TW475956B - Enhanced curtain wall system - Google Patents

Enhanced curtain wall system Download PDF

Info

Publication number
TW475956B
TW475956B TW90114534A TW90114534A TW475956B TW 475956 B TW475956 B TW 475956B TW 90114534 A TW90114534 A TW 90114534A TW 90114534 A TW90114534 A TW 90114534A TW 475956 B TW475956 B TW 475956B
Authority
TW
Taiwan
Prior art keywords
wall
wall panel
building
frame
air
Prior art date
Application number
TW90114534A
Other languages
Chinese (zh)
Inventor
Raymond M L Ting
Original Assignee
Raymond M L Ting
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Raymond M L Ting filed Critical Raymond M L Ting
Priority to TW90114534A priority Critical patent/TW475956B/en
Application granted granted Critical
Publication of TW475956B publication Critical patent/TW475956B/en

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

This invention is of a curtain wall structure especially for an enhanced curtain wall structure. It mainly includes following parts. A horizontal frame member is fixed on wallboard. A vertical frame member is connected to the horizontal frame member and is fixed on wallboard. A joint component connects the wallboard to at least one supporting structure of the building. At least one of the frame members consists in a load bearing side to withstand the force while contacting with the supporting structure. It will also transfer forces that is originally act upon the wallboard and directs toward external direction of the building to the supporting structure of the building in order to reduce the strength of force which may act upon the joint component besides of the dead load of the wall board.

Description

475956 五、發明說明ο) 【發明背景】 1 ·發明領域: 本發明係有關於一種帷幕牆之結構,尤指一種帷幕牆 之強化結構,其主要係利用各種不同材質之多數框裝表板 來製作帷幕牆之構造改良’如美國專利第5 4 5 2 5 5 2號所描 述之顯框式構造及第5 5 9 8 6 7 1號之隱框式構造者。 2 ·習用技術之描述: 為了增進現代大樓外觀之美感,幾個帷幕牆結構之表 現目標係如下列所述·· (1) 提供一隔絕效果或至少是阻抗效果,以減少外部 之空氣經由牆板之邊緣進入内部環境; (2) 提供一隔絕效果或至少是阻抗效果,以減少外部 之雨水、其他液體及粉塵經由牆板之邊緣進入大樓内部空 間’由其是液體或粉塵混合著空氣侵入者; (3 )提供一結構負載之阻抗效果,特別是包含支撐牆 板重量、抗地震負載、風壓負載與熱脹冷縮之負載等等^ 及 空氣與内部環475956 V. Description of the invention [Background of the invention] 1. Field of the invention: The present invention relates to a structure of a curtain wall, especially a reinforced structure of a curtain wall. Making structural improvement of curtain wall 'as shown in U.S. Patent No. 5 4 5 2 5 5 2 with the explicit frame type structure and the hidden frame type No. 5 5 9 8 6 7 1. 2 · Description of conventional technology: In order to enhance the aesthetics of modern buildings, the performance goals of several curtain wall structures are as follows: (1) Provide an insulation effect or at least an impedance effect to reduce the outside air passing through the wall The edge of the panel enters the internal environment; (2) Provide an insulation effect or at least an impedance effect to reduce external rain, other liquids and dust entering the building's interior space through the edge of the wall panel, which is invaded by liquid or dust mixed with air (3) Provide the impedance effect of a structural load, especially including support for wall panel weight, anti-seismic load, wind pressure load and thermal expansion and contraction load, etc. and air and internal loop

(4 )提供一熱隔絕效果或至少減少外部 境間的熱交流。(4) Provide a thermal insulation effect or at least reduce the heat exchange between the external environment.

前面所提到的兩篇美國專利主要係在於解決大量的空 氣及水的滲入問題或氣圈結構之漏氣問題,其設計需使用 幾近完美的封閉以阻止空氣及水的大量滲漏了其中二 係描述一等壓氣圈結構,利用水封及氣封分離的方式,可 在其封閉不完美的狀況態下仍保有可接受的氣水滲漏率。The two U.S. patents mentioned above are mainly to solve the problem of a large amount of air and water infiltration or air leakage of the balloon structure. The design needs to use a nearly perfect seal to prevent a large amount of air and water from leaking into it. The second series describes a first-pressure air ring structure, which can maintain an acceptable gas-water leakage rate under the condition of imperfect sealing by using water seal and air seal separation.

475956 五、發明說明 且其中一 信賴度’ 將牆板與 然而 封閉,故 而產生渗 負載的狀 者)將會 此外’持 或變形’ 又, 熱絕緣效 產生輕微 損之情形 某些方面 【發明概 本發 構,以改 負載、及 明之帷幕 圈,可分 迂迴曲折 氣圈中; 境相等; (2) 實施例之牆 並於表板框 相鄰牆板組 ’前述之氣 於強烈的風 水的情形。 況下(例如 承受張力而 續重覆的負 導致牆掉落 上述框裝牆 果。且,若 變形時,尚 發生。故, 有了長足的 要敘述】 明之主要目 善氣圈式帷 熱絕緣等方 牆強化結構 別將水封與 的路徑,可 一足夠大的 一對各牆板 板可 之邊 裝時 圈結 力狀 再者 風壓 使其 風壓 之危 板在 因地 可能 雖然 進步 於廠房 緣形成 ’則可 構由於 況下, ’其牆 負載的 連結強 負載尚 險。 某些應 震或其 造成封 前述之 ,但仍 内裝樞,uv 一内等产^確保其封閉之 ♦成靟氣圈,而於工場 一外等壓氣圈。 ✓、氣封係可么 雨皮a 為一不完美之 -t I 此透過其氣封 = 固W在負風壓 方向係遠離建築物之壁面 度及封閉之緊緻性降低。 了此k成其安全螺絲鬆動 用上可能無法提供足夠的 他負載而使建築物之結構 閉損壞、牆板鬆動甚至破 技術對帷幕牆之結構已在 有需要改良的空間。 的’在於提供一種帷幕牆之強化結 幕牆結構在防空氣雨水滲漏、負風壓 面之表現。為了達成上述目的,本發 具有下列特徵:一内氣圈及一外氣 氣封、排水與封閉等之功能分離;一 在空氣進入氣孔時限制水分同時進入 氣孔’以保持氣圈中之氣壓與外界環 而言為兩點支撐之結構,配合可滑動475956 V. Description of the invention and one of its reliability 'closes the wallboard, but it will cause a seepage load') In addition, it will 'hold or deform' In addition, the thermal insulation effect will be slightly damaged in some aspects [Invention summary The structure of the present invention can be divided into winding zigzag air circles by changing the load and the curtain circle of the bright; the environment is equal; (2) The wall of the embodiment is adjacent to the wall plate group of the table plate frame, the aforementioned air is in strong Feng Shui situation. Under the conditions (such as repeated negative load due to tension, the wall will fall off the framed wall fruit. And, if it is deformed, it still occurs. Therefore, there is a long way to describe it.) The main purpose of the Ming is the air-cushion type thermal insulation. The equal-wall reinforced structure should not seal the path with water. A large enough pair of each wall panel can be installed in the form of a ring-like force when installed on the side, and the wind pressure may make the wind pressure danger plate improve in some places. Formed at the edge of the factory building can be constructed under the condition, 'the strong load of the wall load connection is still dangerous. Some earthquakes or their causes seal the aforementioned, but they are still equipped with pivots. ♦ To form a gas ring, and to equalize the pressure on the outside of the workshop. ✓ 、 The air seal is OK. The rain cover a is imperfect -t I This through its air seal = solid W is away from the building in the direction of negative wind pressure. The degree of wall surface and the tightness of the seal are reduced. Therefore, the loosening of the safety screw may not provide enough other loads to damage the structural closure of the building, the loosening of the wall panels, and even the breaking technology. There is room for improvement. In order to provide a curtain wall reinforced curtain wall structure to prevent air and rain leakage, negative wind pressure surface performance. In order to achieve the above purpose, the hair has the following characteristics: an inner air ring and an outer air seal, drainage and closure, etc. The function is separated; one restricts the moisture from entering the pores at the same time as the air enters the pores to maintain the air pressure in the balloon and the structure of the outer ring as a two-point support structure, which can slide with cooperation

4/5956 五、發明說明(3) 水 直 作 水 滴 内 便 之封閉與一間隙,可容許樓 平形變或搖擺’而 襟…,可抵抗: 用在結合件上的向外負載者 空間中,使其形成—雙重之 之表面;複數個隔熱塊,設 部與外部環境間熱傳導的阻 牆板之組裝與拆除。 發明詳細說明: 板在地震或其他負載下產生 板承受大的應力;一銜接於 板上的負向風壓負載及限制 ;一凸肋,位於外氣圈的排 排水道,並提供一可收集水 於牆板框中,藉以增加大樓 抗;及可夹設之元件,以方 兹為使貴審查委員對本發明之特徵、結構及所達 力效有進步之瞭解與認識,謹佐以較佳之實施圖例 配合詳細之說明,說明如後: 首先’為了於設計原理的說明,以下幾個名詞定義 下: (1 )帷幕牆板或牆板總成:構成大樓牆面之複數個 板或牆板總成組之其中之一,包含有表板或其他帷幕牆 件,通#固定於牆板框中並加封閉處理,一般表板與牆 框之固定與封閉處理係於工廠中完成; (2 )内氣圈:一包含有空氣之空間,於接近表板之 緣處形成一迴路,一般而言係位於牆板框内; (3)外氣圈:一包含有空氣之空間,鄰接於内氣圈 圍繞表面而形成一迴路; (4 )水封··在等壓或只有些微壓差的情況下,用以 制水由外部滲入大樓内部空間之封閉線;及 成 及 如 牆 元 板 週 限 475956 五、發明說明(4) (5 )氣封:一遠離外部水滲流路徑之内部封閉線,用 以限制空氣滲入者。 請參閱第1圖,係本發明一較佳實施例外牆結構之等 角視圖。如圖所示,本發明之強化氣圈式帷幕牆結構1 0 包含有複數個帷幕牆之牆板1 1 a至1 1 f,分別由大樓之 結構體或分開安裝的直樑1 4加以支撐。圖中所示實施例 之牆板1 1 a至1 1 f係以可隔熱之雙層玻璃做為其表板之 材質,而形狀則大體上為平面之正方形,然本發明尚可以 其他材質製作表板,形狀亦可不拘於平面正方形而為其他 形狀。無論如何,該個別的牆板必需是設定之形狀,並可 組合而形成大樓帷幕牆之一部份者。 當牆板組合時,相鄰兩牆板間會形成兩種型態的牆隙 ,一種為水平牆隙1 2 (如牆板1 1 a與1 1 b間之牆隙) ,另一為直垂牆隙1 3 (如牆板1 1 a與1 1 c間之牆隙) 。另外,尚有許多可能形成及利用的型態,如非線性牆隙 、對角線或其他方向之線性牆隙、及用以配合突出或不規 則形狀牆板之牆隙等。 請參閱第2圖,係牆板1 1 a與1 1 b間水平牆隙1 2 之截面圖。其中,下邊框1 6係固著於上方表板1 5之下 週緣處,而形成牆板1 1 a之一部份;同樣的,上邊框1 8固著於下方表板1 7之上週緣處而形成牆板1 1 b之一 部份,而水平牆隙1 2則於下邊框1 6與上邊框1 8間的 連接處形成。各牆板係位於大樓之外部,而以結合件3 4 分別固定於分開安裝的兩直樑1 4上,使牆板可結合於大4/5956 5. Description of the invention (3) Water directly acts as a seal and a gap in the water droplets, which can allow the floor to deform or sway, and can resist: used in the space of the outward loader on the joint, Make it a double surface; Assemble and dismantle a number of heat-insulating blocks, block walls that conduct heat between the exterior and the environment. Detailed description of the invention: The plate is subjected to large stress under earthquake or other loads; a negative wind pressure load and limit connected to the plate; a convex rib is located in the drainage channel of the outer aerosphere and provides a collectible Water is in the wall panel frame to increase the building resistance; and the components that can be clamped are used to make your review committee understand and understand the features, structure, and effectiveness of the invention. The implementation of the legend with detailed description is as follows: First of all, in order to explain the design principles, the following terms are defined: (1) Curtain wall panel or wall panel assembly: a plurality of panels or wall panels constituting the wall of the building One of the assembly groups, including the table board or other curtain wall parts, is fixed in the wall board frame and sealed, and the general board plate and wall frame are fixed and closed in the factory; (2 ) Inner air ring: a space containing air, forming a loop near the edge of the surface plate, generally located in the wall panel frame; (3) outer air ring: a space containing air, adjacent to the inside The balloon is formed around the surface Road; (4) ·· isobaric seal or only a slight differential pressure in the case, for infiltration of water from outside the building line enclosed interior space; and as to a wall element and plate 475,956 five weeks limit described invention ( 4) (5) Air seal: An internal closed line away from the external water seepage path to limit air infiltration. Please refer to FIG. 1, which is an isometric view of an exception wall structure according to a preferred embodiment of the present invention. As shown in the figure, the reinforced balloon-type curtain wall structure 10 of the present invention includes a plurality of curtain wall panels 1 1 a to 1 1 f, which are respectively supported by the building structure or separately installed straight beams 14. . The wall panels 1 1 a to 1 1 f in the embodiment shown in the figure are made of heat-resistant double-layer glass as the material of the surface plate, and the shape is generally a flat square. However, the present invention can also be made of other materials. The shape of the watch plate can be other shapes without being limited to a flat square. In any case, the individual wall panels must be in the set shape and can be combined to form part of the curtain wall of the building. When wall panels are combined, two types of wall gaps will be formed between two adjacent wall panels, one is a horizontal wall gap 1 2 (such as the wall gap between wall panels 1 1 a and 1 1 b), and the other is straight. Wall gap 1 3 (such as the wall gap between 1 1 a and 1 1 c). In addition, there are still many types that can be formed and used, such as non-linear wall gaps, diagonal wall or other direction linear wall gaps, and wall gaps used to fit protruding or irregularly shaped wall panels. Please refer to Figure 2, a cross-sectional view of the horizontal wall gap 12 between the wall panels 1 1 a and 1 1 b. Among them, the lower frame 16 is fixed to the lower periphery of the upper table 15 and forms a part of the wall plate 1 1 a. Similarly, the upper frame 18 is fixed to the upper periphery of the lower table 17. A part of the wall panel 1 1 b is formed, and a horizontal wall gap 12 is formed at the connection between the lower frame 16 and the upper frame 18. Each wall panel is located on the outside of the building, and it is fixed on the two straight beams 14 installed separately by the joints 3 4 so that the wall panels can be combined in the large

475956 五、發明說明(5) -- |樓之結構而得到支撐。而下邊框1 6與上邊框丄8 八 般而言,牆板之邊框(如下邊框1 )备、 然而亦可以其他方法或材質製作,如使^ =材擠 、塑膠射出成形、或其組合式等等 /、他金 別於工廠内組裝到表板1 5與1 7上。 ’、可为 一般而言,牆板之邊框(如下邊栺 壓成形 屬 合成橡膠 第 4 第2圆π不之上遺框i 8係以結合件3 4固 或大樓之其他支撐結構上,其結合件3 4係了%罝樑 …釘、螺絲與螺帽、鉤與槽、夾鉗或其他可供=^螺釘 置。圖中上邊框1 8係以兩點固定的方式,用螺:=裝 端分別固定於由直樑i 4主體箱形支撐結 4 = ^兩 丨出的L型翼緣i 4 a上。而其他形 二卜凸 形狀之支撐結構)之=於箱形或其他 |定支撐之用。 Ώ敬梂及榼樑等,皆可作為固 上述將上邊框i 8以兩點 fc巧翼緣1 4 a上,可提供數個定於直樑1 4 :不=;到大樓的内部空以緣…上, 發生。‘:件34無需使用氣封亦不合’如 可使水涞、ί於結合孔3 4 a之兩端“門;:f漏的情事 “漏及其伴隨的腐餘情 :並無壓力差,故 元件:f —好處為維修方便,只要=低。 件3 4水封架2 6及擋水簾2,、,设或其他可拆卸的 4,可方便對牆板作維修或以:作即會露出結合 ___ 狹的動作。而此-先組 第8頁 五 、發明說明(6) 裝 架 設 將 裝夹設元件的方式,可簡化帷幕牆大體 ,例如、=肉Ϊ ί可於無鷹狀況下由大樓的内部來架 下牆板1 1 L二間1 S經尚未組裝的上牆板1 1 a空間處 : 113之上邊框18固定於直樑14上。 =兩點固定及間隙D (請參閱第3圖)設計的另一 之:動像Si: 3 4之安排可使邊框於樓板變形負載下 該牆板1 1 Γ Ϊ;樣。例如1在地震的橫向彎曲負載下, 一夕 有一水平分ϊ之運動而不會造成損害。換 (或翼緣14 a上之結合孔3 4 a)在直 2、 7平方向相對運動,可經由下邊框1 6於水封 甘从加\ 5處滑動而加以吸收’不致使表板1 5或牆板的 ^十1伤產生大量的應力或應變。部份垂直於兩直樑1 4 1、、 °的水平相對運動,亦可在不產生大量應力及應變的 二^:被及收’例如,牆板1 1 a的下緣可在水封2 4及 处I微向内或向外擺盪。與其他固定方法相較之下, 田強”、、地震的仏向負載使直樑1 4發生變形時,水封2 4 與2 5的設計可大幅降低表板1 5的負載。由於本加強氣 ,Ί ΐ ΐ封閉不完美的情況下仍可阻隔水的渗漏,故即使475956 V. Description of the invention (5)-| The structure of the building is supported. In general, the lower frame 16 and the upper frame 八 8 are generally made of the wallboard frame (see frame 1 below), but can also be made by other methods or materials, such as ^ = material extrusion, plastic injection molding, or a combination thereof Wait /, Takin is assembled on the watch plates 15 and 17 in the factory. ', Can be generally speaking, the frame of the wall panel (as shown below is formed by pressing the edge of the synthetic rubber, the second circle is not on the second circle, the frame i 8 is fixed with the joint 3 4 or other supporting structures of the building, The joints 3 and 4 are attached to the 罝 beam ... nails, screws and nuts, hooks and grooves, clamps or other available = ^ screws. The upper frame 18 in the figure is fixed at two points with screws: = The mounting ends are respectively fixed on the box-shaped support knot 4 of the main body i 4 of the straight beam 4 = ^ two L-shaped flanges i 4 a. And the other support structures of the two-shaped convex shape) = box-shaped or other | Use for support. Ώ 敬 梂 and 榼 beams, etc., can be used to fix the upper frame i 8 with two points fc on the flange 1 4 a. Several fixed beams 1 4 can be provided: no =; to the interior of the building. It happened on ... ': Piece 34 does not need to use an air seal and is not compatible.'If you can make the water puppet and 于 on the two ends of the joint hole 3 4 a "doors ;: the leakage of" f leakage "and its accompanying corruption: there is no pressure difference, Therefore, the component: f — the advantage is easy maintenance, as long as = low. Piece 3 4 water seal frame 2 6 and water curtain 2, 2, or other detachable 4, it is convenient to repair the wall panel or to: the action will reveal the combination of narrow movements. And this-the first group, page 8. V. Description of the invention (6) The method of installing and clamping the components can simplify the curtain wall. For example, = ΪΪ can be installed from the inside of the building without the eagle. Wallboards 1 1 L two rooms 1 S through the unassembled upper wallboard 1 1 a space: 113 The upper frame 18 is fixed on the straight beam 14. = Another two-point fixing and gap D (see Figure 3) design: Another arrangement of moving image Si: 3 4 can make the frame under the deformation load of the floor. The wall panel 1 1 Γ 样; For example, 1 under horizontal bending load of an earthquake, there is a horizontal tiller motion overnight without causing damage. Change (or the joint hole 3 4 a on the flange 14 a) relative movement in the straight 2 and 7 flat directions, and it can be absorbed through the lower frame 16 sliding on the water seal from the plus \ 5 without causing the watch plate 1 A large number of stresses or strains are caused by 5 or 1 1 injuries of the wallboard. Partially perpendicular to the horizontal movement of the two straight beams 1 4 1 and °, can also be used in two places that do not generate a lot of stress and strain: For example, the lower edge of the wall plate 1 1 a can be in the water seal 2 4 and place I slightly swing inward or outward. Compared with other fixing methods, when Tian Qiang's and earthquake's normal load deforms the straight beam 14, the design of the water seals 2 4 and 25 can greatly reduce the load of the surface plate 15. Due to the strengthening of the gas , Ί ΐ ΐ can still prevent water leakage under imperfect sealing conditions, so even if

# L &彳水封2 4與2 5受損,其防水滲漏之功效亦可繼 續維持。 在本實施例中,該間隙D係位於直樑丄4與牆板的側 a框之間’其设计讓牆板可在樓板水平形變或搖擺(例如 i風ί或地震所引起)時伴隨做相對運動。一般而言,大 樓可谷許其樓板的橫向搖冑範圍為樓板間5巨離的二百分之# L & 彳 Water seals 2 4 and 2 5 are damaged, and its waterproof and leak-proof effect can be maintained. In this embodiment, the gap D is located between the straight beam 丄 4 and the side a frame of the wall panel. Its design allows the wall panel to accompany the horizontal deformation or swing of the floor (such as caused by wind or earthquake). Relative motion. Generally speaking, the horizontal sway range of a building's slab can be about two percent of the distance between the five floors.

第9頁 475956 五、發明說明(7) 一。例如,若樓層局度為1 2叹’則其容許範圍約為3 / 4英 对,如此,一個6呎見方的牆板將要承受約3 / 8吋的橫向變 形。該間隙D的設計一般會 ,在此例中則至少需3 /8吋 樓結構的剛度設計有關’只 於1 / 4 。又,若使用較小的 仍可承受的範圍下’都可使 除了間隙D的設計之外 結合件及封閉將其上邊框1 如第2圖及第3圖所示,該 在結合栓槽5 0處做水平方 互相碰撞。故而當大樓做橫 時,其運動可在牆板不損壞 容許牆板框與大樓支撐結構 下仍保有可接受的封閉效果 ’或其他具有封閉塗層的材 的海棉、合成橡膠如鐵弗龍 塗上潤滑劑的合成橡膠封閉 填物、及具彈性的接合劑等 在弟2圖中,空間2〇 於表板1 7之上緣,係為環 。牆板1 1 a之上邊框(未 皆與牆板1 1 b之上邊框1 邊框36與38 (如第3圖 選擇為可承受牆板的最大變形 。但間隙D之設計實際上與大 要剛度夠強其距離也有可能小 踏板’或設計於在最大變形時 用較小間隙D 。 ’各牆板框係以可容許移動的 8之兩端結合於直樑14上。 下邊框1 6在發生搖擺時,可 向的相對運動,而不會與直樑 向搖擺(在間隙D的範圍下) 變形的情況下被吸收。為了在 (如直樑1 4 )間的相對運動 ^較好的方式是使用乾式封閉 貝做為封閉4 6 ,例如具彈性 、或二硫化鉬粉末等。其他如 、潤滑脂、油灰或其他隙縫充 皆可做為封閉使用。 位於牆板1 1 b的上方而鄰接 繞牆板1 1 b内氣圈之一部份 顯示)及下邊框1 6 ,其構造 8相似’其兩端可分別斜接側 所不),而在表板之週緣形成Page 9 475956 V. Description of Invention (7) For example, if the floor level is 12 sighs, its allowable range is about 3/4 inch pairs. In this way, a 6-foot-square wall panel will undergo lateral deformation of about 3/8 inches. The design of the gap D will generally be, in this example, at least 3/8 inch of the stiffness of the building structure is related to the design, which is only 1/4. In addition, if a smaller and still tolerable range is used, in addition to the design of the gap D, the coupling member and the seal can be used to close the upper frame 1 as shown in FIG. 2 and FIG. Do horizontal collisions at 0. Therefore, when the building is horizontal, its movement can allow the wall panel frame and the building support structure to maintain an acceptable sealing effect without damaging the wall panel or the sponge or synthetic rubber such as Teflon with a sealing coating. The synthetic rubber sealing filler coated with lubricant, and the elastic bonding agent, etc. In the figure 2, the space 20 is on the upper edge of the watch plate 17 and is a ring. The upper frame of the wall panel 1 1 a (not both are the same as the upper frame 1 of the wall panel 1 1 b 36 and 38 (as shown in Figure 3 is selected to withstand the maximum deformation of the wall panel. But the design of the gap D is actually The rigidity is strong enough, and the distance may also be small pedals 'or designed to use a small gap D at the time of maximum deformation.' Each wall panel frame is connected to the straight beam 14 with two ends that can allow movement. The lower frame 16 is When swaying occurs, the relative motion can be absorbed without being deformed with the straight beam swinging (within the range of the gap D). For relative movement between (such as straight beams 1 4) ^ better The method is to use a dry sealing shell as the sealing 4 6, such as elastic, or molybdenum disulfide powder, etc. Others such as grease, putty or other gap filling can be used for sealing. It is located above the wall panel 1 1 b and A part of the inner air ring adjacent to the wall plate 1 1 b is shown) and the lower frame 16 is similar to the structure 8 (the two ends can be slanted to the sides, respectively), and is formed on the periphery of the watch plate.

475956 五、發明說明(8) 一連續的内氣圈結構。 下邊框1 6上鑿設有至少一氣孔2 3 ,其大小係可容 許空氣進入内氣圈,藉以使内氣圈(包含上下邊框中之空 間1 9與2 0 )之氣壓保持與外界環境E大致相等。換言 之,氣孔2 3的大小應在最糟的情況下,其氣流的流動也 不會使氣孔2 3的兩端產生大的壓力差,例如,應使其最 大壓力差保持在0. 1吋水柱以下,一般而言係以0. 0 5吋水 柱以下較好,若要求更高,則應以0 . 0 3吋水柱以下為基準 〇 空氣經由氣孔2 3進入内氣圈,主要係由環境、設計 、及封閉因數等因素所造成,而其中最重要的則是表板與 邊框接合處不完美氣封3 1的空氣滲漏問題,而其滲漏率 則可在各種不同的壓差條件下,由模擬計算或實際測試取 得其估計值。另一個可能的滲漏途徑為制動器GS的週圍, 故可在制動器GS與上下邊框1 8及1 6間設置一堵縫物做 為一輔助封閉4 6 a 。其他空氣進入内氣圈的原因,諸如 水(包含内部空氣凝結析出的水)由内氣圈排出、其封閉 的不完美、外部環境氣壓快速增加、及内氣圈快速的熱膨 脹等。根據推估所得的結果,當氣孔2 3大小為5平方厘 米時,則氣封、輔助氣封及邊框接合處的空氣滲漏將成為 空氣進出氣孔2 3的主要因素。為了使氣孔2 3兩端之壓 差降到最低,氣孔2 3的大小至少需為上述估計值的2 0倍 ,亦即其開口面積至少為1 〇 〇平方厘米,即其直徑至少為 3 / 8吋,若為1 / 2吋則效果更好。為了將其他因素(如水的475956 V. Description of the invention (8) A continuous inner balloon structure. The lower frame 16 is provided with at least one air hole 2 3, the size of which allows air to enter the inner air ring, thereby keeping the air pressure of the inner air ring (including the spaces 19 and 20 in the upper and lower frames) and the external environment E Roughly equal. In other words, the size of the pores 23 should be in the worst case, and the flow of the airflow will not cause a large pressure difference between the two ends of the pores 2 3, for example, the maximum pressure difference should be maintained at 0.1 inches of water column. Below, generally speaking, it is better to be below 0. 5 inches of water column, if it is more demanding, it should be based on 0. 3 inches of water column. The air enters the inner air ring through the air holes 23, mainly from the environment, Caused by factors such as design and closure factor, and the most important of these is the imperfect air seal at the joint between the panel and the frame. The leakage of air can be caused under various pressure differential conditions. The estimated value is obtained by simulation calculation or actual test. Another possible leakage path is around the brake GS, so a gap can be set between the brake GS and the upper and lower frames 18 and 16 as an auxiliary seal 4 6 a. Other reasons for the air to enter the inner air ring, such as water (including the water condensed from the internal air) are discharged from the inner air ring, its imperfect seal, the rapid increase in external atmospheric pressure, and the rapid thermal expansion of the inner air ring. According to the estimated results, when the size of the air holes 23 is 5 cm2, air leakage at the joints of the air seals, auxiliary air seals, and frames will become the main factor for air entering and exiting the air holes 23. In order to minimize the pressure difference between the two ends of the stomata 23, the size of the stomata 23 needs to be at least 20 times the above estimated value, that is, its opening area is at least 1,000 square centimeters, that is, its diameter is at least 3 / 8 inches, if 1/2 inch is better. In order to combine other factors (such as water

475956 五、發明說明(9) 排出)考慮進 例中則包含有 考慮氣孔 2 3位置的設 以利排水。其 孔設於下邊框 6與3 8的排 將其他氣孔2 界環境E大致 層或其他内氣 如位於側邊框 一實施例,係 各設置至少兩 3排出,而其 孔2 3之設計 氣孔之間,如 邊框流下者) 流入,藉以平 如圖所示 氣圈,需先繞 及一 L型擋板 )前進,藉由 殿、水分凝結 ,以避免空氣 來,以確 三個直徑 2 3的排 置,應至 實施例可 1 6之中 水路徑) 3設於其 相等。另 圈不連續 之底端) 於下邊框 個氣孔2 他氣孔2 尚可於增 此,可使 順利排出 衡内氣圈 ,外界環 過一外擋 16b, 水分、粉 後,分別 直接將水 保内氣圈之等壓性,在較 至少為3/8吋之氣孔2 3 c 水或進氣或同時發生的狀 少有一氣孔2 3設於下邊 有幾個不同的態樣,其一 央位置(意即遠離鄰近於 而以空氣進出為主。另一 他邊框,以確保内氣圈之 一種變化則是當牆板位於 的狀況時,則可能需要增 以利空氣的流入及水的排 1 6兩端與侧邊框接合處 3 ,可方便水由其中至少 3則供空氣流通。另外, 設一氣孔2 3於下邊框1 水(包含由不完美水封滲 ,同時容許足夠的空氣由 與外界環境E之壓力。 境E的空氣要經由氣孔2 板1 6 a、一夾設之撞水 以迂迴曲折的路徑(如箭 塵與空氣之比重不同,可 由排水面2 7 a及排水槽 分帶入内氣圈。 佳的實施 況, 框1 為將 側邊 實施 氣壓 大樓 設氣 出。 之附 氣孔 6 氣 氣 此 6兩 入及 新增 框3 例為 與外 最底 孔( 其又 近, 孔2 雙氣 端雙 由側 氣孔475956 V. Description of the invention (9) Discharge) The consideration includes the consideration of the position of the air holes 2 and 3 to facilitate drainage. The holes are arranged in the rows of the lower frame 6 and 38, and the other air holes 2 are generally layered with the surrounding environment E or other internal air. For example, in the side frame, at least two 3 are set to discharge each, and the holes of the design of the holes 2 3 are (Such as the frame flowing down), in order to flatten the air ring as shown in the figure, you need to go around an L-shaped baffle) first, by the temple, the moisture condenses to avoid air to ensure the three diameters 2 3 The arrangement should be in the same way as the water path in the embodiment (16) 3). The bottom of the other circle is discontinuous) There are two air holes 2 in the lower frame. Other air holes 2 can be increased, which can smoothly discharge the inner air ring of the scale. The equal pressure of the air ring is less than the air hole 2 3 c of at least 3/8 inches, and there is one air hole less than the air hole 2 3 c at the same time. There are several different positions on the lower side, and its central position ( It means to stay away from the neighbor and let the air flow in and out. The other frame to ensure that the inner air ring changes. When the wall panel is located, it may be necessary to increase the air inflow and water discharge. The joint 3 between the two ends and the side frame can facilitate the circulation of water through at least 3 of them. In addition, an air hole 2 3 is provided in the bottom frame 1 (including impervious water impervious seal, while allowing enough air to pass from the outside). The pressure of the environment E. The air of the environment E must pass through the air holes 2 and the plate 16a, and a sandwiched water hits a tortuous path (if the proportion of arrow dust and air is different, it can be divided by the drainage surface 27a and the drainage groove. Into the inner air balloon. The gas pressure building is provided with gas outlets. Attached to the air holes are 6 air holes, 6 air holes, and 3 newly added frames. The bottom hole is the outermost hole (it is near, the hole is 2 and the air is double.

3進入内 簾2 7、 頭A所示 使粉塵沉 3 5排出3 Enter the inner curtain 2 7, as shown in head A, make dust 3 5 discharge

第12頁 475956 五、發明說明(10) 上述L型擋板1 6b其實與第3圖中凸肋3 6 a及3 8 a是連續的,其中凸肋1 8 a自上邊框1 8凸起而未顯 示L型。而擋板1 6 b在遠離氣孔2 3的部分由於空氣流 入氣孔的量較少,故不設L型構造(如1 8 a )亦不會有 太大的影響。在本實施例中,擋板1 6 a之L型構造可向 氣孔2 3之兩側延申至少1 /1 6吋,擋板向濕接合空間2 1 凸出至少1 / 4吋,若為9 / 1 6吋則更佳。Page 12 475956 V. Description of the invention (10) The above-mentioned L-shaped baffle plate 16b is actually continuous with the ribs 3a and 3a in FIG. 3, wherein the ribs 1a and 8a protrude from the upper frame 18 No L-shape is shown. The baffle 16 b is far away from the air holes 23 because the amount of air flowing into the air holes is relatively small. Therefore, no L-shaped structure (such as 1 8 a) will not have much influence. In this embodiment, the L-shaped structure of the baffle 16 a can extend to at least 1/1 16 inches to both sides of the air hole 23, and the baffle protrudes to the wet joint space 2 1 at least 1/4 inch. 9/16 is even better.

其他的形狀、分隔位置、和凸出長度可依不同的需求 而做不同的搭配,若要降低水分進入氣孔的量,可增加凸 出的長度、縮小分隔的距離、及增加擋板的厚度;相對, 若要降低成本則反之。同樣的,在本實施例中,擋板及擋 水簾係以鋁材壓擠成形,然其他材質如其他金屬、網板、 多孔材質、合成橡膠等皆可替代運用。 擋水簾2 7與水封架2 6係夾設或以可移除的方式接 著於上邊框1 8之凸出物;[8b和1 8 c上,可方便架設 及移除,於欲組裝或拆除牆板時,可快速安裝或拆除結合 件34。上述可移除的接著方式可為栓合、鉤與槽、黏著 、或螺絲鎖固等。 η a <Other shapes, separation positions, and protruding lengths can be matched according to different needs. To reduce the amount of moisture entering the pores, you can increase the protruding length, reduce the separation distance, and increase the thickness of the baffle. In contrast, if you want to reduce costs, the opposite is true. Similarly, in this embodiment, the baffle and the water curtain are extruded from aluminum, but other materials such as other metals, screens, porous materials, and synthetic rubber can be used instead. The water curtain 2 7 and the water seal frame 2 6 are clamped or removable in the protrusions on the upper frame 18; [8b and 1 8 c can be easily erected and removed. When the wall panel is removed, the coupling 34 can be quickly installed or removed. The above-mentioned removable bonding method may be bolting, hook and groove, adhesion, or screw locking. η a <

氣孔2 3的設置尚可有其他態樣,如設一直徑至少為 3/8吋之圓孔供空氣流通,而於其靠近邊框接角:一側另 設一直徑約1/4吋之圓孔供排水之用。另外,於氣孔之開 口處増設濾網,或於氣孔附近的内氣圈或空 板,皆可進一步降低水進入氣圈的量。 ]1 9^心擂There can be other aspects of the arrangement of the air holes 23, such as a circular hole with a diameter of at least 3/8 inches for air circulation, and near the border of the frame: a circle with a diameter of about 1/4 inches on the other side Hole for water supply and drainage. In addition, setting a filter at the opening of the air hole, or an inner air ring or an empty plate near the air hole can further reduce the amount of water entering the air ring. ] 1 9 ^ 心 擂

第13頁 475956 五、發明說明(11) 間1 9外側可形成外氣圈之一部分,即為上牆板1 1 a外 氣圈之底部,亦同時為下牆板1 1 b外氣圈之頂部。其大 致被分隔為一濕接合空間2 1與一乾接合空間2 2 ,其中 ,濕接合空間2 1可做為一排水路徑。 水封2 4係設於下邊框1 6的第三個凸肋1 6 c與水 封架2 6之間。一般而言,水封2 4係固著於水封架2 6 上而與上邊框1 8保持有一段距離,且不需連續佈滿整個 牆板的寬度,而水封架2 6與凸肋1 8 c之接合可不具防 空氣滲漏之封閉效果。如此,空氣可進入濕接合空間2 1 與乾接合空間2 2中,藉以保持外氣圈、内氣圈與外界環 境E間的壓力平衡,而不致使水分進入乾接合空間2 2中 。在其他的實施例中,尚可於濕接合空間2 1與乾接合空 間2 2之間,遠離排水路徑處增設通氣道,以確保其間之 氣壓大致相等。 在本實施例中,下牆板1 1 b之表板1 7與其上邊框 1 8之間係以一水封3 2及一氣封3 3加以密封,而牆板 1 1 a與1 1 b間之牆隙1 2則以水封2 4及氣封2 5為 主。其中,水封3 2與2 4及氣封3 3與2 5係可以封閉 巢狀泡沐密封帶(closed cell foam sealing tapes)、 其他型式之密封帶或抗滲漏之材質實施者。 下邊框1 6設有一結合槽5 1 ,可與自上邊框1 8凸 出設置之結合栓5 0結合。其中,結合槽5 1與結合栓5 0之結合面,可襯以封閉材質而成一氣封2 5之表面;相 同的水封架2 6與凸肋1 6 c之接合面,亦可襯以封閉材Page 13 475956 V. Description of the invention (11) A part of the outer aerosphere can be formed on the outside of the room 9, which is the bottom of the outer aerosphere of the upper wall panel 1 1 a and also the outer aerosphere of the lower wall panel 1 1 b top. It is roughly divided into a wet joint space 2 1 and a dry joint space 2 2, wherein the wet joint space 21 can be used as a drainage path. The water seal 2 4 is disposed between the third rib 16 c of the lower frame 16 and the water seal frame 26. Generally speaking, the water seal 2 4 is fixed on the water seal frame 2 6 and maintains a distance from the upper frame 18, and does not need to continuously cover the entire width of the wall panel. The water seal frame 2 6 and the ribs The joint of 1 8 c can be sealed without air leakage. In this way, air can enter the wet joint space 2 1 and the dry joint space 22 to maintain the pressure balance between the outer air ring, the inner air ring, and the external environment E without causing water to enter the dry joint space 22. In other embodiments, an air duct can be added between the wet joint space 21 and the dry joint space 22, away from the drainage path, to ensure that the air pressure therebetween is substantially equal. In this embodiment, a water seal 3 2 and an air seal 3 3 are sealed between the surface plate 17 of the lower wall plate 1 1 b and the upper frame 18 thereof, and the wall plate 1 1 a and 1 1 b are sealed. The wall gap 1 2 is mainly water seal 2 4 and air seal 2 5. Among them, the water seals 3 2 and 24 and the air seals 3 3 and 2 5 can be closed cell foam sealing tapes (closed cell foam sealing tapes), other types of sealing tapes or leak-proof materials. The lower frame 16 is provided with a coupling groove 5 1, which can be combined with a coupling bolt 50 protruding from the upper frame 18. Among them, the joint surface of the joint groove 51 and the joint bolt 50 can be lined with a closed material to form a surface of the air seal 25; the joint surface of the same water seal frame 26 and the rib 16c can also be lined with Closure material

475956475956

五、發明說明(12) 一水封2 水槽3 5 水簾2 7 側邊框排 氣被強边 減少直接 以分隔肋 内部的曲 部分實施 〇 了帷幕牆· 下邊框1 隔熱塊2 製作,或 材質亦可 熱塊2 8 質而成 排 濺過擋 1 b之 隨著空 效,可 水量。 氣進入 然而在 排水槽 為 如,在 設置上 之塑膠 的剛性 6與隔 層,以 4之表面。 係位於外氣圈之濕接合空間2 1 ,可將喷 的水引導至兩端的邊框接角,再沿牆板1 出。排水槽3 5的分隔肋1 8 a可在水滴 繞過_擔板1 6 b,提供一播水表面的功 進入而喷藏到水封2 4或水封架2 6上的 1 8 a將排水槽3 5分隔的構造,可使空 折度增加’將大部分的水滴阻隔於外部, 例中,亦可將分隔肋去除,而使用單一之 的隔熱效果’可在邊框中設置隔熱塊,例 6中設置下隔熱塊2 8 ,而上邊框1 8則 9等。其中,該隔熱塊係可以低熱傳導率 其他具有足夠的結構強度及較低熱傳導率 作為隔熱塊之用。另外,在框架1 8、1 、2 9之接觸面可做粗糙化處理或上一塗 低其熱傳導率。 帷幕牆的組裝,一般係從大樓底部的牆板開始,再接 著組裝鄰接的牆板’而水封架2 6與播水簾2 7可與牆板 分離運送再予以組裝。一個較好的牆組裝程序應包含三個 主要步驟:首先,將牆板之底部結合槽5 1與下方已裝設 好之牆板的結合栓5 〇對準嚙合;其次,使用結合件3 4 將牆板(如牆板1 1 b )之上邊框1 8結合於相鄰的兩直 樑1 4上;及第三,將水封架2 6及播水簾2 7裝設到上V. Description of the invention (12) A water seal 2 Water tank 3 5 Water curtain 2 7 The side frame exhaust is reduced by strong edges and is directly implemented by the curved part of the partition rib. 〇 Curtain wall · Lower frame 1 Heat insulation block 2 production, or The material can also be made of heat block 2 8 which can splash and block 1 b. With the air effect, the amount of water can be. Gas enters the drainage trough for example, the rigidity of the plastic on the setup is 6 and the partition is on the surface of 4. It is located in the wet joint space 2 1 of the outer air ring, which can guide the sprayed water to the corners of the frame at both ends, and then exit along the wall panel 1. The partition rib 1 8 a of the drainage groove 3 5 can bypass the _ stretcher 1 6 b under the water droplets, providing work access to the water surface and spraying to the water seal 2 4 or 1 8 a on the water seal frame 2 6 Drain trough 3 and 5 partition structure can increase the degree of air fold. 'Block most of the water droplets to the outside. For example, you can also remove the partition ribs, and use a single thermal insulation effect.' In the example 6, the lower heat-insulating block 2 8 is set, and the upper frame 18 is 9 and so on. Among them, the thermal insulation block can be used as a thermal insulation block with low thermal conductivity and others having sufficient structural strength and low thermal conductivity. In addition, the contact surfaces of the frames 18, 1, 2 and 9 can be roughened or coated to reduce their thermal conductivity. The curtain wall assembly generally starts from the wall panel at the bottom of the building, and then assembles the adjacent wall panel '. The water seal frame 26 and the water curtain 27 can be transported separately from the wall panel for assembly. A good wall assembly procedure should include three main steps: first, the bottom groove 5 1 of the wall plate is aligned with the coupling bolt 5 0 of the wall plate installed below; second, the use of a joint 3 4 Combine the upper frame 18 of the wall panel (such as the wall panel 1 1 b) on the two adjacent straight beams 14; and third, install the water seal frame 2 6 and the water-spreading curtain 27 on it.

475956 五、發明說明(13) 邊框1 8上。完成上述三個主要步驟後,即可準備將鄰接 的牆板(如牆板1 1 a )繼續組裝。 請參閱第3圖,係如第1圖所示位於牆板1 1 a與1 1 c間垂直牆隙1 3之3 — 3截面圖。垂直牆隙1 3係由 於左側之牆板1 1 a與右側之牆板1 1 c在工地組裝時( 即牆板架設至大樓之結構體時)所形成的。 圖中所示之右邊框3 6及右空間3 7 ,係分別為牆板 1 1 a之邊框及内氣圈之右側部分,而左邊框3 8及左空 間3 9 ,係分別為牆板1 1 c之邊框及内氣圈之左側部分 。一般而言,牆板1 1 a左邊框之構造係與左邊框3 8大 致相同,而牆板1 1 c右邊框之構造則與右邊框3 6大致 相同。然而,在不同的實施例中,亦可使用兩側邊框型式 不同的邊框。 由於垂直牆隙1 3内的空間係可對稱分隔為左右兩個 部分,故為了避免說明内容嚴重覆,以下的敘述將主要針 對左側牆板1 1 a之構造作說明。第一接合空間4 0與第 二接合空間4 1係分別為牆板1 1 a外氣圈右側部分之兩 個空間。垂直水封4 2附著於垂直水封架4 3之上,可與 第2圖中之水封2 4形成一連續之水封。在變化的實施例 中,垂直水封架4 3係可凸設於直樑1 4上,甚至可將水 封4 2直接設於直樑之上。由於外界的空氣必須經過紆迴 曲折如箭頭V所示的路徑才能接觸到垂直水封4 2 ,故而 在垂直水封4 2兩側沒有大壓力差的況下,即使水封是不 連續的或是不完美的,仍可保持足夠的防滲漏品質。475956 V. Description of the invention (13) On the frame 18. After completing the above three main steps, it is ready to continue to assemble adjacent wall panels (such as wall panel 1 1 a). Please refer to FIG. 3, which is a sectional view of 3—3 of the vertical wall gap 1 3 located between the wall panels 1 1 a and 1 1 c as shown in FIG. 1. The vertical wall gap 1 3 is formed when the left wall panel 1 1 a and the right wall panel 1 1 c are assembled at the construction site (that is, when the wall panel is erected to the structure of the building). The right frame 36 and the right space 3 7 shown in the figure are the frame of the wall plate 1 1 a and the right part of the inner air ring, and the left frame 3 8 and the left space 3 9 are the wall plate 1 respectively. The frame of 1 c and the left part of the inner balloon. In general, the structure of the left frame of the wall plate 1 1 a is substantially the same as that of the left frame 38, and the structure of the right frame of the wall plate 1 1 c is approximately the same as the right frame 36. However, in different embodiments, frames with different frame types on both sides may be used. Since the space in the vertical wall gap 13 can be symmetrically divided into left and right parts, in order to avoid serious explanation, the following description will focus on the structure of the left wall panel 1 1 a. The first joint space 40 and the second joint space 41 are two spaces on the right side of the outer balloon of the wall panel 1a, respectively. The vertical water seal 4 2 is attached to the vertical water seal frame 4 3 and forms a continuous water seal with the water seal 2 4 in FIG. 2. In a modified embodiment, the vertical water seal frame 4 3 can be convexly arranged on the straight beam 14, and even the water seal 4 2 can be directly arranged on the straight beam. Since the outside air must pass through the zigzag path as shown by the arrow V to contact the vertical water seal 4 2, there is no large pressure difference on both sides of the vertical water seal 4 2 even if the water seal is discontinuous or It is imperfect and still maintains sufficient anti-leakage quality.

475956 五、發明說明(14) 牆板1 1 a之玻璃表板1 5與右邊框3 6間係以垂直 水封4 4 (做為表板與右邊框3 6間之封閉)與垂直氣封 4 5 (做為連接於右邊框3 6上之制動器GS與表板間之封 閉)做為封閉,可與如第2圖所示之水封3 0 、3 2及氣 封3 1 、3 3形成連續的水封及氣封。一般而言,垂直水 封4 4、垂直氣封4 5及制動器GS會在工廠内組裝,以免 在工地中因無法控制的因素而在組裝時產生封閉的不完整 。為了增加對水及空氣滲漏的阻抗,可於右邊框3 6與制 動器GS間增設一輔助封閉4 6 a 。為了帷幕牆的隔熱效果 ,可在右邊框36中設置垂直隔熱塊47 ,如第2圖中之 隔熱塊2 8、2 9 —般。另外,尚可於直樑1 4與垂直水 封架4 3 (在本實施例中係為分離設置者)之間增設一隔 熱塊4 8。在變化的實施例中,直樑1 4與垂直水封架4 3可為一連接之整體,而在其結構中混入如隔熱塊4 8之 隔熱構造。又,在本實施例中,直樑1 4兩側的支撐翼緣 4 9皆位於外氣圈的第二接合空間内4 1 ,故其用以裝設 結合件3 4的開口將不會穿透到建築物的内部空間,因此 不會有空氣滲漏的情形產生,同時也提高了帷幕牆強化結 構的氣密性、隔熱性及防水滲漏方面的表現。 垂直氣封4 6所提供的功效與第2圖中之氣封2 5大 係相同,而垂直氣封4 6與垂直水封4 2係分隔一距離而 設置者。 垂直牆隙1 3中各元件之尺寸及設置位置,皆可如在 討論水平牆隙1 2時之各相對元件般在不同的實施例中做475956 V. Description of the invention (14) The glass panel 15 and the right frame 36 of the wall panel 1 1 a are sealed with vertical water 4 4 (as the seal between the panel and the right frame 36) and the vertical air seal 4 5 (as the seal between the brake GS and the dial attached to the right frame 3 6) as a seal, and can be connected with the water seals 3 0, 3 2 and air seals 3 1, 3 3 as shown in Figure 2 Forms continuous water and gas seals. Generally speaking, vertical water seal 4 4, vertical air seal 4 5 and brake GS will be assembled in the factory, so as to avoid closed incompleteness during assembly due to uncontrollable factors in the construction site. In order to increase the resistance to water and air leakage, an auxiliary seal 4 6 a can be added between the right frame 36 and the brake GS. For the thermal insulation effect of the curtain wall, a vertical heat insulation block 47 may be provided in the right frame 36, as in the heat insulation blocks 2 8 and 2 9 in FIG. 2. In addition, a heat-blocking block 48 can also be added between the straight beam 14 and the vertical water-sealing frame 4 3 (in this embodiment, it is a separate installation). In a variant embodiment, the straight beams 14 and the vertical water-sealing frame 43 may be a connected whole, and a heat-insulating structure such as a heat-insulating block 48 may be mixed into the structure. Moreover, in this embodiment, the supporting flanges 49 on both sides of the straight beam 14 are located in the second joint space 4 1 of the outer air ring, so the openings for mounting the coupling members 3 4 will not pass through. It penetrates into the interior space of the building, so there is no air leakage, and it also improves the performance of airtightness, heat insulation and waterproof leakage of the curtain wall reinforced structure. The effect provided by the vertical air seal 4 6 is the same as that of the air seal 25 in the second figure, and the vertical air seal 4 6 and the vertical water seal 4 2 are set apart by a distance. The dimensions and placement positions of the various elements in the vertical wall gap 13 can be made in different embodiments, as in the case of the opposite elements when discussing the horizontal wall gap 12

jyjOjyjO

兵水封及氣封 r # ^ “ "犯四乳圈系統的多重隔间丨叫 了使帷幕腾結構對封閉不完美的容忍度更加 改變。 的構造 第 增進: 2圖及第3圖所示 之實施例尚可達到下列之功效之 本發明使氣圈 '封閉、 化。其中,幾個氣圈與封閉 直與水平邊框斜角對接而連 閉構造,而隔熱塊亦可經由 果。雖然’在氣圈中邊框上 不同的功用,然其在各邊框 密封、及牆板周圍等壓連續 本發明可改善對負向風 牆結構中,其對抗負向風壓 板安全結合件來提供,然而 ,可能導致結合件的損毁或 發明之結構中,其右邊框3 遠離結合件3 4的位置頂住 11a與lie上的負向風 由大樓之主體結構來承受, 風壓下的負載。另外,在其 架4 3上,除了垂直水封4 ’以承受支腳5 2的擠壓。 在此一可降低其週期性 及隔熱塊之連續構造之成形簡 的片段,可藉由構造相似的垂 接起來,形成連續的氣圈與封 斜角對接而提供連續的隔熱效 的凸起在不同的位置可能會有 中類似的構造,可使其組裝、 氣圈之成形手續簡化。 壓負載之阻抗。在習用的帷幕 之主要結構係以一個或多個牆 在反覆的張力及剪力的作用下 鬆動,以及封閉的損壞。而本 6則包含有一支腳5 2 ,可在 垂直水封架4 3 ,藉以將牆板 壓負載直接導向直樑1 4 ,而 因此可減少結合件3 4在負向 他實施例中,尚可在垂直水封 2之外,再增設一負载承受面 負載、保有長期性封閉及隔熱Bingshuifeng and Qifengr # ^ "" Multiple compartments of the guilty four milk ring system 丨 called to make the curtain Teng structure more tolerance to imperfect closure. The structure of the first improvement: Figure 2 and Figure 3 The illustrated embodiment can still achieve the following effects of the present invention to close and close the balloon. Among them, several balloons are connected to the closed straight and horizontal frame obliquely to connect the closed structure, and the heat insulation block can also pass through. Although 'different functions on the frame in the air ring, it is sealed at each frame and isobaric continuous around the wall panel. The present invention can improve the structure of the negative wind wall, which is provided by the safety joint against the negative wind pressure plate. However, in the structure that may cause damage to the joint or the invention, the right side of the frame 3 away from the joint 34 will withstand the negative wind on 11a and lie by the main structure of the building to bear the load under the wind pressure. On its frame 4 3, except for the vertical water seal 4 ′ to withstand the compression of the feet 5 2. Here is a simplified segment that can reduce its periodic and continuous structure of the thermal insulation block, which can be similar in structure Connected vertically to form a continuous atmosphere The bumps that are connected with the sealing bevel to provide continuous heat insulation effect may have similar structures in different positions, which can simplify the assembly and balloon forming procedures. Impedance of pressure load. In the conventional curtain The main structure is that one or more walls are loosened under repeated tension and shear, and the damage is closed. But this 6 contains a foot 5 2, which can be installed in a vertical water-sealing frame 4 3, so that the wall panel The compressive load is directly guided to the straight beam 1 4, and thus the coupling member 3 4 can be reduced. In the negative embodiment, an additional load can be added in addition to the vertical water seal 2 to bear the surface load, and maintain long-term sealing and heat insulation.

第18頁 五 發明說明(17) 常 2 透水封3 0的驅動力。铁 ^嚴重’導致水的滲漏水封3 〇之缺陷非 合!迅速流向排水槽3 5而排出t的水亦可經由氣孔 會有水累積,而氣封3 i 、=。因此,空間1 9中將不 之中。由於氣封(如3丄、3、及45亦不會暴露於水 如3 0、3 4 )係分離,5 )與牆板中對應之水封( 水封功能亦分開,故可容許梦即帷幕牆結構之氣封功能與 有大量水滲漏的情況發生。^大的封閉缺陷存在而仍不會 間的氣封與水封係 外’大部分表板與牆板框之P.18 5 Description of the invention (17) Constant 2 Driving force of permeable seal 30. Iron ^ severe ’causes the water leakage of the water seal 30 to be defective! Water that flows quickly to the drainage tank 35 and discharges t can also accumulate water through the pores, and the air seals 3 i and =. Therefore, space 19 will not be missed. Since the air seal (such as 3 丄, 3, and 45 will not be exposed to water such as 30, 3, 4), it is separated from the corresponding water seal (the water seal function is also separated in the wall panel), so dreams can be allowed. The air-sealing function of the curtain wall structure and the occurrence of a large amount of water leakage occur. ^ Large sealing defects exist but the air-sealing and water-sealing system is still intact.

美的產生,進而増加盆氣;:部組袭,以降低其封閉不完 在其他的實施態樣=在=與水密性。 的帷幕牆結構中,如美國同樣的設計原理可應用於其他 式氣圈結構。其中,氣孔利第5 5 9 8 6 71號所揭露之隱框 為進氣及排水之用。在另二以類似的大小及位置設置,做 ,封架4 3之結構凸出元實施態樣中,將使用類似垂直 髮負載(或其他指向大樓外j藉以確保牆板可抵抗負向風 袭置只承受重力負载。而部之負载),而使結構之結合 緣構造,則可提供—無需直樑1 4翼緣4 9之結構翼 定結構。 、、、而方氣水滲漏之密封處理的牆板固The generation of beauty, and further increase the basin gas ;: Ministry of assault to reduce its incomplete closure In other implementations = = = and water tightness. In the curtain wall structure, the same design principles as in the United States can be applied to other balloon structures. Among them, the hidden frame disclosed by No. 5 5 9 8 6 71 is used for air intake and drainage. In the other two, with similar size and position, the structure of the structure of the sealing frame 43 will be similar to the vertical hair load (or other pointing to the outside of the building to ensure that the wall panel can resist negative wind. The installation only bears the gravity load. And the load of the part), and the structure of the joint edge structure can provide-without the need for a straight beam 1 4 flange 4 9 structure wing structure. Sealed treatment of wallboard

綜上所述,當知本發 指—種氣圈式帷幕牆之強,、有關於一種帷幕牆結構,尤 受面將作用在牆板上而指上2 ’其主要係利用該負載承 建築之支樓結構承受,=建築外部方向之作用力轉而由 氣壓與外界相等,而可對J用乳封水封分離及内外氣圈之 」對封閉不完美有較大的容忍度者。In summary, when we know the strength of this type of air curtain curtain wall, and about the structure of a curtain wall, especially the receiving surface will act on the wall panel and the finger 2 'It is mainly used to load the building. The bearing structure bears, = the force in the external direction of the building is changed from the air pressure to the outside, and it can be used to isolate J with milk seals and water seals, and the inner and outer air rings have greater tolerance for imperfect sealing.

475956 五、發明說明(18) 故 本 發 明 實 為 一 富 有 新 穎 性 進 步性 > 及 可 供 產 業 利 用 功 效 者 應 符 合 專 利 中 請 要 件 無 疑 ,爰 依 法 提 請 發 明 專 利 中 請 懇 請 貴 審 查 委 員 早 曰 賜 予 本發 明 專 利 5 實 感 德 便 〇 惟 以 上 所 述 者 j 僅 為 本 發 明 之一 較 佳 實 施 例 而 已 5 並 非 用 來 限 定 本 發 明 實 施 之 範 圍 即凡 依 本 發 明 中 請 專 利 範 圍 所 述 之 形 狀 構 造 特 徵 及 精 神所 為 之 均 等 變 化 與 修 飾 均 應 包 括 於 本 發 明 之 中 請 專 利 範圍 内 〇 圖 號 簡 單 說 明 • 0 帷 幕 牆 結 構 1 1 a 牆 板 1 1 b 牆 板 1 1 C 牆 板 1 1 d 牆 板 1 1 e 牆 板 1 1 f 牆 板 \/1 2 水 平 牆 隙 4 3 直 垂 牆 隙 x/1 4 直 樑 1 4 a L 型 翼 緣 1 4 b 箱 形 支 撐 結 構 1 5 表 板 1 6 下 邊 框 1 6 a 外 擋 板 1 6 b L 型 擋 板 1 6 c 凸 肋 1 7 表 板 1 8 上 邊 框 1 8 a 凸 肋 1 8 b 凸 出 物 1 8 c 凸 出 物 1 9 空 間 2 0 空 間 2 1 濕 接 合 空 間 2 2 乾 接 合 空 間 2 3 氣 孔 2 4 水 封 2 5 水 封 2 6 水 封 架 2 7 擋 水 簾475956 V. Description of the invention (18) Therefore, the present invention is truly novel and progressive; and those available for industrial use should meet the requirements of the patent. Without a doubt, if you request the invention patent in accordance with the law, please ask your examiner for your gift. The patent of the present invention 5 is a real sense. However, the above-mentioned j is only one of the preferred embodiments of the present invention. It is not intended to limit the scope of the present invention, that is, to the features of the shape and structure described in the patent scope Equal changes and modifications should be included in the scope of the present invention. Please refer to the drawings for a brief description. 0 Curtain wall structure 1 1 a wall panel 1 1 b wall panel 1 1 C wall panel 1 1 d wall panel 1 1 e Wall panel 1 1 f Wall panel \ / 1 2 Horizontal wall gap 4 3 Straight wall gap x / 1 4 Straight beam 1 4 a L-shaped flange 1 4 b Box Supporting structure 1 5 Table plate 1 6 Lower bezel 1 6 a Outer bezel 1 6 b L-shaped bezel 1 6 c Convex rib 1 7 Table plate 1 8 Upper bezel 1 8 a Convex rib 1 8 b Protrusion 1 8 c Projections 1 9 Space 2 0 Space 2 1 Wet joint space 2 2 Dry joint space 2 3 Air hole 2 4 Water seal 2 5 Water seal 2 6 Water seal frame 2 7 Water curtain

475956 五、發明說明(19) 2 7 a 排 水 面 2 9 隔 熱 塊 3 0 水 封 3 2 水 封 3 4 結 合 件 3 5 排 水 槽 3 6 a 凸 肋 3 8 左 邊 框 2 8 3 1 3 4a 3 6 3 7 3 8a 左空間 4 0 第 一 接 合 空間 4 1 ^4 2 垂 直 水 封 4 3 ^4 4 水 封 5 4 6 封 閉 4 6 a 4 7 垂 直 隔 熱 塊 4 8 4 9 支 撐 翼 緣 5 0 結 合 栓 5 1 5 2 支 腳 結合槽 隔熱塊 氣封 氣封 結合孔 右邊框 右空間 凸肋 第二接合空間 垂直水封架 氣封 輔助封閉 隔熱塊475956 V. Description of the invention (19) 2 7 a Drain surface 2 9 Insulation block 3 0 Water seal 3 2 Water seal 3 4 Joint 3 5 Drain trough 3 6 a Raised rib 3 8 Left frame 2 8 3 1 3 4a 3 6 3 7 3 8a Left space 4 0 First joint space 4 1 ^ 4 2 Vertical water seal 4 3 ^ 4 4 Water seal 5 4 6 Closed 4 6 a 4 7 Vertical insulation block 4 8 4 9 Support flange 5 0 Combining bolt 5 1 5 2 Feet Combining groove Insulation block Air-sealing and air-sealing combination hole Right frame Right space Raised ribs Second joint space Vertical water-sealing frame Air-seal Auxiliary sealing heat-insulating block

475956 圖式簡單說明 第1圖:係本發明一較佳實施例外牆結構之等角視圖; 第2圖:係如第1圖所示實施例一水平牆隙之2 — 2截面 圖;及 第3圖··係如第1圖所示實施例一垂直牆隙之3 — 3截面 圖。475956 Brief description of the drawings. Figure 1: is an isometric view of an exceptional wall structure of a preferred embodiment of the present invention; Figure 2: is a sectional view of the horizontal wall gap 2-2 of the embodiment shown in Figure 1; and Fig. 3 is a 3-3 cross-sectional view of the vertical wall gap of the first embodiment shown in Fig. 1.

第23頁Page 23

Claims (1)

、申請專利範圍 一種帷幕牆之強化結構,可以建築之支撐結構支撐複 數個牆板’其中各牆板之主要構造係包含有: 一固設於牆板之水平邊框; 一固設於牆板並與水平邊框連接之垂直邊框;及 一結合件’用以將牆板結合到建築之至少一支撐結構 上, 2 · 4 · 其中至少一邊框包含有一負載承受面,以承受與支撐 結構之表面接觸,並可抵抗作用在牆板上而使結合 件額外承受的指向外側的作用力。The scope of the patent application is a reinforced structure of curtain wall, which can support a plurality of wall panels by the supporting structure of the building. The main structure of each wall panel includes: a horizontal frame fixed on the wall panel; and a fixed wall panel. A vertical frame connected to the horizontal frame; and a coupling member 'for bonding the wall panel to at least one supporting structure of the building, 2 · 4 · where at least one frame includes a load bearing surface for bearing contact with the surface of the supporting structure , And can resist the external force acting on the wallboard and causing the joint to bear extra. 如申請專利範圍第1項所述之帷幕牆之強化結構,尚 包含有複數個設於各牆板連接隙中之封閉,其中該負 載承文面係設於建築之一直樑之凸出結構上,而該封 1在作用力作用於牆板上時,仍可抵抗流體之滲漏。 ::明專利範圍第2項所述之帷幕牆之強化結構,其 遠凸出結構係為一連接直樑之垂直水封架,而該負 载承受面亦為一封閉之表面。For example, the strengthened structure of the curtain wall described in item 1 of the scope of the patent application still includes a plurality of closures provided in the connection gaps of the wall panels, wherein the load bearing surface is provided on the protruding structure of the straight beam of the building. The seal 1 can still resist the leakage of fluid when the force is applied to the wall panel. :: The reinforced structure of the curtain wall described in item 2 of the Ming patent scope, the far protruding structure is a vertical water seal frame connected to a straight beam, and the load bearing surface is also a closed surface. 一種帷幕牆之強仆4士德 π^ ^ ^ 數個於极,直:可以建築之支撐結構支撐4 二:牆板中各牆板之主要構造係包含有: ^ 一固设於牆板之水平邊框; — ΐίίϊ接分:並與至少-7 ;及 ^成大體上垓繞牆板之連續邊才 結構上’其中至A strong servant of a curtain wall 4 Shide π ^ ^ ^ Several in the pole, straight: can be supported by the supporting structure of the building 4 2: The main structure of each wall panel in the wall panel includes: ^ one fixed on the wall panel Horizontal borders: ΐίίϊ: and with at least -7; and ^ forming a continuous edge around the wall panel is structurally 'wherein 第24頁Page 24 475956 六、申請專利範圍 而使其兩端暴露於外界環境之空氣中。 5 ·如申請專利範圍第4項所述之帷幕牆之強化結構,其 中該結合件係配合穿設於直樑凸出物之結合孔而作用 ,而該結合孔之兩端開口皆暴露於外界環境之空氣中 〇 6 · —種帷幕牆強化結構之牆板組裝方法,其主要係包含 有下列步驟: 將一第一牆板置放於一預設位置,該預設位置係鄰接 於一先前已固定在建築結構上之牆板; 以至少一結合件將該第一牆板結合到建築之至少一支 彳g 撐結構上;及 以結合件以外之裝置抑制該第一牆板指向建築外側之 運動。 7 · —種帷幕牆強化結構之牆板組裝方法,其主要係包含 有下列步驟: 將一上牆板置放於一預設位置,該預設位置至少與兩 個已固定在建築結構之牆板相鄰接,其中,該上牆 板係先與位於下方之牆板做結構上的喫合,再結合 到建築之結構上;及 再上述之置放步驟後,以兩個結合件將牆板結合到建 + 築之結構上,其中結合件兩端大部分的表面係暴露 於外界環境之空氣中。 8 ·如申請專利範圍第7項所述之方法,其中該上牆板亦 與建築支撐結構之凸出物做結構上的喫合,以抑制該475956 6. Scope of applying for patent Exposing both ends to the air of the external environment. 5. The reinforced structure of the curtain wall as described in item 4 of the scope of the patent application, wherein the joint works with the joint holes running through the protrusions of the straight beam, and the openings at both ends of the joint holes are exposed to the outside. In the air of the environment 0—A method for assembling a wall panel for a curtain wall reinforced structure mainly includes the following steps: A first wall panel is placed in a preset position, which is adjacent to a previous position A wall panel that has been fixed on the building structure; the first wall panel is connected to at least one 彳 g brace structure of the building with at least one joint; and a device other than the joint is used to inhibit the first wall panel from pointing to the outside of the building Its movement. 7 · —A method for assembling a wall panel of a curtain wall reinforced structure, which mainly includes the following steps: Placing an upper wall panel in a preset position, the preset position is at least with two walls fixed to the building structure The panels are adjacent to each other, wherein the upper wall panel is first structurally combined with the lower wall panel and then combined with the building structure; and after the above-mentioned placing steps, the wall is connected by two joints. The board is bonded to the built + built structure, where most of the surfaces of the two ends of the joint are exposed to the air of the external environment. 8 · The method as described in item 7 of the scope of patent application, wherein the upper wall plate is also structurally engaged with the protrusions of the building support structure to suppress the 第25頁 475956 六、申請專利範圍 第一牆板指向建築外側之運動。 9 · 一種帷幕牆之強化結構,可以建築之支撐結構支撐複 數個牆板,其中各牆板之主要構造係包含有·· 至少一固設於一第一牆板之水平邊框; 至少一垂直邊框,固設於該第一牆板上,並與至少一 水平邊框連接,以形成一大體上環繞牆板之連續邊 框; 複數個封閉’設於至少一前述邊框之接合處;及 至少一結合件,用以將牆板結合到建築之至少一支撐 結構上,其中各結合件之兩端係暴露於外界環境約 略相等之氣壓下;及 其中,至少一邊框包含有一負載承受面,該負載承受 面與建築支撐結構之一表面接觸,而可限制並承受 大部分作用於牆板上之作用力指向建築外部方向之 分量。 10· —種帷幕牆之強化結構,可以建築之支撐結構支樓複 數個牆板’其中各牆板之主要構造係包含有: 一固設於牆板之邊框; 一用以支撐牆板之裝置,該裝置係可結合至建築之矣士 構上;及 / V' 一限制邊框之元件,可結合至建築之結構上; 其中,該限制邊框之元件可限制牆板之邊框在指 築外部方向之運動分量。 胃η $ 11 ·如申請專利範圍第1 〇項所述之帷幕牆之強化結構,其Page 25 475956 6. Scope of patent application The movement of the first wall panel pointing to the outside of the building. 9 · A reinforced structure of a curtain wall, which can support a plurality of wall panels by a supporting structure of a building, wherein the main structure of each wall panel includes: · at least one horizontal frame fixed to a first wall panel; at least one vertical frame Fixed on the first wall panel and connected with at least one horizontal frame to form a continuous frame that substantially surrounds the wall panel; a plurality of closed 'sets at the junction of at least one of the aforementioned frames; and at least one joint For coupling the wall panel to at least one supporting structure of the building, wherein both ends of each of the coupling members are exposed to an approximately equal atmospheric pressure from the external environment; and wherein at least one frame includes a load bearing surface, and the load bearing surface It is in contact with one surface of the building support structure, and can limit and withstand the component of most of the force acting on the wall panel in the direction of the exterior of the building. 10 · —A kind of reinforced structure of curtain wall, which can be used as the supporting structure of the building. The main structure of each wall plate includes: a frame fixed to the wall plate; a device for supporting the wall plate The device can be combined with the architecture of the building; and / V 'a frame-limiting element can be combined with the structure of the building; wherein the frame-limiting element can limit the frame of the wallboard in the direction of the building. Its motion component. Stomach η $ 11 · The reinforced structure of the curtain wall as described in item 10 of the patent application scope, which 475956 六、申請專利範圍 中該用以 板結合到 12 支撐牆板之裝置包含有一結合件,藉以將牆 建築之支撐結構上。 種帷幕牆之強化結構,可以建築之支撐結構支撐複 ,其中各牆板之主要構造係包含有: 牆板之邊框;及 撐牆板之裝置,該裝置係可結合至建築之結 數個牆板 一固設於 一用以支 13 14 構上, 其中,該 大部分 如申請專 中該用以 如申請專 中該用以 用以支撐牆板之裝置,其露在外面的表面, 皆暴露於外界環境之空氣中。 利範圍第1 2項所述之帷幕牆之強化結構,其 支樓牆板之裝置係為一結合件。 利範圍第1 2項所述之帷幕牆之強化結構,其 支撐牆板之裝置係為一螺絲。475956 6. In the scope of the patent application, the device for panel connection to 12 supporting wallboards includes a coupling member to connect the wall structure to the supporting structure. This kind of curtain wall reinforced structure can support the supporting structure of the building. The main structure of each wall panel includes: the frame of the wall panel; and the device for supporting the wall panel. The device can be connected to several walls of the building. A board is fixed on a structure for supporting 13 14, most of which are used to support the wallboard as in the application school, and the exposed surface of the device is exposed. In the air of the external environment. The reinforced structure of the curtain wall described in Item 12 of the scope of benefit, the device of the supporting wall panel is a joint. The reinforced structure of the curtain wall described in Item 12 of the scope of benefit, the device for supporting the wall plate is a screw. 第27頁Page 27
TW90114534A 2001-06-15 2001-06-15 Enhanced curtain wall system TW475956B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW90114534A TW475956B (en) 2001-06-15 2001-06-15 Enhanced curtain wall system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW90114534A TW475956B (en) 2001-06-15 2001-06-15 Enhanced curtain wall system

Publications (1)

Publication Number Publication Date
TW475956B true TW475956B (en) 2002-02-11

Family

ID=21678550

Family Applications (1)

Application Number Title Priority Date Filing Date
TW90114534A TW475956B (en) 2001-06-15 2001-06-15 Enhanced curtain wall system

Country Status (1)

Country Link
TW (1) TW475956B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109487938A (en) * 2018-12-05 2019-03-19 力福建材(昆山)有限公司 Multifunctional modular curtain wall
CN113653226A (en) * 2021-08-05 2021-11-16 浙江盈科建设工程有限公司 Decorative wallboard structure and mounting method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109487938A (en) * 2018-12-05 2019-03-19 力福建材(昆山)有限公司 Multifunctional modular curtain wall
CN109487938B (en) * 2018-12-05 2024-04-16 力福建材(昆山)有限公司 Multifunctional modularized curtain wall
CN113653226A (en) * 2021-08-05 2021-11-16 浙江盈科建设工程有限公司 Decorative wallboard structure and mounting method thereof
CN113653226B (en) * 2021-08-05 2023-03-28 浙江盈科建设工程有限公司 Decorative wallboard structure and mounting method thereof

Similar Documents

Publication Publication Date Title
TW200402504A (en) Improved exterior vision panel system
WO2018064944A1 (en) Inflatable building and door structure therefor
TW475956B (en) Enhanced curtain wall system
JP2003531326A (en) Augmented curtain wall system
KR20170102333A (en) Clean gas cabin
JP2010071047A (en) Exterior wall structure
JP2008184816A (en) Curtain wall
JPS6053828B2 (en) building room temperature control device
JP2007100435A (en) Structure of outer wall corner part by metal curtain wall
JP4700407B2 (en) Foundation and building with decorative panel
PL204009B1 (en) Sealing system for a heat recuperation chember
JP2008184817A (en) Curtain wall
CN212534510U (en) Boundary connecting assembly for ETFE air pillow type membrane structure
JP2008057228A (en) Fire-resistive covering structure
JP3704671B2 (en) Half-duplex air membrane structure
CN107896500B (en) Carrier
CN112878756A (en) Heat preservation equipment
JP2577490Y2 (en) Equipment storage in multi-family housing
JP2019116765A (en) Double sash
JPH03208931A (en) Extensible joint of building
KR102541626B1 (en) Combination structure of slip stone panel for curtain wall
CN211523537U (en) Stand overlap joint structure and room roof beam frame structure thereof
JP2504147Y2 (en) Partition device
TWM562883U (en) Extruded aluminum pillar and compartment panel having aluminum extruded frame formed by the extruded aluminum pillar
JPH0212515Y2 (en)

Legal Events

Date Code Title Description
GD4A Issue of patent certificate for granted invention patent
MM4A Annulment or lapse of patent due to non-payment of fees