TW200513909A - Project management method - Google Patents
Project management methodInfo
- Publication number
- TW200513909A TW200513909A TW092127356A TW92127356A TW200513909A TW 200513909 A TW200513909 A TW 200513909A TW 092127356 A TW092127356 A TW 092127356A TW 92127356 A TW92127356 A TW 92127356A TW 200513909 A TW200513909 A TW 200513909A
- Authority
- TW
- Taiwan
- Prior art keywords
- project
- milestones
- milestone
- determination
- man
- Prior art date
Links
- 238000007726 management method Methods 0.000 title abstract 2
- 238000000034 method Methods 0.000 abstract 3
Abstract
A project management method defines a project framework to establish multiple project templates. Set up a project based on these project templates, wherein the project comprises multiple milestones forming the network structure and schedule achieving these milestones, approval regarding project, assignment of persons in charge to achieve these milestones and dynamic scheduling regarding project including the status receiving man-hour card and setting milestone, the status and schedule based on the milestone and the estimated finish day of project calculated by the critical path method in network structure, determination if all the milestones are accomplished and continuously proceed the man-hour card receiving procedure in case of any unachieved milestone, and determination of the rework required by any milestone and the continuous main-hour card receiving procedure if any of milestones is needed to rework.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
TW92127356A TWI224268B (en) | 2003-10-02 | 2003-10-02 | Project management method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
TW92127356A TWI224268B (en) | 2003-10-02 | 2003-10-02 | Project management method |
Publications (2)
Publication Number | Publication Date |
---|---|
TWI224268B TWI224268B (en) | 2004-11-21 |
TW200513909A true TW200513909A (en) | 2005-04-16 |
Family
ID=34568539
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
TW92127356A TWI224268B (en) | 2003-10-02 | 2003-10-02 | Project management method |
Country Status (1)
Country | Link |
---|---|
TW (1) | TWI224268B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI423135B (en) * | 2005-07-19 | 2014-01-11 | Raytheon Co | System and method for schedule quality assessment |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI395146B (en) * | 2009-05-27 | 2013-05-01 | Univ Nat Taiwan Science Tech | System feasible duration evaluation method for project management in budget and time restriction |
-
2003
- 2003-10-02 TW TW92127356A patent/TWI224268B/en not_active IP Right Cessation
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI423135B (en) * | 2005-07-19 | 2014-01-11 | Raytheon Co | System and method for schedule quality assessment |
Also Published As
Publication number | Publication date |
---|---|
TWI224268B (en) | 2004-11-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Dlouhy et al. | Three-level method of Takt planning and Takt control–A new approach for designing production systems in construction | |
Kadefors | Institutions in building projects: implications for flexibility and change | |
WO2005006142A3 (en) | Method and system for scheduling and sharing a pool of resources across multiple distributed forecasted workloads | |
US20060167731A1 (en) | Automatically scheduling meetings | |
WO2007112425A3 (en) | Method and system for social and leisure life management | |
MXPA05006431A (en) | Hierarchical projects in a computer-enabled project management method and system. | |
WO2005057373A3 (en) | System and method for the light-weight management of identity and related information | |
DE60310209D1 (en) | METHOD AND SYSTEM FOR CARRYING OUT A CALL FOR AUTHORIZATION IN THE THIRD GENERATION WIRELESS COMMUNICATION SYSTEMS | |
ATE420765T1 (en) | DECORATIVE PLATE FOR OUTDOOR USE AND METHOD FOR PRODUCING SAME | |
CN110705815A (en) | Shop scheduling system and method | |
TW200513909A (en) | Project management method | |
AU2019250254A1 (en) | Recording, tracking and evaluating system | |
WO2018229895A1 (en) | Energy management device and method, energy management system, and energy management system operation planning method | |
Guihaire et al. | Improving timetable quality in scheduled transit networks | |
ATE381736T1 (en) | FLEXIBLE USER AUTHENTICATION METHOD FOR A PASSWORD-BASED SYSTEM | |
Lange et al. | Scheduling preventive maintenance tasks with synchronization constraints for human resources by a CP modeling approach | |
US20140324535A1 (en) | Power infrastructure sizing and workload management | |
Srivastava et al. | Process Driven Optimized Decision Making in an Integrated Project Delivery (IPD) Environment-The Importance of Decision Matrices. | |
Haghshenas et al. | Development of Citizen's Daily Travel Scheduling Models with the Activity Based Approach with Emphasis on the Behavior of Mode Choice at the Different Times of the Day (Case Study: Isfahan) | |
SG145606A1 (en) | Method and system for reticle scheduling | |
CN115310872A (en) | Activity planning and scheduling method and system based on activity management platform | |
Tontarski et al. | OR Nurse Planning and Scheduling Under Uncertainty | |
CN110287232A (en) | The method swiped the card based on sequential correlation and behavior probability weighting discovery doubtful generation | |
WO2004038566A3 (en) | Demand-based resource scheduling method and system | |
Alarcón et al. | Reducing Schedule in Repetitive Construction Projects |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MK4A | Expiration of patent term of an invention patent |