SU628269A1 - Erecting device - Google Patents

Erecting device

Info

Publication number
SU628269A1
SU628269A1 SU762340709A SU2340709A SU628269A1 SU 628269 A1 SU628269 A1 SU 628269A1 SU 762340709 A SU762340709 A SU 762340709A SU 2340709 A SU2340709 A SU 2340709A SU 628269 A1 SU628269 A1 SU 628269A1
Authority
SU
USSR - Soviet Union
Prior art keywords
frame
mounting
installation
elements
grip
Prior art date
Application number
SU762340709A
Other languages
Russian (ru)
Inventor
Владилен Евгеньевич Сно
Original Assignee
Центральный Научно-Исследовательский И Проектный Институт Типового И Экспериментального Проектирования Зданий Торговли, Общественного Питания, Бытового Обслуживания И Туристских Комплексов
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Центральный Научно-Исследовательский И Проектный Институт Типового И Экспериментального Проектирования Зданий Торговли, Общественного Питания, Бытового Обслуживания И Туристских Комплексов filed Critical Центральный Научно-Исследовательский И Проектный Институт Типового И Экспериментального Проектирования Зданий Торговли, Общественного Питания, Бытового Обслуживания И Туристских Комплексов
Priority to SU762340709A priority Critical patent/SU628269A1/en
Application granted granted Critical
Publication of SU628269A1 publication Critical patent/SU628269A1/en

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

Изобретение относитс  к области строительства , преимущественно каркасно-чта епьных зданий.FIELD OF THE INVENTION The invention relates to the field of construction, primarily frame-to-floor buildings.

{ вестей рамно-шарнирный индикатор дл  монтажа колонн и ригелей каркаса{message frame-hinged indicator for mounting columns and frame beams

многоэтажного здани , устанавл таемый на перекрытие и включающий, пространственные подкгости с захватами дл  выверки , монтажные площадки и подвижную индикаторную раму с щарнирно соединенным между собой продольными и поперечными балками, имеющими фиксирующие приспособлени  колонн и ригелей fll.multi-storey building, installed on the overlap and including, spatial podggosti with grips for alignment, mounting platforms and a moving indicator frame with pivotally interconnected longitudinal and transverse beams with fixing devices columns and girders fll.

Недостатком известного решени   вл етс  то, что при монтаже многоэтажных вертикальных строительных элементов рамно-щарнирный индикатор принимает вид многоэтажной бащни той же высоты , что требует больших затрат металла Кроме того, при извлечении рамно-шарнирного индикатора нарушаетс  точность установки смонтированных элементов,A disadvantage of the known solution is that when mounting multi-storey vertical building elements, the frame-hinged indicator takes on the form of a multi-storey bashni of the same height, which requires large metal costs. Moreover, when removing the frame-hinged indicator, the installation accuracy of the mounted elements

Наиболее близким техническим решением к описываемому изобретению  вл етс  кондуктор дл  установки в проектThe closest technical solution to the described invention is a jig for installation in a project

ное положение т желых много русных стоек (колонн).The position of the heavy multi-racks (columns).

Этот кондуктор состоит из пространственной жесткой рамы и смонтированных на ней установочного и фиксирующего захватов с подвижными упорами. Пространственна  жестка  рама выполнена консопь ной в горизонтальной и вертикальной ппоскост х , установлена по оси колонн и обеспечивает поворот в горизонтальной плоскости. Монтажные работы ведутс  рабочими сверху на раме, снабженной дн  безопасности площадками и .сетчатым ограждением .This jig consists of a rigid spatial frame and mounting and fixing grips mounted on it with movable stops. The spatial rigid frame is made consoles in the horizontal and vertical positions, mounted along the axis of the columns and ensures rotation in the horizontal plane. Installation work is carried out by workers on the top of the frame, equipped with safety platforms and a net fence.

Недостатком указанного кондуктора  вл етс  то, что закреппенне пространстпенной жесткой между колоннами затрудн ет Монтаж элементов перекрытий и запопнени , расположенных ниже кондуктора по оси копонн.The disadvantage of this conductor is that the fixation of the space-hard space between the columns makes it difficult to install the floor and ceiling elements located below the conductor along the axis of the cylinders.

Claims (2)

Кроме того, коисопьное крепление кондуктора требует значительных размеров поперечного речени  копонн, а больша  высота сечени  пространственной жесткой рамы и необход11мость поворота концу к3 тора при его сн тии требует больших высот этажей. Цепь изобретени  - повышение точности установки элементов и уменьшение металлов мкости устройства, Постовленна  цель достигаетс  тем, что рама в поперечном направлении выполнена коробчатой с наружными ребрами на стенках у ее торцов и снабжена шарнирно закрепленными на ней дополнитель ным установочным захватом, причем фик сируюишй   установочные захваты смонти рованы на раме с одной стороны. Дополнительный установочный захват может быть выполнен коробчатого сечени  с раструбом, Рама может быть выполнена составно из секций, соединенных между собой посредством фланцев ы может быть снабжена роликами, прикрепленными к ее днишу На фиг, 1 показано устройство дл  мо тажа сбоку; на фиг. 2 - то же, вид свер ху} на фиг 3, 4 и 5 - поперечные paapeaj по установочным и фнксирукшим захватам Устройство ОЛЯ монта ла многоэтажны вертикальных строительных элементов, преимущественно каркасно-панепьного зда ни , содержит раму 1, выполненную в поперечном направлении коробчатой, на .. концах которой смонтированы фиксирующий 2 и установочный 3 захваты. Рама 1 снабжена шарнирно закрепленным на ней дополнительным установочным захва том 4. Все захваты выполнены с подвижными упорами 5 и смонтированы на раме 1 с одной стороны (фиг, 2). Раму 1 монтируют на двух выверенны и окончательно закрепленных многоэтажных вертикальных, строительных элементах б с помошыо подвижных упоров 5 ус тановочных захватов 3 и 4, На противоположном конце рамы 1 при помощи фиксирующего захвата 2 устанавливают , временно закрепл ют, ф ксируют и привод т в проектное положесируют и привод т в проектное по ложеиие монтируемый многоэтажный вертикаль ный строительный элемент 7. Пр  закреплении установочных 3 и 4   фиксируюшего 2 захватов выдвигают стопоры 8 в нижней част  рамы 1, установке рамы 1 краном сверху на концевую часть 9 многоэтажных вертнкапьны} строительных элементов 6, выступающую над перекрытием 1О верхнего этажа, дополнительный установочный захват 4, снабженный направл ющим .распрубом 11, упираетс  в торец кониеBofl част  9 ппитой-аиафрагмой 12(фнг, З) Ппнта-лиафрагма 12 имеет отверстие 13 с нанесенными на ее кромках осевы- 69 мн рисками дл  совмещени  с осевыми рисками, нанесенными на торце концевой части 9. Дл  установки рамы 1 на перекрытие 14 одного из этажей она снабжена роликами 15, прикрепленными к днищу 16 рамы 1, Захваты 3 и 4 выполн ют разъемными , а дд  фиксировани  вертикального положени  рамы 1 используют регулируемые винтовые упоры 17. Рама 1 состоит из жестка св занных между собой днища 16 и стенок 18 и 19, снабженных наружными ребрами 20 торцов и в местах фланцев. Днище 16 рамы 1 обеспечивает ее геометрическую неизмен емость в горизонтальной плоскости, а стенки 18 и 19 - в вертикальной. Внутренн   полость рамы 1 служит монтажным ходовым мостиком , а ее стенки-зашитным ограждением. Рама 1 может быть выполнена составной из секций, соединенных между собой посредством фланцев 2О, средн   секци  - вставка 21 служит дл  изменени  размеров рамы при различных величинах пролетов U и L 2 . Дл  уменьшени  длины пролета на модульный размер, например , в примыкании к темперагурно осадочному шву, к наружным ребрам 20 . на стенках 18 и торцевой секции 22 рамы 1 временно устанавливают сьемный фиксирующий захват со смешением его 1М модульный размер. Монтаж элемента 7 выполшоот в следующей последовательности. После закреплени  рамы 1 в пролете 1«(фиг, 1, 2) к элементам 6, к фиксируюшему захвату консольно выступакущей части рамы 1 пролета Цл краном подвод т устанавливаемый элемент 7, ажимают его подвижными упорами 5 и о разметочным рискам вывод т в верикальное проектное положение. бое работы по установке, выверке и , uu.ui |jnc; п акреплению элемента 7 ведут монтажни-; акреплению элемента 7 , наход щиес  во внутренней полости амы 1, служащей монтажным ходовым остиком. Возможность подхода моитажников епосредственно к месту фиксации и выерки устанавливаемого элемента 7 поэо )Шет сократить сроки монтажа в сох- аивть точность установки многоэтажых вертикальных эпементов перекрыти  заполнени  каркаса. Возможность поачи элементов перекрыти  и заполнени  одной из боковых сторон позволит сокатить трудозатраты на их монтаж. S62 -- Формула изобретен 1, Устройство дл  монтажа многоэтаж ных вертикальных строительных элементов , преимущественно каркасно-панельного .здани , содержащее раму, смонтированные на ее концах фнксируюший и установочный захваты с подвижными упорами, отличаюшеес  VeM, что, с цепью повышени  точности установки элементов и уменьшени  металлоемкости уст ройства, рама в поперечном сечении выполнена коробчатой с наружными ребрами на стенках у ее торцов и снабжена шарнирно- закрепленным на ней дополнительным установочным захватом, причем фиксиигюший и установочные захваты смонтированы на раме с одной стороны .In addition, the co-installation of the conductor requires a significant cross-section of the coponn, and the large sectional height of the rigid spatial frame and the need to turn the end of the torch to the end of k3 when it is removed requires large heights of floors. The chain of the invention is an increase in the accuracy of the installation of elements and the reduction of the metal of the device's reservoir. The purpose of the goal is to ensure that the frame in the transverse direction is made boxed with external fins on the walls at its ends and provided with an additional mounting grip hinged to it, and fixing the mounting grips on the frame on one side. Additional installation grip can be made of a box section with a socket, the Frame can be made of sections that are interconnected by means of flanges and can be equipped with rollers attached to its bottom. Fig. 1 shows a device for stretching from the side; in fig. 2 - the same, top view in figs 3, 4 and 5 - transverse paapeaj according to the installation and flexural grips. The OLE device mounted multi-storey vertical building elements, mainly of frame-pandeen building, contains frame 1, made in the transverse direction box-shaped, at the ends of which are mounted fixing 2 and adjusting 3 grips. The frame 1 is equipped with an additional adjusting gripper 4 hinged on it. All the grippers are made with movable stops 5 and mounted on the frame 1 on one side (FIG. 2). Frame 1 is mounted on two aligned and finally fixed multi-storey vertical building elements using movable stops 5 of setting grippers 3 and 4. At the opposite end of frame 1, fixing 2 is fixed, temporarily fixed, fastened and brought to the design end The mounted multi-storey vertical building element 7 is placed and brought into the design according to the designations. When fixing the mounting 3 and 4 fixed 2 grippers, they move the stoppers 8 into the lower part of the frame 1, install the frame 1 cranes On top of the end part 9 of multi-storey turnpins} of building elements 6, protruding above the overlap 1O of the upper floor, an additional installation grip 4, equipped with a guide pipe 11, abuts the butt of the end portion 9 of the food with aperture 12 (FNG, 3). 12 has an aperture 13 with axial-axis risks deposited on its edges to be combined with axial risks applied at the end of the end part 9. For mounting frame 1 on the overlap 14 of one of the floors it is provided with rollers 15 attached to the bottom 16 of frame 1, Grips 3 and 4 vol. The screws are detachable, and the fixing of the vertical position of the frame 1 uses adjustable screw stops 17. Frame 1 consists of rigidly interconnected bottoms 16 and walls 18 and 19, provided with external ribs 20 ends and in the flanges. The bottom 16 of the frame 1 ensures its geometrical immutability in the horizontal plane, and the walls 18 and 19 in the vertical one. The internal cavity of the frame 1 serves as an assembly running bridge, and its walls are a protective barrier. The frame 1 can be made of composite sections interconnected by means of flanges 2O, the middle section — the insert 21 serves to change the dimensions of the frame at various spans U and L 2. To reduce the length of the span by a modular size, for example, at the junction with the temperature of the sedimentary seam, to the outer ribs 20. On the walls 18 and the end section 22 of the frame 1, a removable fixing grip is temporarily installed with its 1M modular size mixed. The installation of the element 7 is performed in the following sequence. After fixing the frame 1 in span 1 "(Fig, 1, 2) to the elements 6, the fixed element 7 is attached to the locking grip of the cantilever projecting part of the frame 1 span Tsl with a crane, they are pressed by the movable stops 5 and the marking risks are position. combat installation, reconciliation and, uu.ui | jnc; mounting element 7 are mounting; the fastening element 7, located in the internal cavity of ama 1, which serves as a mounting travel axle. The possibility of approaching the co-workers directly to the place of fixation and dredging of the installed element 7 of the poto) Shet shortens the installation time to ensure the accuracy of the installation of the multi-storey vertical elements of overlapping the frame filling. The possibility of overlapping the elements of overlapping and filling one of the sides will allow reducing the labor costs for their installation. S62 - Formula invented 1, Device for mounting multi-storey vertical building elements, mainly frame-panel building, containing a frame, mounted on its ends, fitting and mounting grippers with movable stops, characterized by VeM, which, with a chain of increasing the accuracy of installation of elements and reduce the metal consumption of the device, the frame in cross section is made box-shaped with external ribs on the walls at its ends and is provided with an additional mounting grip hinged to it, iigyushy and mounting clamps are mounted on the frame with one hand. JJ //// V.V. / 2. Устройство по п,1, отличаю е ё с   тем, что, дополнительный тановочный захват выполнен коробчато сечени  с раструбом. 3.Устройство по П.1, о т п н ч в ю ее с   тем, что рама выполнена соовной из секций, соединенных между сопосредством фланцев. 4.Устройство по п. 1, о т л и ч а ю е е с   тем, что к днищу рамы прик пены ролики. Источники информации, прин тые во мание при экспертизе: 1.Авторское свидетельство СССР 253341, кл. JE 04 Q 21/26, 19б4. / 2. The device according to claim 1, is distinguished by the fact that the additional fitting grip is made of a box section with a socket. 3. The device according to Clause 1, about t p h h in it, so that the frame is made co-wise of the sections connected between the flanges. 4. The device according to claim 1, of which there are rollers to the bottom of the frame. Sources of information taken in the examination: 1. The author's certificate of the USSR 253341, cl. JE 04 Q 21/26, 19b4. 2.Авторское свидетельство СССР 183920, кл. Е 04 Q 21/18, 1964.2. Authors certificate of the USSR 183920, cl. E 04 Q 21/18, 1964. 2121 ././ tete efS.3efS.3 XX Фае ЛFaye L
SU762340709A 1976-03-31 1976-03-31 Erecting device SU628269A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU762340709A SU628269A1 (en) 1976-03-31 1976-03-31 Erecting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU762340709A SU628269A1 (en) 1976-03-31 1976-03-31 Erecting device

Publications (1)

Publication Number Publication Date
SU628269A1 true SU628269A1 (en) 1978-10-15

Family

ID=20654456

Family Applications (1)

Application Number Title Priority Date Filing Date
SU762340709A SU628269A1 (en) 1976-03-31 1976-03-31 Erecting device

Country Status (1)

Country Link
SU (1) SU628269A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2540602C2 (en) * 2013-06-18 2015-02-10 Общество с ограниченной ответственностью "Научно-производственная Компания Информационные Системы и Компьютерные Технологии" (ООО "Компания ИНКОМТЕХ") Technological complex for erection of hydraulic engineering work

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2540602C2 (en) * 2013-06-18 2015-02-10 Общество с ограниченной ответственностью "Научно-производственная Компания Информационные Системы и Компьютерные Технологии" (ООО "Компания ИНКОМТЕХ") Technological complex for erection of hydraulic engineering work

Similar Documents

Publication Publication Date Title
CN108797379B (en) Synchronous construction method for variable-spacing double-frame bridge by adopting segment assembly bridge girder erection machine
CN107201719B (en) Viaduct anti-collision wall template hoisting transfer machine and anti-collision wall construction method
NO153146B (en) DEVICE FOR CONNECTING SUCH CONCRETE BLOCKS INTENDED FOR AA LIMIT DRIVING ROADS, PARKING PLACES AND SIMILAR
SU628269A1 (en) Erecting device
US4577727A (en) Scaffold for the construction of round buildings of concrete or the like
US3089217A (en) Equipment for concrete building construction
JPS6041165B2 (en) Equipment for cantilevering bridge structures made of reinforced concrete or prestressed concrete into sections.
SU1521705A1 (en) Device for securing ballast on portal with inclined pillars
JPH0372165A (en) Lifting fixture
US4269442A (en) Roof truss suspension
SU1761916A1 (en) Formwork for erecting monolithic wall
SU579392A1 (en) Suspended scaffolds for erection work
SU838072A1 (en) Jig for erecting lift shafts
SU979601A1 (en) Sliding form for erecting ferroconcrete structures with reinforcement framework
SU586261A1 (en) Jig for assembling beam-type construction elements
JPS621910A (en) Working vehicle for repairing bridge and its construction
SU366260A1 (en) ADAPTATION DEVICE FOR INSTALLATION
SU885415A1 (en) Unit for mounting the members of bridge span structure
SU727732A1 (en) Steel-ferroconcrete span structure of railway bridge
SU512982A1 (en) Device for mounting bridge cranes
SU717249A1 (en) Suspended roof
JPH0244966Y2 (en)
SU905474A1 (en) Arrangement for securing multilevel cradle of hoistable vessel
JPS62129406A (en) Method for bending novement of moving scaffold
SU916721A1 (en) Mounted device for provisional attachment of wall panel top