SU825988A1 - Temporary discharge-free roof support - Google Patents

Temporary discharge-free roof support Download PDF

Info

Publication number
SU825988A1
SU825988A1 SU782564927A SU2564927A SU825988A1 SU 825988 A1 SU825988 A1 SU 825988A1 SU 782564927 A SU782564927 A SU 782564927A SU 2564927 A SU2564927 A SU 2564927A SU 825988 A1 SU825988 A1 SU 825988A1
Authority
SU
USSR - Soviet Union
Prior art keywords
roof support
temporary discharge
free roof
rollers
temporary
Prior art date
Application number
SU782564927A
Other languages
Russian (ru)
Inventor
Иосиф Абрамович Эйдельштейн
Анатолий Васильевич Барулин
Майжан Мукушевич Мукушев
Рудольф Оттович Гегеле
Александр Никонорович Шманев
Ефим Борисович Рофман
Аркадий Дмитриевич Куртагин
Юрий Семенович Павлов
Original Assignee
Vni Pk Ugolnyj Inst
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vni Pk Ugolnyj Inst filed Critical Vni Pk Ugolnyj Inst
Priority to SU782564927A priority Critical patent/SU825988A1/en
Application granted granted Critical
Publication of SU825988A1 publication Critical patent/SU825988A1/en

Links

Landscapes

  • Road Paving Machines (AREA)

Description

(54) ВРЕМЕННАЯ БЕЗРАЗГРУЗОЧНАЯ КРЕПЬ(54) TEMPORARY NON-LOADING FIXTURE

Изобретение относитс  к горному делу и может быть использовано при проведении подготовительных выработок проходческими комбайнами. Известен проходческий комбайн с установленной верхней распорной гу сеницей, включающей раму, ролики и гусеничную цепь 1. Однако верхн   гусеница не обеспечивает крепление выработки, а способствует увеличению сцепного ве са и устойчивости комбайна, особенно при работе в наклонных выработка Наиболее близкой к предлагаемой  вл етс  временна  безразгрузочна  крепь, включающа  раму, ролики и верхнее перекрытие из отдельных про дольных секций, св занных между соб в бесконечную цепь 2. Недостатком данной крепи  вл етс то, что верхн к помещаетс  во вкладыш у груди забо , дл  чего необходимо каким-то образом (веро тнее вс го вручную) протащить его над комба ном развернув вдоль оси выработки,. так как св зь гусеничной тележки с основным агрегатом не дает возможности протащить верхн к в поперечно положении. Затем этот верхн к долже быть развернут поперек выработки, п н т на высоту 2-3 м и помещен во вкладыш . Весь этот процесс  вл етс  трудоемким , не обеспечиваетбезопасных условий труда и не поддаетс  iJ зханизации в данных услови х. Цель изобретени  - придание крепи продольной устойчивости при криволинейной форме.кровли. Поставленна  цель достигаетс  тем, что рамы крепи снабжены направл ющими , а .секции перекрыти  - упорными фиксаторами, выполненными в виде роликов с-ос ми, перпендикул рными раме, которые установлены на секци х с возможностью взаимодействи  с направл ющими рамы. .. На фиг. 1 изображена выработка арочной формы с временной крепью, разрез; на фиг. 2 - крепь, вид сбоку; на фиг. 3 - то же, вид сверху; на фиг. 4 - сечение А-А на фиг. 1; на фиг. 5 - продольна  секци  с изображением дополнительных роликов, обеспечивающих устойчивость продольных секций. Временна  безразгрузочна  крепь состоит из рам 1 с гидродомкратами, установленных на колесах 2 и соединенных между собой направл ющими 3. В верхней части рам разметены продольные секции 4 с верхн ками 5 на роликах б и дополнительных роликах 7 дл  передвижени  верхн ков вдоль оси выработки . Верхн ки соединены между собой пластинами 8,FIELD OF THE INVENTION The invention relates to mining and can be used during development workings by roadheaders. A roadheader is known with an installed upper spacing hinge comprising a frame, rollers and a track chain 1. However, the top caterpillar does not fix the output, but contributes to an increase in coupling weight and stability of the combine, especially when working in inclined workings. an unloading lining comprising a frame, rollers and an upper overlap from separate longitudinal sections connected between an assembly in an endless chain 2. The disadvantage of this lining is that it is upper to with the liner at the working face, for which it is necessary somehow (tnee probability of entirely manually) to drag it over the combo prefecture expanding axially generation ,. Since the linkage of the crawler carriage to the main assembly does not allow the upper to be pulled in the transverse position. Then this top should be deployed across the excavation, pn t to a height of 2-3 m and placed in the liner. This whole process is laborious, does not provide a safe working environment and is not amenable to janning under these conditions. The purpose of the invention is to give the support longitudinal stability in a curvilinear form. The goal is achieved by the fact that the support frames are provided with guides, and the sections of the overlapping are stop clamps made in the form of rollers with axles, perpendicular to the frame, which are mounted on the sections with the possibility of interaction with the guides of the frame. .. FIG. 1 shows the development of an arched shape with temporary lining, section; in fig. 2 - lining, side view; in fig. 3 - the same, top view; in fig. 4 is a section A-A in FIG. one; in fig. 5 is a longitudinal section with an image of additional rollers providing stability to the longitudinal sections. The temporary non-relief lining consists of frames 1 with hydraulic jacks mounted on wheels 2 and interconnected by guides 3. In the upper part of the frames there are longitudinal sections 4 with upper 5 on rollers b and additional rollers 7 for moving the upper along the working axis. The tops are interconnected by plates 8,

Временна  безразгрузочна  крепь работает следующим образом.Temporary without lining works as follows.

Рамы 1 перемещаютс  вдоль выработки вместе с комбайном. Продольные секции 4 с верхн ками 5, перекатыва сь на роликах б по направл ющим 3, поддерживают кровлю выработки. Фиксащи  положени  продольных секций обеспечиваетс  дополнительными роликам 7. .Дл устранени  просыпани  породы из кровли между верхн ками и кровлей выработки возможна установка сетки. The frames 1 move along the mine along with the combine. The longitudinal sections 4 with the tops 5, rolling on the rollers b along the guides 3, support the roof of the excavation. Fixing the position of the longitudinal sections is provided by additional rollers 7. A grid can be installed to eliminate spillage from the roof between the tops and the roof of the excavation.

Выполнение перекрыти  из отдельных ПРОДОЛЬНЫХ секций с дополнительными роликами позвол ет проводить обработку выработки любой формы, например арочной, без остановки комбайна, а также уменьшить усилие перемещени  крепи. Физический труд дл  возведени  временной крепи в забое полностью ликвидируетс .The overlapping of separate LONGITUDINAL sections with additional rollers allows the processing of production of any shape, for example arched, without stopping the combine, as well as reducing the force of displacement of the support. The physical labor for the construction of temporary lining in the face is completely eliminated.

ii

....

Claims (2)

1.Справочник горного инженера.1. Reference mining engineer. М., Госгортехиздат, I960, с. 419-425M., Gosgortekhizdat, I960, p. 419-425 2.Авторское свидетельство СССР № 663847, кл. Е 21 D 13/04, 1977 (прототип).2. USSR author's certificate number 663847, cl. E 21 D 13/04, 1977 (prototype). ,хуhoo .. /. S 2331 I I у; /. S 2331 I I y; Риг. 2 L фиг.З V ГО .Rig. 2 L fig.Z V GO.
SU782564927A 1978-01-05 1978-01-05 Temporary discharge-free roof support SU825988A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU782564927A SU825988A1 (en) 1978-01-05 1978-01-05 Temporary discharge-free roof support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU782564927A SU825988A1 (en) 1978-01-05 1978-01-05 Temporary discharge-free roof support

Publications (1)

Publication Number Publication Date
SU825988A1 true SU825988A1 (en) 1981-04-30

Family

ID=20742410

Family Applications (1)

Application Number Title Priority Date Filing Date
SU782564927A SU825988A1 (en) 1978-01-05 1978-01-05 Temporary discharge-free roof support

Country Status (1)

Country Link
SU (1) SU825988A1 (en)

Similar Documents

Publication Publication Date Title
CN104564050B (en) Equipment for heading and anchoring parallel operation construction
US3885397A (en) Mining shield-supporter
US4002035A (en) Mobile shoring rig for excavation of trenches
SU825988A1 (en) Temporary discharge-free roof support
US2111405A (en) Power-mucking shield
JP2539151B2 (en) Excavation method for bottom floor in tunnel
RU2021520C1 (en) Aggregate roadway support
SU1017778A1 (en) Single-vault station for deep underground electric railway
SU1146460A1 (en) Entry-driving unit
SU418610A1 (en)
SU877036A1 (en) Header cutter-loader
SU863872A1 (en) Device for erecting power roof support unit
SU846748A1 (en) Power roof support
ES442115A1 (en) Method of and apparatus for handling and erecting builtup steel section supporting frames in large section underground roadways or tunnels
SU998762A1 (en) Temporary safety roof support
SU150460A1 (en) Aggregate for rock excavation
US3712071A (en) Method and apparatus for forming subterranean structures
SU899989A2 (en) Power-roof support
SU1504352A1 (en) Niche-excavating unit
SU652333A1 (en) Method of conveyer-type loading of transport workings and conveyer plant for performing same
SU1078060A1 (en) Driving station of planer unit
SU663847A1 (en) Device for mounting beams in development workings
SU972134A1 (en) Machinery set for winning coal from steep seams
SU614241A1 (en) Reloader
RU2069761C1 (en) Roofing of powered support unit