TWI250426B - System determining dispatching rule by knowledge-mining technology and method thereof - Google Patents

System determining dispatching rule by knowledge-mining technology and method thereof Download PDF

Info

Publication number
TWI250426B
TWI250426B TW093101685A TW93101685A TWI250426B TW I250426 B TWI250426 B TW I250426B TW 093101685 A TW093101685 A TW 093101685A TW 93101685 A TW93101685 A TW 93101685A TW I250426 B TWI250426 B TW I250426B
Authority
TW
Taiwan
Prior art keywords
performance
database
test
dispatching
module
Prior art date
Application number
TW093101685A
Other languages
English (en)
Other versions
TW200525386A (en
Inventor
Kung-Jeng Wang
Yun-Shiuan Lin
Jia-Jen Shie
Yu-Lung Tau
Original Assignee
Univ Chung Yuan Christian
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Univ Chung Yuan Christian filed Critical Univ Chung Yuan Christian
Priority to TW093101685A priority Critical patent/TWI250426B/zh
Publication of TW200525386A publication Critical patent/TW200525386A/zh
Application granted granted Critical
Publication of TWI250426B publication Critical patent/TWI250426B/zh

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

1250426 玫.發明說明 (發明說明應敘明:發明所屬之技術領域、先前技術、內容、實施方式及圖式簡單說明) 【發明所屬之技術領域】 本發明係與測試產業之測試派工有關,特別是關於一 種在資訊有雜訊的情況下,以知識探勘技術正確選取派工 方法之系統與方法。 5 【先前技術】 由於半導體測試場於進行測試時,需搭配多種測試資 源才能進行,且以多項測試績效指標來作為工廠測試效率 之評估依據,目前派工法則在半導體測試產業已被廣泛的 10 應用。但是固定且單一的派工法則無法適應半導體測試廠 之多資源派工的特性,經常變動的訂單組合以及其他測試 系統擾動因素,使得當派工法則無法合適使用時,再利用 人工方式調整改變派工法則,常常已導致訂單延遲或測試 資源浪費,造成製造成本損失或違約賠償之可能。 15 目前沒有一種派工法則能適用各種不同的測試訂單、 測試作業與績效指標衡量上,即使目前半導體測試廠已高 度資訊化,相關資訊多已儲存於資料庫中,派工法則在人 工反覆尋找資料並判斷選擇時仍需花費大量的時間。 20 【發明内容】 本發明之主要目的在於提供一種以知識探勘技術決定 派工方法之系統與方法,可準確地使用派工方法以達到良 好的測試績效。 本發明之另一目的在於提供一種以知識探勘技術決定 V|續次頁(發明說明頁不敷使用時,請註記並使用續頁) -4- 1250426 發明說明#賣;Η 派工方法之系統與方法,可在實施派工前精確地預測測試 績效。 為達成上述目的,本發明之以知識探勘技術決定派工 方法之系統與方法包含有:建立各種相關資料庫,並以模 5 擬系統建立虛擬工廠,以蒐集各種變動環境下派工方法之 績效,饋入以統計檢測方法之重要因子篩選模組,決定重 要之測試因子,再輸入最適派工選擇模組,決定最適派工 方法。之後,並可利用人工智慧技術,預測測試績效值。 10 【實施方式】 為了詳細說明本發明之構造及特點所在,茲舉以下之 較佳實施例並配合圖式說明如后,其中: 第一圖係本發明較佳實施例之模組架構圖; 第二圖係本發明較佳實施例之派工法則選擇決策樹; 15 第三圖係本發明較佳實施例之倒傳遞類神經網路之績 效值預測模組。 本發明實施例係以半導體測試派工為例,應用具體化 的知識探勘與學習工程’選擇有效的派工方式’並預測半 導體測試派工績效。 20 本發明所提供的實施例,考慮工廠上最被接受且最常 使用的幾種啟發式派工法則為例,以決策樹技術,在特定 績效衡量準則下,建立選擇最適之派工的規則,並利用倒 傳遞類神經網路,預測測試績效值,請配合第一圖,該系 統包括有: -5-

Claims (1)

1250426 拾、申請專利範匿 1. 一種以知識探勘技術決定派工方法之系統,包含有: 一訂單資料庫,用以儲存訂單的基本資料; 一測試作業實績資料庫,用以儲存實績評估因子; 一影響測試作業因子資料庫,用以儲存影響測試因子; 5 一虛擬工廠模組,耦合於訂單資料庫,測試作業實績 資料庫與影響測試作業因子資料庫,進行工廠測試活動模 擬; 一重要因子篩選模組,耦合於虛擬工廠模組與訂單資 料庫,篩選出影響績效之重要測試因子; 10 一重要因子資料庫,耦合於重要因子篩選模組,針對 不同的績效指標儲存重要測試因子; 一績效指標資料庫,用以儲存績效指標; 一派工法則庫,用以儲存各種派工法則; 一最適派工法選擇模組,耦合於重要因子資料庫,績 15 效指標資料庫以及派工法則庫,用以產生派工法則選擇決 策樹; 一派工方法選擇規則庫,耦合於最適派工法選擇模 組,儲存選擇決策樹之派工規則。 2. 依據申請專利範圍第1項所述之以知識探勘技術決 20 定派工方法之系統,其中一績效預測模組耦合於該派工方 法選擇規則庫,產生預測派工績效值。 3. 依據申請專利範圍第2項所述之知識探勘技術決定 派工方法之系統,其中一預測工廠績效值資料庫耦合於該 績效預測模組,用以儲存工廠績效預測值。 ▽續次頁(申請專利範圍頁不敷使用時,請註記並使用續頁) -13- 1250426 申lit:利麵續頁 4. 依據申請專利範圍第3項所述之知識探勘技術決定 派工方法之系統,其中該預測工廠績效值資料庫另可用以 儲存實際執行績效值,該預測工廠績效值資料庫與該虛擬 工廠模組耦合,該虛擬工廠根據績效預測值與實際執行績 5 效值修正測試活動模擬。 5. —種以知識探勘技術決定派工方法之方法,包含有 以下步驟: A :將訂單資料輸入訂單資料庫,並設定儲存測試作業 # 實績資料庫、影響測試作業因子資料庫之資料值; 10 B :將訂單資料庫,測試作業實績資料庫與影響測試作 業因子資料庫的環境資料輸入一虛擬工廠,進行模擬各種 變動環境下派工方法之績效; C:將績效值饋入一重要因子篩選模組,決定重要測試 因子; 15 D:將重要測試因子輸入一最適派工選擇模組,產生最 適派工選擇法則; E :依照所需的不同績效衡量準則,根據最適派工選擇 © 法則,決定最適派工方法。 6. 依據申請專利範圍第5項所述之以知識探勘技術決 20 定派工方法之方法,其中最適派工方法可利用人工智慧技 術預測其績效值。 7. 依據申請專利範圍第6項所述之以知識探勘技術決 定派工方法之方法,其中將預測之測試績效值記錄儲存在 一預測工廠績效值資料庫,該預測工廠績效值資料庫並儲 -14- 1250426 申if#利續貢 存實際工廠之實際績效值,根據測試績效值與實際績效值 之差異,修正虛擬工廠模組。 …8.依據中請專利範圍第6項所述之以知識探勘技術決 疋冗方法之方法’其中人卫智慧技術係採用倒傳遞類神 5 經網路方法。 、 —9·依據申请專利範圍第5項所述之以知識探勘技術決 工方法之方法,其中最適派工選擇模組係利用決策樹 /貝算去產生派工法則選擇決策樹,作為最適派工選擇法則。 10
TW093101685A 2004-01-20 2004-01-20 System determining dispatching rule by knowledge-mining technology and method thereof TWI250426B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW093101685A TWI250426B (en) 2004-01-20 2004-01-20 System determining dispatching rule by knowledge-mining technology and method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW093101685A TWI250426B (en) 2004-01-20 2004-01-20 System determining dispatching rule by knowledge-mining technology and method thereof

Publications (2)

Publication Number Publication Date
TW200525386A TW200525386A (en) 2005-08-01
TWI250426B true TWI250426B (en) 2006-03-01

Family

ID=37433025

Family Applications (1)

Application Number Title Priority Date Filing Date
TW093101685A TWI250426B (en) 2004-01-20 2004-01-20 System determining dispatching rule by knowledge-mining technology and method thereof

Country Status (1)

Country Link
TW (1) TWI250426B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI739229B (zh) * 2019-12-03 2021-09-11 財團法人工業技術研究院 快篩派工法則方法和裝置

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI633504B (zh) * 2017-11-16 2018-08-21 財團法人工業技術研究院 基於樹狀搜尋的排程方法與使用此方法的電子裝置

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI739229B (zh) * 2019-12-03 2021-09-11 財團法人工業技術研究院 快篩派工法則方法和裝置
US11762376B2 (en) 2019-12-03 2023-09-19 Industrial Technology Research Institute Quick dispatching rule screening method and apparatus

Also Published As

Publication number Publication date
TW200525386A (en) 2005-08-01

Similar Documents

Publication Publication Date Title
Durmanov et al. Simulation modeling, analysis and performance assessment
Özbayrak et al. A knowledge-based decision support system for the management of parts and tools in FMS
Jeong et al. A real-time scheduling mechanism for a flexible manufacturing system: using simulation and dispatching rules
CN109902954B (zh) 一种基于工业大数据的柔性作业车间动态调度方法
Mathaisel A lean architecture for transforming the aerospace maintenance, repair and overhaul (MRO) enterprise
CN109034483B (zh) 一种基于质量功能配置的检测规划方法
CN101408769A (zh) 一种基于乘积arima模型的在线能源预测系统及方法
CN105550393A (zh) 一种支持方案快速生成的枪械变型设计方法
Abd et al. Simulation modelling and analysis of scheduling in robotic flexible assembly cells using Taguchi method
US20220327398A1 (en) Technology maturity judgment method and system based on science and technology data
CN109726926A (zh) 一种多元质量约束下基于灰色关联算法的机床装备资源供需匹配方法
Shmeleva et al. Industrial management decision support system: From design to software
CN110209589B (zh) 知识库系统测试方法、装置、设备和介质
Wang* et al. A hybrid knowledge discovery model using decision tree and neural network for selecting dispatching rules of a semiconductor final testing factory
TWI250426B (en) System determining dispatching rule by knowledge-mining technology and method thereof
CN109615115A (zh) 一种面向任务可靠性的集成生产任务调度方法
CN113570118A (zh) 一种基于调度规则的车间排产和分析方法
CN111062574A (zh) 一种制造工艺过程相似度的度量方法
JP2003280714A (ja) 生産スケジューリング方法及び生産スケジューリング装置
CN101533486A (zh) 一种实现质量机能综合展开的方法
Li et al. Planning production and equipment qualification under high process flexibility
JPH06161989A (ja) 予測装置
Eguchi et al. A robust scheduling rule using a neural network in dynamically changing job-shop environments
JP4419814B2 (ja) サービス品質評価支援装置
Chen et al. Modeling Production scheduling problem and its solution by genetic algorithm.

Legal Events

Date Code Title Description
MM4A Annulment or lapse of patent due to non-payment of fees