SU732699A1 - Method for determining the efficiency of drilling rig lifting system - Google Patents

Method for determining the efficiency of drilling rig lifting system Download PDF

Info

Publication number
SU732699A1
SU732699A1 SU782609253A SU2609253A SU732699A1 SU 732699 A1 SU732699 A1 SU 732699A1 SU 782609253 A SU782609253 A SU 782609253A SU 2609253 A SU2609253 A SU 2609253A SU 732699 A1 SU732699 A1 SU 732699A1
Authority
SU
USSR - Soviet Union
Prior art keywords
efficiency
determining
speed
change
time
Prior art date
Application number
SU782609253A
Other languages
Russian (ru)
Inventor
Абдул-Вахаб Ахмедович Саидов
Юрий Михайлович Дунаев
Original Assignee
Грозненский Ордена Трудового Красного Знамени Нефтяной Институт Им. Академика М.Д.Миллионщикова
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Грозненский Ордена Трудового Красного Знамени Нефтяной Институт Им. Академика М.Д.Миллионщикова filed Critical Грозненский Ордена Трудового Красного Знамени Нефтяной Институт Им. Академика М.Д.Миллионщикова
Priority to SU782609253A priority Critical patent/SU732699A1/en
Application granted granted Critical
Publication of SU732699A1 publication Critical patent/SU732699A1/en

Links

Landscapes

  • Earth Drilling (AREA)

Description

Изобретенне относитс  к области определе ни  механического коэффициента полезного действи  и может быть применено в нефт ной и нефтедобывающей промышленности дл  опре делени  коэффициента полезного действи  бур вой подъемной системы и использовано во многих других отрасл х народного хоз йства изготавливающих, испытывающих и эксплуатирующих грузоподъемные системы, краны и шахтоподъемники. Известный способ определени  коэффициента Полезного действи  буровой подъемной системы, заключающийс  в учете потерь трени  и жесткости каната, не обеспечивает требуемой точности 1 . Наиболее близким по технической сущности к изобретению  вл етс  способ определени  коэффициента полезного действи  буровой подъемной системы, заключающийс  в разгоне системы при движении ее на спуск под действием веса подвижных частей и груза , и измерение времени разгона 2. К недостаткам известного способа отиосиТ с  низка  точность определени . Цель изобретени  - повышение точности измерени . Указанна  цель достигаетс  за счет того, что осуществл ют разгон системы приводом на подъем, регистрируют изменение скорости движени  системы во времени на спуск и замедлении на подъем, а коэффициент полезного действи  определ ют по формуле: . / сл W изменение скорости движени  системы при спуске за врем  A-ij-j,, iV|, - изменение скорости движени  при подъексе за врем  . Способ осуществл етс  следующим образом. Выполн ют разгон буровой подъемной системы при движении ее на спуск под действиепл веса подвижных частей и груза-и регистрируют изменение скорости движени  системы во времени. Затем осуществл ют разгон буровой подъемной системы приводом при движении системы на подъем. Отключают привод и регистрируют 3 изменение скорости движени  системы во вре мени. . Коэффициент полезного действи  определ ют по формуле: гт г-, и- I п-л/мгтргц;Формула изобретени  Способ определени  коэффициента полезного действи  буровой подъемной систексы, заключающийс  в разгоне системы при движг НИИ ее на спуск род действием веса подвижных частей и груза и измерении времени разгона, отличающийс  тем, что, с целью повыщени  точности, осуществл ют разгон системы приводом на подъем, регист рируют изменение скорости движени  системы во времени на спуск и замедлении на подъем а коэффициент полезного действи  определ ют по формуле: n-if гдедМдп изменение скорости движени  системы при спуске за врем  tg,,, fiVfj - изменение скорости движени  при подъеме за врем  , Источники информации, прин тые во внимание при экспертизе 1.Мазахейн Б. И, Уточнение коэффициента полезного действи  талевой системы подъемной лебедки буровой установки. Нефт ное хоз йство , 196:9, № 8, с. 12. 2,Архангельский В. М. и др. Определение коэффициента полезного действи  талевой системы современных буровых установок. Ма шины и нефт ное оборудование, № 4, 1968, ;. 22 (прототип).The invention relates to the field of determining the mechanical efficiency and can be applied in the petroleum and petroleum industry to determine the efficiency of the drilling lift system and used in many other national industries manufacturing, testing and operating load-lifting systems, cranes and mine lifters. The known method for determining the Utilization Ratio of a drilling lifting system, which consists in taking into account losses of friction and rope stiffness, does not provide the required accuracy 1. The closest in technical essence to the invention is a method for determining the efficiency of a drilling lifting system, which consists in accelerating the system as it moves to the descent under the action of the weight of moving parts and cargo, and measuring the acceleration time 2. The disadvantages of the known method are: . The purpose of the invention is to improve the measurement accuracy. This goal is achieved due to the fact that the system is accelerated by a drive to the ascent, the change in the speed of the system in time to the descent and the deceleration to the ascent is recorded, and the efficiency is determined by the formula:. / w W change the speed of the system during descent during time A-ij-j ,, iV |, is the change in the speed of movement with elevation over time. The method is carried out as follows. Acceleration of the drilling system is carried out when it moves to descent under the action of the weight of the moving parts and the load — and the change in the speed of the system in time is recorded. Then the acceleration of the drilling lift system is carried out by a drive while the system is moving upwards. Turn off the drive and record 3 changes in system speed over time. . Efficiency is determined by the formula: rmr, i-ipl / mgtrc; Formula of Invention The method of determining the efficiency of a drilling lifting system, which consists in accelerating the system when moving the research institute to descent, by the action of the weight of moving parts and cargo and measurement of acceleration time, characterized in that, in order to increase the accuracy, acceleration of the system is carried out by a drive to lift, a change in the speed of the system’s movement with time to descent and deceleration to lift is registered, and the efficiency is determined t according to the formula: n-if whereMedMdp change the speed of the system during descent during time tg ,, fiVfj - change the speed of movement during ascent over time, Information sources taken into account during the examination 1. B. Mazahain And, Refinement of the efficiency rig lifting winch system. Oil business, 196: 9, No. 8, p. 12. 2, Arkhangelskiy V. M, et al. Determination of the efficiency of the thrust system of modern drilling rigs. Machines and oil equipment, No. 4, 1968,;. 22 (prototype).

Claims (1)

Формула изобретенияClaim Способ определения коэффициента полезного действия буровой подъемной системы, заключающийся в разгоне системы при движе нии ее на спуск цод действием веса подвижных частей и груза и измерении времени разгона, отличающийся тем, что, с целью повышения точности, осуществляют разгон системы приводом на подъем, регистрируют изменение скорости движения системы во времени на спуск и замедлении на подъем, а коэффициент полезного действия определяют по формуле:The method of determining the efficiency of the drilling lifting system, which consists in accelerating the system when moving it to the lowering center by the action of the weight of the moving parts and the load and measuring the acceleration time, characterized in that, in order to improve accuracy, the system is accelerated by a lifting drive, the change is recorded the speed of the system in time for descent and deceleration to rise, and the efficiency is determined by the formula: гдед\1сп движения !where \ 1 cn movement! изменение скорости системы при спуске за время 6tcn.system speed change during descent during 6t cn . — изменение скорости движения при подъеме за время- change in speed when lifting during time
SU782609253A 1978-04-24 1978-04-24 Method for determining the efficiency of drilling rig lifting system SU732699A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU782609253A SU732699A1 (en) 1978-04-24 1978-04-24 Method for determining the efficiency of drilling rig lifting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU782609253A SU732699A1 (en) 1978-04-24 1978-04-24 Method for determining the efficiency of drilling rig lifting system

Publications (1)

Publication Number Publication Date
SU732699A1 true SU732699A1 (en) 1980-05-05

Family

ID=20761836

Family Applications (1)

Application Number Title Priority Date Filing Date
SU782609253A SU732699A1 (en) 1978-04-24 1978-04-24 Method for determining the efficiency of drilling rig lifting system

Country Status (1)

Country Link
SU (1) SU732699A1 (en)

Similar Documents

Publication Publication Date Title
FI84050C (en) FOERFARANDE FOER KONTROLL AV FRIKTIONEN MELLAN DRIVSKIVA OCH BAERLINOR TILL EN HISS.
ATE147055T1 (en) METHOD FOR MEASURING THE DRIVING CAPABILITY OF A DRIVE OF A CONVEYOR SYSTEM
SU732699A1 (en) Method for determining the efficiency of drilling rig lifting system
ES448329A1 (en) Improvements in elevator wheel lifters. (Machine-translation by Google Translate, not legally binding)
US2361053A (en) Ship cargo rig
CN101896415A (en) Elevator device
CN112830403B (en) Compensation method for accurately detecting hoisting weight of tower crane
JPS54107037A (en) Elevator cage rope flaw detector
FR2333743A1 (en) Multi sheave trolley for travelling crane - has automatic transposition of weight to provide for two or four way working of crane
SU1280371A2 (en) Method of determining technical condition of single-stage reduction gear
DK0401863T3 (en) Hydraulic lift
SU779844A1 (en) Method of measuring unbalance of cabin-lift counterweight
GB1355507A (en) Telescopic jib for a crane
SU735548A1 (en) Electromagnetic load-engaging device
SU549408A1 (en) Lifting device with a sliding boom type Nuremberg scissors
SU1086350A1 (en) Device for determination of object mass in handling operations
SU1541172A1 (en) Mine hoisting installation
FR2314886A1 (en) Moving load lifting equipment - has rope kept under constant tension and hoisting is by mechanism controlled by rope movement
SU700426A1 (en) Crane trolley
SU740705A1 (en) Converting block of apparatus for testing operability of load-handling machine brakes
FR2377963A1 (en) Load handling grab - has winch actuating jaws mounted on slewing column and moving controlling component
SU787329A1 (en) Construction hoist
SU945692A1 (en) Method of determination of weight drive reduced moment of inertia
SU738986A1 (en) Floating crane
SU564248A1 (en) Crane trolley current supply