SU810969A1 - Dump-formating method - Google Patents

Dump-formating method Download PDF

Info

Publication number
SU810969A1
SU810969A1 SU792749448A SU2749448A SU810969A1 SU 810969 A1 SU810969 A1 SU 810969A1 SU 792749448 A SU792749448 A SU 792749448A SU 2749448 A SU2749448 A SU 2749448A SU 810969 A1 SU810969 A1 SU 810969A1
Authority
SU
USSR - Soviet Union
Prior art keywords
dump
dumping
rock
unloading
dead end
Prior art date
Application number
SU792749448A
Other languages
Russian (ru)
Inventor
Вадим Гаврилович Зотеев
Александр Владимирович Фролов
Нина Алексеевна Ворошилова
Владимир Егорович Гриценко
Василий Кондратьевич Добышев
Original Assignee
Институт горного дела
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Институт горного дела filed Critical Институт горного дела
Priority to SU792749448A priority Critical patent/SU810969A1/en
Application granted granted Critical
Publication of SU810969A1 publication Critical patent/SU810969A1/en

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

Изобретение относится к горной промышленности и может быть использовано при месторождений поотвалообразования, породы железнодопоследовательную открытой разработке лезных ископаемых.The invention relates to the mining industry and can be used in the fields of waste formation, rocks of iron-sequential open-cast mining of minerals.

Известен способ включающий доставку рожным транспортом, разгрузку думпкаров под откос и переукладку железнодорожного пути [1].There is a method including delivery by truck, unloading dumpcars on a slope and re-laying the railway track [1].

Однако данный способ характеризуется низкой интенсивностью ведения отвальных работ.However, this method is characterized by low intensity of dumping.

Известен также способ отвалообразования, включающий доставку породы железнодорожным транспортом, последователь ную разгрузку думпкаров в приемную яму и отсыпку породы в отвал экскаватором параллельными заходками с последующей переукладкой железнодорожного пути [2].There is also a known method of dumping, including the delivery of rock by rail, the sequential unloading of dumpcars into the receiving pit, and dumping of the rock into the dump with an excavator in parallel with subsequent re-laying of the railway track [2].

Однако данный способ характеризуется частыми сходами железнодорожного транспорта на отвальном тупике.However, this method is characterized by frequent gatherings of railway transport at the dump dead end.

Целью настоящего изобретения является устранение указанных недостатков.The aim of the present invention is to remedy these disadvantages.

Поставленная цель достигается тем, что отсыпку породы в каждой заходке производят от конца тупика с разгрузкой думпкаров, начиная с ближайшего к концу тупика, и с последующим передвижением пу стых думпкаров в конец тупика, причем переукладку пути на отсыпанную заходку производят частями от конца тупика.The goal is achieved in that the filling of the rock in each entry is carried out from the end of the dead end with the dump cars unloading, starting from the one closest to the end of the dead end, and then the empty dump cars are moved to the end of the dead end, and the path to the dumped entry is re-laid in parts from the end of the dead end.

На фиг. 1 представлена схема разгрузки думпкаров и отсыпки яруса; на фиг. 2 — оощая схема отвалообразования.In FIG. 1 is a diagram of dump truck unloading and longline dumping; in FIG. 2 is a generalized scheme for dumping.

Способ заключается в следующем. Отсыпку породы в каждой заходке при отва10 лообразовании производят от конца тупика экскаватором 1. Локомотив 2 доставляет груженые думпкары 3 на отвальный тупик. Разгрузку производят с ближайшего к концу тупика думпкара 4, подошедшего к при15 емной яме t>. После отсыпки экскаватором заходки 6 он возвращается к концу отвального тупика и начинает отсыпать новую заходку 7. Переукладку железнодорожных путей 8 производят частями 9. За время от20 сыпки экскаватором участка заходки, параллельного части 9 железнодорожного пути, интенсивные деформации уплотнения на следующем участке заходки 6 прекращаются, что позволяет в дальнейшем пере25 уложить новый участок железнодорожного пути. В дальнейшем операции повторяют.The method is as follows. During each dumping, the rock is poured in each run from the end of the dead end by excavator 1. Locomotive 2 delivers loaded dumpcars 3 to the dump dead end. Unloading is performed from the dumpcar 4 closest to the end of the dead end, which approached the receiving pit t>. After excavator filling in run-in 6, he returns to the end of the dumping dead end and begins to fill in new run-in 7. Re-laying of railway tracks 8 is carried out in parts 9. During the period from 20, the excavator sprinkles the run-in section parallel to part 9 of the railroad track, the intensive deformation of compaction in the next run-in section 6 stops, which allows in the future to re-lay a new section of the railway track. Further operations are repeated.

Данный способ позволит сократить сходы железнодорожного транспорта на отваль30 ном тупике.This method will reduce railroad gatherings at the dump dead end.

Claims (1)

Формула изобретенияClaim Способ отвалообразования, включающий доставку породы железнодорожным транспортом, последовательную разгрузку думпкаров в приемную яму и отсыпку породы в отвал экскаватором параллельными заходками с последующей переукладкой железнодорожного пути, отличающийся тем, что, с целью сокращения сходов железнодорожного транспорта на отвальном тупике, отсыпку породы в каждой заходке производят от конца тупика с разгрузкой думпка4 ров, начиная с ближайшего к концу тупика, и с последующим передвижением пустых думпкаров в конец тупика, причем переукладку пути на отсыпанную заходку произ5 водят частями от конца тупика.The method of dumping, including the delivery of the rock by rail, the sequential unloading of dumpcars into the receiving pit and dumping of the rock into the dump with an excavator in parallel with subsequent re-laying of the railway track, characterized in that, in order to reduce the gathering of railway transport at the dump dead end, dumping of the rock in each sunset is carried out from the end of the dead end with unloading the dumpka4 ditch, starting from the one closest to the end of the deadlock, and with the subsequent movement of empty dumpcars to the end of the deadlock, eukladku paved the way to the stope proiz5 lead parts from the end of the impasse.
SU792749448A 1979-04-09 1979-04-09 Dump-formating method SU810969A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU792749448A SU810969A1 (en) 1979-04-09 1979-04-09 Dump-formating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU792749448A SU810969A1 (en) 1979-04-09 1979-04-09 Dump-formating method

Publications (1)

Publication Number Publication Date
SU810969A1 true SU810969A1 (en) 1981-03-07

Family

ID=20820694

Family Applications (1)

Application Number Title Priority Date Filing Date
SU792749448A SU810969A1 (en) 1979-04-09 1979-04-09 Dump-formating method

Country Status (1)

Country Link
SU (1) SU810969A1 (en)

Similar Documents

Publication Publication Date Title
JPS58110701A (en) Moving machine for repairing road bed of railroad
CN1936271A (en) Method for filling coal-steam-free extraction working surface goaf by coal mine waste rock
CN100494635C (en) Method for filling goaf by gangue
US3167193A (en) Loading car with conveyor
SU810969A1 (en) Dump-formating method
US4400897A (en) Method and railway train for draining a railway track
RU2022105C1 (en) Method for construction of embankment
SU949177A1 (en) Method for forming outside railway stockpiles
RU1781430C (en) Process of formation of disposal area
SU842196A1 (en) Method of mining sloping ore bodies
CN216785117U (en) Underground waste bin
SU1451285A1 (en) Mine skip and car yard
SU1507972A1 (en) Method of shaping dumps in controlled deformation duty
SU1257218A1 (en) Method of formation of multilayer dumps
RU2039267C1 (en) Method for formation of open pit transfer point
SU1218110A1 (en) Method of open mining of gently sloping mineral bed deposits
SU1218111A1 (en) Method of forming outer excavator dumps
CN209975269U (en) A auxiliary device that is used for transporting mine car between main laneway in pit and ore removal river
SU831972A1 (en) Method of dump formation with railway vehicles
RU1788250C (en) Method for filling worked out deep pits with loose rocks and hard rock inclusions
SU1204719A1 (en) Method of forming dumps
RU2081322C1 (en) Method of forming descent from dump
RU2112732C1 (en) Installation for side unloading of train of mine drop-sided cars
SU633970A1 (en) Repair train for railway bridges
UA13678A1 (en) Method for dumping