TWI623668B - Manufacturing and transportation method of caissons - Google Patents

Manufacturing and transportation method of caissons Download PDF

Info

Publication number
TWI623668B
TWI623668B TW106104087A TW106104087A TWI623668B TW I623668 B TWI623668 B TW I623668B TW 106104087 A TW106104087 A TW 106104087A TW 106104087 A TW106104087 A TW 106104087A TW I623668 B TWI623668 B TW I623668B
Authority
TW
Taiwan
Prior art keywords
pallet
caisson
area
production
transfer area
Prior art date
Application number
TW106104087A
Other languages
Chinese (zh)
Other versions
TW201829880A (en
Inventor
Zong-Bang Chen
Original Assignee
Hung Hua Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hung Hua Construction Co Ltd filed Critical Hung Hua Construction Co Ltd
Priority to TW106104087A priority Critical patent/TWI623668B/en
Application granted granted Critical
Publication of TWI623668B publication Critical patent/TWI623668B/en
Publication of TW201829880A publication Critical patent/TW201829880A/en

Links

Landscapes

  • Ship Loading And Unloading (AREA)

Abstract

一種沉箱製作及搬運方法,包含:於沉箱製作場區分一轉運區、一第一至一第四製作區與一避讓區;分別提供第一至第四托板,且分別置於第一至第四製作區,並依序於第一至第四托板上分別製作第一至第四沉箱。依序於每一個沉箱製作完成後,將托板連同沉箱經轉運區移至浮台船載運離開,藉此,有效提升製作沉箱的產能。A caisson manufacturing and handling method includes: distinguishing a transfer area, a first to a fourth production area, and an avoidance area at a caisson production site; providing first to fourth pallets, and placing the first to fourth pallets, respectively; Four production areas, and the first to fourth caissons are made on the first to fourth pallets in order. After the production of each caisson is completed in sequence, the pallets and caissons are moved to the floating platform via the transfer area and carried away, thereby effectively increasing the production capacity of the caissons.

Description

沉箱製作及搬運方法Manufacturing and transportation method of caissons

本發明係與沉箱製作有關;特別是指一種沉箱製作及搬運方法。The invention relates to the manufacture of caissons; in particular, it relates to a method for manufacturing and carrying caissons.

沉箱是海事工程的基礎結構,例如碼頭、海堤皆需使用沉箱作為基礎。習用的沉箱之製作可分為海工法與陸工法,其中:The caisson is the basic structure of maritime engineering. For example, the caisson needs to use the caisson as the foundation. The production of conventional caissons can be divided into offshore and land engineering methods, of which:

海工法係在浮台船上製作沉箱,在沉箱製作完成後,浮台船直接載運沉箱到需設置沉箱的投放點。以海工法之缺點在於,施工進度易受海像的影響,且沉箱的產量低。The marine engineering system makes caissons on floating pontoons. After the caisson is completed, the floating pontoons directly carry the caissons to the drop point where caissons need to be set. The disadvantages of the offshore method are that the construction progress is easily affected by the seahorse, and the output of the caisson is low.

陸工法係在陸地上製作沉箱,於沉箱製作完成後再將沉箱移至碼頭並送上浮台船載運出投放點。陸工法具有不受海像影響施工進度的優點,且沉箱的產量較高。惟,如何提供一種易於搬運沉箱的製作場所乃是沉箱製造業者苦思的重要課題。The land engineering system makes caissons on land. After the caissons are completed, the caissons are moved to the pier and sent to the floating platform for transportation out of the drop point. The land method has the advantage of not being affected by the construction progress of the seahorse, and the output of the caisson is high. However, how to provide a manufacturing place that is easy to handle the caissons is an important subject for caisson manufacturers.

有鑑於此,本發明之目的在於提供一種沉箱製作及搬運方法,可有效提升製作沉箱的產能。In view of this, an object of the present invention is to provide a method for manufacturing and carrying a caisson, which can effectively increase the production capacity of the caisson.

緣以達成上述目的,本發明提供的一種沉箱製作及搬運方法,係應用於一沉箱製作場;該方法包含下列步驟:A. 於該沉箱製作場區分一轉運區、一第一製作區、一第二製作區、一第三製作區、一第四製作區與一避讓區,其中該轉運區具有相對的一第一側與一第二側以及相對的一第三側與一第四側;該第一製作區連接於該轉運區的第一側,且該第一製作區連接於該轉運區與該第二製作區之間;該第三製作區連接於該轉運區的該第二側,且該第三製作區連接於該轉運區與該第四製作區之間;該避讓區連接於該轉運區的第三側;該第四側對應浮台船之停靠區;B. 提供一第一托板設置於該第一製作區,且於該第一托板上開始製作第一沉箱;C. 提供一第二托板設置於該第二製作區,且於該第二托板上開始製作第二沉箱;D. 提供一第三托板設置於該第三製作區,且於該第三托板上開始製作第三沉箱;E. 提供一第四托板設置於該第四製作區,且於該第四托板上開始製作第四沉箱;F. 於第一沉箱製作完成後,將該第一托板連同第一沉箱移至該轉運區,再由該轉運區移至浮台船載運離開;G. 於第二沉箱製作完成後,將該第二托板連同第二沉箱經該第一製作區移至該轉運區,再由該轉運區移至浮台船載運離開;H. 於第三沉箱製作完成後,將該第三托板連同第三沉箱移至該轉運區,再由該轉運區移至浮台船載運離開;I. 於第四沉箱製作完成後,將該第四托板連同第四沉箱經該第三製作區移至該轉運區,再由該轉運區移至浮台船載運離開。In order to achieve the above object, the present invention provides a caisson manufacturing and handling method, which is applied to a caisson manufacturing field; the method includes the following steps: A. In the caisson manufacturing field, a transfer area, a first production area, a A second production area, a third production area, a fourth production area and an avoidance area, wherein the transfer area has a first side and a second side opposite and a third side and a fourth side opposite; The first production area is connected to the first side of the transfer area, and the first production area is connected between the transfer area and the second production area; the third production area is connected to the second side of the transfer area And the third production area is connected between the transfer area and the fourth production area; the avoidance area is connected to the third side of the transfer area; the fourth side corresponds to the docking area of the floating platform; B. Provide a A first pallet is disposed in the first production area, and a first caisson is produced on the first pallet; C. A second pallet is provided in the second production area, and is disposed on the second pallet. Start to make the second caisson; D. Provide a third pallet to set in the third production area A third caisson is produced on the third pallet; E. A fourth pallet is provided in the fourth production area, and a fourth caisson is produced on the fourth pallet; F. On the first caisson After the production is completed, move the first pallet together with the first caisson to the transfer area, and then move from the transshipment area to the floating platform for transportation and departure; G. After the second caisson is completed, the second pallet together with the The second caisson is moved to the transshipment area via the first production area, and then moved from the transhipment area to the floating platform for shipment; H. After the third caisson is completed, the third pallet is moved to the third caisson to The transfer area is then moved from the transfer area to the pontoon and carried away. I. After the fourth caisson is completed, move the fourth pallet together with the fourth caisson to the transfer area through the third production area, and then Move from the transfer area to the pontoon and leave.

本發明之效果在於藉由巧妙地安排沉箱製作場之佈局以及於沉箱製作場之製作及搬運方法,有效提升製作沉箱的產能。The effect of the present invention is to effectively increase the production capacity of the caissons by cleverly arranging the layout of the caissons production field and the manufacturing and handling methods at the caisson production field.

為能更清楚地說明本發明,茲舉一較佳實施例並配合圖式詳細說明如後。請參圖1所示,為本發明一較佳實施例之沉箱製作及搬運方法所應用的沉箱製作場100,沉箱製作場100包含一結構體10及複數個台車28,其中,結構體10於本實施例中為鋼筋混凝土結構之碼頭,結構體10具有一承載面12以及一側面14,承載面12供放置複數個製作沉箱所需的第一至第四托板421, 422, 423, 424,側面14面對載運沉箱的浮台船50之停靠區。In order to explain the present invention more clearly, a preferred embodiment is described in detail below with reference to the drawings. Please refer to FIG. 1, which is a caisson manufacturing site 100 applied to a caisson manufacturing and handling method according to a preferred embodiment of the present invention. The caisson manufacturing site 100 includes a structure 10 and a plurality of trolleys 28. This embodiment is a wharf of a reinforced concrete structure. The structural body 10 has a bearing surface 12 and a side surface 14. The bearing surface 12 is used for placing a plurality of first to fourth pallets 421, 422, 423, 424 required for making caissons. The side 14 faces the docking area of the floating vessel 50 carrying the caissons.

本實施例之沉箱製作及搬運方法係先於沉箱製作場100的承載面12區分一轉運區16、一第一製作區181、一第二製作區182、一第三製作區183、一第四製作區184與一避讓區20,其中,轉運區16位於沉箱製作場100的中央且具有相對的一第一側161與一第二側162以及相對的一第三側163與一第四側164;第一製作區181連接於轉運區16的第一側161,且第一製作區181連接於轉運區16與第二製作區182之間;第三製作區183連接於轉運區16的第二側162,且第三製作區183連接於轉運區16與第四製作區184之間;避讓區20連接於轉運區16的第三側163;第四側164對應浮台船50之停靠區。The caisson manufacturing and handling method of this embodiment is to distinguish a transfer area 16, a first production area 181, a second production area 182, a third production area 183, and a fourth area before the load bearing surface 12 of the caisson production field 100. Production area 184 and an avoidance area 20, wherein the transfer area 16 is located in the center of the caisson production area 100 and has a first side 161 and a second side 162 opposite to each other and a third side 163 and a fourth side 164 opposite ; The first production area 181 is connected to the first side 161 of the transfer area 16, and the first production area 181 is connected between the transfer area 16 and the second production area 182; the third production area 183 is connected to the second of the transfer area 16 Side 162, and the third production area 183 is connected between the transfer area 16 and the fourth production area 184; the avoidance area 20 is connected to the third side 163 of the transfer area 16; the fourth side 164 corresponds to the docking area of the pontoon 50.

承載面12凹入形成有複數條橫向通道22及複數條縱向通道24,橫向通道22係由第二製作區182延伸至第四製作區184,縱向通道24係由避讓區20延伸至轉運區16的第四側164,再延伸到結構體10的側面14,且縱向通道24與橫向通道22於轉運區16相交會。縱向通道24鄰近轉運區16之第四側164的位置分別樞設有複數個防水門242,以阻擋海水灌入縱向通道24。橫向通道22與縱向通道24的底部分別設置有供台車28行走的軌道26。The bearing surface 12 is recessed to form a plurality of lateral channels 22 and a plurality of longitudinal channels 24. The lateral channels 22 extend from the second production area 182 to the fourth production area 184, and the longitudinal channels 24 extend from the avoidance area 20 to the transfer area 16. The fourth side 164 extends to the side 14 of the structure 10, and the longitudinal channel 24 and the transverse channel 22 meet at the transfer area 16. A plurality of waterproof doors 242 are respectively pivotally disposed at positions of the longitudinal passage 24 adjacent to the fourth side 164 of the transfer area 16 to prevent seawater from flowing into the longitudinal passage 24. The bottom of the lateral passage 22 and the longitudinal passage 24 are respectively provided with rails 26 for the trolley 28 to travel.

台車28分別設置於橫向通道22內的軌道26上及縱向通道24內的軌道26上,台車28係受控制分別沿對應的橫向通道22的長軸向或縱向通道24的長軸向往復移動。請配合圖2與圖3,各台車28包括複數個千金頂30及一分配樑32,千金頂30係沿台車的長軸向設置,分配樑32設置於千金頂30上。千金頂30係受控制而帶動分配樑32往上或往下位移,以使分配樑32突出或低於承載面12。The trolleys 28 are respectively disposed on the tracks 26 in the lateral passage 22 and the tracks 26 in the longitudinal passage 24. The trolleys 28 are controlled to reciprocate along the long axis of the corresponding transverse passage 22 or the long axis of the longitudinal passage 24, respectively. Please refer to FIG. 2 and FIG. 3, each trolley 28 includes a plurality of golden crowns 30 and a distribution beam 32. The golden crowns 30 are arranged along the longitudinal axis of the trolley, and the distribution beams 32 are arranged on the golden crowns 30. The golden crown 30 is controlled to drive the distribution beam 32 to move up or down, so that the distribution beam 32 protrudes or is lower than the bearing surface 12.

舉例而言,當橫向通道22中的台車28移動第一托板421下方後,控制千金頂30頂升使分配樑32突出承載面12時,可由下往上將第一托板421頂離承載面12,再控制台車移動,即可搬運第一托板421及其上的沉箱。當縱向台車28將第一托板421移到轉運區16後,再控制千金頂30下移使分配樑32低於承載面12即可將第一托板421置於轉運區16。而後,控制橫向通道22中的台車28離開轉運區16,再控制縱向通道24中的台車28由避讓區20移動到位於轉運區16之第一托板421下方,再控制千金頂30使分配樑32突出承載面12,將第一托板421頂離承載面12,台車28即可搬運第一托板421沿縱向通道24移動。第二至第四托板422, 423, 424的搬運方法相同,容不贅述。For example, when the trolley 28 in the lateral passage 22 moves below the first pallet 421, and controls the jack of gold 30 to lift the distribution beam 32 to protrude from the bearing surface 12, the first pallet 421 can be lifted away from the load from bottom to top Surface 12, and then move the console vehicle to carry the first pallet 421 and the caissons thereon. After the vertical pallet 28 moves the first pallet 421 to the transfer area 16, and then controls the golden crown 30 to move downward so that the distribution beam 32 is lower than the bearing surface 12, the first pallet 421 can be placed in the transit area 16. Then, the trolley 28 in the lateral passage 22 is controlled to leave the transfer area 16, and the trolley 28 in the longitudinal passage 24 is controlled to move from the avoidance area 20 to the first pallet 421 located in the transfer area 16, and then the golden crown 30 is controlled to make the distribution beam 32 protrudes the bearing surface 12 and lifts the first supporting plate 421 away from the supporting surface 12 so that the trolley 28 can carry the first supporting plate 421 and move along the longitudinal passage 24. The second to fourth pallets 422, 423, 424 are carried in the same way, so I won't go into details.

為避免千金頂30失效而下降,導致施力不平均,台車28上更設置有複數個第一支架34、複數個第二支架36、複數個伸縮桿38與複數個輔助支撐墊40,第一支架34與第二支架36分別沿台車28的長軸向相對設置,且千金頂30位於第一支架34與第二支架36之間;伸縮桿38沿台車28的長軸向併列設置,各伸縮桿38係受控制而伸長或縮短,至少一個伸縮桿38的兩端分別連接一個第一支架34與一個第二支架36。輔助支撐墊40分別設置於第一支架34與第二支架36上。於分配樑32突出承載面12時,控制伸縮桿38伸長或縮短即可帶動第一支架34與第二支架36,使輔助支撐墊40於一第一位置P1與一第二位置P2間移動,於第一位置P1時,輔助支撐墊40位於分配樑32的外側且離開對應之分配樑32的正下方(圖2參照),於第二位置P2時,輔助支撐墊40位於分配樑32的正下方(圖3參照)。In order to avoid the failure of the Qianjin Dome 30 and the decline in force, resulting in uneven force application, the trolley 28 is further provided with a plurality of first brackets 34, a plurality of second brackets 36, a plurality of telescopic rods 38, and a plurality of auxiliary support pads 40. The bracket 34 and the second bracket 36 are respectively opposite to each other along the long axis of the trolley 28, and the golden crown 30 is located between the first bracket 34 and the second bracket 36. The telescopic rod 38 is arranged side by side along the long axis of the trolley 28, each of which is telescopic The rod 38 is controlled to be extended or shortened, and two ends of at least one telescopic rod 38 are respectively connected to a first bracket 34 and a second bracket 36. The auxiliary support pads 40 are respectively disposed on the first bracket 34 and the second bracket 36. When the distribution beam 32 protrudes from the bearing surface 12, controlling the extension or contraction of the telescopic rod 38 can drive the first bracket 34 and the second bracket 36 to move the auxiliary support pad 40 between a first position P1 and a second position P2. In the first position P1, the auxiliary support pad 40 is located outside the distribution beam 32 and directly below the corresponding distribution beam 32 (refer to FIG. 2). In the second position P2, the auxiliary support pad 40 is located directly at the distribution beam 32. Below (refer to Figure 3).

藉此,在對應之分配樑32將對應之第一托板421、第二托板422、第三托板423或第四托板424頂離承載面12後,控制各伸縮桿38縮短,讓輔助支撐墊40移位於分配樑32的正下方,即使發生千金頂30失效的情形,輔助支撐墊40亦能撐住分配樑32,避免施予第一至第四托板421, 422, 423, 424的力量不平均,而造成其上的沉箱破裂。在控制對應之台車28的千金頂30下移之前,則先控制各伸縮桿38伸長,使輔助支撐墊40離開分配樑32的正下方。With this, after the corresponding distribution beam 32 lifts the corresponding first bracket 421, second bracket 422, third bracket 423, or fourth bracket 424 away from the bearing surface 12, each telescopic rod 38 is controlled to shorten, The auxiliary support pad 40 is moved directly below the distribution beam 32. Even if the golden crown 30 fails, the auxiliary support pad 40 can support the distribution beam 32 and avoid giving the first to fourth pallets 421, 422, 423. The uneven strength of 424 caused the caisson to rupture. Before controlling the jackpot 30 of the corresponding trolley 28 to move down, each telescopic rod 38 is controlled to extend so that the auxiliary support pad 40 leaves directly below the distribution beam 32.

藉由上述之架構,即可搬運第一至第四托板421, 422, 423, 424移動。With the above structure, the first to fourth pallets 421, 422, 423, 424 can be moved.

在沉箱的製作過程可分為四個階段,其中:The manufacturing process of the caisson can be divided into four stages, of which:

第一階段:係在托板上製作沉箱的底部(以下稱為大底),包含綁紮鋼筋、澆置混凝土。The first stage: the bottom of the caisson is made on the pallet (hereinafter referred to as the large bottom), which includes binding steel bars and pouring concrete.

第二階段:係在大底上組立外模及內艙模。The second stage: the outer mold and the inner cabin mold are assembled on the outsole.

第三階段:在外模與內艙模之間澆置混凝土,並於混凝土凝固後,將外模與內艙模逐漸往上移動,並繼續澆置混凝土,直到沉箱的結構完成。The third stage: placing concrete between the outer mold and the inner tank mold, and after the concrete is solidified, gradually move the outer mold and the inner tank mold upward, and continue to pour the concrete until the structure of the caisson is completed.

第四階段:係將外模與內艙模自沉箱上拆除。The fourth stage: the outer mold and the inner cabin mold are removed from the caisson.

經第四階段後即完成沉箱之成品。前述第一至第四階段所製作的沉箱皆為半成品。After the fourth stage, the finished product of the caisson is completed. The caissons produced in the aforementioned first to fourth stages are all semi-finished products.

於後請配合圖4至圖14說明後續之沉箱製作及搬運之步驟。Please refer to Figures 4 to 14 to explain the subsequent steps of making and transporting the caissons.

請配合圖4,提供第一托板421放置於承載面12上之第一製作區181,且於第一托板421上開始製作第一沉箱C1,本步驟中,第一沉箱C1的製作過程屬於第一階段。Please refer to FIG. 4 to provide a first production area 181 where the first support plate 421 is placed on the bearing surface 12, and the production of the first caisson C1 is started on the first support plate 421. In this step, the production process of the first caisson C1 Belongs to the first stage.

待第一沉箱C1製作過程的第一階段結束後,提供第二托板422放置於承載面12上之第二製作區182,且於第二托板422上開始製作第二沉箱C2,本步驟中,第二沉箱C2的製作過程屬於第一階段。在此同時,第一沉箱C1的製作過程進入第二階段。After the first stage of the manufacturing process of the first caisson C1 is completed, a second supporting plate 422 is provided on the second production area 182 on the bearing surface 12, and the second caisson C2 is started to be manufactured on the second supporting plate 422. This step The production process of the second caisson C2 belongs to the first stage. At the same time, the manufacturing process of the first caisson C1 enters the second stage.

待第二沉箱C2製作過程的第一階段結束後,提供第三托板423放置於承載面12上之第三製作區183,且於第三托板423上開始製作第三沉箱C3,本步驟中,第三沉箱C3的製作過程屬於第一階段。在此同時,第一沉箱C1的製作過程進入第三階段,第二沉箱C2的製作過程進入第二階段。After the first stage of the production process of the second caisson C2 is completed, the third pallet 423 is provided on the third production area 183 on the bearing surface 12 and the third caisson C3 is produced on the third pallet 423. This step The production process of the third caisson C3 belongs to the first stage. At the same time, the manufacturing process of the first caisson C1 enters the third stage, and the manufacturing process of the second caisson C2 enters the second stage.

待第三沉箱C3製作過程的第一階段結束後,提供第四托板424放置於承載面12上之第四製作區184,且於第四托板424上開始製作第四沉箱C4,本步驟中,第四沉箱C4的製作過程屬於第一階段。在此同時,第一沉箱C1的製作過程進入第四階段,第二沉箱C2的製作過程進入第三階段,第三沉箱C3的製作過程進入第二階段。After the first stage of the production process of the third caisson C3 is completed, the fourth pallet 424 is provided on the fourth production area 184 on the bearing surface 12 and the fourth caisson C4 is produced on the fourth pallet 424. This step The production process of the fourth caisson C4 belongs to the first stage. At the same time, the manufacturing process of the first caisson C1 enters the fourth stage, the manufacturing process of the second caisson C2 enters the third stage, and the manufacturing process of the third caisson C3 enters the second stage.

以下步驟係分別控制位於橫向通道22或縱通道24中的台車28之千金頂30上升使對應之分配樑32將對應之第一托板421、第二托板422、第三托板423或第四托板424頂離承載面12,並控制對應之台車28移動以搬運對應之第一至第四托板421, 422, 423, 424。為便於說明,以下說明省略台車28的移動方式。The following steps are to control the golden crown 30 of the trolley 28 located in the horizontal passage 22 or the vertical passage 24 to rise so that the corresponding distribution beam 32 will correspond to the first pallet 421, the second pallet 422, the third pallet 423, or the first pallet. The four pallets 424 are lifted off the bearing surface 12 and control the corresponding trolley 28 to move to carry the corresponding first to fourth pallets 421, 422, 423, 424. For convenience of explanation, the following description omits the movement of the trolley 28.

請配合圖5,在第一沉箱C1製作完成後,將第一托板421連同第一沉箱C1移至轉運區,打開防水門242後,第一托板421連同第一沉箱C1由轉運區16移至浮台船50載運離開至第一沉箱C1的投放點。此時,第二沉箱C2的製作過程進入第四階段,第三沉箱C3的製作過程進入第三階段,第四沉箱C4的製作過程進入第二階段。Please refer to Figure 5. After the first caisson C1 is manufactured, the first pallet 421 and the first caisson C1 are moved to the transfer area. After opening the waterproof door 242, the first pallet 421 and the first caisson C1 are transferred from the transfer area 16 Move to the pontoon 50 and leave it to the drop-in point of the first caisson C1. At this time, the manufacturing process of the second caisson C2 enters the fourth stage, the manufacturing process of the third caisson C3 enters the third stage, and the manufacturing process of the fourth caisson C4 enters the second stage.

請配合圖6,在浮台船50返回停靠後,將浮台船50上的第一托板421移至轉運區16,再由轉運區16移至避讓區20暫置,並關上防水門242。而後,於避讓區20上的第一托板421上重新開始製作新的第一沉箱C1,此時,第一沉箱C1的製作過程屬於第一階段。Please refer to FIG. 6, after the floating boat 50 returns to dock, move the first pallet 421 on the floating boat 50 to the transfer area 16, and then move from the transfer area 16 to the avoidance area 20 for temporary storage, and close the waterproof door 242 . Then, the production of a new first caisson C1 is restarted on the first pallet 421 on the avoidance area 20. At this time, the manufacturing process of the first caisson C1 belongs to the first stage.

請配合圖7,於第二沉箱C2製作完成後,將第二托板422連同第二沉箱C2經第一製作區181移至轉運區16,打開防水門242後,第二托板422連同第二沉箱C2由轉運區16移至浮台船50載運離開至投放點。此時,第一沉箱C1的製作過程進入第二階段,第三沉箱C3的製作過程進入第四階段,第四沉箱C4的製作過程進入第三階段。Please refer to Figure 7. After the second caisson C2 is manufactured, the second pallet 422 and the second caisson C2 are moved to the transfer area 16 through the first production area 181. After opening the waterproof door 242, the second pallet 422 together with the first The second caisson C2 is moved from the transfer area 16 to the pontoon ship 50 and left to the drop-off point. At this time, the manufacturing process of the first caisson C1 enters the second stage, the manufacturing process of the third caisson C3 enters the fourth stage, and the manufacturing process of the fourth caisson C4 enters the third stage.

請配合圖8,在浮台船50返回停靠後,將浮台船50上的第二托板422移至轉運區16,再由轉運區16經第一製作區181移回第二製作區182,並關上防水門242。而後,於第二製作區182上的第二托板422上重新開始製作第二沉箱C2,此時,第二沉箱C2的製作過程屬於第一階段。Please refer to FIG. 8, after the floating platform 50 returns to dock, the second pallet 422 on the floating platform 50 is moved to the transfer area 16, and then transferred from the transfer area 16 to the second production area 182 through the first production area 181. And close the waterproof door 242. Then, the production of the second caisson C2 is restarted on the second pallet 422 on the second production area 182. At this time, the manufacturing process of the second caisson C2 belongs to the first stage.

請配合圖9,於第二托板422移至第二製作區182後,將位於避讓區上的第一托板421連同第一沉箱C1之半成品移至轉運區16,再由轉運區16移至第一製作區181。Please cooperate with FIG. 9, after the second pallet 422 is moved to the second production area 182, the first pallet 421 located on the avoidance area and the semi-finished product of the first caissons C1 are moved to the transfer area 16, and then transferred from the transfer area 16 To the first production area 181.

請配合圖10,於第三沉箱C3製作完成後,將第三托板423連同第三沉箱C3移至轉運區16,打開防水門後,第三托板423連同第三沉箱C3由轉運區16移至浮台船50載運離開至投放點。此時,第一沉箱C1的製作過程進入第二階段,第二沉箱C2的製作過程為第一階段;第四沉箱C4的製作過程進入第四階段。Please refer to FIG. 10, after the third caisson C3 is completed, move the third pallet 423 together with the third caisson C3 to the transfer area 16. After opening the waterproof door, the third pallet 423 together with the third caisson C3 is transferred from the transfer area 16 Move to the pontoon 50 and leave it to the drop point. At this time, the manufacturing process of the first caisson C1 enters the second stage, the manufacturing process of the second caisson C2 is the first stage; the manufacturing process of the fourth caisson C4 enters the fourth stage.

請配合圖11,在浮台船50返回停靠後,將浮台船50上的第三托板423移至轉運區16,再由轉運區16移至避讓區20暫置,並關上防水門242。而後,於避讓區20上的第三托板423上重新開始製作第三沉箱C3,此時,第三沉箱C3的製作過程屬於第一階段。Please refer to FIG. 11, after the floating platform ship 50 returns to dock, move the third pallet 423 on the floating platform ship 50 to the transfer area 16, and then move from the transfer area 16 to the avoidance area 20 for temporary storage, and close the waterproof door 242 . Then, the third caisson C3 is restarted on the third pallet 423 on the avoidance area 20. At this time, the manufacturing process of the third caisson C3 belongs to the first stage.

請配合圖12,於第四沉箱C4製作完成後,將第四托板424連同第四沉箱C4經第三製作區183移至轉運區16,打開防水門242後,第四托板424連同第四沉箱C4由轉運區16移至浮台船50載運離開至投放點。此時,第一沉箱C1的製作過程進入第三階段,第二沉箱C2的製作過程進入第二階段,第三沉箱C3的製作過程為第一階段。Please refer to FIG. 12. After the fourth caisson C4 is completed, move the fourth pallet 424 and the fourth caisson C4 to the transfer area 16 via the third production area 183. After opening the waterproof door 242, the fourth pallet 424 together with the first The four caissons C4 are moved from the transfer area 16 to the pontoon ship 50 and left to the drop point. At this time, the manufacturing process of the first caisson C1 enters the third stage, the manufacturing process of the second caisson C2 enters the second stage, and the manufacturing process of the third caisson C3 is the first stage.

請配合圖13,在浮台船50返回停靠後,將浮台船50上的第四托板424移至轉運區16,再由轉運區16經第三製作區183移回第四製作區184,並關上防水門242。而後,於第四製作區184上的第四托板424上重新開始製作第四沉箱C4,此時,第四沉箱C4的製作過程屬於第一階段。Please refer to FIG. 13, after the pontoon 50 returns to dock, the fourth pallet 424 on the pontoon 50 is moved to the transfer area 16, and then transferred from the transfer area 16 through the third production area 183 to the fourth production area 184. And close the waterproof door 242. Then, the production of the fourth caisson C4 is restarted on the fourth pallet 424 on the fourth production area 184. At this time, the manufacturing process of the fourth caisson C4 belongs to the first stage.

請配合圖14,於第四托板424移至第四製作區184後,將位於避讓區20上的第三托板423連同第三沉箱C3之半成品移至轉運區16,再由轉運區16移至第三製作區183。此時,第一沉箱C1的製作過程進入第四階段,第二沉箱C2的製作過程進入第三階段,第三沉箱C3的製作過程進入第二階段。Please refer to FIG. 14, after the fourth pallet 424 is moved to the fourth production area 184, the third pallet 423 located on the avoidance area 20 is moved to the transfer area 16 together with the semi-finished product of the third caisson C3, and then transferred from the transfer area 16 Move to the third production area 183. At this time, the manufacturing process of the first caisson C1 enters the fourth stage, the manufacturing process of the second caisson C2 enters the third stage, and the manufacturing process of the third caisson C3 enters the second stage.

上述步驟即是依序將第一至第四沉箱C1, C2, C3, C4製作完成後依序搬運出塢。The above steps are to sequentially transport the first to fourth caissons C1, C2, C3, and C4 out of the dock after the production is completed.

之後,復如圖5所示,於新的第一沉箱C1製作完成後,將第一托板421連同第一沉箱C1移至轉運區,打開防水門242後,第一托板421連同第一沉箱C1由轉運區16移至浮台船50載運離開。再進行圖6至圖14所示之步驟,即可繼續製作第二至第四沉箱C2, C3, C4並搬運出塢。After that, as shown in FIG. 5, after the production of the new first caisson C1 is completed, the first pallet 421 together with the first caisson C1 is moved to the transfer area. After opening the waterproof door 242, the first pallet 421 together with the first The caisson C1 is moved from the transfer area 16 to the pontoon ship 50 for departure. After performing the steps shown in FIG. 6 to FIG. 14, the second to fourth caissons C2, C3, and C4 can be continuously manufactured and removed from the dock.

據上所述,本發明沉箱製作及搬運方法,藉由巧妙地安排沉箱製作場100之佈局以及於沉箱製作場之製作及搬運方法,可以讓沉箱的製作效率達到最大,有效提升製作沉箱的產能。According to the above, the method for making and transporting caissons according to the present invention, by cleverly arranging the layout of the caisson production field 100 and the method for making and transporting the caisson production field, can maximize the production efficiency of the caisson and effectively increase the production capacity of the caisson .

以上所述僅為本發明較佳可行實施例而已,舉凡應用本發明說明書及申請專利範圍所為之等效變化,理應包含在本發明之專利範圍內。The above descriptions are only the preferred and feasible embodiments of the present invention, and any equivalent changes made by applying the description of the present invention and the scope of patent application should be included in the patent scope of the present invention.

[本發明]
100‧‧‧沉箱製作場
10‧‧‧結構體
12‧‧‧承載面
14‧‧‧側面
16‧‧‧轉運區
161‧‧‧第一側
162‧‧‧第二側
163‧‧‧第三側
164‧‧‧第四側
181‧‧‧第一製作區
182‧‧‧第二製作區
183‧‧‧第三製作區
184‧‧‧第四製作區
20‧‧‧避讓區
22‧‧‧橫向通道
24‧‧‧縱向通道
242‧‧‧防水門
26‧‧‧軌道
28‧‧‧台車
30‧‧‧千金頂
32‧‧‧分配樑
34‧‧‧第一支架
36‧‧‧第二支架
38‧‧‧伸縮桿
40‧‧‧輔助支撐墊
421‧‧‧第一托板
422‧‧‧第二托板
423‧‧‧第三托板
424‧‧‧第四托板
50‧‧‧浮台船
C1‧‧‧第一沉箱
C2‧‧‧第二沉箱
C3‧‧‧第三沉箱
C4‧‧‧第四沉箱
P1‧‧‧第一位置
P2‧‧‧第二位置
[this invention]
100‧‧‧ caisson production
10‧‧‧ Structure
12‧‧‧ bearing surface
14‧‧‧ side
16‧‧‧Transit area
161‧‧‧first side
162‧‧‧second side
163‧‧‧Third side
164‧‧‧Fourth side
181‧‧‧First production area
182‧‧‧Second production area
183‧‧‧ third production area
184‧‧‧Fourth production area
20‧‧‧Avoidance Area
22‧‧‧ horizontal passage
24‧‧‧Vertical Channel
242‧‧‧Waterproof door
26‧‧‧ track
28‧‧‧ trolley
30‧‧‧Thousand Golden Domes
32‧‧‧ distribution beam
34‧‧‧First bracket
36‧‧‧Second bracket
38‧‧‧ Telescopic Rod
40‧‧‧ auxiliary support pad
421‧‧‧The first pallet
422‧‧‧Second pallet
423‧‧‧Third pallet
424‧‧‧Fourth pallet
50‧‧‧ pontoon
C1‧‧‧The first caisson
C2‧‧‧Second Caisson
C3‧‧‧The third caisson
C4‧‧‧The fourth caisson
P1‧‧‧First position
P2‧‧‧Second position

圖1為本發明一較佳實施例之沉箱製作場的俯視圖。 圖2為一示意圖,揭示台車之結構。 圖3為一示意圖,揭示台車之頂升裝置上移,輔助支撐墊內移。 圖4為一示意圖,揭示在第一至第四製作區製作第一至第四沉箱。 圖5為一示意圖,揭示搬移第一托板及第一沉箱。 圖6為一示意圖,揭示空的第一托板搬移至避讓區。 圖7為一示意圖,揭示搬移第二托板及第二沉箱。 圖8為一示意圖,揭示空的第二托板搬移至避讓區。 圖9為一示意圖,揭示搬移第一托板及第一沉箱。 圖10為一示意圖,揭示搬移第三托板及第三沉箱。 圖11為一示意圖,揭示空的第三托板搬移至避讓區。 圖12為一示意圖,揭示搬移第四托板及第四沉箱。 圖13為一示意圖,揭示空的第四托板搬移至避讓區。 圖14為一示意圖,揭示搬移第三托板及第三沉箱。FIG. 1 is a top view of a caisson manufacturing site according to a preferred embodiment of the present invention. Fig. 2 is a schematic diagram showing the structure of the trolley. Figure 3 is a schematic diagram showing the lifting device of the trolley is moved up and the supporting pad is moved inward. FIG. 4 is a schematic diagram showing that the first to fourth caissons are made in the first to fourth production areas. FIG. 5 is a schematic diagram illustrating the removal of the first pallet and the first caisson. FIG. 6 is a schematic diagram showing that the empty first pallet is moved to the avoidance area. FIG. 7 is a schematic diagram illustrating the removal of the second pallet and the second caisson. FIG. 8 is a schematic diagram showing that the empty second pallet is moved to the avoidance area. FIG. 9 is a schematic diagram illustrating the removal of the first pallet and the first caisson. FIG. 10 is a schematic diagram illustrating the removal of the third pallet and the third caisson. FIG. 11 is a schematic diagram showing that the empty third pallet is moved to the avoidance area. FIG. 12 is a schematic diagram illustrating the removal of the fourth pallet and the fourth caisson. FIG. 13 is a schematic diagram showing that the empty fourth pallet is moved to the avoidance area. FIG. 14 is a schematic diagram illustrating the removal of the third pallet and the third caisson.

Claims (13)

一種沉箱製作及搬運方法,係應用於一沉箱製作場;該方法包含下列步驟: A. 於該沉箱製作場區分一轉運區、一第一製作區、一第二製作區、一第三製作區、一第四製作區與一避讓區,其中該轉運區具有相對的一第一側與一第二側以及相對的一第三側與一第四側;該第一製作區連接於該轉運區的第一側,且該第一製作區連接於該轉運區與該第二製作區之間;該第三製作區連接於該轉運區的該第二側,且該第三製作區連接於該轉運區與該第四製作區之間;該避讓區連接於該轉運區的第三側;該第四側對應浮台船之停靠區; B. 提供一第一托板設置於該第一製作區,且於該第一托板上開始製作第一沉箱; C. 提供一第二托板設置於該第二製作區,且於該第二托板上開始製作第二沉箱; D. 提供一第三托板設置於該第三製作區,且於該第三托板上開始製作第三沉箱; E. 提供一第四托板設置於該第四製作區,且於該第四托板上開始製作第四沉箱; F. 於第一沉箱製作完成後,將該第一托板連同第一沉箱移至該轉運區,再由該轉運區移至浮台船載運離開; G. 於第二沉箱製作完成後,將該第二托板連同第二沉箱經該第一製作區移至該轉運區,再由該轉運區移至浮台船載運離開; H. 於第三沉箱製作完成後,將該第三托板連同第三沉箱移至該轉運區,再由該轉運區移至浮台船載運離開;以及 I. 於第四沉箱製作完成後,將該第四托板連同第四沉箱經該第三製作區移至該轉運區,再由該轉運區移至浮台船載運離開。A caisson manufacturing and handling method is applied to a caisson manufacturing field; the method includes the following steps: A. In the caisson manufacturing field, a transfer area, a first production area, a second production area, and a third production area are distinguished. A fourth production area and an avoidance area, wherein the transfer area has a first side and a second side opposite and a third side and a fourth side opposite; the first production area is connected to the transfer area The first production area is connected between the transfer area and the second production area; the third production area is connected to the second side of the transfer area, and the third production area is connected to the Between the transfer area and the fourth production area; the avoidance area is connected to the third side of the transfer area; the fourth side corresponds to the docking area of the pontoon boat; B. a first pallet is provided for the first production Area, and a first caisson is produced on the first pallet; C. A second pallet is provided in the second production area, and a second caisson is produced on the second pallet; D. Provide a The third pallet is set in the third production area, and production of the third pallet is started on the third pallet. Three caissons; E. Provide a fourth pallet to be set in the fourth production area, and start to produce the fourth caisson on the fourth pallet; F. After the first caisson is completed, combine the first pallet with The first caisson moves to the transfer area, and then moves from the transfer area to the pontoon ship for departure; G. After the second caisson is completed, the second pallet and the second caisson are moved through the first production area to the The transfer area is then moved from the transfer area to the pontoon ship for departure; H. After the third caisson is completed, move the third pallet together with the third caisson to the transfer area, and then move from the transfer area to The pontoon ship is carried away; and I. After the fourth caisson is completed, the fourth pallet and the fourth caisson are moved to the transfer area via the third production area, and then transferred from the transfer area to the pontoon ship. go away. 如請求項1所述之沉箱製作及搬運方法,其中於步驟F、G之間包含於浮台船返回停靠後,將浮台船上的第一托板移至該轉運區,再由該轉運區移至該避讓區。The caisson manufacturing and handling method as described in claim 1, wherein between steps F and G is included in the floating platform after the floating platform returns to dock, and the first pallet on the floating platform is moved to the transfer area, and then from the transfer area Move to the avoidance zone. 如請求項2所述之沉箱製作及搬運方法,其中於步驟F、G之間包含於該避讓區上的該第一托板上重新開始製作第一沉箱。The method for making and transporting a caisson as described in claim 2, wherein the first caisson is restarted on the first pallet included in the avoidance area between steps F and G. 如請求項3所述之沉箱製作及搬運方法,其中於步驟G、H之間包含於浮台船返回停靠後,將浮台船上的第二托板移至該轉運區,再由該轉運區經該第一製作區移至該第二製作區;以及於該第二托板上重新開始製作第二沉箱。The caisson manufacturing and handling method as described in claim 3, wherein between steps G and H is included in the floating platform after the floating platform returns to the dock, and the second pallet on the floating platform is moved to the transfer area, and then from the transfer area Moving to the second production area via the first production area; and restarting the production of the second caisson on the second pallet. 如請求項4所述之沉箱製作及搬運方法,其中步驟G、H之間於該第二托板移至該第二製作區後,包含將位於該避讓區上的第一托板連同第一沉箱之半成品移至該轉運區,再由該轉運區移至該第一製作區。The method for making and transporting a caisson as described in claim 4, wherein after the second pallet is moved to the second production area between steps G and H, the method includes the first pallet located on the avoidance area together with the first pallet. The semi-finished products of the caissons are moved to the transfer area, and then transferred from the transfer area to the first production area. 如請求項5所述之沉箱製作及搬運方法,其中於步驟H、I之間包含於浮台船返回停靠後,將浮台船上的第三托板移至該轉運區,再由該轉運區移至該避讓區。The method for making and transporting caissons as described in claim 5, wherein the steps between steps H and I are included after the floating platform returns to dock, and the third pallet on the floating platform is moved to the transfer area, and then from the transfer area Move to the avoidance zone. 如請求項6所述之沉箱製作及搬運方法,其中於步驟H、I之間包含於該避讓區上的該第三托板上重新開始製作第三沉箱。The method for making and transporting a caisson as described in claim 6, wherein the third caisson included in the avoidance area between steps H and I is restarted to produce a third caisson. 如請求項7所述之沉箱製作及搬運方法,其中於步驟I之後包含於浮台船返回停靠後,將浮台船上的第四托板移至該轉運區,再由該轉運區經該第三製作區移至該第四製作區;以及於該第四托板上重新開始製作第四沉箱。The caisson manufacturing and handling method as described in claim 7, wherein after step I, the fourth pallet on the pontoon is moved to the transfer area after the pontoon returns to dock, and then the transfer area passes the first The three production areas are moved to the fourth production area; and the production of the fourth caisson is resumed on the fourth pallet. 如請求項8所述之沉箱製作及搬運方法,其中步驟I之後於該第四托板移至該第四製作區後,包含將位於該避讓區上的該第三托板連同第三沉箱之半成品移至該轉運區,再由該轉運區移至該第三製作區。The method for making and transporting a caisson as described in claim 8, wherein after step I, after the fourth pallet is moved to the fourth production area, it includes the third pallet located on the avoidance area together with the third caisson. The semi-finished product is moved to the transfer area, and then transferred from the transfer area to the third production area. 如請求項9所述之沉箱製作及搬運方法,其中步驟I之後於該第三托板連同第三沉箱之半成品移至該第三製作區後,包含於新的第一沉箱製作完成後,將該第一托板連同第一沉箱移至該轉運區,再由該轉運區移至浮台船載運離開。The method for making and transporting the caissons as described in claim 9, wherein after step I, the third pallet and the semi-finished product of the third caissons are moved to the third production area, and after the new first caisson is completed, the The first pallet together with the first caisson is moved to the transfer area, and then transferred from the transfer area to the floating platform to be carried away. 如請求項1所述之沉箱製作及搬運方法,該沉箱製作場包含一結構體與複數個台車,該結構體具有一承載面,該承載面凹入形成有複數條橫向通道及複數條縱向通道,該些橫向通道係由該第二製作區延伸至第四製作區,該些縱向通道係由該避讓區延伸至該轉運區的第四側,且該些縱向通道與該些橫向通道於該轉運區相交會;該些台車可移動地分別設置於該些橫向通道及該些縱向通道中;各該台車包括複數個千金頂及一分配樑,該些千金頂係沿各該台車的長軸向設置,該分配樑設置於該些千金頂上,該些千金頂係受控制而帶動該分配樑位移,以使該分配樑突出或低於該承載面;步驟B至步驟E中,該第一托板、該第二托板、該第三托板及該第四托板係置於該承載面上;步驟F至步驟I中係控制位於該些橫向通道或該些縱通道中的台車之千金頂上升使對應之分配樑將對應之該第一托板、該第二托板、該第三托板或該第四托板頂離該承載面,並控制對應之台車移動以搬運對應之該第一托板、該第二托板、該第三托板或該第四托板。The caisson manufacturing and handling method according to claim 1, the caisson manufacturing site includes a structure and a plurality of trolleys, the structure has a bearing surface, and the bearing surface is recessed to form a plurality of lateral channels and a plurality of longitudinal channels The lateral channels extend from the second production area to the fourth production area, the vertical channels extend from the avoidance area to the fourth side of the transfer area, and the vertical channels and the lateral channels are in the The transfer areas meet; the trolleys are movably disposed in the transverse passages and the longitudinal passages respectively; each of the trolleys includes a plurality of golden crowns and a distribution beam, and the golden crowns are along the long axis of each of the trolleys The distribution beam is arranged on the golden roofs, and the golden roofs are controlled to drive the distribution beams so that the distribution beams protrude or fall below the bearing surface; in steps B to E, the first The pallet, the second pallet, the third pallet, and the fourth pallet are placed on the bearing surface; steps F to I control the trolleys located in the transverse passages or the longitudinal passages. Thousands of gold crowns rise to correspond The supporting beam lifts the corresponding first pallet, the second pallet, the third pallet, or the fourth pallet away from the bearing surface, and controls the corresponding trolley to move to carry the corresponding first pallet, The second pallet, the third pallet, or the fourth pallet. 如請求項11所述之沉箱製作及搬運方法,包含於在控制對應之台車的千金頂上移使對應之分配樑將對應之該第一托板、該第二托板、該第三托板或該第四托板頂離該承載面後,將複數個輔助支撐墊移至對應之分配樑的正下方;以及在控制對應之台車的千金頂下移之前,將該些輔助支撐墊移開對應之分配樑的正下方。The method for making and transporting a caisson as described in claim 11 includes moving the control over the jack of the corresponding trolley so that the corresponding distribution beam will correspond to the first pallet, the second pallet, the third pallet or After the fourth pallet is lifted off the bearing surface, a plurality of auxiliary support pads are moved directly below the corresponding distribution beams; and before controlling the corresponding gold top of the corresponding trolley to be moved down, the auxiliary support pads are removed from the corresponding ones. Its distribution beam is directly below. 如請求項12所述之沉箱製作及搬運方法,其中各該台車包括複數個第一支架、複數個第二支架與複數個伸縮桿,該些第一支架與該些第二支架分別沿各該台車的長軸向相對設置,且各該台車的千金頂位於該些第一支架與該些第二支架之間;該些伸縮桿沿各該台車的長軸向併列設置,至少一個該伸縮桿的兩端分別連接一個該第一支架與一個該第二支架;該些輔助支撐墊分別設置於該些第一支架與該些第二支架上;各該伸縮桿係受控制而伸長或縮短,以帶動該些輔助支撐墊於一第一位置與一第二位置間移動,於該第一位置時,該些輔助支撐墊位於對應之分配樑的外側且離開對應之分配樑的正下方,於該第二位置時,該些輔助支撐墊位於對應之分配樑的正下方;在對應之分配樑將對應之該第一托板、該第二托板、該第三托板或該第四托板頂離該承載面後,控制各該伸縮桿縮短,使該些輔助支撐墊於該第二位置;在控制對應之台車的千金頂下移之前,係控制各該伸縮桿伸長,使該些輔助支撐墊位於該第一位置。The method for making and transporting a caisson as described in claim 12, wherein each of the trolleys includes a plurality of first brackets, a plurality of second brackets, and a plurality of telescopic rods, and the first brackets and the second brackets respectively extend along the respective brackets. The longitudinal axes of the trolleys are opposite to each other, and the golden crowns of the trolleys are located between the first brackets and the second brackets; the telescopic rods are arranged side by side along the longitudinal axis of each of the trolleys, and at least one of the telescopic rods is arranged side by side. The two ends of the bracket are respectively connected to the first bracket and the second bracket; the auxiliary support pads are respectively arranged on the first brackets and the second brackets; each of the telescopic rods is controlled to be extended or shortened, In order to drive the auxiliary support pads to move between a first position and a second position, in the first position, the auxiliary support pads are located on the outside of the corresponding distribution beam and leave directly below the corresponding distribution beam. In the second position, the auxiliary support pads are located directly below the corresponding distribution beams; the corresponding distribution beams will correspond to the first pallet, the second pallet, the third pallet, or the fourth pallet. After the top of the board is away from the bearing surface Control the shortening of each telescopic rod to make the auxiliary support pads in the second position; before controlling the top of the corresponding trolley to move down, control the extension of each telescopic rod to make the auxiliary support pads in the first position .
TW106104087A 2017-02-08 2017-02-08 Manufacturing and transportation method of caissons TWI623668B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW106104087A TWI623668B (en) 2017-02-08 2017-02-08 Manufacturing and transportation method of caissons

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW106104087A TWI623668B (en) 2017-02-08 2017-02-08 Manufacturing and transportation method of caissons

Publications (2)

Publication Number Publication Date
TWI623668B true TWI623668B (en) 2018-05-11
TW201829880A TW201829880A (en) 2018-08-16

Family

ID=62951429

Family Applications (1)

Application Number Title Priority Date Filing Date
TW106104087A TWI623668B (en) 2017-02-08 2017-02-08 Manufacturing and transportation method of caissons

Country Status (1)

Country Link
TW (1) TWI623668B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4797031A (en) * 1986-06-06 1989-01-10 Daiho Construction Co., Ltd. Caisson sinking method
TW309559B (en) * 1996-06-14 1997-07-01 Jen-Chwen Liou Structure and construction method of caisson
TW200617243A (en) * 2004-11-19 2006-06-01 Koyo Jidoki Structure of caisson
CN201241334Y (en) * 2008-06-20 2009-05-20 中交第一航务工程局有限公司 Equipment for hydraulically pushing and transporting caisson
CN102873748B (en) * 2012-09-22 2014-09-17 王炳贞 Large-scale concrete member preforming device and preforming method of large-scale concrete member
CN204023597U (en) * 2014-07-31 2014-12-17 中交四航局第五工程有限公司 A kind of trailer system of carrying large caisson
CN205555334U (en) * 2016-04-04 2016-09-07 中建筑港集团有限公司 Component transfer arrangement

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4797031A (en) * 1986-06-06 1989-01-10 Daiho Construction Co., Ltd. Caisson sinking method
TW309559B (en) * 1996-06-14 1997-07-01 Jen-Chwen Liou Structure and construction method of caisson
TW200617243A (en) * 2004-11-19 2006-06-01 Koyo Jidoki Structure of caisson
CN201241334Y (en) * 2008-06-20 2009-05-20 中交第一航务工程局有限公司 Equipment for hydraulically pushing and transporting caisson
CN102873748B (en) * 2012-09-22 2014-09-17 王炳贞 Large-scale concrete member preforming device and preforming method of large-scale concrete member
CN204023597U (en) * 2014-07-31 2014-12-17 中交四航局第五工程有限公司 A kind of trailer system of carrying large caisson
CN205555334U (en) * 2016-04-04 2016-09-07 中建筑港集团有限公司 Component transfer arrangement

Also Published As

Publication number Publication date
TW201829880A (en) 2018-08-16

Similar Documents

Publication Publication Date Title
KR100623201B1 (en) A Method for Shipbuilding on the ground and Launching Ships Using a Skid Launching System
KR101282350B1 (en) Deck house for container vessel and container loading method using the deck house
CN102337736B (en) Installation process of upper module on offshore oil platform
CN110055902B (en) Large-tonnage box girder normal position lifting beam bridge erecting construction method and erection method thereof
KR20150034278A (en) Overhead crane and assembly of at least two overhead cranes
CN107499968A (en) A kind of unloading method of bridge crane in shallow draft quay
CN112081011B (en) Shipping and transporting method for large prestressed concrete precast box girder
JP5158544B2 (en) Landing and launching equipment for floating structures
TWI380932B (en) A method of contemporaneously constructing more than one semi-submersible rig using transverse skidding
SE511187C2 (en) Methods and installations for transporting large units, especially for loading and unloading containers
CN102442407A (en) Production line and method for building superstructures of ships
TWI623668B (en) Manufacturing and transportation method of caissons
US20110142590A1 (en) Modular heavy lift system
CN112081012B (en) Jacking and transporting method for large prestressed concrete precast box girder
CN203877524U (en) High-efficiency transit system for shoreside container
KR20130005516A (en) Erection method with divided block of vessel and system for the method thereof
RU2553487C1 (en) Equipment for installation of heavy ship equipment and method of its installation
CN206485367U (en) A kind of board migration device of accommodation module peculiar to vessel
JP2002068078A (en) Floating body structure
CN217123497U (en) Factory system for prefabricating integral reinforced concrete immersed tube on assembly line
RU2441799C2 (en) Method for construction of floating structures
CN109110050A (en) Semi-submersible type loads and unloads ship
CN105926466A (en) Device and construction method for steel truss bridge integral transporting
CN113482004A (en) Offshore multi-tube jacket foundation and wind power complete machine wharf launching construction method thereof
JP2006182296A (en) On-land vessel construction and launching method using skid launching system