SU964154A1 - Method of sinking vertical mine working in unstable rock beds - Google Patents
Method of sinking vertical mine working in unstable rock beds Download PDFInfo
- Publication number
- SU964154A1 SU964154A1 SU792766225A SU2766225A SU964154A1 SU 964154 A1 SU964154 A1 SU 964154A1 SU 792766225 A SU792766225 A SU 792766225A SU 2766225 A SU2766225 A SU 2766225A SU 964154 A1 SU964154 A1 SU 964154A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- rock
- unstable
- excavation
- section
- penetration
- Prior art date
Links
Landscapes
- Earth Drilling (AREA)
Description
Изобретение относится к горному ' делу и касается проходки вертикальных горных выработок в неустойчивых породах.The invention relates to mining, and relates to the sinking of vertical mine workings in unstable rocks.
Известен способ проходки горной выработки, включающий крепление за- 5 бивной крепью и выдачу породы [1].Known tunneling excavation method comprising fastening za- 5 Bivni rock bolting and delivery [1].
Недостатком способа является большой расход необорачиваемого металла.The disadvantage of this method is the high consumption of non-turnaround metal.
Наиболее близким по технической сущности и достигаемому результату к предлагаемому является способ, включающий выемку породы и крепление (2).The closest in technical essence and the achieved result to the proposed is a method that includes the excavation of the rock and fastening (2).
Недостатком такого способа является необходимость применения искусст венного замораживания, что из-за удороживания, повышенной трудоемкости и увеличения сроков строительства снижает эффективность проходки.The disadvantage of this method is the need to use artificial freezing, which, due to the increase in cost, increased labor intensity, and increased construction time, reduces the efficiency of sinking.
Цель изобретения - повышение эф- 20 фективности проходки.The purpose of the invention is to increase the efficiency of sinking.
Поставленная цель достигается тем, что согласно способу проходки, включающему выемку породы и крепление после выемки слоя неустойчивой породы производят с сечением, превышающим сечение выработки, затем производят бетонирование образовавшейся полости, при этом бетон после набора им прочности в пределах сечения выработки извлекают.·This goal is achieved by the fact that according to the method of sinking, including excavation of the rock and fastening after excavation of a layer of unstable rock is produced with a cross section exceeding the cross section of the excavation, then the formed cavity is concreted, and concrete is recovered after building strength within the excavation cross section. ·
На фиг. 1-7 показана- последовательность проходки шахтного ствола; на фиг. 8 - ствол, общий вид.In FIG. 1-7 shows the sequence of penetration of the shaft shaft; in FIG. 8 - trunk, general view.
Проходку выработки, например ствола, производят следующим образом.The penetration of a mine, for example a trunk, is as follows.
Вскрывают слой 1 неустойчивых пород. При этом неустойчивая порода, например, плывун заполняет ствол на уровне 2. После этого в ствол подают жидкость (воду, глинистую суспензию и др.) до уровня з, достаточного для уравновешивания статического напора породы.Open layer 1 of unstable rocks. In this case, unstable rock, for example, a quicksand fills the trunk at level 2. After that, liquid (water, clay suspension, etc.) is fed into the trunk to a level h sufficient to balance the static pressure of the rock.
Далее производят разработку и выдачу породы под слоем пригрузочной жидкости. По достижении нижней границы 4 слоя неустойчивой породы в ствол подают бетон (цементный раствор) 5- После набора бетоном 5 необходимой прочности пригрузочную жидкость откачивают, его разрушают и выдают на поверхность в пределах сечения выработка.Next, the development and delivery of the rock is carried out under a layer of loading fluid. Upon reaching the lower boundary of the 4th layer of unstable rock, concrete (cement mortar) is fed into the barrel 5- After the concrete 5 has set the required strength, the loading fluid is pumped out, it is destroyed and the output is delivered to the surface within the cross-section.
Предлагаемый способ позволяет сни· зить капиталовложения и сроки строительства за счет исключения операций по искусственному замораживанию.The proposed method allows to reduce capital investment and construction time due to the exclusion of operations on artificial freezing.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU792766225A SU964154A1 (en) | 1979-05-07 | 1979-05-07 | Method of sinking vertical mine working in unstable rock beds |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU792766225A SU964154A1 (en) | 1979-05-07 | 1979-05-07 | Method of sinking vertical mine working in unstable rock beds |
Publications (1)
Publication Number | Publication Date |
---|---|
SU964154A1 true SU964154A1 (en) | 1982-10-07 |
Family
ID=20827709
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU792766225A SU964154A1 (en) | 1979-05-07 | 1979-05-07 | Method of sinking vertical mine working in unstable rock beds |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU964154A1 (en) |
-
1979
- 1979-05-07 SU SU792766225A patent/SU964154A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EA000555B1 (en) | Undercut excavation with protection against seismic events or excessive ground movement | |
RU2348808C2 (en) | Method of preparing bottom of block | |
SU964154A1 (en) | Method of sinking vertical mine working in unstable rock beds | |
RU2128773C1 (en) | Method for supporting mining workings with loose roof rock by anchor support | |
Bekbergenov et al. | CURRENT CONDITION AND OUTLOOKS OF SUSTAINABLE DEVELOPMENT OF CHROMITE UNDERGROUND) MIINING, AT LOWER HORIZONS OF MINES OF THE DONSKOY MINING, AND PROCESSING, PLANT | |
SU989083A1 (en) | Method of driving large-section workings | |
RU2134786C1 (en) | Method for saving sections of development workings | |
RU2194858C2 (en) | Method of combined mining of bedded mineral deposits | |
SU1126698A1 (en) | Method of tunelling deep mine shafts in low-flooded rocks | |
CN109653751A (en) | A kind of use wears city expressway method for tunnel construction under yielding rubber ledge | |
RU2055209C1 (en) | Method for creating underground drifts such as tunnels | |
SU909173A1 (en) | Method of directing artificial pillars | |
RU2058464C1 (en) | Method for making foundation | |
CN209586372U (en) | A kind of use wears city expressway constructing tunnel structure under yielding rubber ledge | |
JPH05118189A (en) | Large sectional tunnel excavating method | |
SU729360A1 (en) | Method of relieving strain of mine working contour | |
SU889853A1 (en) | Pillar excavating method | |
RU2004811C1 (en) | Method for tunnel lining with monolithic concrete | |
SU863867A1 (en) | Method of sinking a vertical mine working | |
RU2278267C1 (en) | Vertical excavation liquidation method | |
SU715798A1 (en) | Method of mining gently sloping ore bodies | |
RU1794192C (en) | Method for constructing pits | |
SU1671866A1 (en) | Shaft tunneling method with pre-shaft drifting | |
RU1803562C (en) | Method of erection of artificial pillars in underground working of mines | |
SU711294A1 (en) | Method of mining stone blocks for walls |