Method of stripping and preparing gentry sloping coal seamsInfo
- Publication number
- SU693013A1 SU693013A1 SU772466397A SU2466397A SU693013A1 SU 693013 A1 SU693013 A1 SU 693013A1 SU 772466397 A SU772466397 A SU 772466397A SU 2466397 A SU2466397 A SU 2466397A SU 693013 A1 SU693013 A1 SU 693013A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- blocks
- mines
- trunks
- block
- conducted
- Prior art date
Links
Landscapes
- Artificial Fish Reefs (AREA)
Description
(54) СПОСОБ ВСКРЫТИЯ И ПОДГОТОВКИ ПОЛОГИХ УГОЛЬНЫХ(54) METHOD OF OPENING AND PREPARING COIL LOGGING
ПЛАСТОВ грантгам блоков; главные центральные стволы провод т либо в среднем, либо в нижнем блоках. На фиг. 1 представлена схема разделени шахтного пол на блоки; на фиг, 2 - схема вскрыти ; на фиг. 3 схема подготовки. Способ заключаетс в следующем. Шахтное поле дел т на блоки 1-9. Блоки 2, 5, 8, расгголоженные в створе по падению, одновременно вскрывают главный скиповым 10 и клетевым 11 стволами, а также спаренными блоковым возд ухо подающими 12 и вентил ционными 13 стволами. При этом скиповый ствол провод т до предпоследнего горизонта , а клетевой - до дренажно-вентил ционного горизонта нижнего блока 8. При проведении главного и клетевого стволов сооружают околоствольный . двор 14. Основной выдачной горизонт сооружают и оборудуют на весь срок эксплуатации шахты. Пласт на втором горизонте вскрывают двум параллельными квершлагами 15. Уголь с первого горизонта на второй транспортируют по бремсбергу 16, с трётьего горизонта на второй - по наклонному конвейе ному квершлагу 17. Дренажно-вентил ционный горизонт обслуживают через клетевой ствол и квершлаг 18. Дл обслу5кивани первого горизонта проход т комплекс наклонных выработок 19 на втором горизонте. В каждом из блоков - к моменту ввода их в эксплуатацию не посредственно у блоковых стволов нарезают лавы 20. Длинные столбы отрабатывают по восстанию или падению. Очистные забои при этом оснащают механиэирован1П )1МИ комплексами иди агре гатами. Магистральные Полевые штре .ки 21 провод т в выработанном простра стве очистных забоев в разгруженном от горного давлений массиве пород; Одновременно с проведением указанных вы работок производ т доразведку шахтног тюл . На втором, третьем и четвертом горизонтах параллельно магистральным попевь1М выработкам провод т пластов магистральные штреки 22. Отработку блоков производ т от центра к юс гра . ницам. При одновременной отработке двух блоков главные центральные ствоPLASTGOTGAM blocks; main central trunks are conducted either on average or in the lower blocks. FIG. Figure 1 shows a scheme for dividing a mine floor into blocks; FIG. 2 is a schematic view; in fig. 3 preparation scheme. The method is as follows. The mine field is divided into blocks 1-9. Blocks 2, 5, 8, arranged in the fall range, simultaneously open the main skip 10 and cage 11 trunks, as well as paired block air supplying 12 and ventilation 13 trunks. At the same time, the skip shaft is led to the penultimate horizon, and the cage one - to the drainage-ventilation horizon of the lower unit 8. When the main and cage trunks are constructed, a near-stem is built. yard 14. The main outgoing horizon is constructed and equipped for the entire life of the mine. The seam on the second horizon is opened with two parallel crosscuts 15. Coal from the first horizon to the second is transported along the bremsberg 16, from the third horizon to the second horizon - along an inclined conveyor pit 17. The drainage-ventilation horizon is served through a cage shaft and a crosshead 18. For maintenance of the first horizon passes a complex of inclined workings 19 on the second horizon. In each of the blocks, by the time they are commissioned, the lava 20 is cut into the blocking barrels directly at the block trunks. At the same time, the cleaning faces of the mine are equipped with 1P) 1 MI complexes or aggregates. The main field shafts 21 are conducted in the developed area of the mining faces in the rock massif unloaded from rock pressure; At the same time as these studies were carried out, additional mine exploration was carried out. On the second, third, and fourth horizons, parallel to the trunk piping mines, the seams are driven by seams 22. The blocks are developed from the center to the south. nitsami. With the simultaneous testing of two blocks, the main central properties
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU772466397A SU693013A1 (en) | 1977-03-28 | 1977-03-28 | Method of stripping and preparing gentry sloping coal seams |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU772466397A SU693013A1 (en) | 1977-03-28 | 1977-03-28 | Method of stripping and preparing gentry sloping coal seams |
Publications (1)
Publication Number | Publication Date |
---|---|
SU693013A1 true SU693013A1 (en) | 1979-10-25 |
Family
ID=20701031
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU772466397A SU693013A1 (en) | 1977-03-28 | 1977-03-28 | Method of stripping and preparing gentry sloping coal seams |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU693013A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EA015969B1 (en) * | 2009-08-31 | 2012-01-30 | Открытое Акционерное Общество "Белгорхимпром" (Оао "Белгорхимпром") | Method for opening and preparing flat-lying mineral seam with complicated bedding structure |
-
1977
- 1977-03-28 SU SU772466397A patent/SU693013A1/en active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EA015969B1 (en) * | 2009-08-31 | 2012-01-30 | Открытое Акционерное Общество "Белгорхимпром" (Оао "Белгорхимпром") | Method for opening and preparing flat-lying mineral seam with complicated bedding structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA1038411A (en) | Method for mining oil shales, tar sands and other minerals | |
SU693013A1 (en) | Method of stripping and preparing gentry sloping coal seams | |
US2891778A (en) | Long wall mining apparatus having a seam embracing channel | |
SU1097796A1 (en) | Method of underground working of bed deposits of minerals | |
SU1666719A1 (en) | Opening and preparation method for gently dipping coal seam | |
SU1102953A1 (en) | Method of preparing mine field of steep coal beds | |
RU2319011C2 (en) | Method for steeply dipping ore body development | |
SU150460A1 (en) | Aggregate for rock excavation | |
SU643644A1 (en) | Method of mining thick steep coal seams | |
RU2096618C1 (en) | Drill-and-drift method for underground mining of coal seams | |
SU690181A1 (en) | Method of combined mining of mineral fields | |
SU905471A1 (en) | Method of working horizontal and gently sloping mineral beds | |
SU1177482A1 (en) | Method of mining gently-sloping outburst-hazardous coal bed | |
SU42527A1 (en) | Dredging machine for drilling | |
RU2079655C1 (en) | Method of mining of series of flat-lying coal seams | |
RU2120551C1 (en) | Method of underground mining of mineral bedded deposits | |
SU740939A1 (en) | Method of working mineral deposits by subterranean leaching in blocks | |
SU566933A1 (en) | Method of exploitation of thick gently sloping gas-bearing-strata | |
SU732531A1 (en) | Method for open mining of mineral deposits | |
SU588376A1 (en) | Method of mining sloping coal beds | |
SU934006A1 (en) | Method of working gently-sloping mineral beds | |
SU842194A1 (en) | Method of mining sloping ore bodies | |
SU611003A1 (en) | Method of mining orebodies | |
SU649845A1 (en) | Method of excavating slightly inclined seams of minerals | |
SU1028845A1 (en) | Method of working thick steep coal seams |