SU639993A1 - Casing pile - Google Patents

Casing pile

Info

Publication number
SU639993A1
SU639993A1 SU762343838A SU2343838A SU639993A1 SU 639993 A1 SU639993 A1 SU 639993A1 SU 762343838 A SU762343838 A SU 762343838A SU 2343838 A SU2343838 A SU 2343838A SU 639993 A1 SU639993 A1 SU 639993A1
Authority
SU
USSR - Soviet Union
Prior art keywords
pile
casing pile
casing
foundations
immersed
Prior art date
Application number
SU762343838A
Other languages
Russian (ru)
Inventor
Виктор Васильевич Гритчин
Анатолий Афанасьевич Шафоростов
Original Assignee
Gritchin Viktor V
Shaforostov Anatolij A
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gritchin Viktor V, Shaforostov Anatolij A filed Critical Gritchin Viktor V
Priority to SU762343838A priority Critical patent/SU639993A1/en
Application granted granted Critical
Publication of SU639993A1 publication Critical patent/SU639993A1/en

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Description

(54) СВАЯ-ОБОЛОЧКА(54) COIL ENVIRONMENT

4 вечномерзлого грунта. После погрул ени  сваи-оболочки на требуемую глубину внутренний и внешний кольцевые зазоры между стволом / и поверхностью грунта заполн ют раствором, например цементным .4 permafrost. After the pile shell is immersed to the required depth, the inner and outer annular gaps between the barrel / and the soil surface are filled with a solution, for example, cement.

Описываемую сваю целесообразно выполн ть составной из набора унифицированных железобетонных труб длиной 3-6 м, причем отдельные секции последовательно стыковать по мере погружени  сваи в грунт.It is advisable to perform the described pile as a composite of a set of standardized reinforced concrete pipes 3–6 m long, with the individual sections sequentially joining as the pile is immersed in the ground.

Использование предлагаемой конструкции сваи-оболочки позволит сократить трудозатраты и сроки возведени  свайных фундаментов в услови х вечной мерзлоты.The use of the proposed pile shell design will reduce the labor costs and the timing of the construction of pile foundations in permafrost conditions.

Claims (2)

1.Костерив Э. В. Основани  и фундаменты . М., «Высша  школа, 1966 с. 228-229.1. Costeriv E. V. Foundations and Foundations. M., “Higher School, 1966 p. 228-229. 2.Патент США № 2023966, кл. 61-50, опублик. 1935.2. US patent number 2023966, cl. 61-50, published. 1935. Фиг.22
SU762343838A 1976-04-05 1976-04-05 Casing pile SU639993A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU762343838A SU639993A1 (en) 1976-04-05 1976-04-05 Casing pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU762343838A SU639993A1 (en) 1976-04-05 1976-04-05 Casing pile

Publications (1)

Publication Number Publication Date
SU639993A1 true SU639993A1 (en) 1978-12-30

Family

ID=20655579

Family Applications (1)

Application Number Title Priority Date Filing Date
SU762343838A SU639993A1 (en) 1976-04-05 1976-04-05 Casing pile

Country Status (1)

Country Link
SU (1) SU639993A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4680063A (en) * 1986-08-13 1987-07-14 The United States Of America As Represented By The Secretary Of The Air Force Method for refining microstructures of titanium ingot metallurgy articles
GB2429229A (en) * 2005-08-18 2007-02-21 Seacore Ltd Methods and apparatus for the installation of foundation piles
GB2444411A (en) * 2006-12-05 2008-06-04 Fugro Seacore Ltd Pile installation method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4680063A (en) * 1986-08-13 1987-07-14 The United States Of America As Represented By The Secretary Of The Air Force Method for refining microstructures of titanium ingot metallurgy articles
GB2429229A (en) * 2005-08-18 2007-02-21 Seacore Ltd Methods and apparatus for the installation of foundation piles
GB2444411A (en) * 2006-12-05 2008-06-04 Fugro Seacore Ltd Pile installation method

Similar Documents

Publication Publication Date Title
SU639993A1 (en) Casing pile
SE8601994L (en) CISTER FOR LIQUID OR GAS, MADE OF ARMED CONCRETE
JPS5526378A (en) Method of foundation construction of soft ground
SU586235A1 (en) Reinforced-concrete pile
JPS57158436A (en) Method of construction of precast concrete underground room
JPS56111725A (en) Constructing method for strip footing by using existing concrete pile
SU688556A1 (en) Method of erecting pile foundation for building or structure
JPS61113920A (en) Draining method by use of water permeable concrete
GB1424112A (en) Method and apparatus for producing sub-aqueous and other cast-in- place concrete structures in situ
SU753988A1 (en) Method of erecting prefabricated pile in soil
JPS5568931A (en) Construction of block piled retaining wall and block
SU1728493A1 (en) Lining of shaft
JPH0247153Y2 (en)
SU666247A1 (en) Method of erecting foundation on unsteady soil
SU1430463A1 (en) Method of constructing cast-in-place piles
Graham Early Exploration of Tell el-Fûl
JPS5724733A (en) Basement construction method
GB866664A (en) A new or improved method of fabricating foundations and foundations so produced
JPS57143016A (en) Construction of retaining wall built with hoop steel acting as guide
JPS6439421A (en) Anti-earthquake and water proof construction of underground structure
JPS55165308A (en) Constructing method for underground dam
JPS56150222A (en) Construction of marine structure
FR2455654A1 (en) Anchoring structures on the sea-bed - using system with few structural elements
JPS55122926A (en) Construction method of underground structure
JPS5768415A (en) Ground improving method