USSR - Soviet Union
Prior art keywords
platform
outrigger
supporting columns
dock
assembly
Prior art date
Application number
SU833645071A
Other languages
Russian (ru)
Inventor
Nikolaj M Chernigin
Nikolaj I Alekseev
Nikolaj D Levin
Original Assignee
Nikolaj M Chernigin
Alekseev Nikolaj
Nikolaj D Levin
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nikolaj M Chernigin, Alekseev Nikolaj, Nikolaj D Levin filed Critical Nikolaj M Chernigin
Priority to SU833645071A priority Critical patent/SU1184896A1/en
Application granted granted Critical
Publication of SU1184896A1 publication Critical patent/SU1184896A1/en

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

Изобретение относится к судостроению и касается технологии монтажа секционных опорных колонн плавучих буровых установок.The invention relates to shipbuilding and relates to the installation of sectional support columns of floating drilling rigs.

Цель изобретения — уменьшение трудоемкости и повышение эффективности сборки.The purpose of the invention is to reduce the complexity and increase assembly efficiency.

На фиг. 1 изображены блоки аутригера и портала с механизмами подъема (установлены на стапеле тележки, палуба передаточного дока совмещена с достроечной набережной); на фиг. 2 — аутригер на палубе передаточного дока; на фиг. 3 — узел I на фиг. 4; на фиг. 4 — вид А на фиг. 2; на фиг. 5 — аутригер с установленным порталом и сформированным участком опорной колонны; на фиг. 6 — аутригер с порталом, поднятым на опоры (секция опорной колонны перемещена под аутригер); на фиг. 7 — передаточный док, перемещенный к плавучей достроечной базе, где размещена платформа; на фиг. 8 — опоры, убранные из-под аутригера; на фиг. 9 — вид Б на фиг. 8; на фиг. 10 — аутригер, опущенный на палубу передаточного дока и подготовленный для стыковки на плаву с корпусом' платформы; на фиг. 111 — схема выполнения способа с использованием однобашенного дока, вид сбоку; на фиг. 12 — то же, вид сверху; на фиг. 13 — второй вариант выполнения способа, вид сбоку; на фиг. 14 — то же, вид сверху.FIG. Figure 1 shows the outrigger and portal units with lifting mechanisms (mounted on the cart's slipway, the deck of the transfer dock is combined with the extension embankment); in fig. 2 - outrigger on the deck of the transfer dock; in fig. 3 shows the node I in FIG. four; in fig. 4 is a view A of FIG. 2; in fig. 5 - an outrigger with an installed portal and a formed section of the support column; in fig. 6 - outrigger with the portal raised on the supports (the section of the supporting column is moved under the outrigger); in fig. 7 - transfer dock moved to the floating outfitting base where the platform is located; in fig. 8 - supports removed from the outrigger; in fig. 9 is a view B in FIG. eight; in fig. 10 - outrigger lowered onto the deck of the transfer dock and prepared for docking afloat with the hull of the platform; in fig. 111 is a schematic diagram of a method using a single-dock, side view in fig. 12 - the same, top view; in fig. 13 is a second embodiment of the method, side view; in fig. 14 - the same, top view.

Способ по первому варианту осуществляют следующим образом.The method according to the first embodiment is as follows.

Аутригер 1 (часть корпуса плавучей платформы), собранный, например, с помощью крана (не показан) с порталом 2, включающий механизмы подъема (не показаны), по достроечной набережной 3 перемещают на стапельных тележках 4 и устанавливают на палубу 5 передаточного дока 6 так, чтобы его монтажные кромки 7 выступали за край палубы 5 (фиг. 2). Передаточный док при этом фиксируют относительно достроечной набережной 3 посредством кронштейнов 8. Аутригер 1 устанавливают с возможностью перемещения в вертикальных направляющих 9, закрепленных на башнях 10 передаточного дока 6 и вертикальных направляющих 11, закрепленных на аутригере 1. Установку производят путем опускания сверху дополнительного элемента 12 (фиг. 3). Затем аутригер 1 с порталом 2 собирают с помощью передаточного дока 6, для чего последний с установленным на нем аутригером 1 притапливают до совмещения палубы 13 аутригера 1 с достроечной набережной 3, и фиксируют посредством кронштейнов 8. Затем портал 2 с механизмами подъема перемещают на стапельных тележках 4 на палубу 13 аутригера 1, для чего на палубе аутригера 1 выложены технологические рельсы 14. Опускание портала 2 на палубу 13 и аутригера 1The outrigger 1 (part of the hull of the floating platform), assembled, for example, using a crane (not shown) with portal 2, including lifting mechanisms (not shown), is moved along the outfitting embankment 3 on the slipway carts 4 and installed on the deck 5 of the transfer dock 6 so so that its mounting edges 7 protrude beyond the edge of deck 5 (FIG. 2). The transfer dock is fixed relative to the final embankment 3 by means of the brackets 8. The outrigger 1 is mounted for movement in vertical guides 9 fixed on the towers 10 of the transfer dock 6 and vertical guides 11 fixed on the outrigger 1. The installation is made by lowering the top element 12 ( Fig. 3). Then outrigger 1 with portal 2 is assembled with the help of transfer dock 6, for which the latter with the outrigger 1 installed on it is heated until the deck 13 of the outrigger 1 is combined with the outboard embankment 3, and fixed by means of brackets 8. Then the portal 2 with lifting mechanisms is moved on the slipway carts 4 on the deck 13 of the outrigger 1, for which on the deck of the outrigger 1 lined technological rails 14. Lowering the portal 2 on the deck 13 and the outriger 1

на палубу 5 осуществляют с помощью гидродомкратов (не показаны) и стапельных тележек 4.on deck 5 is carried out with the help of hydraulic jacks (not shown) and slipway trolleys 4.

После сборки и установки аутригера 1 с порталом 2 и механизмами подъема на палубе 3 дока 6 в шахту 15 аутригера 1 подают сверху с помощью крана (не показан) три секции 16 опорной колонны 17 и соединяют их между собой. Аутригер 1 с помощью подъемных механизмов поднимают в вертикальных направляющих 9 на высоту, превышающую высоту одной секции 16, установленной на тележки 4.After assembly and installation of the outrigger 1 with the portal 2 and the mechanisms for lifting on the deck 3 of dock 6 into the shaft 15 of the outrigger 1, three sections 16 of the support column 17 are fed from the top using a crane (not shown) and interconnect them. Outrigger 1 with the help of lifting mechanisms lift in the vertical guides 9 to a height greater than the height of one section 16 mounted on the trolley 4.

Под аутригер 1 заводят опоры 18, опускают его на них и поднимают собранный участок опорной колонны 17 посредством штатных механизмов подъема. Секции 16 кантуют краном в вертикальное положение (фиг. 6), на стапельных тележках 4 перемещают под аутригер 1 и стыкуют с поднятым участком опорной колонны 17. Затем участок опорной колонны 17 снова поднимают и указанные операции повторяют до полного формирования опорной колонны, после чего заводят и стыкуют с указанной колонной башмак 19.Under the outrigger 1, the supports 18 are turned on, they are lowered onto them and the assembled portion of the support column 17 is lifted by means of standard lifting mechanisms. Sections 16 turn over the crane into a vertical position (FIG. 6), on the slip carts 4 they move under the outrigger 1 and dock with the raised section of the supporting column 17. Then the section of the supporting column 17 is lifted again and the operations are repeated until the full formation of the supporting column is completed, and then wind up and dock with the specified column shoe 19.

Передаточный док 6 перемещают к корпусу 20 платформы, которая располагается на плавучей достроечной базе 21 (см. фиг. 7) так, что края ее с трех сторон свешиваются над водой. Балластировкой дока 6 выравнивают положение аутригера 1 относительно корпуса 20 платформы, после чего соединяют их. Затем вынимают дополнительные элементы 12, разъединяя при этом передаточный док 6 и аутригер 1, притапливают док 6 и выводят его из-под аутригера 1.The transfer dock 6 is moved to the platform body 20, which is located on the floating outfitting base 21 (see FIG. 7) so that its edges are hung over the water from three sides. Ballasting the dock 6 aligns the position of the outrigger 1 relative to the body 20 of the platform, and then connect them. Then, additional elements 12 are removed, disconnecting the transfer dock 6 and outrigger 1, attach dock 6 and remove it from under outrigger 1.

В другом случае собранную колонну 17 опускают до палубы 5 и приподнимают аутригер 1 над опорами 18, которые затем выдвигаются из-под аутригера 1 (фиг. 8), а последний штатными механизмами подъема опускают на палубу 5. Передаточный док 6 перемещают к корпусу 20 плавучей платформы, спущенной на воду (фиг. 10). Балластировкой дока 6 выравнивают положение аутригера 1 относительно корпуса 20, после чего соединяют их на плаву известными способами с помощью известных герметизирующих устройств.In another case, the assembled column 17 is lowered to deck 5 and the outrigger 1 is lifted above the supports 18, which are then pulled out from under the outrigger 1 (FIG. 8), and the latter is lowered onto deck 5 by standard lifting mechanisms to the floating dock 6 platform launched into the water (Fig. 10). Ballasting the dock 6 aligns the position of the outrigger 1 with respect to the housing 20, after which they are connected afloat by known methods using known sealing devices.

Далее вынимают дополнительный элемент 12, разъединяя при этом док 6 и аутригер 1, притапливают док 6 и выводят его из-под аутригера 11.Next, remove the additional element 12, while separating the dock 6 and outrigger 1, attach the dock 6 and remove it from under the outrigger 11.

При наличии однобашенного дока 22 формируют и затем стыкуют к корпусу 20 платформы аналогичным образом одновременно три и более опорных колонн 17. для чего док 22 пришвартовывают к набережной откидным бортом 23 (фиг. 11 и 12).In the presence of one-hull dock 22, three or more support columns 17 are simultaneously formed and then joined to the platform body 20 in the same way. For this purpose, the dock 22 is moored to the embankment by a hinged side 23 (FIGS. 11 and 12).

Способ по второму варианту осуществляют следующим образом.The method according to the second variant is as follows.

11848961184896

Аутригер 1 с порталом 2 и механизмами подъема устанавливают на стапеле рядом с корпусом 20 платформы напротив места стыковки, предварительно стыкуют с корпусом 20 платформы, но не скрепляют с ним, закрепляют аутригеры 1 с возможностью вертикального перемещения в вертикальных направляющих 9 стоек 24, закрепленных на фундаменте стапеля. Затем повторяют описанные ранее операции поAn outrigger 1 with a portal 2 and lifting mechanisms is installed on the slipway next to the platform body 20 opposite the docking point, pre-docked with the platform body 20, but not fastened to it, fix the outriggers 1 with the possibility of vertical movement in vertical guides 9 racks 24 fixed to the foundation slipways. Then repeat the previously described operations

формированию опорной колонны 17. После формирования опорной колонны 17 до полной высоты аутригеры 1 приподнимают с помощью механизмов подъема над опорами 18. Опоры 18 вынимают и аутригеры 1 опускают до совмещения их стыковых кромок 7 со стыковыми кромками корпуса 20 платформы, после чего скрепляют их между собой и открепляют аутригеры 1 от стоек 24.the formation of the support column 17. After the formation of the support column 17, the outriggers 1 are raised to their full height using the lifting mechanisms above the supports 18. The supports 18 are removed and the outriggers 1 are lowered to align their butt edges 7 with the butt edges of the platform body 20, then fasten them together and detach outriggers 1 from racks 24.

Фиг. 3FIG. 3

Фиг. 4 1 FIG. 4 1

5 Фиг. 55 of FIG. five

11848961184896

19 δ Фиг. δ19 δ FIG. δ

Вид6View6

Фиг. 9FIG. 9

66

11848961184896

1717

Фаг. 11Phage. eleven

Фаг. 12Phage. 12

11848961184896

2 Фиг. !4-2 FIG. !four-

Claims (4)

1. Способ монтажа опорных колонн плавучей буровой установки, включающий сборку установки из отдельных частей, снабжение ее механизмами подъема опорных колонн, формирование опорных колонн сначала подачей краном секций в шахты сверху вниз с последующим наращиванием до полной высоты опор отдельными секциями снизу вверх, отличающийся тем, что, с целью уменьшения трудоемкости и повышения эффективности сборки, колонну формируют в пределах части установки-аутригера до соединения его с платформой, причем аутригер устанавливают на палубе передаточного1. The method of mounting the supporting columns of a floating drilling rig, including assembling the installation from separate parts, supplying it with mechanisms for lifting the supporting columns, forming supporting columns first by feeding the sections into the shafts from top to bottom with a crane and then increasing them to the full height of the supports with separate sections from the bottom up, characterized in that, in order to reduce the labor intensity and increase the efficiency of the assembly, the column is formed within a part of the outrigger installation before connecting it to the platform, with the outrigger being installed on the deck in front of active дока в вертикальных направляющих с возможностью вертикального перемещения, при этом стыковочные кромки выполняют выступающими за палубу передаточного дока, а после формирования колонны передаточный док перемещают к месту установки платформы и стыкуют с ней.dock in vertical guides with the possibility of vertical movement, while the docking edges perform protruding beyond the deck of the transfer dock, and after the formation of the column, the transfer dock is moved to the platform installation site and joined with it. 2. Способ по п. 11, отличающийся тем, что платформу устанавливают на достроечной базе или на плаву.2. The method according to p. 11, characterized in that the platform is installed on the outfitting base or afloat. 3. Способ монтажа опорных колонн плавучей буровой установки, включающий сборку установки из отдельных частей, снабжение ее механизмами подъема опорных колонн, формирование опорных колонн сначала подачей краном секций в шахты сверху вниз с последующим наращиванием до пол- с ной высоты опор отдельными секциями снизу !δ вверх, отличающийся тем, что, с целью уменьшения трудоемкости и повышения эффективности сборки, части установки, состоящие из платформы и аутригеров, устанавливают в сборочное положение, причем аутригеры устанавливают в вертикальных направляющих стоек стапеля, после чего формируют колонны в пределах аутригеров и соединяют их с платформой.3. A process assembly supporting columns floating drilling rig, comprising installing the assembly of the individual parts, supplies its lifting mechanisms supporting columns, supporting columns forming first tap sections in the shaft top to bottom followed by a build-up to full height hydrochloric supports separate sections below! Δ up, characterized in that, in order to reduce labor intensity and increase assembly efficiency, parts of the installation, consisting of a platform and outriggers, are installed in the assembly position, and the outriggers are installed in the ikalnyh pile guide racks, after which the column is formed within the outriggers and connect them with the platform. Фиг. 1FIG. one 5 и „„ 11848965 and „„ 1184896 >> 1one 11848961184896 22
SU833645071A 1983-09-27 1983-09-27 Versions of method of erecting support columns of floating drilling rig SU1184896A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU833645071A SU1184896A1 (en) 1983-09-27 1983-09-27 Versions of method of erecting support columns of floating drilling rig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU833645071A SU1184896A1 (en) 1983-09-27 1983-09-27 Versions of method of erecting support columns of floating drilling rig

Publications (1)

Publication Number Publication Date
SU1184896A1 true SU1184896A1 (en) 1985-10-15

Family

ID=21082818

Family Applications (1)

Application Number Title Priority Date Filing Date
SU833645071A SU1184896A1 (en) 1983-09-27 1983-09-27 Versions of method of erecting support columns of floating drilling rig

Country Status (1)

Country Link
SU (1) SU1184896A1 (en)

Similar Documents

Publication Publication Date Title
US5188484A (en) Jack-up type offshore oil and gas production platform and method
US4103503A (en) Drilling substructure transfer system
US4648751A (en) Method and apparatus for erecting offshore platforms
NO771673L (en) FIXED OFFSHORE PLATFORM AND PROCEDURE FOR SETTING UP THE SAME
US4723875A (en) Deep water support assembly for a jack-up type platform
OA13085A (en) Offshore deployment of extendable draft platforms.
US4012917A (en) Bridge beam tower erection methods and apparatus
US4002038A (en) Method and apparatus for rapid erection of offshore towers
CA2397023C (en) Removal of decks from offshore structures
US4797035A (en) Method of installing a template on the seafloor
SU1184896A1 (en) Versions of method of erecting support columns of floating drilling rig
US4144940A (en) Method and apparatus for installing an offshore pile driving rig
US5237949A (en) Floating platform shallow draft hull/deck mating
US4824291A (en) Offshore tower structures
USRE35912E (en) Method of installing lean-to well protector
US2873581A (en) Marine platform
KR101153607B1 (en) A method of constructing a semi-submersible vessel using dry dock mating
JP2606799B2 (en) Installation method of marine platform
GB2080860A (en) A process for mounting in relatively shallow or moderately deep water and installing at the work site a drilling and oil-production platform with base-weight.
SU943082A1 (en) Method of constructing self-raising offshore platform
EP0053861B1 (en) Artificial island
SU816861A1 (en) Method of assembling,mounting and dismantling the support columns of self-hoisting floating drillrig
SU1108166A1 (en) Method and apparatus for constructing semi-submerged floating drilling rig
SU735478A1 (en) Method of constructing a semisubmerged platform for offshore drilling for gas and oil
SU1014786A1 (en) Method of mounting support column of self-raising offshore drilling rig