SU697727A1 - Entry-driving bucket - Google Patents
Entry-driving bucketInfo
- Publication number
- SU697727A1 SU697727A1 SU752300015A SU2300015A SU697727A1 SU 697727 A1 SU697727 A1 SU 697727A1 SU 752300015 A SU752300015 A SU 752300015A SU 2300015 A SU2300015 A SU 2300015A SU 697727 A1 SU697727 A1 SU 697727A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- tub
- trolleys
- rope
- carried out
- bucket
- Prior art date
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
- Load-Engaging Elements For Cranes (AREA)
Description
(54) ПРОХОДЧЕСКАЯ БАДЬЯ(54) PASSAGE BUDGET
1one
Изобретение относитс к проходческим бадь м, используемым в горной промышленности при проходке вертикальных и крутопадающих выработок.The invention relates to a tunnel head used in the mining industry when driving vertical and steeply dipping workings.
Известна бадь , содержаща подвеску с фиксатором и прикрепленную в нижней части бадьи грузовую петлю 1.The famous tub containing a suspension with a clamp and a cargo loop 1 attached in the lower part of the tub is known.
Недостатком данной бадьи вл етс разбрасывание груза при опорожнении и наличие значительного свободного пространства над местом разгрузки.The disadvantage of this bucket is the scattering of cargo during emptying and the presence of considerable free space above the place of unloading.
Известна также проходческа бадь , содержаш,а подвеску и прикрепленную в нижней части бадьи грузовую петлю 2.Also known prokatcheskaya tub, containing, and the suspension and attached at the bottom of the tub cargo loop 2.
Данную бадью поднимают выще уровн разгрузки и прикрепл ют к ее грузовой петле гибкую св зь ограниченной длины, другой конец которой за корен. При обратном ходе гибка св зь задерживат бадью за днище и бадь опрокидываетс , высыпа породу.This bucket is raised above the discharge level and attached to its cargo loop is a flexible link of limited length, the other end of which is located at the root. During the return stroke, the bond will be held up by the bucket behind the bottom and the tub is overturned, discharging the rock.
Недостаток указанной бадьи заключаетс в том, что дл обеспечени ее разгрузки необходимо иметь значительное свободное пространство над местом разгрузки.The disadvantage of this tub is that, in order to ensure its unloading, it is necessary to have considerable free space above the unloading point.
Цель изобретени - обеспечение разгрузки в стесненных услови х.The purpose of the invention is to provide unloading in cramped conditions.
Эта цель дос1;1гаетс тем, что проходческа бадь содержаща подвеску и прикрепленную в нижней части бадьи грузовую петлю, снабжена за.хватами, щарнирно смонтированными на борту у ее верхней кромки.This goal reaches 1; 1 by the fact that the tunnel head containing the suspension and the cargo loop attached at the bottom of the tub is equipped with grip flanges that are hinged on board at its upper edge.
На фиг. 1 - положение бадьи при ее зацеплении с щахтной вагонеткой; на фиг. 2положение бадьи при разгрузке; на фиг. 3 - захват, прикрепленный на борту бадьи.FIG. 1 - the position of the tub when it engages with a punched trolley; in fig. 2 position of the tub during unloading; in fig. 3 - grip attached on board the tub.
Проходческа бадь 1 содержит подвеску 2 и прикрепленную Б ее нижней части грузовую петлю 3. На борту бадьи у ее верхней кромки смонтированы захваты 4. Каждый захват выполнен в виде пластины 5 с фигурным пазом, прикрепленной к бадье с помощью щарнира 6. Бадь подвещена к канату 7 лебедки, размещенной на каретке 8, котора установлена на монорельсе 9. Монорельс размещен в подвод щей горизонтальной выработке, оснащенной пут ми дл щахтных вагонеток 10 и упорами 11.The projectile tub 1 contains a suspension bracket 2 and a cargo loop 3 attached to its lower part. On board the bucket, grips 4 are mounted at its upper edge. 7 winches placed on the carriage 8, which is mounted on the monorail 9. The monorail is housed in a supplying horizontal excavation, equipped with paths for the shunting trolley 10 and the stops 11.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU752300015A SU697727A1 (en) | 1975-12-08 | 1975-12-08 | Entry-driving bucket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU752300015A SU697727A1 (en) | 1975-12-08 | 1975-12-08 | Entry-driving bucket |
Publications (1)
Publication Number | Publication Date |
---|---|
SU697727A1 true SU697727A1 (en) | 1979-11-15 |
Family
ID=20640838
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU752300015A SU697727A1 (en) | 1975-12-08 | 1975-12-08 | Entry-driving bucket |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU697727A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108625421A (en) * | 2018-03-26 | 2018-10-09 | 谢小展 | The automatic clearing and digging machine of mine flowing water lane coal slime |
CN114198114A (en) * | 2021-12-03 | 2022-03-18 | 浙江浙商装备工程服务有限公司 | Shield constructs quick-witted dregs circulation and transports trailer system that emptys |
-
1975
- 1975-12-08 SU SU752300015A patent/SU697727A1/en active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108625421A (en) * | 2018-03-26 | 2018-10-09 | 谢小展 | The automatic clearing and digging machine of mine flowing water lane coal slime |
CN108625421B (en) * | 2018-03-26 | 2020-12-25 | 谢小展 | Automatic coal slime clearing and digging machine for mine water flow lane |
CN114198114A (en) * | 2021-12-03 | 2022-03-18 | 浙江浙商装备工程服务有限公司 | Shield constructs quick-witted dregs circulation and transports trailer system that emptys |
CN114198114B (en) * | 2021-12-03 | 2024-04-16 | 浙江浙商装备工程服务有限公司 | Slag soil circulating conveying dumping trailer system of shield tunneling machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
NO152984B (en) | DEVICE FOR TREATMENT OF PUTS BETWEEN A PIPE STOCK AND A DRILLER | |
SU697727A1 (en) | Entry-driving bucket | |
US2587362A (en) | Tunnel mucking apparatus | |
US3219199A (en) | Method for loading mine cars and loading apparatus therefor | |
US3123240A (en) | macalpine | |
RU63445U1 (en) | COMPLEX FOR MINING | |
US2873866A (en) | Material handling apparatus | |
US2743830A (en) | Inclined shaft mucking apparatus | |
SU901541A1 (en) | Tunnel driving device | |
SU699189A1 (en) | Grapple rock loader for sinking vertical mine shafts | |
SU977788A1 (en) | Tunneling complex for erecting vertical mining workings | |
SU750078A1 (en) | Machinery set for sinking vertical mine workings | |
CN113184693B (en) | Deep-digging grab bucket structure for mine field traveling crane | |
SU855211A1 (en) | Grab rock-loading machine | |
US2147634A (en) | Method of and apparatus for handling loose material | |
SU752010A1 (en) | Set for deepening vertical mine shafts | |
US2115641A (en) | Material handling mechanism | |
SU771341A1 (en) | Mining machine feed mechanism | |
US1997589A (en) | Material handling mechanism | |
SU1121440A1 (en) | Entry-driving unit for sinking vertical mine workings | |
SU78733A1 (en) | Excavating machine | |
SU1321820A1 (en) | Mine shaft loading machine | |
SU473834A1 (en) | Suspended mine crane | |
SU972148A1 (en) | Loading machine | |
US2115640A (en) | Material handling mechanism |