RU1788253C - Method for erection of temporary mobile roofing from level pillar in mining mineral deposits - Google Patents

Method for erection of temporary mobile roofing from level pillar in mining mineral deposits

Info

Publication number
RU1788253C
RU1788253C SU914906760A SU4906760A RU1788253C RU 1788253 C RU1788253 C RU 1788253C SU 914906760 A SU914906760 A SU 914906760A SU 4906760 A SU4906760 A SU 4906760A RU 1788253 C RU1788253 C RU 1788253C
Authority
RU
Russia
Prior art keywords
pillar
workings
overlap
wells
roof
Prior art date
Application number
SU914906760A
Other languages
Russian (ru)
Inventor
Виктор Иванович Фукс
Евгений Васильевич Агарков
Виктор Леонидович Кшуманев
Галина Васильевна Головкова
Original Assignee
Всесоюзный научно-исследовательский и проектно-конструкторский угольный институт "КузНИУИ"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный научно-исследовательский и проектно-конструкторский угольный институт "КузНИУИ" filed Critical Всесоюзный научно-исследовательский и проектно-конструкторский угольный институт "КузНИУИ"
Priority to SU914906760A priority Critical patent/RU1788253C/en
Application granted granted Critical
Publication of RU1788253C publication Critical patent/RU1788253C/en

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

Использование: примен етс  при разработке мощных крутых пластов угл  столбами по падению дл  повышени  эффективности очистных работ за счет увеличени  надежности перекрыти  при разработке крутых пластов угл  столбами по падению. Сущность изобретени : выработки проход т в верхней и нижней част х меж- горизонтного целика у кровли и почвы пласта, между выработками в нижней части целика бур т наклонные скважины, а из выработок в верхней части целика выход щие скважины, концы которых простреливают, над целиком формируют изолирующую зону подачей в жущего материала в простреленные концы скважины, всестороннюю подрезку перекрыти  производ т проходкой щелей между выработками в верхней и нижней част х целика, укрепление передвижного перекрыти  осуществл ют монтажом металлического мата в образованных щел х , верхние концы которогозакрепл ютан- керами к кровле выработок в верхней части целика, а нижние концы скрепл ющими элементами , которые монтируют в скважинах, пробуренных между выработками в нижней части целика, а после отработки столба по падению выемку запасов полезного ископаемого из временного передвижного перекрыти  производ т полностью. 4 ил. елUsage: it is used in the development of powerful steep formations with angle columns by dip to increase the efficiency of treatment operations by increasing the reliability of the overlap in the development of steep formations with corner posts in columns. The essence of the invention: the workings take place in the upper and lower parts of the horizontal pillar near the roof and the soil of the formation, between the workings in the lower part of the pillar, inclined wells are drilled, and from the workings in the upper part of the pillar, the outgoing wells, the ends of which are shot through, over the whole they form an insulating zone by supplying cementitious material to the shot through ends of the well, comprehensive trimming of the overlap is done by sinking gaps between the workings in the upper and lower parts of the pillar, the mobile overlap is strengthened by even with a metal mat in the formed slots, the upper ends of which are fixed by the veneers to the roof of the workings in the upper part of the pillar, and the lower ends by fastening elements, which are mounted in the wells drilled between the workings in the lower part of the pillar, and after working out the column, the notch of stocks minerals from the temporary movable ceiling are fully produced. 4 ill. ate

Description

Изобретение относитс  к горной промышленности и может быть использовано при разработке мощных крутых пластов угл  столбами по падению.FIELD: mining. SUBSTANCE: invention can be used in the development of powerful steep strata with coal columns in a dip.

Целью изобретени   вл етс  повыше-, ние эффективности очистных работ за счет увеличени  надежности перекрыти  при разработке крутых пластов угл  столбами по падению.The aim of the invention is to increase the efficiency of sewage treatment by increasing the reliability of the overlap during the development of steep formations of coal by pillars in the fall.

На фиг. 1 показана схема подготовки и возведени  временного передвижного перекрыти ; на фиг. 2 - узел I на фиг. 1; на фиг.In FIG. 1 shows a diagram of the preparation and construction of a temporary movable ceiling; in FIG. 2 - node I in FIG. 1; in FIG.

3 - узел II на фиг. 2; на фиг. 4 - схема расположени  наклонных скважин.3 - node II in FIG. 2; in FIG. 4 is a diagram of an arrangement of deviated wells.

Способ заключаетс  в следующем.The method is as follows.

Подготовка пласта начинаетс  с проходки выработок 1, 2, 3, 4 в верхней и нижней част х межгоризонтного целика 5 у кровли и почвы пласта, из выработок 1, 2 в верхней части бур т выход щие скважины 6, концы которых простреливаютс  и над целиком 5 формируетс  изолирующа  зона 7 путем подачи в жущего в измельченные прострелом породы отработанного горизонта. Зах| 0 00 N3 СЛ ЫPreparation of the formation begins with the sinking of the workings 1, 2, 3, 4 in the upper and lower parts of the horizontal horizon 5 at the roof and soil of the formation, from the workings 1, 2 in the upper part, outgoing wells 6 are drilled, the ends of which are shot across the whole 5 an insulating zone 7 is formed by supplying a worked-out horizon to the rock crushing in the ground lumbago. Zach | 0 00 N3 CL S

тем между выработками 3, 4 s нижней части целика бур т два р да наклонных скважин 8 в которые пропускаетс  скрепл ющие элементы 9, состо щие из бывших в употреблении скрепленных между собой пол- утораметровых отрезков спецпрофил , выход щих из скважины 8 в выработки 3, 4. После этого производ т всестороннюю подрезку (перекрыти  проходкой щелей 10, 11, посредством канатных пил между выработ- ками 1. 2, 3, 4 в верхней и нижней част х целика 5 с последующим монтажом в них металлических матов 12, 13.meanwhile, between the workings 3, 4 s of the lower part of the pillar, two rows of deviated wells 8 are drilled into which fastening elements 9 are passed, consisting of used one and a half meter sections of special profiles emerging from the well 8 into workings 3, 4. After that, a comprehensive trimming is performed (by sinking the slots 10, 11 by means of wire saws between the workings 1. 2, 3, 4 in the upper and lower parts of the pillar 5 with the subsequent installation of metal mats 12, 13 in them.

Между выработками 3, 4 в нижней части целика 5 под наклонными скважинами 8 проходитс  монтажна  щели 14 и в ней монтируетс  металлический мат 15. Затем усть  наклонных скважин 8 и монтажна  щель 14 герметизируютс  и в них нагнетаетс  скрепл ющий состав. Верхние концы металличе- ских матов 12, 13 закрепл ют на торцовых канатах 16 анкерами 17, к кровле выработки 1, 2 в верхней части целика 5.Between the workings 3, 4, in the lower part of the pillar 5, under the inclined wells 8, a mounting slot 14 is passed and a metal mat 15 is mounted in it. Then, the mouth of the inclined wells 8 and the mounting slot 14 are sealed and a fastening composition is pumped into them. The upper ends of the metal mats 12, 13 are fixed on the end cables 16 with anchors 17, to the roof of the working 1, 2 in the upper part of the pillar 5.

Нижние концы металлических матов 12, 13, 15 закрепл ютс  на швеллерах 18 жест- ко соедин емых с скрепл ющими элементами 9. Затем возведенным временным передвижным перекрытием ведут очистные работы по существующим щитовой либо подэтажной системе разработки, а после отработки столба выемку запасов полезного ископаемого из временного передвижного перекрыти  производ т полностью.The lower ends of the metal mats 12, 13, 15 are fixed on the channels 18 that are rigidly connected to the fastening elements 9. Then, the erected temporary movable overlap is being cleaned according to the existing panel or sub-floor development system, and after mining the column, mining of mineral resources from temporary movable ceilings are carried out completely.

Фор.мула изобретени Formula of the invention

Способ возведени  временного пере- движного перекрыти  из межгоризонтногоA method of erecting a temporary movable ceiling from inter-horizontal

целика при разработке залежей полезных ископаемых, включающий проведение выработок по полезному ископаемому, всестороннюю подрезку перекрыти  по полезному ископаемому из указанных выработок , укрепление перекрыти  гибкими элементами и выемку запасов полезного ископаемого из перекрыти , отличающий- с   тем, что, с целью повышени  эффективности очистных работ за счет увеличени  надежности перекрыти  при разработке крутых пластов угл  столбами по падению, выработки проход т в верхней и нижней част х межгоризонтного целика у кровли и почвы пласта, между выработками в нижней части целика бур т наклонные скважины , а из выработок в верхней части целика - выход щие скважины, концы которых простреливают, над целиком формируют изолирующую зону подачей в жущего материала в простреленные концы скважин , всестороннюю подрезку перекрыти  производ т проходкой щелей между выработками в верхней и нижней част х целика , укрепление передвижного перекрыти  осуществл ют монтажом металлического мата в образованных щел х, верхние концы которого прикрепл ют анкерами к кровле выработок в верхней части целика, а нижние концы скрепл ющими элементами, которые монтируют в скважинах, пробуренных между выработками в нижней части ц елика, а после отработки столб.а выемку запасов полезного ископаемого из временного передвижного перекрыти  производ т полностью .a pillar in the development of mineral deposits, including conducting mine workings, comprehensive trimming of the mineral overlap from the indicated mine workings, reinforcing the overlap with flexible elements and excavating mineral reserves from the overlapping, characterized in that, in order to increase the efficiency of treatment work for by increasing the reliability of the overlap during the development of steep formations of coal by pillars in the fall, the workings take place in the upper and lower parts of the horizontal horizon at the roof and formation soils, inclined wells are drilled between the workings in the lower part of the pillar, and outgoing wells, the ends of which are shot from the workings in the upper part of the pillar, are formed over the entire isolating zone by supplying the cementing material to the shot ends of the wells, comprehensive cutting of the overlap is done by sinking gaps between the workings in the upper and lower parts of the pillar, the movable ceiling is strengthened by mounting a metal mat in the formed slots, the upper ends of which are attached with anchors to the roof of the excavation a boot in the upper part of the pillar, and the lower ends with fastening elements that are mounted in wells drilled between the workings in the lower part of the pillar, and after mining the pillar, the extraction of mineral reserves from the temporary mobile overlap is carried out completely.

фе/г. /fe / g. /

33

f i, .. : .. - ... -.f i, ..: .. - ... -.

V. f,.: vV-..v.V. f,.: VV - .. v.

0v.. 0v ..

.-::- S..- :: - S.

SU914906760A 1991-01-31 1991-01-31 Method for erection of temporary mobile roofing from level pillar in mining mineral deposits RU1788253C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU914906760A RU1788253C (en) 1991-01-31 1991-01-31 Method for erection of temporary mobile roofing from level pillar in mining mineral deposits

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU914906760A RU1788253C (en) 1991-01-31 1991-01-31 Method for erection of temporary mobile roofing from level pillar in mining mineral deposits

Publications (1)

Publication Number Publication Date
RU1788253C true RU1788253C (en) 1993-01-15

Family

ID=21557987

Family Applications (1)

Application Number Title Priority Date Filing Date
SU914906760A RU1788253C (en) 1991-01-31 1991-01-31 Method for erection of temporary mobile roofing from level pillar in mining mineral deposits

Country Status (1)

Country Link
RU (1) RU1788253C (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 542830, кл. Е 21 С 41/22.1974. Авторское свидетельство СССР № 233587, кл. Е 21 С 41/22, 1967. *

Similar Documents

Publication Publication Date Title
CN108661646A (en) A kind of false top house column type shrink afterwards filling mining method
RU2537711C1 (en) Erection of tunnels in structurally unstable soils with karst phenomena and/or boil processes
RU1788253C (en) Method for erection of temporary mobile roofing from level pillar in mining mineral deposits
RU2315867C2 (en) Method for thick steeply inclined coal seam excavation
RU2007577C1 (en) Method of guarding of workings in heaving soils
RU2263213C1 (en) Method for thick steeply inclined fire-hazardous bed mining with caving
RU2444624C1 (en) Method of full development of gently sloping coal beds with power-driven systems without any preparatory mine workings
RU2011824C1 (en) Method for mining thick steep coal seams under fires on upper horizon
RU2069758C1 (en) Method for support of extraction drifts
SU1696722A1 (en) Method of erection of dismantling room
SU989083A1 (en) Method of driving large-section workings
SU1129354A1 (en) Method of underground working of mineral deposits
RU2327036C2 (en) Excavation method of thick formations of mineral resources
RU2183746C2 (en) Method of driving mine workings in mining of flat-lying coal seams
SU1504349A1 (en) Method of supporting underground working
RU2042032C1 (en) Method for support of mine workings
RU2215146C1 (en) Method of salt deposit mining
SU1092246A1 (en) Method of consolidating slopes
RU1830417C (en) Method of hydro-isolation and consolidation of mountain-mass while tunneling
SU1446307A1 (en) Method of creating artificial roof in mining coal seams in horizontal layers in descending order
SU617601A1 (en) Method of drawing pillars at chamber-and-pillar system of mining minerals
SU688631A1 (en) Monolithic concrete roof support
SU1745940A1 (en) Method of erecting supporting pillar
SU1550150A1 (en) Method of matching vertical shaft to horizontal workings
SU1624161A1 (en) Method of developing thick sloping coal seams