SU730040A1 - Method of open working of stratum deposits of mineral resources - Google Patents

Method of open working of stratum deposits of mineral resources Download PDF

Info

Publication number
SU730040A1
SU730040A1 SU782675529A SU2675529A SU730040A1 SU 730040 A1 SU730040 A1 SU 730040A1 SU 782675529 A SU782675529 A SU 782675529A SU 2675529 A SU2675529 A SU 2675529A SU 730040 A1 SU730040 A1 SU 730040A1
Authority
SU
USSR - Soviet Union
Prior art keywords
mineral
mining
ledge
pillar
overburden
Prior art date
Application number
SU782675529A
Other languages
Russian (ru)
Inventor
Э.Л. Галустьян
Original Assignee
Всесоюзный Научно-Исследовательскийинститут Горной Геомеханики И Mapk-Шейдерского Дела
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный Научно-Исследовательскийинститут Горной Геомеханики И Mapk-Шейдерского Дела filed Critical Всесоюзный Научно-Исследовательскийинститут Горной Геомеханики И Mapk-Шейдерского Дела
Priority to SU782675529A priority Critical patent/SU730040A1/en
Application granted granted Critical
Publication of SU730040A1 publication Critical patent/SU730040A1/en

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Description

изобретение относитс  к горной промы ленности и можег быть использовано при открытой разработке пластовых МбсТО{эй}кцений полеэнык нскопаемык.. Известен способ открытой разработки месторождений полезных ископаемых, вклю чающий выемку пород вскрыши с подвалко ими добычного уступа и последующей перевалкой вскрышны пород В выработанное пространство D-j . Известен также способ разработки пластовых месторождений полезных ис- копаемык, включающий перевалку вскрышных пород с подвалкой добычного уступа и с отделением добычной заходки от отва ла вскрышных пород целиком полезного ископаемого Г2. Однако первый из указанных способов характеризуетс  необходимостью дополнительной перевалки пород а второй - потер ми полезно ч ископаемого Целью изобретени   вл етс  уменьшени потерь полезного ископаемого. Посгавлейна  цель достнгаегс  тем, что после прохода забо  добычного уступа производ т перемещение полезного ископаемого целика аа пределы зоны БОЭМОЙС- ного обрушени  откоса отвела. Кроме roroj перемешениа полезного ископаемого целнка осуществл -ют взрыванием аар дов ВВ, размесценнык в скважинак, пробуренных в массиве добычного уступа до подхода забо  последнего взрыЕаниемзар дов ВВ, размещенных до начала вскрышных работ на откосе добычного уступа. На фиг. 1 дана схема разработки iwac. TOE месторождений, аид в плане, на фнг.2то же, в плоскосга пласта. Способ заключаетс  в следующем. Экскаватор-араглайн 1 вецег разработ ку вскрышного уступа 2 н укладывает породу под откос добычного уступа 3, подвалива  его до уровн  кровли полезного ископаемого с созданнем конуса отвала 4. Роторный экскаватор 5 разрабатывав рлеэнов ископаемое в грузит его на конвейер 6„ Со стороны отвала оставл ют целик 7. Вслед аа проходом забо  добычного уступа взрывают скважины которые пробурийают в массиве цобычного уступа с опереженвем забо  последнего. Взрывом перемешают полезное ископаемое в навал 9 за пределы зоны возможного обрушени  откоса отвала. Премещение полезного ископа мого могут также производить и взры ванием зар дов ВВ, размещенных до нача па вскрышны)с работ на откосе добычного уступа. Шаг разрушени  целика не должен превышать 10 м, чтобы за врем  уборки полезного ископаемого не развились, дефор мации отвала. Погрузку полезного ископае мого из канала 9 производ т экскаватором 10. Данный способ позволит свеЬти к минимуму потери полезного ископаемого. изобретени  о р м у л а li Способ открытой разработки ПЯйсто- вых месторождений полезных ископаемых, включающий перевалку вскрышных пород с подвЗлкой добычного уступи и с отделением добычной чЗаходки от отвала вскрыш ных пород деликом полезного ископаемого, отличающийс  тем, что, с целью уменьшени  потерь полезного ископаемого, после прохода забо  добычного уступа производ т перемещение полезного ископаемого целика за пределы зоны возможного обрушени  откоса отвала. 2. Способ по П.1, отличающийс   тем, что перемещение полезного ископаемого делика осуществл ют взрыванием зар дов ВВ, размещенных в скважинах, пробуренных в массиве добычного уступа до подхода забо  последнего. З.Способ по ti.l,, отличающийс   тем, что перемещение полезного ископаемого целика осуществл ют взрыванием зар дов ВВ, размещенных до начала вскрыш, ных работ на откосе добычног-о уступа. Источники информации, прин тые во внимание при экспертизе 1.Ржевский В.В. Технологи  и комплексна  механизаци  открытых горных работ, М., Недра, 1975, с. 215 - 216. 2.Докучаев М.М. и др. Совершенствование технологии вскрышных работ на Афанасьевском карьере. Горный журнал, 1974, №4, с,27-28. .The invention relates to mining and can be used in the open development of reservoir MbsTO {hey} kseniy poleenyk nskopaemyk. . There is also a known method for developing reservoir deposits of mineral deposits, including transshipment of overburden with basement of a mining scarp and separation of the mining entry from overburden dump of the entire mineral G2. However, the first of these methods is characterized by the need for additional transshipment of rocks and the second is the loss of useful minerals. The aim of the invention is to reduce the loss of minerals. Posgavlejn's goal was achieved by the fact that after passing the bottom of the mining ledge, the mineral resources were moved, and the rear pillar aa had withdrawn the limits of the boemois zone. In addition to roroj, mixing of the minerals, the tselnka is carried out by blasting aar explosives, crushed in wells, drilled in the mass of the mining ledge before the approach of the last explosives explosives, placed before the start of the stripping works on the slope of the mining scarp. FIG. 1 shows the iwac development scheme. TOE deposits, Hades in the plan, on fng. The same, in a flat seam. The method is as follows. The aragline excavator 1 excavator of the overburden ledge 2 n lays the rock under the escarpment of the mining ledge 3, basement it to the level of the mineral roof with the cone of the blade created 4. The rotary excavator 5 developed the mineral to load it onto the conveyor 6 "From the blade side pillar 7. After the aa passage of the mining escarpment, wells are blown up which are drilled in the massif of the conventional escarpment with the lead of the latter. The explosion will mix the mineral in the pile 9 outside the zone of possible collapse of the blade slope. Mineral replacement can also be carried out by blasting explosive charges placed prior to the start of overburden from works on the slope of the mining scarp. The pillar destruction pitch should not exceed 10 m, so that during the harvesting of the mineral, deformations of the blade will not develop. The loading of the mineral from channel 9 is carried out by an excavator 10. This method will allow minimizing the loss of the mineral. The invention of open pit mining of mineral deposits, including the transshipment of overburden rocks with the subsoil of mining escarpment and the separation of mining waste from the dump of overburden precious minerals, in order to reduce the loss of beneficial the fossil, after the passage of the mining mining step, the mineral resources of the pillar are moved beyond the zone of possible collapse of the blade slope. 2. The method of Claim 1, wherein the movement of the mineral delicate is carried out by blasting explosives placed in wells drilled in the mass of the mining ledge before the approach of the latter. H. Method according to ti.l, characterized in that the movement of a mineral fossil pillar is carried out by blasting explosive charges placed prior to the commencement of stripping on the slope of the mining-and-scarp. Sources of information taken into account in the examination 1.Rzhevsky V.V. Technologists and complex mechanization of open pit mining, M., Nedra, 1975, p. 215 - 216. 2.Dokuchaev M.M. et al. Improving the technology of overburden operations at the Afanasyevsky open pit. Mining Journal, 1974, No. 4, p. 27-28. .

Claims (3)

Формула изобретенияClaim 1. Способ открытой разработки ПЛДСТО- ’ вых месторождений полезных ископаемых, включающий перевалку вскрышных пород 25 с подвалкой добычного уступи и с отделением добычной за ходки от отвала вскрыш ных пород целиком полезного ископаемого, отличающийся тем, что, с целью уменьшения потерь полезного ископаемого, после прохода забоя добычного уступа производят перемещение полезного ископаемого целика за пределы эоны возможного обрушения откоса отвала.1. A method for open-cast mining of the PLDSTO 's mineral deposits, including transshipment of overburden 25 with the basement of the production step and with separation of the quarry from the overburden dump of the whole mineral, characterized in that, in order to reduce mineral losses, after the pass of the face of the mining ledge displace the mineral pillar beyond the limits of the eon of possible collapse of the slope of the dump. 2. Способ по п.1, отличающийс я тем, что перемещение полезного ископаемого целика осуществляют взрыванием зарядов ВВ, размещенных в скважинах, пробуренных в массиве добычного уступа до подхода забоя последнего.2. The method according to claim 1, characterized in that the movement of the mineral pillar is carried out by blasting explosive charges located in wells drilled in the massif of the production ledge before the bottom face approach. 3. Способ по п,1„ отличающийс я тем, что перемещение полезного ископаемого целика осуществляют взрыванием зарядов ВВ, размещенных до начала вскрышных работ на откосе добычного уступа.3. The method according to claim 1, characterized in that the movement of the mineral pillar is carried out by blasting explosive charges placed before the beginning of stripping operations on the slope of the mining ledge.
SU782675529A 1978-10-23 1978-10-23 Method of open working of stratum deposits of mineral resources SU730040A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU782675529A SU730040A1 (en) 1978-10-23 1978-10-23 Method of open working of stratum deposits of mineral resources

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU782675529A SU730040A1 (en) 1978-10-23 1978-10-23 Method of open working of stratum deposits of mineral resources

Publications (1)

Publication Number Publication Date
SU730040A1 true SU730040A1 (en) 1981-06-23

Family

ID=20789910

Family Applications (1)

Application Number Title Priority Date Filing Date
SU782675529A SU730040A1 (en) 1978-10-23 1978-10-23 Method of open working of stratum deposits of mineral resources

Country Status (1)

Country Link
SU (1) SU730040A1 (en)

Similar Documents

Publication Publication Date Title
SU730040A1 (en) Method of open working of stratum deposits of mineral resources
RU2762170C1 (en) Method for developing thin and low-powered steel-falling ore bodies
SU783472A1 (en) Method of solid rood control
SU812922A1 (en) Method of consolidating slopes
SU717335A1 (en) Method of stripping mineral fields at open-cast mining
SU1717821A1 (en) Method for mining mineral deposits
RU1776310C (en) Method of working of natural resources
SU985290A1 (en) Method of opening-up a mine field adjoining an open mine
SU825964A1 (en) Method of working thick steeply-inclined ore bodies
SU926284A1 (en) Method for extracting mineral under quarry banks
RU1789700C (en) Method for mineral deposit opencast mining
SU622978A1 (en) Method of open-cut mining of mineral deposits
SU602684A1 (en) Method of mining mineral deposits
SU631657A1 (en) Method of excavating thick orebodies
SU855209A1 (en) Method of caving overlapping rocks
RU96109970A (en) COMBINED METHOD FOR DEVELOPING STEPS OF STEEP COAL COAST
SU669053A1 (en) Method of mining an excavation level
SU875038A1 (en) Method of afterworking of sloping mineral deposits
SU976070A1 (en) Method of mining thick ore deposits
SU909179A1 (en) Method of working extra-thin gently sloping coal beds
SU732531A1 (en) Method for open mining of mineral deposits
SU1460275A1 (en) Method of excavating sloping mineral deposits
SU785488A1 (en) Method of mining minerals in the contour-adjoining areas of a quarry
SU827790A1 (en) Method of working thick gently sloping mineral deposits
SU636391A1 (en) Mineral winning method