SU781266A1 - Subterranean structure and method of its construction - Google Patents

Subterranean structure and method of its construction Download PDF

Info

Publication number
SU781266A1
SU781266A1 SU762431514A SU2431514A SU781266A1 SU 781266 A1 SU781266 A1 SU 781266A1 SU 762431514 A SU762431514 A SU 762431514A SU 2431514 A SU2431514 A SU 2431514A SU 781266 A1 SU781266 A1 SU 781266A1
Authority
SU
USSR - Soviet Union
Prior art keywords
arch
walls
soil
wall
tray
Prior art date
Application number
SU762431514A
Other languages
Russian (ru)
Inventor
Юрий Николаевич Айвазов
Олег Юрьевич Антонов
Владимир Александрович Лысяк
Original Assignee
За витель
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by За витель filed Critical За витель
Priority to SU762431514A priority Critical patent/SU781266A1/en
Application granted granted Critical
Publication of SU781266A1 publication Critical patent/SU781266A1/en

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

1one

Изобретение относитс  к строительству подземных сооружений мелкого заложени  и может быть использовано в метростроении, а также при строительстве городских транспортных тоннелей, подземных гаражей и т. п.The invention relates to the construction of underground structures of small paving and can be used in metro construction, as well as in the construction of urban transport tunnels, underground garages, etc.

Известны подземные конструкции мелкого заложени , сооружаемые траншейными способами, например, способом «стена в грунте. Перекрыти  таких конструкций, опирающиес  на стены, выполнены в виде плоских или ребристых плит 1.Underground shallow laying structures are known that are constructed by trenching methods, for example, the wall-in-ground method. The ceilings of such structures resting on the walls are made in the form of flat or ribbed plates 1.

Однако в процессе возведени  сооружений такого типа требуетс  крепить стены .расстрелами, подкосами, либо с помощью глубоких анкеров, что усложн ет строительство , значительно повышает затраты труда, материалоемкость и стоимость его, а также -не обеспечивает устранени  деформаций породы с боков и осадок ее, чреватых такими осложнени ми, как деформаци  зданий, разрушение коммуникаций и т. п.However, in the process of erection of structures of this type, it is required to fix walls with shots, struts, or with deep anchors, which complicates the construction, significantly increases labor costs, material consumption and its cost, and also does not ensure the elimination of rock deformations from the sides and its sediment, fraught with such complications as deformation of buildings, destruction of communications, etc.

Наиболее близким по технической сущности к изобретению в части конструктивного выполнени   вл етс  подземное сооружение , включающее вертикальные стены, возведенные методом «стена в грунте наThe closest to the technical essence of the invention in terms of design is an underground structure, including vertical walls, built by the method "wall in the ground on

высоту не менее высоты сооружени , свод и, лоток 2.height not less than the height of the structure, the arch and, tray 2.

Недостатком этого сооружени   вл етс  значительна  Jaтepиaлoeмкocть и трудоемкость в св зи с тем, что возведение свода осуществл етс  горным способом. При использовании же открытого способа дл  возведени  свода необходимо использовать временную крепь при выемке грунта.The disadvantage of this construction is significant joint capacity and laboriousness due to the fact that the roof is erected by mining method. When using the same open method for erecting the roof, it is necessary to use temporary lining when excavating.

Известен способ возведени  подземного сооружени , включающий выполнение стен, 10 разработку и удаление грунта .до уровн  свода, монтаж свода, разработку и удаление грунта между стенами под сводом с последующим выполнением лотка 3.There is a method of erecting an underground structure, including the construction of walls, 10 development and removal of soil, up to the arch level, installation of the roof, development and removal of soil between the walls under the roof, followed by tray 3.

Однако способ используетс  при возведении подземных сооружений с плоским However, the method is used in the construction of underground structures with a flat

IS перекрытием и при использовании,дл  сооружений с криволинейным сводом также требует использовани  временной крепи, что  вл етс  его недостатком.IS overlap also, when used, for structures with a curved arch also requires the use of temporary support, which is its disadvantage.

Claims (3)

Цель изобретени  - снижение материалоемкости и трудозатрат при возведении свода подземного сооружени  открытым способом за счет исключени  необходимости использовани  временной крепи при выемке грунта. Достигаетс  цель тем, что в подземном сооружении, включающем вертикальные стены, возведенные методом «стена в грунте на высоту не менее высоты сооружени , свод и лоток, кажда  стена в уровне п ты свода выполнена суступом, на который шарнйрно оперта соответствующа  п та свода, а свод выполнен сборным из арок, кажда  из которых состоит из щарнирно соединенных между собой элементов. При этом способе возведени  подземного сооружени , включающем вьтолнение стен, разработку и удаление грунта до уровн  С1вода, монтаж свода, разработку li удаление грунта между стенами под сводом с последующим выполнением лотка, при монтаже свода арки последовательно распирают в стены путем обратной засыпки грунтом. На чертеже схематически изображено сооружение, реализующее способ. Описываемое подземное сооружение включает стены 1, возведенные методом «стена в грунте на высоту не менее высоты сооружени , свод 2 и лоток 3. Стены в уровне п т 4 свода выполнены с уступами 5, на которые шзрнирно оперты п ты 4 свода. Свод выполнен в виде арок, кажда  из которых состоит из элементов 6 и 7, соединенных между собой посредством шарнира 8. Свод пригружен обратной засыпкой грунта 9. Описываемое подземное сооружение возвод т следующим образом. В грунте возвод т стены известным методом «стена в грунте, причем дл  устройства опорной площадки стены выполн ют разной толщины (при бетонировании в верхней части закладываютс  инвентарные шаблОны ) дл  образовани  уступов. Затем раскрывают котлован до уровн  свода, устанавливают сборные арки и устраивают по мере их монтажа обратную засыпку грунтом. Разработку грунта  дра и устройство лотка осуществл ют в подсводном и ограниченном стенами пространстве. Арки, распертые в стены, выполн ют функции временной крепи,  вл  сь элементами посто нной несущей конструкции. ЧТО обеспечивает исключение необходимости использовани  временной крепи при выемке грунта, устойчивость призмы обрушени  окружающего сооружени  грунта и снижение материалоемкости и трудозатрат в св зи с выполнением свода распорным, пригруженным обратной засыпкой грунта. Формула изобретени  1.Подземное сооружение, включающее вертикальные стены, возведенные методом «стена в грунте на высоту не менее высоты сооружени , свод и лоток, отличающеес  тем, что, с целью снижени  материалоемкости и трудозатрат при возведении свода подземного сооружени  открытым способом за счет исключени  необходимости использовани  временной крепи при выемке грунта, а также обеспечени  устойчивости призмы обрушени  окружающего сооружение грунта, кажда  стена в уровне п ты свода выполнена с уступом, на котором шарнирно оперта соответствующа  п та свода, а свод выполнен сборным из арок, кажда  из которых состоит из щарнирно соединенных между собой элементов. 2.Способ по п. 1, включающий выполнение стен, разработку и удаление грунта до уровн  свода, монтаж свода, разработку и удаление грунта между стенами под сводом с последующим выполнение.м. лотка, отличающийс  тем, что при монтаже свода арки последовательно распирают в стены путем обратной засыпки грунтом. Источники информации, прин тые во внимание при экспертизе 1.Маковский Л. В. Городские транспортные и пешеходные тоннели. М., изд-во МАДИ, 1973, рис. 22. The purpose of the invention is to reduce material consumption and labor during the erection of the underground structure by the open method by eliminating the need to use temporary support during excavation. The goal is achieved by the fact that in an underground structure that includes vertical walls erected by the method "wall in the ground to a height not less than the height of the building, the arch and the tray, each wall in the level of the arch of the arch is made with sutup, on which the corresponding arch of the arch is the arch is made of arches, each of which consists of elements that are hinged together. In this method of erecting an underground structure, which includes wall filling, development and removal of soil to the water level, installation of the roof, development and removal of soil between the walls under the roof and subsequent construction of the tray, during arch installation, the arch is successively pushed into the walls by backfilling with soil. The drawing shows schematically the structure that implements the method. The described underground structure includes walls 1, erected by the method “wall in the ground” at a height of at least the height of the structure, arch 2 and tray 3. Walls in the level of pn 4 of the arch are made with ledges 5 on which shtrnirny supported 5 of the arch. The arch is made in the form of arches, each of which consists of elements 6 and 7, interconnected by means of a hinge 8. The arch is loaded with backfilling of the soil 9. The described underground structure is erected as follows. Walls are erected in the soil using a well-known "wall in the ground" method, and for constructing the support platform, walls are made of different thickness (when concreting, inventory templates are laid in the upper part) to form ledges. Then they open the pit to the level of the arch, install prefabricated arches and arrange the backfilling with soil as they are installed. The excavation of the core and the device of the tray are carried out in the space below and below the walls. The arches, uncovered into the walls, serve as temporary support, being elements of a permanent supporting structure. THAT provides the elimination of the need to use temporary lining when excavating, the stability of the prism of the collapse of the surrounding soil structure and the reduction of material consumption and labor costs in connection with the construction of the arch with a spacer loaded with backfilling of the soil. Claim 1. Subterranean structure, including vertical walls erected by the method "wall in the ground to a height not less than the height of the structure, arch and tray, characterized in that, in order to reduce material consumption and labor costs in the construction of the arch of the underground structure in the open way by eliminating the need the use of temporary support during excavation, as well as ensuring the stability of the prism of the collapse of the surrounding soil structure, each wall in the level of the fifth arch is made with a ledge on which it is hinged the corresponding penta of the vault, and the vault is made of arcades, each of which consists of elements hinged together. 2. The method according to claim 1, which includes the execution of the walls, the development and removal of soil to the level of the arch, the installation of the arch, the development and removal of soil between the walls under the arch, followed by the implementation of m. a tray, characterized in that during the installation of the arch, the arches are successively pushed into the walls by backfilling with soil. Sources of information taken into account in the examination 1.Makovsky L.V. Urban transport and pedestrian tunnels. M., publishing house MADI, 1973, fig. 22 2.Патент Германии № 1658747, кл. 19 f 3/00, 1972. 2. German Patent No. 1658747, cl. 19 f 3/00, 1972. 3.Тоннели и метрополитены. Под ред. В. П. Волкова, N{., «Транспорт, 1975, с. 498.3. Tunnels and subways. Ed. V.P. Volkova, N {., “Transport, 1975, p. 498.
SU762431514A 1976-12-13 1976-12-13 Subterranean structure and method of its construction SU781266A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU762431514A SU781266A1 (en) 1976-12-13 1976-12-13 Subterranean structure and method of its construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU762431514A SU781266A1 (en) 1976-12-13 1976-12-13 Subterranean structure and method of its construction

Publications (1)

Publication Number Publication Date
SU781266A1 true SU781266A1 (en) 1980-11-23

Family

ID=20687189

Family Applications (1)

Application Number Title Priority Date Filing Date
SU762431514A SU781266A1 (en) 1976-12-13 1976-12-13 Subterranean structure and method of its construction

Country Status (1)

Country Link
SU (1) SU781266A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080295A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of lid of assembled vault greatly across no column underground structure digs full-reverse construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080295A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of lid of assembled vault greatly across no column underground structure digs full-reverse construction method

Similar Documents

Publication Publication Date Title
SU781266A1 (en) Subterranean structure and method of its construction
RU2686206C1 (en) Method of erection of underground structures along river bed or canal
RU2715497C1 (en) Method of erection and arrangement of a single-span underground metro station of an open method of performing works
SU868019A1 (en) Method of erecting a structure partly submerged in soil
JPS62288269A (en) Method for extending underground stair of building
JP3808962B2 (en) Tunnel construction method
US4008577A (en) Cut and cover construction of subway with utility chamber and air conditioning with minimum street traffic disturbance
US3914946A (en) Cut and cover construction of subway with utility chamber and air conditioning with minimum street traffic disturbance and method
CN112538981A (en) Old building basement obstacle removing and new building pile foundation synchronous construction method
JPS6117696A (en) Construction of underground head
RU2753301C1 (en) Method for foundation construction under conditions of year-round negative temperatures
Humpheson et al. THE BASEMENTS AND SUBSTRUCTURE FOR THE NEW HEADQUARTERS OF THE HONGKONG AND SHANGHAI BANKING CORPORATION, HONG KONG.
RU1786223C (en) Method for erection of structure
RU2059753C1 (en) Method for erecting underground storehouse
CN211285674U (en) General prefabricated template device of basement cushion cap and grade beam
SU1249164A1 (en) Ferroconcrete lining of underground structure walls
RU2091542C1 (en) Underground structure and method of construction of underground structure
Trabold et al. Second Avenue Subway Project, New York: repair and refurbishment of existing structures adjacent to deep excavations
RU1794193C (en) Method of construction of line of subway of shallow depth
RU2079617C1 (en) Method of erection of three-dimensional cast-in-situ structures
SU947293A1 (en) Method of constructing a shallow-depth tunnel
Marchand A DEEP BASEMENT IN ALDERSGATE STREET, LONDON. PART 2: CONSTRUCTION.
SU1186738A1 (en) Method of erecting building or structure
Sdoga et al. Design and construction of artificial tunnels in urban context
SU1273572A1 (en) Method of constructing subterranean structure