SU943082A1 - Method of constructing self-raising offshore platform - Google Patents
Method of constructing self-raising offshore platform Download PDFInfo
- Publication number
- SU943082A1 SU943082A1 SU803223429A SU3223429A SU943082A1 SU 943082 A1 SU943082 A1 SU 943082A1 SU 803223429 A SU803223429 A SU 803223429A SU 3223429 A SU3223429 A SU 3223429A SU 943082 A1 SU943082 A1 SU 943082A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- platform
- pontoons
- pier
- under
- lifting mechanisms
- Prior art date
Links
Description
Изобретение относитс к технологии судостроени и касаетс способов постройки и спуска на воду самоподъемных платформ, например, дл освоени морского шельфа. Известен способ постройки морской самоподъемной платформы, включающий монтаж на степеле корпуса платфорг ол, установку на нем надстройки, буровой вышки, механизмов подъема и частичное формирование опорных колонн, причем платформу перемещают на достроечный мол, размешают кра корпуса платформы с механизмами подъема и сформированными част ми опорных колонн со свесом над водой, а после монтажа плат форму ввод т с мола Г1 Недостатком известного способа вл етс высока стоимость постройки самоподъемной платформы в св зи с повышенными затратами на транспортирование частей корпуса морской самоподъ- емной плаач{юрмы. Цель изобретени - сокращение стоимости постройки. Это достига ;гс тем, что нижние секции опорных колонн устанавливают в вырезы монтажно-спусковых понтонов, после чего подвод т последние к молу под корпус платформы, затем опускают сформированные части опорных колонн и стыкуют их с нижними секци ми, после чего вывод т монтажио-спусковые понтоны из-под корпуса, устанавливают на них опоры, вновь завод т под корпус и дебаАластируют монтажио-спусковые понтоны , а затем буксируют платформу на монтажно-спусковых понтонах до полного вывода с мола, опускают механизмами подъема опорные колонны до упора их в грунт и поднимают платформу над монтажно-спусковыми понтонами, после чего вывод т последние из-под корпуса платформы и опускакл платфорк у механизмами подъема до всплыти . На фиг. 1 изображены платформа на молу и монтажно-спусковые понтоны с 1гажними секци ми опорных колонн в отведенном положении; на фиг. 2 - то- же вид сверху; на фиг. 3 - платформа на молу и монтажно спусковые понтоны с нижними секци ми опорных колонн, подведенные под корпус; на фиг. 4 - плат форма на молу и монтажно спусковые понтоны с опорами в отведенном положе1пга; на фиг. 5 - то же, вид сверху; на фиг. 6 - платформа на монтажноспусковых понтонах вьшедена с мола; на фиг. 7 - то же, вид спереди; на фиг. 8 - платформа стоит на опорных колоннах, монтажно спусковые пойтоны отведены; на фиг. 9 - платформа на Способ осуществл етс следуюшим образом. Корпус 1 морской самоподъемной платформы с установленными на нем Me низмами 2 подъема настройкой 3, буровой вышкой (не показано) и частично сформированными опорными колоннами 4 перемещают на судовозньпс- тележках 5 со стапел 6 на достроечный мол 7 так что корпус 1 с механизмами 2 и колоннами 4 оказываетс над водой. Нижние секции 8 колонн 4 устанавли ваьот попарно в вырезы 9 двух монтажно-спусковых понтонов 1О, забалластированных дл увеличени их осадки, и фиксируют в вертикальном положении (фиг. 1 и 2). Понтоны 10 подвод т к молу 7 так, чтобы секции В оказались над сформиро ванными част ми колонн 4. С помопшю механизмов 2 колонны 4 опускают и стыкуют с секци ми 8, после чего прои вод т сварку их между собой и подъем вверх на длину одной секции (фиг. 3). Операцию повтор ют до полного формировани колонн 4. Понтоны 10 вывод т из-под корпуса и устанавливают на них опоры 11 (фиг. и 5). Затем вновь подвод т понтоны Ю с опорами 11 под нависающие над водо части корщса 1. При этом колонны 4 свободно заход т в вырезы 9 понтонов 10. Последние за счет продувки баллас та подвсплывают и опорами 11 поднимают корпус 1 над тележками 5, после чегх) платформу буксируют вдоль мола 7 до полного вывода с мола (фиг. 6 и 7) С помощью механизмов 2 колонны 4 опускают до опирани их в грунт и корпус 1 поднимают с опор 11 понтонов 10, которые затем вывод т из-под корпуса (фиг. 8). После этого колонны 4 поднимают механизмами 2 в крайнее верхнее положение, и корпус 1 платформы опускаетс на воду (фиг. 9). Технико-экономический эффект от применени изобретени достигаетс в св зи с исключением необходимости применени сухого дока и затрат на его содержание ри постройке морских самоподъекшых платформ с помощью монтажно-спусковых понтонов. ормула изобретени Способ постройки морской самоподъемной платформы, включающий монтаж на стапеле корпуса платформы, установку на нем надстройки, буровой вьппки, механизмов подъема и частичное формирование опорных колонн, причем платформу перемещают на достроечный мол, размещают кра корпуса платформы с механизмами подъема и сформированными част ми опорных колонн со свесом над водой, а после монтажа платформу вывод т с мола , отличающийс тем, что, с целью сокращени стоимости постройки, нижние секции опорных, колонн устанавливают в вырезы монтажно-спусковых понтонов, после чего подвод т последние к молу под корпус платформы, затем опускают сформированные части опорных колонн и стыкуют их с нижними секци ми , после чего вывод т монтажно-спусковые понтоны из-под корпуса, устанавливают на них опоры, вновь завод т под корпус и дебалластируют монтажно-спусковые понтоны, а затем буксируют платформу на монтажно-спусковых понтонах до полного вывода с мола, опускают механизмы подъема до упора их в грунт и поднимают платформу над монтажно-спусковыми понтонами, после чего вывод т последние из-под корпуса платформы и опускают платформу механи;элами подъема до всплыти . Источники информации, прин тые во внимание при экспертизе 1. Авторское свидетельство СССР № 735478, кл. В 63 В 9/ОО, 27.О9.78 (прототип).The invention relates to shipbuilding technology and relates to methods for constructing and launching self-lifting platforms, for example, for the development of the sea shelf. There is a known method of building a marine self-lifting platform, including mounting on a stepper of a platform casing, installing superstructures on it, a derrick, lifting mechanisms and partial formation of supporting columns, the platform being moved to an outhouse pier, the edges of the platform casing are mixed with lifting mechanisms and columns with an overhang above the water, and after mounting the plate is inserted from the pier G1. A disadvantage of the known method is the high cost of building a self-lifting platform in connection with elevated the cost of transporting parts of the hull of the sea self-erecting platform {jurma. The purpose of the invention is to reduce the cost of construction. This is achieved; by the fact that the lower sections of the supporting columns are installed in the cut-outs of the installation and launch pontoons, after which the latter are brought under the platform body to the pier, then the formed parts of the supporting columns are lowered and joined to the lower sections, after which launching pontoons from under the hull, set up supports on them, re-enter the hull under the hull and de-assembled the erection-launching pontoons, and then tow the platform to the erection-launching pontoons to complete withdrawal from the pier, lower the support columns to the lifting mechanisms stop them in the ground and raise the platform above the assembly and triggers pontoons, and then output the last out of the platform hull and opuskakl platfork in lifting mechanisms to ascent. FIG. Figure 1 shows the platform on the pier and the mounting and launch pontoons with 1 main sections of the supporting columns in the designated position; in fig. 2 is also a top view; in fig. 3 - platform on the pier and mounting pontoons with lower sections of supporting columns, connected to the hull; in fig. 4 - plate shaped pier and mounting pontoons with supports in the assigned position; in fig. 5 - the same, top view; in fig. 6 - the platform on the mounting-start pontoons was removed from the pier; in fig. 7 - the same, front view; in fig. 8 - the platform stands on supporting columns, mounting and launching points are retracted; in fig. 9 is a platform for the method as follows. The hull 1 offshore self-lifting platform installed on it Memo 2 lifting lift setting 3, a derrick (not shown) and partially formed supporting columns 4 are moved on the ship carts 5 from the stocks 6 to the pier building 7 so that the housing 1 with mechanisms 2 and columns 4 is above water. The lower sections of the 8 columns 4 were installed in pairs in the cuts 9 of the two assembly and launch pontoons 1O, ballasted to increase their draft, and fixed in a vertical position (Fig. 1 and 2). The pontoons 10 are led to the pier 7 so that sections B are above the formed parts of the columns 4. With the help of the mechanisms 2, the columns 4 are lowered and joined to sections 8, after which they are welded together and raised up by one length sections (Fig. 3). The operation is repeated until the columns 4 are completely formed. The pontoons 10 are led out from under the hull and the supports 11 are mounted on them (Fig. 5). Then pontoons U with supports 11 are brought down below the overhanging bodies of water pipe 1. At the same time, columns 4 freely enter the notches of 9 pontoons 10. The latter, due to the blowing of the ballas, float and support 11 and lift the body 1 above the carriages 5 after it) The platform is towed along pier 7 to complete removal from the pier (figs. 6 and 7). Using mechanisms 2, columns 4 are lowered to ground in the ground and case 1 is lifted from supports 11 of pontoons 10, which are then removed from under the case (Fig. eight). After this, the columns 4 are raised by the mechanisms 2 to the extreme upper position, and the platform body 1 is lowered onto the water (Fig. 9). The technical and economic effect of the application of the invention is achieved in connection with the elimination of the need to use a dry dock and the cost of its maintenance when building offshore self-elevating platforms using mounting and launching pontoons. Formula of the invention. A method of building an offshore self-lifting platform, including mounting on the slipway of the platform body, installing a superstructure on it, a drilling rig, lifting mechanisms and partial formation of supporting columns, the platform being moved to an extension pier, the edges of the platform body with lifting mechanisms and formed parts of the supporting columns with an overhang above the water, and after installation the platform is removed from the pier, characterized in that, in order to reduce the cost of construction, the lower sections of the supporting columns are installed in The cutouts of the mounting and lowering pontoons, after which the latter are brought under the platform body to the pier, then the formed parts of the supporting columns are lowered and joined to the lower sections, after which the mounting and lowering pontoons are pulled out from under the body, they are supported plant under the hull and deball the mounting and launch pontoons, and then tow the platform to the mounting and launch pontoons to complete withdrawal from the pier, lower the lifting mechanisms until they stop into the ground and raise the platform above the mounting and launch pontoons, after outputting the latest from the platform body and the platform is lowered mechanical; elami lift to ascend. Sources of information taken into account during the examination 1. USSR Author's Certificate No. 735478, cl. B 63 B 9 / OO, 27.O9.78 (prototype).
WW
5 s .5 s.
И1.2And 1.2
If.If.
toФиг .5to .5
10ten
К ЧKH
11eleven
10ten
иand
/ /
и and
лl
лl
ffff
1Л1L
АBUT
(пЛ(PL
-П-P
SS
тt
//
10 ten
ыs
оabout
лl
XX
ffff
77
F АF A
л l
II
II
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU803223429A SU943082A1 (en) | 1980-12-16 | 1980-12-16 | Method of constructing self-raising offshore platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU803223429A SU943082A1 (en) | 1980-12-16 | 1980-12-16 | Method of constructing self-raising offshore platform |
Publications (1)
Publication Number | Publication Date |
---|---|
SU943082A1 true SU943082A1 (en) | 1982-07-15 |
Family
ID=20933977
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU803223429A SU943082A1 (en) | 1980-12-16 | 1980-12-16 | Method of constructing self-raising offshore platform |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU943082A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2608588C2 (en) * | 2012-11-23 | 2017-01-23 | Кеппел Офшор Энд Марин Текнолоджи Сенте Пте Лтд | Jacking system with auxiliary structure |
-
1980
- 1980-12-16 SU SU803223429A patent/SU943082A1/en active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2608588C2 (en) * | 2012-11-23 | 2017-01-23 | Кеппел Офшор Энд Марин Текнолоджи Сенте Пте Лтд | Jacking system with auxiliary structure |
RU2608588C9 (en) * | 2012-11-23 | 2017-07-19 | Кеппел Офшор Энд Марин Текнолоджи Сенте Пте Лтд | Jacking system with auxiliary structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4648751A (en) | Method and apparatus for erecting offshore platforms | |
SE8600498L (en) | SET TO INSTALL THE OBJECT OF A OFFSHORE PLATFORM AND EQUIPMENT TO PERFORM THE SET | |
US3996754A (en) | Mobile marine drilling unit | |
GB2201980A (en) | Offshore oil/gas production | |
NO771673L (en) | FIXED OFFSHORE PLATFORM AND PROCEDURE FOR SETTING UP THE SAME | |
US4002038A (en) | Method and apparatus for rapid erection of offshore towers | |
US4012917A (en) | Bridge beam tower erection methods and apparatus | |
JPS62215711A (en) | Ocean structure and method for anchoring the same | |
SU943082A1 (en) | Method of constructing self-raising offshore platform | |
US5237949A (en) | Floating platform shallow draft hull/deck mating | |
US2873581A (en) | Marine platform | |
JP2606799B2 (en) | Installation method of marine platform | |
US20100296873A1 (en) | Method for installing a topside module on an offshore support structure | |
GB2080860A (en) | A process for mounting in relatively shallow or moderately deep water and installing at the work site a drilling and oil-production platform with base-weight. | |
US20020067958A1 (en) | Methods of installing offshore platforms | |
GB1533032A (en) | Method for assembling and siting an off-shore structure | |
RU2085659C1 (en) | Method of building seaborne self-lifting platform | |
FR2416306A2 (en) | Offshore platform in several sections - floats fully equipped and is lowered on to just-submerged support structure | |
JPS5789013A (en) | Fabrication of marine structure, etc. | |
SU1184896A1 (en) | Versions of method of erecting support columns of floating drilling rig | |
CN107653854B (en) | Construction and folding method of self-elevating platform cantilever beam | |
SU1030489A1 (en) | Method of installation of support pillars of self-lifting drilling sea platform | |
SU1108166A1 (en) | Method and apparatus for constructing semi-submerged floating drilling rig | |
SU1021708A1 (en) | Method of mounting self-lifting floating platform support columns in dry dock | |
RU2085660C1 (en) | Method of building seaborne platform |