SU688631A1 - Monolithic concrete roof support - Google Patents
Monolithic concrete roof supportInfo
- Publication number
- SU688631A1 SU688631A1 SU782615169A SU2615169A SU688631A1 SU 688631 A1 SU688631 A1 SU 688631A1 SU 782615169 A SU782615169 A SU 782615169A SU 2615169 A SU2615169 A SU 2615169A SU 688631 A1 SU688631 A1 SU 688631A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- rods
- walls
- soil
- lining
- base
- Prior art date
Links
- 239000002689 soil Substances 0.000 claims description 10
- 239000011435 rock Substances 0.000 claims description 6
- 230000002787 reinforcement Effects 0.000 claims description 5
- 238000010276 construction Methods 0.000 claims description 2
- 230000003245 working effect Effects 0.000 claims 4
- 241000566515 Nedra Species 0.000 claims 2
- 238000005299 abrasion Methods 0.000 claims 1
- 238000005452 bending Methods 0.000 claims 1
- 239000011083 cement mortar Substances 0.000 claims 1
- 238000009415 formwork Methods 0.000 claims 1
- 238000012423 maintenance Methods 0.000 claims 1
- 238000010008 shearing Methods 0.000 claims 1
- 238000009412 basement excavation Methods 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Description
1one
Изобретение относитс к области креплени подземных горных выработок.The invention relates to the field of attachment of underground mines.
Известна монолитна бетонна крепь, включающа свод, стены с основанием, заглубленным в почву выработки 1.Known monolithic concrete lining, including the arch, the wall with the base, recessed into the soil of development 1.
Недостатком такой крепи вл етс необходимость разработки канав под основание стен, что повышает трудоемкость работ по возведению крепи.The disadvantage of such lining is the need to develop trenches under the base of the walls, which increases the complexity of the work on the construction of lining.
Известна также друга монолитна бетонна крепь, включающа свод, стены с основанием, установленны.м на почву без заглублени , и арматуру со стержнем, установленным в пробуренных в породе шпурах 2.Another well-known monolithic concrete lining, including a roof, walls with a base, installed on the soil without penetration, and reinforcement with a rod installed in the hole 2 drilled in the rock, is also known.
Недостатком такой крепи вл етс незначительное сопротивление боковому давлению пород, снижающее надежность ее работы.The disadvantage of this support is a slight resistance to lateral pressure of rocks, which reduces the reliability of its operation.
Целью изобретени вл етс повышение надежности работы крепи в породах, оказывающих боковое давление.The aim of the invention is to increase the reliability of the support in the rocks that exert lateral pressure.
Это достигаетс тем, что стержни установлены в почве перпендикул рно торцу основани стен.This is achieved by the fact that the rods are installed in the soil perpendicular to the end of the base of the walls.
На фиг. 1 изображена предлагаема крепь в поперечном сеченпп выработкп; на фиг. 2 - то же, в продольном сечении выработки .FIG. 1 shows the proposed lining in cross section; in fig. 2 - the same in the longitudinal section of production.
Монолитна бетонна крепь содержит свод 1, стены 2 с основанием 3, установленным на почву выработки без заглублени . Основание 3 стен содержит арматуру, соединенную с вертикальными стержн ми 4, верхние концы которых св заны продольными стержн ми 5 арматуры, а нижние - заглублены в щпуры 6, пробуренные в почве выработки. Диаметр стержней 4, установленных перпендикул рно торцу основани 3 стен, исход из расчетов, принимаетс равным 25-40 мм, рассто ние между стержн ми в продольном направлении выработки-200-4UO мм, глубина шпуров- 200-300 мм.Monolithic concrete lining contains vault 1, walls 2 with base 3 installed on the working soil without deepening. The base 3 of the walls contains reinforcement connected to the vertical rods 4, the upper ends of which are connected by longitudinal rods 5 of the reinforcement, and the lower ones are recessed into the drill holes 6 drilled in the excavation soil. The diameter of the rods 4, installed perpendicular to the end face of the 3 walls, is calculated from 25-40 mm, the distance between the rods in the longitudinal direction of generation is 200-4UO mm, the depth of the holes is 200-300 mm.
В других вариантах выполнени крепь может иметь также арматуру в стенах 2 и своде 1, а также стержни, заглубленные в боковые породы.In other embodiments, the support may also have reinforcement in the walls 2 and roof 1, as well as rods recessed into the side rocks.
Крепь возвод т следующим образом.The support was erected as follows.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU782615169A SU688631A1 (en) | 1978-05-12 | 1978-05-12 | Monolithic concrete roof support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU782615169A SU688631A1 (en) | 1978-05-12 | 1978-05-12 | Monolithic concrete roof support |
Publications (1)
Publication Number | Publication Date |
---|---|
SU688631A1 true SU688631A1 (en) | 1979-09-30 |
Family
ID=20764386
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU782615169A SU688631A1 (en) | 1978-05-12 | 1978-05-12 | Monolithic concrete roof support |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU688631A1 (en) |
-
1978
- 1978-05-12 SU SU782615169A patent/SU688631A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2537711C1 (en) | Erection of tunnels in structurally unstable soils with karst phenomena and/or boil processes | |
CN105401946A (en) | Reverse blasting excavation method of shaft and pilot shaft | |
CN109322683A (en) | Underground Large chamber medium-length hole controls blasting construction method | |
SU688631A1 (en) | Monolithic concrete roof support | |
CN210919066U (en) | Fully mechanized caving face coal top down integrated tunneling device | |
CN112664194A (en) | Method for integrally reinforcing upper-wall broken surrounding rock long anchor cable | |
US3468131A (en) | Retaining structures placed into the ground and their procedures of execution | |
SU881331A1 (en) | Method of constructing shallow-depth tunnel in unsolid rock | |
Katuwal et al. | Challenges associated with the construction of vertical and inclined shafts in the Himalayan Region | |
SU1002594A1 (en) | Method of advanced supporting of mine working with anchors | |
SU989083A1 (en) | Method of driving large-section workings | |
SU1624161A1 (en) | Method of developing thick sloping coal seams | |
CN119244237B (en) | False roof construction method under mixed cementing body condition | |
SU1446310A1 (en) | Mine working protection method | |
RU2055209C1 (en) | Method for creating underground drifts such as tunnels | |
RU2444624C1 (en) | Method of full development of gently sloping coal beds with power-driven systems without any preparatory mine workings | |
SU1276816A1 (en) | Method of constructing a tunnel | |
SU1656130A1 (en) | Method of driving the under-vault part of large-span underground structure | |
SU1754906A1 (en) | Method for degassing underworked coal measures | |
SU1504349A1 (en) | Method of supporting underground working | |
SU699182A1 (en) | Method of working thick beds | |
RU1788253C (en) | Method for erection of temporary mobile roofing from level pillar in mining mineral deposits | |
RU2042032C1 (en) | Method for support of mine workings | |
SU639995A1 (en) | Method of shoring slopes | |
SU947296A1 (en) | Method of protection of foundation of structures erected on undermined territory |