SU601351A1 - Composite pile - Google Patents

Composite pile

Info

Publication number
SU601351A1
SU601351A1 SU762364176A SU2364176A SU601351A1 SU 601351 A1 SU601351 A1 SU 601351A1 SU 762364176 A SU762364176 A SU 762364176A SU 2364176 A SU2364176 A SU 2364176A SU 601351 A1 SU601351 A1 SU 601351A1
Authority
SU
USSR - Soviet Union
Prior art keywords
pile
foundations
elements
piles
level
Prior art date
Application number
SU762364176A
Other languages
Russian (ru)
Inventor
Вадим Николаевич Голубков
Юрий Федорович Тугаенко
Николай Петрович Ли
Анатолий Павлович Ткалич
Original Assignee
Одесский Инженерно-Строительный Институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Одесский Инженерно-Строительный Институт filed Critical Одесский Инженерно-Строительный Институт
Priority to SU762364176A priority Critical patent/SU601351A1/en
Application granted granted Critical
Publication of SU601351A1 publication Critical patent/SU601351A1/en

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Description

(54) СБОРНАЯ СВАЯ(54) TEAMWEAR

Изобретение относитс  к строительству, а нмеННО к воЗВедению свайиых фундаментоз зда нй и сооружений, преимущественно, s услови х слабых грунтов. Известны сваи повышенной иесущей способности , напри.мер короткие железобетонные сваи 1. Ири погружении таких свай не создаетс  эффективного уплотнени  грунта, в св зи с чем их несуща  спосо-бность не используетс  ПОЛНОСТЫО. Иаиболее близким решением к изобретению но технической сущности и достлгаемому результату  вл етс  сборна  сва , включающа  элементы призматической формы, объединенные между собой св з ми в уровне головы сваи и скошенные IB нижней части 2. Элементы оваи соединены шарнир-но и плотно прилегают друг к другу. Недостатко.м известной сваи  вл етс  переунлотнение грунта во внутрисвайном пространстве , возникающее при ее забив ке из-за плотного прилегани  элементов, соединенных в пакет. Ие полностью используетс  сопротивление боковой чтоверхности элементов сваи. Целью изобретени   вл етс  по;вышение несущей способности оваи. Указанна  цель достигаетс  тем, что в известной сборнои свае, включающей, элементы призматической формы, объединенные между собой св з ми в уровне головы сваи и окошенные в нижней части, элементы сваи в плаще расположены по окружности и размещены друг относительно друга с зазором в уровне головы свап. Длина окошенной части .может быть Д зы:оты элгме;та. На фиг. 1 изображена аредлсженна  сва , вид сверху; на фиг. 2 - разрез .4-.1 фиг. 1. Сбор а  ова  содержит элементы /, выполненные в в.иде плоского кли1на, И меющего в поперечном сечении форму пр моугольника, соединенные крепежными детал м; 2 и 3 в виде гибких св зей, например eтaлл Iчecкими стержн ми, причем диаметр стержней 3, ра сположенных у начала сужени , значительно меньше диаметра стержней 2, расположенных у головы сваи. Металличес-кие стержни 2 и 3 креп тс  с элементам) / при сварки. Работает сва  следующим образом. При погружении сва вокруг каждого элемента создаетс  зона уплот;{ени . При олределенко величигге уплотнени  прунта происходит разрыв нижних металлических стержней 3, что вызывает раздв Ж1ку элементов в радиаль-ном направлении, в уже уплотненном грунте, что, в овою очередь, позвол ет увеличить объем зоны уплот е.ни .The invention relates to the construction and, nevertheless, to the construction of pile foundations of buildings and structures, mainly, s conditions of weak soils. Piles of increased load-carrying capacity are known, for example, short reinforced concrete piles 1. Iri immersion of such piles does not create an effective compaction of the soil, and therefore their carrying capacity is not used COMPLETELY. The closest solution to the invention, but to the technical essence and the result achieved, is a collective pile, including elements of a prismatic form, interconnected by links in the level of the pile head and skewed IB of the lower part 2. The elements of the joint are connected to each other . A disadvantage of the known pile is the reinitialization of the soil in the infill area, which occurs when it is clogged due to the tight fit of the elements connected in the package. It completely utilizes the lateral resistance of the surface of the pile elements. The aim of the invention is to increase the carrying capacity of ovai. This goal is achieved by the fact that in a well-known assembled pile, including prismatic elements, interconnected by links in the level of the pile head and slanted in the lower part, the elements of the pile in a raincoat are located around the circumference and placed swap The length of the skewed part. Can be D Threat: oty elgme; that. FIG. 1 shows a top view of the pile; in fig. 2 shows a section .4-.1 of FIG. 1. The collection contains elements /, made in the form of a flat wedge, and the cross-sectional shape of the cross section, connected by fasteners; 2 and 3 in the form of flexible links, for example etallic rods, with the diameter of the rods 3, located at the beginning of the narrowing, much smaller than the diameter of the rods 2 located at the pile head. Metal rods 2 and 3 are attached to the elements) / during welding. Works as follows. When a pile is immersed, a compaction zone is created around each element; {en. When the Olitedenko pin of the rod compresses, the lower metal rods 3 break, which causes the elements to split in a radial direction, in the soil already compacted, which, in turn, increases the volume of the compaction zone.

Материалоемкость при сохра ненин высокой несущей опособности предлагаемых свай, в сравнеиии с известными, значительно уменьшаетс , так на оди.н элемент при высоте его 2,0 Л1 приходитс : объем бетона 0,07 лг, вес арматуры кг; sec элеме} та 60- 180 кг.The material consumption with the preserved high bearing capacity of the proposed piles, in comparison with the known ones, is significantly reduced, so one element at a height of 2.0 L1 is: concrete volume 0.07 lg, reinforcement weight kg; sec element 60–180 kg.

Это, ;в свою очередь, приводит к уменьшению стоиМОСти преалагаемой сборлой сваи.This, in turn, leads to a decrease in the cost of the pile that was collected.

П(ри1меиение предлагаемых свай позвол ет увеличить несущую снособиость единицы объема бетона на 40-70% по сравнению с известными конструкци ми.II (The design of the proposed piles allows an increase in the bearing capacity of a unit volume of concrete by 40-70% compared with the known structures.

Claims (2)

1. Сборна  сва , включающа  элементы приз,матической формы, объединенные между собой св з ми в уровне головы сваи и скошенные :в нижней части, о т л и ч а ю ш а   с   тем, что, с целью повышени  несущей способности , элементы сваи в плане расположены по окружности и размещены друг относительно друга с зазором в уровне головы сваи.1. A composite pile, including elements of a prize, of a mathematical form, interconnected by links in the level of the pile head and beveled: at the bottom, in order to increase the bearing capacity, the elements piles in the plan are located around the circumference and placed relative to each other with a gap in the level of the pile head. 2. Сборна  сва  но и. 1, отличающа /42. Collection and pile. 1, different / 4 скошенной части ра:виаbeveled ra: via с   тем, что дли:на высоты элеМента.due to the fact that: at the height of the element. И-сточникл информации, прин тые во вн мание при экспертизе:A source of information taken into account in the examination: 1.Далматов Б. И. и др. Проектирование свайных фундаментов в услови х слабых грунтов. Л., Стройиздат, 1975, с. 14, фиг. 1.5.1. B.I. Dalmatov and others. Designing pile foundations in conditions of weak soils. L., Stroyizdat, 1975, p. 14, FIG. 1.5. 2.Голубков В. Н. и др. Полевые исследовани  развити  деформаций в основани х козловых и нира-мидальных свай. «Основашш и фундашенты, вып. 8, 1975, «Будивельник, с. 44-48.2. Golubkov V.N. and others. Field studies of the development of deformations in the foundations of gantry and niramidal piles. “Foundations and Foundations, vol. 8, 1975, “Budivelnik, p. 44-48. иг. /ig. / V// ffy7// ; /// :SSy//. Фиг. 2V // ffy7 //; ///: SSy //. FIG. 2
SU762364176A 1976-05-26 1976-05-26 Composite pile SU601351A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU762364176A SU601351A1 (en) 1976-05-26 1976-05-26 Composite pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU762364176A SU601351A1 (en) 1976-05-26 1976-05-26 Composite pile

Publications (1)

Publication Number Publication Date
SU601351A1 true SU601351A1 (en) 1978-04-05

Family

ID=20662759

Family Applications (1)

Application Number Title Priority Date Filing Date
SU762364176A SU601351A1 (en) 1976-05-26 1976-05-26 Composite pile

Country Status (1)

Country Link
SU (1) SU601351A1 (en)

Similar Documents

Publication Publication Date Title
US3706204A (en) Method and apparatus for improving bearing strength of piles in permafrost
US3352120A (en) Reinforced concrete pile
SU601351A1 (en) Composite pile
JP2000136541A (en) Liquefaction preventing construction method
SU939649A1 (en) Foundation
JPH01290824A (en) High horizontal bearing force foundation method using solidification process
CN206503171U (en) Concrete-pile
US3735595A (en) Reinforced soil bridge
US5934840A (en) Excavation support structure
RU2032021C1 (en) Pile of landslide-prevention structures, used on soft grounds
SU1043263A2 (en) Foundation
SU1168648A1 (en) Method of concreting massive concrete structures
JPS6319340A (en) Collecting pile
SU870584A1 (en) Precast pile
RU202787U1 (en) CHAMMED SLEEPER FOUNDATION
SU1060762A2 (en) Foundation
JPS6128624A (en) Slope-stabilizing construction
CN213743448U (en) Steel plate-steel truss combined reinforcing structure of shield tunnel
SU897959A1 (en) Pile foundation
SU1116120A1 (en) Counter-landslide arrangement
SU1308708A1 (en) Pile
RU2023110C1 (en) Driven pile
SU896189A1 (en) Foundation for buildings and structures
SU1178847A1 (en) Pile foundation
JPS61158511A (en) Soft ground improving pile formed by composite material and improving method thereof