SU718544A1 - Method of erecting wall in soil - Google Patents
Method of erecting wall in soil Download PDFInfo
- Publication number
- SU718544A1 SU718544A1 SU782649312A SU2649312A SU718544A1 SU 718544 A1 SU718544 A1 SU 718544A1 SU 782649312 A SU782649312 A SU 782649312A SU 2649312 A SU2649312 A SU 2649312A SU 718544 A1 SU718544 A1 SU 718544A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- soil
- erecting wall
- wall
- cables
- erecting
- Prior art date
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
Панель по мере ее сборки опускаетс в траншею. Сборка элементов в панель и опускание ее в траншею осуш,ествл етс при помощи блоков 5 и лебедок 6 тросами 7.The panel, as it is assembled, is lowered into the trench. The assembly of the elements into the panel and lowering it into the trench is dried using blocks 5 and winches 6 with cables 7.
Дл пропуска тросов на боковой поверхности элементов имеютс вертикальные пазы 8. Диаметр тросов и их количество определ етс расчетом. В случае необходимости поверхности троса защиш;аютс антикоррозионным покрытием.To pass the cables, there are vertical grooves on the lateral surface of the elements. The diameter of the cables and their number is determined by calculation. If necessary, protect the cable surface with anti-corrosion coating.
По окончании сборки панели и ее выверки верхние концы тросов закрепл ютс на верхнем элементе панели при помош.и анкерных устройств (не показаны).Upon completion of the panel assembly and its alignment, the upper ends of the cables are fixed on the top panel element by means of anchoring devices (not shown).
Вертикальна стыковка между панел ми, собранными из элементов выполн етс , например , при помощи инвентарных труб или двутавров (не показаны).Vertical joining between panels assembled from elements is performed, for example, using inventory pipes or I-beams (not shown).
Использование описываемого способа позволит возводить стены в грунте из сборных элементов любой требуемой глубины заложени с обеспечением долговечности и высокой несущей способности стены.Using the described method will allow the walls to be erected in the soil from prefabricated elements of any desired depth to ensure durability and high bearing capacity of the wall.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU782649312A SU718544A1 (en) | 1978-07-26 | 1978-07-26 | Method of erecting wall in soil |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU782649312A SU718544A1 (en) | 1978-07-26 | 1978-07-26 | Method of erecting wall in soil |
Publications (1)
Publication Number | Publication Date |
---|---|
SU718544A1 true SU718544A1 (en) | 1980-02-29 |
Family
ID=20779094
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU782649312A SU718544A1 (en) | 1978-07-26 | 1978-07-26 | Method of erecting wall in soil |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU718544A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110172965A (en) * | 2019-06-04 | 2019-08-27 | 江苏中南建筑产业集团有限责任公司 | Diaphram wall steel bar segmentation formula constructing device and construction method |
CN110185061A (en) * | 2019-07-04 | 2019-08-30 | 河南聚誉帆工程技术咨询有限公司 | A kind of assembled integral underground space retaining wall and construction method |
-
1978
- 1978-07-26 SU SU782649312A patent/SU718544A1/en active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110172965A (en) * | 2019-06-04 | 2019-08-27 | 江苏中南建筑产业集团有限责任公司 | Diaphram wall steel bar segmentation formula constructing device and construction method |
CN110172965B (en) * | 2019-06-04 | 2021-08-10 | 江苏中南建筑产业集团有限责任公司 | Sectional construction device and construction method for underground continuous wall reinforcing steel bars |
CN110185061A (en) * | 2019-07-04 | 2019-08-30 | 河南聚誉帆工程技术咨询有限公司 | A kind of assembled integral underground space retaining wall and construction method |
CN110185061B (en) * | 2019-07-04 | 2024-03-29 | 河南聚誉帆工程技术咨询有限公司 | Assembled integral type underground space retaining wall and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU718544A1 (en) | Method of erecting wall in soil | |
SU700602A1 (en) | Foundation | |
SU375348A1 (en) | FOUNDATION FOR BUILDINGS AND CONSTRUCTIONS | |
SU996639A1 (en) | Pile foundation | |
SU652274A1 (en) | Method of constructing a sunken-in well | |
GB923776A (en) | Prefabricated house building | |
GB940500A (en) | Improvements relating to the construction of underground buildings | |
SU1756464A1 (en) | Multi-level underground structure | |
RU2094568C1 (en) | Modular foundation | |
SU1618843A1 (en) | Method of erecting deepened structure into ground | |
SU802460A1 (en) | Drilled and filled foundation | |
SU718546A1 (en) | Method of erecting wall in soil | |
JPS5910624A (en) | Construction of basement | |
SU1435710A1 (en) | Foundation of building or structure | |
SU815142A1 (en) | Method of erecting buildings on sagging soils | |
SU702116A1 (en) | Foundation | |
SU545736A1 (en) | The method of construction of buildings | |
SU715724A1 (en) | Pile foundation | |
RU2042013C1 (en) | Method of construction of underground structure | |
SU676688A1 (en) | Foundation for a building or structure | |
SU1390309A1 (en) | Building foundation | |
SU872687A1 (en) | Ferroconcrete block | |
JPS62137324A (en) | Foundation structure for high building | |
SU872765A1 (en) | Device for erecting linings of mine workings | |
SU573541A1 (en) | Ring-shaped building and structure |