TWI614443B - Drainage device and installation method thereof - Google Patents

Drainage device and installation method thereof Download PDF

Info

Publication number
TWI614443B
TWI614443B TW105132779A TW105132779A TWI614443B TW I614443 B TWI614443 B TW I614443B TW 105132779 A TW105132779 A TW 105132779A TW 105132779 A TW105132779 A TW 105132779A TW I614443 B TWI614443 B TW I614443B
Authority
TW
Taiwan
Prior art keywords
layer
positioning portions
disposed
receiving surface
waterproof
Prior art date
Application number
TW105132779A
Other languages
Chinese (zh)
Other versions
TW201814196A (en
Inventor
楊詠植
蕭茂軒
Original Assignee
楊詠植
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=62014520&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=TWI614443(B) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by 楊詠植 filed Critical 楊詠植
Priority to TW105132779A priority Critical patent/TWI614443B/en
Application granted granted Critical
Publication of TWI614443B publication Critical patent/TWI614443B/en
Publication of TW201814196A publication Critical patent/TW201814196A/en

Links

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

本發明提供一種排水器,其包含:一接頭本體,其具有一接管部及一導管部,接管部具有連通導管部之一導水孔,導水孔之內周緣間隔設有複數第一定位部及複數第二定位部,各第二定位部間隔設於每兩相鄰之第一定位部間,各第一定位部與各第二定位部間設有一斜面,其中,各第一定位部及各第二定位部分別設有一階層塊,各第一定位部相對於接頭本體之軸向凸設有一凸塊,藉此,可依照需求銜接不同管徑之套管。The present invention provides a drainer comprising: a joint body having a joint portion and a conduit portion, the joint portion having a water conduit for communicating with the conduit portion, and the inner peripheral edge of the water conduit is provided with a plurality of first positioning portions and a plurality of a second positioning portion, each of the second positioning portions is disposed between each of the two adjacent first positioning portions, and a slope is disposed between each of the first positioning portions and each of the second positioning portions, wherein each of the first positioning portions and each of the first positioning portions The two positioning portions are respectively provided with a block, and each of the first positioning portions is convexly provided with a protrusion with respect to the axial direction of the joint body, thereby connecting the sleeves of different pipe diameters according to requirements.

Description

排水器及其施工方法Drainage device and construction method thereof

本發明係關於一種排水器及施工方法,尤指一種連接於已預埋排水管之排水器及設置之施工方法。The invention relates to a drainer and a construction method, in particular to a drainer connected to a pre-buried drain pipe and a construction method thereof.

按,中華民國專利第M506843號揭露一種排水管路結構,其包含:一管本體,其具有頂管部、底管部以及導管部,頂管部係設有入流口連通導管部,且入流口內壁面係具有環錐面,另外在環錐面上設置有複數定位凸塊,而在頂管部的外周側另環繞有環圈部,環圈部係與頂管部外周側形成有蓄水槽;在導管部外周側另延伸有導管部;一導接件,其插入於頂管部入流口,導接件係設有一導引口連通導管部,又導接件的一端係靠抵於頂管部銜接導管部之內側壁面。According to the Republic of China Patent No. M506843, a drain pipe structure is disclosed, comprising: a pipe body having a top pipe portion, a bottom pipe portion and a duct portion, wherein the top pipe portion is provided with an inflow port connecting conduit portion, and the inflow port The inner wall surface has a ring-shaped tapered surface, and a plurality of positioning protrusions are arranged on the annular cone surface, and a ring-shaped portion is further surrounded on the outer peripheral side of the top tube portion, and a water-storage groove is formed on the outer peripheral side of the ring-shaped portion and the top tube portion. a conduit portion is further extended on the outer peripheral side of the conduit portion; a guiding member is inserted into the inlet portion of the top tube portion, and the guiding member is provided with a guiding port for connecting the conduit portion, and one end of the guiding member is abutted against the top portion The tube portion connects the inner side wall surface of the conduit portion.

然而,在使用前述之排水管結構時,須在規劃埋設管路同時將排水管路結構整組設置於建築物之鋼筋水泥層中,一旦設置好排水管路結構後,若排水管路結構有損壞或破裂時,由於排水管路結構與鋼筋水泥層間無防水措施,因此,當由落水頭進入管本體中之廢水就會由管本體滲出置鋼筋水泥層中,造成壁癌或白化現象,如欲修繕時,須將埋設周圍之地磚大面積拆除,並將整組排水管路結構拆卸更換,造成修繕程序上費時與費工,且提高修整費用。However, when using the above-mentioned drain pipe structure, the drainage pipe structure must be set in the reinforced concrete layer of the building at the same time as the buried pipeline is planned. Once the drainage pipe structure is set, if the drainage pipe structure has When it is damaged or broken, because there is no waterproof measure between the structure of the drainage pipe and the reinforced concrete layer, when the water entering the pipe body from the falling head will ooze out of the pipe reinforced concrete layer, causing wall cancer or whitening phenomenon, such as When repairing, it is necessary to dismantle the large area of the surrounding floor tiles and disassemble and replace the entire set of drainage pipeline structures, resulting in time-consuming and labor-saving repair procedures and increased repair costs.

再者,前述之排水管結構僅適用於新建案中,若欲使用前述之排水管路結構於舊建案翻建中,須將舊建案中之所有管路拆除,再重新做規畫埋設,前述之台水管結構無法依照需求,於原管路中作調整或增設,因此,造成翻修成本之增加與增加施工程序之複雜度。Furthermore, the above-mentioned drain pipe structure is only applicable to the new construction case. If the above-mentioned drainage pipe structure is to be used in the old construction of the case, all the pipes in the old construction case must be demolished and re-planned and buried. The aforementioned water pipe structure cannot be adjusted or added in the original pipeline according to the demand, thus causing an increase in the renovation cost and an increase in the complexity of the construction procedure.

另外,前述之管本體僅能連接單一管徑之管套,能適用之範圍有所限制,無法廣泛運用,若須使用不同管徑之套管時,須於規畫埋設管路時,設置不同類型之排水管路,以配合不同套管使用,進而造成施工步驟與成本之增加,也缺乏其適用性。因此,如何簡化修繕或翻修之程序,且能依照需求連接不同管徑之套管,提高適用性及便利性,有代相關業者解決之。In addition, the above-mentioned pipe body can only be connected to a single pipe diameter pipe sleeve, and the applicable range is limited, and it cannot be widely used. If a casing of different pipe diameters is to be used, it is necessary to set differently when laying the pipeline. Types of drainage pipes are used in conjunction with different casings, resulting in increased construction steps and costs, and lack of applicability. Therefore, how to simplify the repair or renovation process, and can connect different diameters of the casing according to the requirements, improve the applicability and convenience, and solve it by the relevant industry.

為解決上述課題,本發明提供一種排水器及其施工方法,藉由將接頭本體設置於已埋設好之排水管中,讓施工人員能依照需求作調整安裝,若須修繕時,僅須將接頭本體更換,藉此,減化修繕程序與成本花費;另外,接管部設有複數第一定位部及複數第二定位部,以提供不同管徑之套管套設,藉此,增加本發明之適用性及適用範圍。In order to solve the above problems, the present invention provides a drainer and a construction method thereof. The joint body can be installed in a buried drain pipe, so that the construction personnel can adjust and install according to the requirements. The main body is replaced, thereby reducing the repairing procedure and the cost; in addition, the connecting portion is provided with a plurality of first positioning portions and a plurality of second positioning portions to provide sleeve sleeves of different diameters, thereby increasing the present invention Applicability and scope of application.

為達到上述目的,本發明提供一種排水器,其包含:一接頭本體,其具有一接管部及一導管部,接管部具有連通導管部之一導水孔,導水孔之內周緣間隔設有複數第一定位部及複數第二定位部,各第二定位部間隔設於每兩相鄰之第一定位部間,各第一定位部與各第二定位部間設有一斜面,其中,各第一定位部及各第二定位部分別設有一階層塊,各第一定位部相對於接頭本體之軸向凸設有一凸塊。In order to achieve the above object, the present invention provides a drainer comprising: a joint body having a joint portion and a conduit portion, the joint portion having a water conduit for communicating the conduit portion, and the inner circumference of the water conduit is provided with a plurality of intervals a positioning portion and a plurality of second positioning portions, wherein each of the second positioning portions is disposed between each of the two adjacent first positioning portions, and a slope is disposed between each of the first positioning portions and each of the second positioning portions, wherein each of the first positioning portions The positioning portion and each of the second positioning portions are respectively provided with a level block, and each of the first positioning portions is convexly provided with a protrusion relative to the axial direction of the joint body.

為達到上述目的,本發明提供一種排水器施工方法,其包含以下步驟:(A)將已埋設之一排水管周圍去除一面積範圍,形成一容置空間;(B)於容置空間設置一第一防水層;(C)將接頭本體放置於容置空間,令導管部穿設於排水管中,接管部設於排水管外,導水孔與排水管連通;(D)於容置空間設置一固定層,且包覆接管部外側至少一部分;(E)於固定層上方設置一填縫層,藉由填縫層填補固定層與接管部間之縫隙;(F)全面地坪鋪設一第二防水層,同時將第二防水層設於導水孔中,且至少設置到標記件之位置,以完成接頭本體之設置施工;以及(G)將套管與落水頭裝設於接管部,於第二防水層上設置一水泥層與一地材層,以完成施工。In order to achieve the above object, the present invention provides a drainer construction method, which comprises the following steps: (A) removing an area of a drained pipe to form an accommodating space; and (B) arranging a space in the accommodating space. a first waterproof layer; (C) placing the joint body in the accommodating space, the conduit portion is disposed in the drain pipe, the take-up portion is disposed outside the drain pipe, and the water guide hole is connected with the drain pipe; (D) is disposed in the accommodating space a fixing layer and covering at least a portion of the outer side of the pipe portion; (E) providing a caulking layer above the fixing layer, filling a gap between the fixing layer and the connecting portion by the caulking layer; (F) laying a comprehensive floor a waterproof layer, at the same time, the second waterproof layer is disposed in the water guiding hole, and is disposed at least to the position of the marking member to complete the installation of the joint body; and (G) installing the sleeve and the water falling head in the connecting portion, A cement layer and a ground layer are disposed on the second waterproof layer to complete the construction.

藉此,本發明之接頭本體用以設置於已埋設好之排水管中,無論於新舊建案中,施工人員可依據排水管位置或建材位置,增設或調整接頭本體設置之位置,且可增加表面材施作美觀及收邊之位置減少誤差值,以改善習知須先將排水氣預埋設於鋼筋水泥層中,無法再做調整之缺點,因而增加本發明之便利性與調性。另外,各第一定位部與各第二定位部之間隔設置,可依照需求銜接不同管徑之套管,以增加本發明之適用範圍。Thereby, the joint body of the present invention is arranged in the buried drain pipe, and in the new and old construction case, the construction personnel can add or adjust the position of the joint body according to the position of the drain pipe or the position of the building material, and Increasing the surface material for aesthetic appearance and the position of the edge reduction reduces the error value, so as to improve the convenience of the prior art that the drainage gas is first embedded in the reinforced concrete layer, and the adjustment cannot be made, thereby increasing the convenience and tonality of the present invention. In addition, the first positioning portion and the second positioning portions are spaced apart from each other, and the sleeves of different diameters can be connected according to requirements to increase the scope of application of the present invention.

此外,當排水口處之地板或水泥產生裂縫時,廢水會經由裂縫逐漸之侵蝕滲入地面下各材質中,而廢水可以由各第一定位部與各第二定位部間之斜面將廢水排至導管部中,以防止廢水涵於因各材質層中,造成接頭本體損壞之問題。In addition, when the floor or the cement at the water outlet is cracked, the waste water will gradually penetrate into the materials under the ground through the crack, and the waste water can discharge the waste water from the slope between the first positioning portion and each of the second positioning portions. In the duct portion, the problem that the waste water is culminated in the material layer causes the joint body to be damaged.

再著,裝設接頭本體時,於容置空間先鋪第一防水層,並以固定層與填縫層加以固定及防護,接者再以第二防水層作二次防護,藉此,若接頭本體有損壞或破裂時,即使廢水就會由接頭本體滲出,第一防水層能防止廢水滲入鋼筋水泥層中,避免造成壁癌或白化現象,以達到全面排水及防水效果,故能減少漏水機會。Then, when the joint body is installed, the first waterproof layer is first laid in the accommodating space, and fixed and protected by the fixed layer and the caulking layer, and then the second waterproof layer is used for secondary protection, thereby When the joint body is damaged or broken, even if the waste water will seep out from the joint body, the first waterproof layer can prevent the wastewater from penetrating into the reinforced concrete layer to avoid wall cancer or whitening, so as to achieve comprehensive drainage and waterproof effect, thus reducing leakage. opportunity.

為便於說明本發明於上述發明內容一欄中所表示的中心思想,茲以具體實施例表達。實施例中各種不同物件係按適於說明之比例、尺寸、變形量或位移量而描繪,而非按實際元件的比例予以繪製,合先敘明。For the convenience of the description, the central idea expressed by the present invention in the column of the above summary of the invention is expressed by the specific embodiments. Various items in the embodiments are depicted in terms of ratios, dimensions, amounts of deformation, or displacements that are suitable for illustration, and are not drawn to the proportions of actual elements, as set forth above.

請參閱圖1至圖6所示,本發明提供一種排水器,其設置已埋設之一排水管1中,且用以將一排水口處2之廢水3排出,排水器包含:Referring to FIG. 1 to FIG. 6 , the present invention provides a drain device which is disposed in one of the drain pipes 1 and is used for discharging the waste water 3 at a drain port 2, the drainer comprising:

一接頭本體10,其呈漏斗狀,且具有一接管部11及一導管部12,接管部11具有連通導管部12之一導水孔111及設有一頂端112,而導水孔111之內周緣間隔設有複數第一定位部20及複數第二定位部30,各第二定位部30間隔設於每兩相鄰之第一定位部20間,且各第一定位部20與各第二定位部30間設有一斜面40,而斜面40係由頂端112朝導管部12之方向往下傾斜。A joint body 10 having a funnel shape and having a connecting portion 11 and a conduit portion 12 having a water guiding hole 111 communicating with the conduit portion 12 and a top end 112, wherein the inner circumference of the water guiding hole 111 is spaced apart There are a plurality of first positioning portions 20 and a plurality of second positioning portions 30. The second positioning portions 30 are spaced apart from each other between the two adjacent first positioning portions 20, and each of the first positioning portions 20 and each of the second positioning portions 30 A bevel 40 is provided therebetween, and the bevel 40 is inclined downward from the tip 112 toward the conduit portion 12.

再者,接管部11係呈矩形或圓形其中之一,於本發明中,接管部11係圓形,導管部12則為圓柱管,而第一定位部20與第二定位部30係環設於導水孔111之內周緣,且第一定位部20設置於導水孔111之內周緣所佔之面積大於第二定位部30設置於導水孔111之內周緣所佔之面積,其中,第一定位部20之數量係3個,第二定位部30之數量係3個,斜面40之數量係6個,而每一第一定位部20係等間隔120度設置,每一第二定位部30係等間隔120度設置,每一第一定位部20與每一第二定位部30間之夾角係35度至45度,每一第一定位部20與每一斜面40之夾角係10至20度,每一第二定位部30與每一斜面40之夾角係20至35度。Furthermore, the connecting portion 11 is one of a rectangular shape or a circular shape. In the present invention, the connecting portion 11 is circular, the conduit portion 12 is a cylindrical tube, and the first positioning portion 20 and the second positioning portion 30 are looped. The area of the inner circumference of the water guiding hole 111 is greater than the area occupied by the inner circumference of the water guiding hole 111 of the first positioning portion 20, and the area occupied by the inner circumference of the water guiding hole 111. The number of the positioning portions 20 is three, the number of the second positioning portions 30 is three, and the number of the inclined surfaces 40 is six, and each of the first positioning portions 20 is disposed at an interval of 120 degrees, and each of the second positioning portions 30 is provided. The angle between each first positioning portion 20 and each second positioning portion 30 is 35 degrees to 45 degrees, and the angle between each first positioning portion 20 and each inclined surface 40 is 10 to 20. The angle between each second positioning portion 30 and each inclined surface 40 is 20 to 35 degrees.

此外,各第一定位部20及各第二定位部30分別設有一階層塊50,且各第一定位部20相對於接頭本體10之軸向更凸設有一凸塊60,其中,階層塊50具有一第一承接面51及一第二承接面52,而第一承接面51及第二承接面52與接頭本體10之軸向垂直,且第一承接面51與第二承接面52之設置高度不同,其中,第一承接面51與頂端112間具有垂直之一第一距離L1,第二承接面52與頂端112間具有垂直之一第二距離L2,而第二距離L2大於第一距離L1,於本發明中,第二距離L2大於第一距離L1之1.5倍。In addition, each of the first positioning portion 20 and each of the second positioning portions 30 is provided with a level block 50, and each of the first positioning portions 20 is convexly disposed with respect to the axial direction of the joint body 10, wherein the level block 50 is The first receiving surface 51 and the second receiving surface 52 are perpendicular to the axial direction of the joint body 10, and the first receiving surface 51 and the second receiving surface 52 are disposed. The height is different, wherein the first receiving surface 51 and the top end 112 have a first distance L1 perpendicular to each other, and the second receiving surface 52 and the top end 112 have a second distance L2 perpendicular to the first distance, and the second distance L2 is greater than the first distance L1, in the present invention, the second distance L2 is greater than 1.5 times the first distance L1.

另外,第一承接面51與第二承接面52轉角連接處設有一抵靠面53,且抵靠面53與接頭本體10之軸向平行,而抵靠面53係弧面,其中,凸塊60設於第一承接面51上,且凸塊60之設置高度等同於第一距離L1;再者,凸塊60具有一第一側面61及相反設置之一第二側面62,而第一側面61與導水孔111之側壁113間具有一第三距離L3,抵靠面53與導水孔111之側壁113間具有一第四距離L4,其中,第四距離L4大於第三距離L3,於本發明中,第四距離L4大於第三距離L3之1.1倍至1.5倍。In addition, an abutting surface 53 is disposed at a corner joint of the first receiving surface 51 and the second receiving surface 52, and the abutting surface 53 is parallel to the axial direction of the joint body 10, and the abutting surface 53 is a curved surface, wherein the convex portion 60 is disposed on the first receiving surface 51, and the height of the protrusion 60 is equal to the first distance L1; further, the protrusion 60 has a first side 61 and a second side 62 oppositely disposed, and the first side There is a third distance L3 between the abutting surface 53 and the side wall 113 of the water guiding hole 111, wherein the fourth distance L4 is greater than the third distance L3, in the present invention. The fourth distance L4 is greater than 1.1 times to 1.5 times the third distance L3.

因此,當不同管徑之套管4裝設於導水孔111時,套管4之底部5會面接觸於第一承接面51或第二承接面52上,增加套管4與第一承接面51或第二承接面52間之接觸面積,增加其穩固效果。Therefore, when the sleeve 4 of different diameters is installed in the water guiding hole 111, the bottom portion 5 of the sleeve 4 is in surface contact with the first receiving surface 51 or the second receiving surface 52, and the sleeve 4 and the first receiving surface 51 are added. Or the contact area between the second receiving faces 52 increases the stabilizing effect.

再者,藉由第一定位部20與第二定位部30環狀間隔設置,令階層塊50或凸塊60環狀交錯設置,當套管4設置於導水孔111時,不同管徑之套管4外緣可抵靠於符合管徑之抵靠面53、第一側面61、第二側面62、導管部12之內周緣或導水孔111之側壁113其中之一,以達到快速對準定位之效果,且可增加套管4設置之穩固程度。Furthermore, the first positioning portion 20 and the second positioning portion 30 are annularly spaced apart, so that the block 50 or the bumps 60 are annularly staggered. When the sleeve 4 is disposed in the water guiding hole 111, the sleeves of different diameters are set. The outer edge of the tube 4 can abut against one of the abutment surface 53, the first side surface 61, the second side surface 62, the inner circumference of the conduit portion 12 or the side wall 113 of the water conduit 111 to achieve rapid alignment. The effect is increased and the stability of the sleeve 4 setting can be increased.

請參閱圖4所示,表示接管部11套設不同管徑之套管,其中,當最小管徑之套管4a套設於接管部11時,套管4a之外緣會抵靠於導管部12之內周緣;將大於套管4a管徑之套管4b套設於接管部11時,套管4b之外緣會抵靠於抵靠面53,且底部5會面接觸於第二承接面52;將大於套管4b管徑之套管4c套設於接管部11時,套管4c之外緣會抵靠於第一側面61,且底部5會面接觸於第一承接面51;將大於套管4c管徑之套管4d套設於接管部11時,套管4d之外緣會抵靠於第二側面62,且底部5會面接觸於第一承接面51;將大於套管4d管徑之套管4e套設於接管部11時,套管4e之外緣會抵靠於側壁113,且底部5會面接觸於第一承接面51。藉此,本發明除了可依照需求設置不同管徑之套管4,增加本發明之使用範圍,更能增加套管4設置之穩固性及定位效果。Referring to FIG. 4, the connecting portion 11 is sleeved with sleeves of different diameters. When the sleeve 4a of the smallest diameter is sleeved on the connecting portion 11, the outer edge of the sleeve 4a abuts against the conduit portion. The inner circumference of 12; when the sleeve 4b larger than the diameter of the sleeve 4a is sleeved on the joint portion 11, the outer edge of the sleeve 4b will abut against the abutment surface 53, and the bottom portion 5 will face the second receiving surface 52. When the sleeve 4c larger than the diameter of the sleeve 4b is sleeved on the joint portion 11, the outer edge of the sleeve 4c will abut against the first side surface 61, and the bottom portion 5 will face the first receiving surface 51; When the sleeve 4d of the tube 4c is sleeved on the connecting portion 11, the outer edge of the sleeve 4d will abut against the second side surface 62, and the bottom portion 5 will face the first receiving surface 51; it will be larger than the diameter of the sleeve 4d When the sleeve 4e is sleeved on the joint portion 11, the outer edge of the sleeve 4e will abut against the side wall 113, and the bottom portion 5 will face the first receiving surface 51. Therefore, in addition to the sleeve 4 of different diameters, the invention can increase the range of use of the invention, and can further increase the stability and positioning effect of the sleeve 4 setting.

此外,當排水口處2之地板或水泥產生裂縫時,廢水3會經由裂縫逐漸之侵蝕滲入地面下各材質中,而廢水3可以由斜面40將廢水3排至導管部12中,以防止廢水3涵於因各材質層中,造成接頭本體10損壞、壁癌或白化現象之問題。In addition, when a crack occurs in the floor or cement at the water outlet 2, the wastewater 3 will gradually penetrate into the materials under the ground through the crack, and the wastewater 3 can discharge the wastewater 3 into the conduit portion 12 by the slope 40 to prevent the wastewater. 3 is caused by the problem of damage to the joint body 10, wall cancer or whitening due to various material layers.

請參閱圖5至圖6所示,本發明提供一種應用於排水器之施工方法,其包含以下步驟:Referring to FIG. 5 to FIG. 6 , the present invention provides a construction method applied to a drain, which comprises the following steps:

(A)將已埋設之排水管1周圍去除一面積範圍,以形成一容置空間,並於容置空間中設置固定防水材質層70,其中,固定防水材質層70包含:一第一防水層71、一第二防水層72、一固定層73及一填縫層74,用以增加防水及固定效果。再者,面積範圍之邊長係3公分至10公分,面積範圍之高度係1公分至3公分,於本發明中,面積範圍之邊長係5公分,面積範圍之高度係2公分,而面積範圍可依據表面材及收邊之位置作調整,增加本發明之調整性。(A) removing the area around the drained pipe 1 to form an accommodating space, and providing a fixed waterproof material layer 70 in the accommodating space, wherein the fixed waterproof material layer 70 comprises: a first waterproof layer 71. A second waterproof layer 72, a fixed layer 73 and a filling layer 74 are used to increase the waterproofing and fixing effect. Furthermore, the length of the area ranges from 3 cm to 10 cm, and the height of the area ranges from 1 cm to 3 cm. In the present invention, the side of the area is 5 cm long, and the height of the area is 2 cm, and the area is The range can be adjusted according to the position of the surface material and the edge, which increases the adjustability of the present invention.

(B)先於容置空間設置第一防水層71,而第一防水層71係防水漆、防水膠或防水塗料其中之一,可依照所需選擇其防水材料及設置厚度,而第一防水層71設置之目的在於,若接頭本體10有損壞或破裂時,即使廢水3就會由接頭本體10滲出,而第一防水層71能防止廢水3滲入鋼筋水泥層6中,增加接頭本體10與鋼筋水泥層6間防水效果,避免造成壁癌或白化現象,以達到全面排水、防水效果及減少漏水機會。(B) arranging the first waterproof layer 71 prior to the accommodating space, and the first waterproof layer 71 is one of waterproof paint, waterproof glue or waterproof paint, and the waterproof material and the set thickness can be selected according to the need, and the first waterproof The purpose of the layer 71 is to prevent the waste water 3 from oozing out of the joint body 10 if the joint body 10 is damaged or broken, and the first waterproof layer 71 can prevent the wastewater 3 from penetrating into the reinforced concrete layer 6, thereby increasing the joint body 10 and The waterproof effect of the reinforced concrete layer 6 avoids wall cancer or whitening, so as to achieve comprehensive drainage, waterproof effect and reduce leakage opportunities.

(C)接著,將接頭本體10放置於容置空間中,令導管部12穿設於排水管1中,接管部11設於排水管1外,而導水孔111與排水管1連通。(C) Next, the joint main body 10 is placed in the accommodating space, and the duct portion 12 is bored in the drain pipe 1. The joint portion 11 is provided outside the drain pipe 1, and the water guide hole 111 communicates with the drain pipe 1.

(D)再於容置空間設置固定層73,且包覆接管部11外側至少一部分,於本發明中,固定層73之設置高度係面積範圍高度之二分之一,其中,固定層73係無收縮水泥。(D) further providing the fixing layer 73 in the accommodating space and covering at least a part of the outer side of the tube portion 11. In the present invention, the fixing layer 73 is disposed at a height which is one-half the height of the area range, wherein the fixing layer 73 is No shrinkage cement.

(E)於固定層73上方設置填縫層74,藉由填縫層74填補固定層73與接管部11間之縫隙,且固定層73與填縫層74將接管部11之外側完整包覆,以增加接頭本體10之固定效果,其中,填縫層74係PU填縫材質或防水材質其中之一。(E) A caulking layer 74 is disposed above the fixing layer 73, and the gap between the fixing layer 73 and the joint portion 11 is filled by the caulking layer 74, and the fixing layer 73 and the caulking layer 74 completely cover the outer side of the joint portion 11. In order to increase the fixing effect of the joint body 10, the caulking layer 74 is one of a PU caulking material or a waterproof material.

(F)將接頭本體10固定好後,於鋼筋水泥層6上,全面地坪鋪設第二防水層72,同時將第二防水層72設於導水孔111中,其中,導水孔111之內周緣設有一標記件80,而標記件80設置於斜面40、第一承接面51或凸塊60至少其中之一或任兩種以上之組合,於本發明中,標記件80係環設於斜面40、第一承接面51及凸塊60上,因此,需將第二防水層72設置至少到標記件80之位置,以完成接頭本體10之設置施工。其中,第二防水層72係防水漆、防水膠或防水塗料其中之一,而第一防水層71與第二防水層72可依照需求使用同一材質設置或不同材質,且填縫層74也可依照需求使用與第一防水層71及第二防水層72相同之防水材質,增加其防水效果。(F) After the joint body 10 is fixed, the second waterproof layer 72 is laid on the reinforced concrete layer 6 in a comprehensive manner, and the second waterproof layer 72 is disposed in the water guiding hole 111, wherein the inner periphery of the water guiding hole 111 A marking member 80 is provided, and the marking member 80 is disposed on at least one of the inclined surface 40, the first receiving surface 51 or the projection 60, or a combination of two or more. In the present invention, the marking member 80 is looped on the inclined surface 40. The first receiving surface 51 and the bump 60 are disposed. Therefore, the second waterproof layer 72 is disposed at least to the position of the marking member 80 to complete the installation of the joint body 10. The second waterproof layer 72 is one of a waterproof paint, a waterproof adhesive or a waterproof paint, and the first waterproof layer 71 and the second waterproof layer 72 can be provided with the same material or different materials according to requirements, and the seam layer 74 can also be used. The same waterproof material as the first waterproof layer 71 and the second waterproof layer 72 is used as needed to increase the waterproof effect.

(G)最後,將套管4裝設於接管部11中,再將落水頭7將設於套管4上,並於第二防水層72上方依序設置一水泥層8與一地材層9,以完成管路施工,其中,地材層9係磁磚材質。(G) Finally, the sleeve 4 is installed in the joint portion 11, and the water drop head 7 is disposed on the sleeve 4, and a cement layer 8 and a ground layer are sequentially disposed above the second waterproof layer 72. 9, to complete the pipeline construction, wherein the ground material layer 9 is made of tile material.

因此,藉由將固定防水材質層70設置於容置空間中,以提供良好之穩固及防水效果,其中,第一防水層71與第二防水層72皆能防止廢水3滲入鋼筋水泥層6中,且固定層73與填縫層74也能增加接頭本體10之穩固及防護效果,藉此,本發明之施工步驟能提供完善之防水措施,以達到全面排水、防水效果及減少漏水機會。Therefore, the fixed waterproof material layer 70 is disposed in the accommodating space to provide a good stability and waterproof effect, wherein the first waterproof layer 71 and the second waterproof layer 72 can prevent the wastewater 3 from penetrating into the reinforced concrete layer 6. Moreover, the fixing layer 73 and the caulking layer 74 can also increase the stability and protection effect of the joint body 10, whereby the construction steps of the present invention can provide perfect waterproof measures to achieve comprehensive drainage, waterproof effect and reduce leakage opportunities.

以上所舉實施例僅用以說明本發明而已,非用以限制本發明之範圍。舉凡不違本發明精神所從事的種種修改或變化,俱屬本發明意欲保護之範疇。The above embodiments are merely illustrative of the invention and are not intended to limit the scope of the invention. Any modifications or variations that are made without departing from the spirit of the invention are intended to be protected.

1‧‧‧排水管1‧‧‧Drainage pipe

20‧‧‧第一定位部20‧‧‧First Positioning Department

2‧‧‧排水口處2‧‧‧Drainage

30‧‧‧第二定位部30‧‧‧Second Positioning Department

3‧‧‧廢水3‧‧‧ Wastewater

40‧‧‧斜面40‧‧‧Bevel

4‧‧‧套管4‧‧‧ casing

50‧‧‧階層塊50‧‧‧Leng block

4a‧‧‧套管4a‧‧‧ casing

51‧‧‧第一承接面51‧‧‧The first interface

4b‧‧‧套管4b‧‧‧ casing

52‧‧‧第二承接面52‧‧‧Second interface

4c‧‧‧套管4c‧‧‧ casing

53‧‧‧抵靠面53‧‧‧Abutment

4d‧‧‧套管4d‧‧‧ casing

60‧‧‧凸塊60‧‧‧Bumps

4e‧‧‧套管4e‧‧‧ casing

61‧‧‧第一側面61‧‧‧ first side

5‧‧‧底部5‧‧‧ bottom

62‧‧‧第二側面62‧‧‧ second side

6‧‧‧鋼筋水泥層6‧‧‧ reinforced concrete layer

70‧‧‧固定防水材質層70‧‧‧Fixed waterproof layer

7‧‧‧落水頭7‧‧‧Water head

71‧‧‧第一防水層71‧‧‧First waterproof layer

8‧‧‧水泥層8‧‧‧cement layer

72‧‧‧第二防水層72‧‧‧Second waterproof layer

9‧‧‧地材層9‧‧‧Material layer

73‧‧‧固定層73‧‧‧Fixed layer

10‧‧‧接頭本體10‧‧‧Connector body

74‧‧‧填縫層74‧‧‧Seam layer

11‧‧‧接管部11‧‧‧Receipt Department

80‧‧‧標記件80‧‧‧Markings

111‧‧‧導水孔111‧‧‧Water guide hole

L1‧‧‧第一距離L1‧‧‧ first distance

112‧‧‧頂端112‧‧‧Top

L2‧‧‧第二距離L2‧‧‧Second distance

113‧‧‧側壁113‧‧‧ side wall

L3‧‧‧第三距離L3‧‧‧ third distance

12‧‧‧導管部12‧‧‧Tube Department

L4‧‧‧第四距離L4‧‧‧fourth distance

圖1係本發明之接頭本體立體圖。 圖2係本發明沿圖1之2-2剖面線所取之剖面圖。 圖3係本發明沿圖1之3-3剖面線所取之剖面圖。 圖4係本發明之接頭本體適用於不同套管之示意圖。 圖5係本發明之接頭本體施工結構圖。 圖6係本發明之接頭本體裝設後安裝套管與落水頭之示意圖。Figure 1 is a perspective view of the joint body of the present invention. Figure 2 is a cross-sectional view of the present invention taken along line 2-2 of Figure 1. Figure 3 is a cross-sectional view of the present invention taken along line 3-3 of Figure 1. Figure 4 is a schematic illustration of the joint body of the present invention suitable for use with different sleeves. Fig. 5 is a structural view showing the construction of the joint body of the present invention. Fig. 6 is a schematic view showing the mounting sleeve and the water drop head after the joint body of the present invention is installed.

10‧‧‧接頭本體 10‧‧‧Connector body

11‧‧‧接管部 11‧‧‧Receipt Department

111‧‧‧導水孔 111‧‧‧Water guide hole

112‧‧‧頂端 112‧‧‧Top

113‧‧‧側壁 113‧‧‧ side wall

12‧‧‧導管部 12‧‧‧Tube Department

20‧‧‧第一定位部 20‧‧‧First Positioning Department

30‧‧‧第二定位部 30‧‧‧Second Positioning Department

40‧‧‧斜面 40‧‧‧Bevel

50‧‧‧階層塊 50‧‧‧Leng block

51‧‧‧第一承接面 51‧‧‧The first interface

52‧‧‧第二承接面 52‧‧‧Second interface

53‧‧‧抵靠面 53‧‧‧Abutment

60‧‧‧凸塊 60‧‧‧Bumps

61‧‧‧第一側面 61‧‧‧ first side

62‧‧‧第二側面 62‧‧‧ second side

80‧‧‧標記件 80‧‧‧Markings

Claims (12)

一種排水器,其包含:一接頭本體,其具有一接管部及一導管部,該接管部具有連通該導管部之一導水孔,該導水孔之內周緣相對於該導水孔之軸向間隔環設有複數第一定位部及複數第二定位部,各該第二定位部間隔設於每兩相鄰之第一定位部間,各該第一定位部與各該第二定位部間設有一斜面,其中,各該第一定位部及各該第二定位部分別設有一階層塊,各該第一定位部相對於該接頭本體之軸向凸設有一凸塊。 A drainer comprising: a joint body having a joint portion and a conduit portion, the joint portion having a water conduit communicating with the conduit portion, the inner circumferential edge of the water conduit being axially spaced from the water conduit And a plurality of first positioning portions and a plurality of second positioning portions, wherein each of the second positioning portions is disposed between each of the two adjacent first positioning portions, and each of the first positioning portions and each of the second positioning portions is disposed between The inclined surface, wherein each of the first positioning portion and each of the second positioning portions is respectively provided with a layer block, and each of the first positioning portions is convexly provided with a protrusion relative to an axial direction of the joint body. 如請求項1所述之排水器,其中,該階層塊具有一第一承接面及一第二承接面,該第一承接面與該第二承接面之設置高度不同。 The drainer of claim 1, wherein the stratum block has a first receiving surface and a second receiving surface, and the first receiving surface and the second receiving surface are disposed at different heights. 如請求項2所述之排水器,其中,該接管部具有一頂端,該第一承接面與該頂端間具有一第一距離,該第二承接面與該頂端間具有一第二距離,該第二距離大於該第一距離。 The draining device of claim 2, wherein the connecting portion has a top end, the first receiving surface has a first distance from the top end, and the second receiving surface has a second distance from the top end, The second distance is greater than the first distance. 如請求項2或3所述之排水器,其中,該第一承接面及該第二承接面與該接頭本體之軸向垂直。 The drainer of claim 2 or 3, wherein the first receiving surface and the second receiving surface are perpendicular to an axial direction of the joint body. 如請求項2或3所述之排水器,其中,該凸塊設於該第一承接面。 The drain of claim 2 or 3, wherein the bump is disposed on the first receiving surface. 如請求項3所述之排水器,其中,該斜面由該頂端朝該導管部之方向往下傾斜。 The drain of claim 3, wherein the slope is inclined downward from the tip toward the conduit portion. 如請求項1所述之排水器,其中,各該第一定位部之面積大於各該第二定位部之面積。 The drainer of claim 1, wherein an area of each of the first positioning portions is larger than an area of each of the second positioning portions. 如請求項2所述之排水器,更具有一標記件,其設置於該斜面或該階層塊其中之一或其組合。 The drainer of claim 2 further has a marking member disposed on the slope or one of the blocks or a combination thereof. 如請求項8所述之排水器,其中,該標記件設置於該斜面、該第一承接面或該凸塊至少其中之一或任兩種以上之組合。 The drainer of claim 8, wherein the marking member is disposed on the slope, the first receiving surface or at least one of the projections or a combination of any two or more. 一種應用如申請專利範圍第1項所述排水器施工方法,其包含以下步驟:(A)將已埋設之一排水管周圍去除一施工面積,形成一容置空間,該排水管連通該容置空間;(B)於該容置空間設置一第一防水層;(C)將該接頭本體放置於該容置空間,令該導管部穿設於該排水管中,該接管部設於該排水管外,該導水孔與該排水管連通;(D)於該容置空間設置一固定層,且包覆該接管部外側至少一部分;(E)於該固定層上方設置一填縫層,藉由該填縫層填補該固定層與該接管部間之縫隙;(F)全面地坪鋪設一第二防水層,同時將該第二防水層設於該導水孔中,且至少設置到該標記件之位置,以完成該接頭本體之設置;以及(G)將套管與落水頭裝設於該接管部,於該第二防水層上設置一水泥層與一地材層,以完成施工。 The utility model relates to a drain construction method according to claim 1, which comprises the following steps: (A) removing a construction area around a drained pipe to form an accommodating space, the drain pipe connecting the accommodating (B) a first waterproof layer is disposed in the accommodating space; (C) the joint body is placed in the accommodating space, and the duct portion is disposed in the drain pipe, and the pipe connecting portion is disposed on the drain Outside the tube, the water guiding hole is in communication with the drain pipe; (D) providing a fixing layer in the accommodating space and covering at least a part of the outer side of the connecting pipe portion; (E) providing a caulking layer above the fixing layer, Filling a gap between the fixed layer and the connecting portion by the filling layer; (F) laying a second waterproof layer on the entire floor, and setting the second waterproof layer in the water guiding hole, and at least setting the mark The position of the piece is to complete the setting of the joint body; and (G) the sleeve and the water drop head are installed on the joint portion, and a cement layer and a ground layer are disposed on the second waterproof layer to complete the construction. 如請求項10所述之排水器施工方法,其中,該施工面積之邊長係3公分至10公分,該施工面積之高度係1公分至3公分。 The drainer construction method according to claim 10, wherein the side of the construction area is 3 cm to 10 cm, and the height of the construction area is 1 cm to 3 cm. 如請求項10所述之排水器施工方法,其中,該第一防水層與該第二防水層係防水漆、防水膠或防水塗料其中之一,該固定層係無收縮水泥,該填縫層係PU填縫材質或防水材質其中之一。 The drainer construction method according to claim 10, wherein the first waterproof layer and the second waterproof layer are one of a waterproof paint, a waterproof glue or a waterproof paint, and the fixed layer is a non-shrinkage cement, the seal layer One of the PU caulking materials or waterproof materials.
TW105132779A 2016-10-11 2016-10-11 Drainage device and installation method thereof TWI614443B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW105132779A TWI614443B (en) 2016-10-11 2016-10-11 Drainage device and installation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW105132779A TWI614443B (en) 2016-10-11 2016-10-11 Drainage device and installation method thereof

Publications (2)

Publication Number Publication Date
TWI614443B true TWI614443B (en) 2018-02-11
TW201814196A TW201814196A (en) 2018-04-16

Family

ID=62014520

Family Applications (1)

Application Number Title Priority Date Filing Date
TW105132779A TWI614443B (en) 2016-10-11 2016-10-11 Drainage device and installation method thereof

Country Status (1)

Country Link
TW (1) TWI614443B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101929198A (en) * 2010-06-04 2010-12-29 潍坊昌大建设集团有限公司 Floor drain constructing connecting member and constructing method thereof
CN202416481U (en) * 2012-01-13 2012-09-05 洋丰股份有限公司 Water falling head structure
CN203514416U (en) * 2013-09-23 2014-04-02 金高电实业有限公司 Drainage and collecting device for bathroom
CN103774862A (en) * 2014-01-24 2014-05-07 中国建材检验认证集团苏州有限公司 Construction method for applying one-component polyurethane to renovation and reconstruction of old hard waterproof roof
TWM538114U (en) * 2016-10-11 2017-03-11 yong-zhi Yang Water drainer

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101929198A (en) * 2010-06-04 2010-12-29 潍坊昌大建设集团有限公司 Floor drain constructing connecting member and constructing method thereof
CN202416481U (en) * 2012-01-13 2012-09-05 洋丰股份有限公司 Water falling head structure
CN203514416U (en) * 2013-09-23 2014-04-02 金高电实业有限公司 Drainage and collecting device for bathroom
CN103774862A (en) * 2014-01-24 2014-05-07 中国建材检验认证集团苏州有限公司 Construction method for applying one-component polyurethane to renovation and reconstruction of old hard waterproof roof
TWM538114U (en) * 2016-10-11 2017-03-11 yong-zhi Yang Water drainer

Also Published As

Publication number Publication date
TW201814196A (en) 2018-04-16

Similar Documents

Publication Publication Date Title
KR100992051B1 (en) Structure of elbow for water supply pipe and water pressure/fixing plug and faucet constructing method thereby
KR20090054790A (en) Screw type sleeve
CN103410318B (en) Washroom pipe well water-leakage construction method
TWI614443B (en) Drainage device and installation method thereof
TWM538114U (en) Water drainer
CN207194452U (en) Underground chamber outer wall wall pipeline hole waterproof embedding pipe fittingses device
KR101244701B1 (en) Injecting nozzle with function of prevention from counter current
CN210003941U (en) Detachable anti-seepage sleeve assembly
CN210034729U (en) Pre-buried type whirl connects with percolating water connector
TWI753233B (en) drainage system
CN204419202U (en) A kind of tunnel slot repair structure
JP4327026B2 (en) Repair method and equipment for concrete
CN112628477A (en) Drain pipe pre-embedding device with stretching and water drainage preventing functions and installation method
KR20110028325A (en) Conduit assembly and water conduit using the same
KR200424768Y1 (en) The connected socket of the double drain pipe with transfer a fluid
CN210013315U (en) Leakage-proof floor drain drainage pipeline structure
KR200485553Y1 (en) Pc box for drain
KR101737411B1 (en) Common duct pipe with downcomer with epoxy resin
TWI717013B (en) Buried plug for water test leak detection pipe
TWM587719U (en) Pre-buried water inspection and leakage detection pipe plug head
KR100961212B1 (en) Easy contruction of manufacture method and pipe manufactured by the method
CN110676763A (en) Plugging method of electric threading pipe
JP6630155B2 (en) Pipe connection structure and pipe unit used for this pipe connection structure
CN112695875B (en) Method for installing secondary drainage device in toilet
CN217603531U (en) Pipeline wall body junction antiseep device