作係關於一種船舶電力系統損失估計系統,包括: 一輸入端: 該輸入端可供輸入一船舶負載總用電量資料、一變壓器數量資料、各變壓器容量資料、一變壓器容量因數資料、一船舶之饋線長度資料、一船舶之饋線徑度資料。 一處理器: 電性連接該輸入端,該處理器寫有一變壓器電力損失估算程式、及一饋線電力損失估算程式,該變壓器電力損失估算程式可供根據該船舶負載總用電量資料、該變壓器數量資料、各變壓器容量資料、該變壓器容量因數資料進行運算,而得到一變壓器電力損失估算值;該饋線電力損失估算程式可供該處理器執行:根據該饋線長度資料、及饋線徑度資料,配合該船舶負載總用電量資料,估算各饋線之平均供電量資料,再根據該平均供電量資料進行電力潮流運算,而得到一饋線電力損失估算值,再將該饋線電力損失估算值、及該變壓器電力損失估算值進行加總,而得到一船舶電力系統電力損失估算值,並由一輸出端輸出該船舶電力系統電力損失估算值。 本設計就全系統所有不同容量之配電變壓器統計其數量,配合設備廠家及技術手冊提供之變壓器鐵損值及其容量因數為1.0之銅損值,以該船舶負載總用電量資料,並設定該變壓器容量資料,運算出該變壓器電力損失估算值。而饋線損失之估算,則先建立各種不同類型饋線之架構,包括主幹線及分路之長度(即該饋線長度資料),以該船舶負載總用電量資料,推估各種類型饋線之平均供電量(即該平均供電量資料),再進行電力潮流分析,即可推導每小時平均及當航次之線路損失值(即該饋線電力損失估算值)。經上述配電系統之損失分析後,綜合該饋線電力損失估算值、及該變壓器電力損失估算值,即可計算出全船電力系統線路損失佔比(即該船舶電力系統電力損失估算值),此種系統損失推估模式,將可改善傳統以固定線損率推估系統損失之不合理現象。 以下更進一步介紹本發明創作之估算流程,該輸入端輸入一電力單線圖,且該船舶負載總用電量資料包括一出口端饋線供電量;該處理器在執行該電力損失估算程式時,在進行該饋線電力損失估算值之前,先根據該電力單線圖資料、配合該饋線長度資料、該饋線徑度資料,運算出該電力單線圖資料中各節點之間的網路阻抗矩陣,再根據該電力單線圖資料,配合該變壓器數量資料、各變壓器容量資料、該變壓器容量因數資料,建立匯流排之負載點資料,且該電力潮流運算過程中,當運算後之饋線出口供電量,與該出口端饋線供電量不一致時,則改變該變壓器容量因數資料所代表的值再進行該電力潮流運算,直到該饋線出口供電量,與該出口端饋線供電量一致,得到該船舶電力系統電力損失估算值。 本案為更進一步進行配電饋線之損失分析,本說明書以典型商船電力饋線作為分析對象,其中包括機艙設備、甲板機械設備、照明設備、電子航儀設備、住艙設備、火警與警報監視設備饋線。為進行電力潮流分析,完成饋線作業期間及非作業期間之線路損失、配電變壓器鐵損及銅損。首先根據該電力單線圖資料,並根據該饋線長度資料、該饋線徑度資料,以建立其節點之間的網路阻抗矩陣,再進行饋線所屬配電變壓器之阻抗資料收集,與其位置、相別和容量,建立匯流排之負載點資料。在假設所有配電變壓器相同之容量因數之條件下,配合饋線每小時實際供電量,進行電力潮流分析之疊代過程,調整配電變壓器之容量因數,使模擬之饋線出口供電量與量測之該饋線實際供電量一致,即可根據收斂後之匯流排電壓值與網路阻抗矩陣,求解饋線之線路損失。配合變壓器之等校電路模型,求解該饋線所有變壓器之銅損與鐵損。經上述配電系統之損失分析後,即可計算出全船電力系統線路損失佔比。 此外,本發明創作再進一步可以實施為:該船舶負載總用電量資料包括船舶於各種不同航行狀態之負載總用電量資料,該饋線電力損失估算程式更可供該處理器根據不同船舶航行狀態,運算其狀態之該船舶電力系統電力損失估算值。 爰此,透過本發明之創作,可令工程師輸入所需之參數,便可得知整體電力系統之電力損失,以做為規劃、設計、及管理船舶電力系統之參考。 綜上所述,本發明創作確實符合產業利用性,且未於申請前見於刊物或公開使用,亦未為公眾所知悉,且具有非顯而易知性,符合可專利之要件,爰依法提出專利申請。 惟上述所陳,為本發明創作在產業上一較佳實施例,舉凡依本發明創作申請專利範圍所作之均等變化,皆屬本案訴求標的之範疇。
無
無
Claims (3)
- 一種船舶電力系統損失估計系統,包括: 一輸入端:可供輸入一船舶負載總用電量資料、一變壓器數量資料、各變壓器容量資料、一變壓器容量因數資料、一船舶之饋線長度資料、一船舶之饋線徑度資料; 一處理器:電性連接該輸入端,該處理器寫有一變壓器電力損失估算程式、及一饋線電力損失估算程式,該變壓器電力損失估算程式可供根據該船舶負載總用電量資料、該變壓器數量資料、各變壓器容量資料、該變壓器容量因數資料進行運算,而得到一變壓器電力損失估算值;該饋線電力損失估算程式可供該處理器執行:根據該饋線長度資料、及饋線徑度資料,配合該船舶負載總用電量資料,估算各饋線之平均供電量資料,再根據該平均供電量資料進行電力潮流運算,而得到一饋線電力損失估算值,再將該饋線電力損失估算值、及該變壓器電力損失估算值進行加總,而得到一船舶電力系統電力損失估算值,並由一輸出端輸出該船舶電力系統電力損失估算值。
- 如申請專利範圍第1項所述船舶電力系統損失估計系統,其中該輸入端輸入一電力單線圖,且該船舶負載總用電量資料包括一出口端饋線供電量;該處理器在執行該電力損失估算程式時,在進行該饋線電力損失估算值之前,先根據該電力單線圖資料、配合該饋線長度資料、該饋線徑度資料,運算出該電力單線圖資料中各節點之間的網路阻抗矩陣,再根據該電力單線圖資料,配合該變壓器數量資料、各變壓器容量資料、該變壓器容量因數資料,建立匯流排之負載點資料,且該電力潮流運算過程中,當運算後之饋線出口供電量,與該出口端饋線供電量不一致時,則改變該變壓器容量因數資料所代表的值再進行該電力潮流運算,直到該饋線出口供電量,與該出口端饋線供電量一致,得到該船舶電力系統電力損失估算值。
- 如申請專利範圍第1項或第2項所述船舶電力系統損失估計系統,其中該船舶負載總用電量資料包括船舶於各種不同航行狀態之負載總用電量資料,該饋線電力損失估算程式更可供該處理器根據不同船舶航行狀態,運算其狀態之該船舶電力系統電力損失估算值。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
TW106132918A TWI656351B (zh) | 2017-09-26 | 2017-09-26 | Ship power system loss estimation system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
TW106132918A TWI656351B (zh) | 2017-09-26 | 2017-09-26 | Ship power system loss estimation system |
Publications (2)
Publication Number | Publication Date |
---|---|
TWI656351B true TWI656351B (zh) | 2019-04-11 |
TW201915507A TW201915507A (zh) | 2019-04-16 |
Family
ID=66991740
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
TW106132918A TWI656351B (zh) | 2017-09-26 | 2017-09-26 | Ship power system loss estimation system |
Country Status (1)
Country | Link |
---|---|
TW (1) | TWI656351B (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2004019464A1 (de) * | 2002-08-16 | 2004-03-04 | Siemens Aktiengesellschaft | Elektrisches netz für unter- und überwasserfahrzeuge, z.b. marineschiffe, sowie für offshoreanlagen |
TW201043533A (en) * | 2009-06-04 | 2010-12-16 | Csbc Corp Taiwan | Short-circuit current detection device for ship |
US20110304207A1 (en) * | 2008-12-12 | 2011-12-15 | Ambra Sannino | System, apparatus and method for power transfer to vessels |
CN102749492A (zh) * | 2012-06-19 | 2012-10-24 | 江苏科技大学 | 环形船舶电网的短路电流计算方法 |
TWI578178B (zh) * | 2015-11-19 | 2017-04-11 | Short Circuit Current Analysis System for Ship Ring Distribution Network |
-
2017
- 2017-09-26 TW TW106132918A patent/TWI656351B/zh not_active IP Right Cessation
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2004019464A1 (de) * | 2002-08-16 | 2004-03-04 | Siemens Aktiengesellschaft | Elektrisches netz für unter- und überwasserfahrzeuge, z.b. marineschiffe, sowie für offshoreanlagen |
US20110304207A1 (en) * | 2008-12-12 | 2011-12-15 | Ambra Sannino | System, apparatus and method for power transfer to vessels |
TW201043533A (en) * | 2009-06-04 | 2010-12-16 | Csbc Corp Taiwan | Short-circuit current detection device for ship |
CN102749492A (zh) * | 2012-06-19 | 2012-10-24 | 江苏科技大学 | 环形船舶电网的短路电流计算方法 |
TWI578178B (zh) * | 2015-11-19 | 2017-04-11 | Short Circuit Current Analysis System for Ship Ring Distribution Network |
Also Published As
Publication number | Publication date |
---|---|
TW201915507A (zh) | 2019-04-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Džafić et al. | Real time estimation of loads in radial and unsymmetrical three-phase distribution networks | |
TWI479159B (zh) | 電壓穩定度即時估測方法 | |
Atanackovic et al. | Deployment of real-time state estimator and load flow in BC Hydro DMS-challenges and opportunities | |
Adinolfi et al. | Pseudo-measurements modeling using neural network and Fourier decomposition for distribution state estimation | |
KR20110086729A (ko) | 네트워크 특징 결정 방법, 네트워크 특징 결정 장치 및 네트워크 추정 임피던스 결정 장치 | |
CN102983594A (zh) | 电网合环操作冲击电流的控制方法 | |
CN106329535A (zh) | 电网电压稳定性的评估控制方法及评估控制装置 | |
Lavenius et al. | Performance assessment of PMU-based estimation methods of Thevenin equivalents for real-time voltage stability monitoring | |
CN110543696A (zh) | 一种未建模小机组参与电力市场出清和安全校核的方法 | |
Yuan et al. | Real-time wide-area loading margin sensitivity (WALMS) in power systems | |
TWI656351B (zh) | Ship power system loss estimation system | |
CN105676157A (zh) | Wams低频振荡识别功能的测试系统及方法 | |
US20180269681A1 (en) | Power systems and related voltage stability methods | |
US10958099B2 (en) | Real-time electrical grid restoration | |
CN108090626A (zh) | 一种配电网网格化规划的网格划分方法 | |
CN105606911A (zh) | 广域测量系统的动态监视功能的测试系统及方法 | |
JP6129758B2 (ja) | 電力系統監視装置および電力系統監視方法 | |
US11316345B2 (en) | Predictive voltage stability of a power system post-contingency | |
US20210083475A1 (en) | System operation support device and method in power system, and wide-area monitoring protection control system | |
Marashi et al. | Quantification and analysis of interdependency in cyber-physical systems | |
CN105653862B (zh) | 负荷点供电距离计算方法及装置 | |
CN109583117A (zh) | 供电可靠性的确定方法、装置及电子设备 | |
CN109950902B (zh) | 一种配电网实时负荷的计算方法、装置、设备及存储介质 | |
Kim et al. | Enhanced measurement-based dynamic equivalence using coherency identification | |
Lo et al. | Load modelling for Volt-VAR optimization control in limited network visibility-a case study in Malaysia |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | Annulment or lapse of patent due to non-payment of fees |