SU1178847A1 - Pile foundation - Google Patents

Pile foundation Download PDF

Info

Publication number
SU1178847A1
SU1178847A1 SU843751322A SU3751322A SU1178847A1 SU 1178847 A1 SU1178847 A1 SU 1178847A1 SU 843751322 A SU843751322 A SU 843751322A SU 3751322 A SU3751322 A SU 3751322A SU 1178847 A1 SU1178847 A1 SU 1178847A1
Authority
SU
USSR - Soviet Union
Prior art keywords
pile
section
size
cross
construction
Prior art date
Application number
SU843751322A
Other languages
Russian (ru)
Inventor
Алексей Алексеевич Ковалевский
Original Assignee
Дальневосточный научно-исследовательский институт по строительству
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Дальневосточный научно-исследовательский институт по строительству filed Critical Дальневосточный научно-исследовательский институт по строительству
Priority to SU843751322A priority Critical patent/SU1178847A1/en
Application granted granted Critical
Publication of SU1178847A1 publication Critical patent/SU1178847A1/en

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

СВАЙНЫЙ ФУНДАМЕНТ, включающий расположенные р дами на рассто нии друг от друга клиновидные сваи, отличающийс  тем, что, с цепью сокращени  материалоемкости и трудозатрат при возведении и ускорени  сроков строительства, сваи расположены на рассто нии друг от друга, равном от 1,3 (D + et) до 5 (+Ф , где D-размер наибольшей стороны поперечного сечени  сваи, в уровне верхнего торца, (L - размер стороны поперечного сечени  сваи в уровне нижнего торца. S 00 4 Pile foundation, including wedge-shaped piles located apart from each other, characterized in that, with the chain of reduction of material intensity and labor costs during the construction and acceleration of construction time, the piles are located at a distance from each other equal to 1.3 (D + et) to 5 (+ F, where D is the size of the largest side of the pile cross section, at the level of the upper end, (L is the size of the cross section of the pile at the level of the bottom end. S 00 4

Description

1 11 Изобретение относитс  к строительству , а именно к способам возведени  многор дных фундаментов из кли новидных свай. Целью изобретени   вл етс  сокращение материалоемкости и трудозатрат при возведении и ускорении сроков строительства. На фиг. 1 изображена клиновидна  сва , две стороны которой параллельны , а две другие образуют с централь ной осью сваи угол ot на фиг.2 разрез А-А на фиг. 1,на йиг. 3 конфигураци  уплотненной зоны грунта в горизонтальных сечени х, полученJ на  в опытах; на фиг. 4 - расположение клиновидных свай в фундаменте. Свайный фундамент содержит клиновидные сваи 1, расположенные на рассто нии друг от друга, равном от 1,3(Т)-к1)до 5(Dtct), гдеП -размер;; наибольшей стороны поперечног-Ъ сечени  сваи в уровне верхнего торца;d- размер стороны поперечного сечени  сваи в уровне нижнего торца. 72 Возведение свайного фундамента осуществл ют следующим образом. На строительной площадке разбивают свайное поле и осуществл ют забивку клиновидных свай 1, причем рассто ние между ос ми сваи должно быть не менее 1,3 D+ёi}в двух взаимно перпендикул рных направлени х , при этом вдоль наклонных граней сваи формируютс  плотные грунтовые  дра 2, раздвигающие в горизонтальных сечени х грунт в сторону параллельных ее граней, образу  при этом своды уплотненного грунта 3, а вдоль параллельных граней формируютс  зоны 4 с плотностью, близкой к первоначальной. Снижение трудозатрат и материалоемкости достигаетс  равномерным распределением внешней нагрузки ,за счет приближени  работы с грунтом основани  каждой сваи, вход щей в состав свайного фундамента, к работе одиночной сваи.1 11 The invention relates to the construction, in particular to methods for constructing multi-foundation foundations from wedge-shaped piles. The aim of the invention is to reduce the consumption of materials and labor during the construction and acceleration of construction time. FIG. 1 shows a wedge-shaped pile, the two sides of which are parallel, and the other two form with the central axis of the pile an angle ot in FIG. 2, section A-A in FIG. 1, on yig. 3 configuration of the compacted soil zone in horizontal sections, obtained in experiments; in fig. 4 - the location of the wedge-shaped piles in the foundation. The pile foundation contains wedge-shaped piles 1 located at a distance from each other, equal from 1.3 (T) -K1) to 5 (Dtct), where P is the size ;; the largest side of the cross section of the pile section in the upper end; d is the size of the cross section of the pile in the level of the lower end. 72 Construction of the pile foundation is carried out as follows. A pile field is broken at the construction site and wedge-shaped piles 1 are driven in, the distance between the axes of the pile must be at least 1.3 D + ei} in two mutually perpendicular directions, and dense soil cores are formed along the inclined faces of the pile 2, spreading the soil in horizontal sections in the direction of its parallel faces, thus forming arches of compacted soil 3, and zones 4 with density close to the original are formed along the parallel faces. The reduction of labor costs and material consumption is achieved by a uniform distribution of the external load, due to the approach to the work with the ground of the base of each pile, which is part of the pile foundation, to the work of a single pile.

« /"/

1.(Р)1. (P)

фиг. 3FIG. 3

ШSh

VV

+.+.

(риг.(rig.

Claims (1)

СВАЙНЫЙ ФУНДАМЕНТ, включающий расположенные рядами на расстоянии друг от друга клиновидные сваи, отличающийся тем, что, с целью сокращения материалоемкости и трудозатрат при возведении и ускорения сроков строительства, сваи расположены на расстоянии друг от друга, равном от 1,3 (D + ct) до 5 (D+d) , где D-размер наибольшей стороны попе речного сечения сваи, в уровне верхнего торца, cL ~ размер стороны поперечного сечения сваи в уровне нижнего торца.PILED FOUNDATION, including wedge-shaped piles arranged in rows at a distance from each other, characterized in that, in order to reduce material consumption and labor costs during the construction and accelerate the construction period, the piles are located at a distance from each other equal to 1.3 (D + ct) to 5 (D + d), where D is the size of the largest side of the cross section of the pile, at the level of the upper end, cL is the size of the side of the cross section of the pile at the level of the lower end. <Риг.1<Riga 1
SU843751322A 1984-03-28 1984-03-28 Pile foundation SU1178847A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU843751322A SU1178847A1 (en) 1984-03-28 1984-03-28 Pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU843751322A SU1178847A1 (en) 1984-03-28 1984-03-28 Pile foundation

Publications (1)

Publication Number Publication Date
SU1178847A1 true SU1178847A1 (en) 1985-09-15

Family

ID=21123127

Family Applications (1)

Application Number Title Priority Date Filing Date
SU843751322A SU1178847A1 (en) 1984-03-28 1984-03-28 Pile foundation

Country Status (1)

Country Link
SU (1) SU1178847A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Временные технические указани по проектированшо, и устройству фундаментов из плоскопрофилированных свай. - вен 66.21.04-75, М., 1975, с. 6. *

Similar Documents

Publication Publication Date Title
ATE76152T1 (en) BUILDING CONSTRUCTION WITH HIGH EXPLOSION AND PERFECTION RESISTANCE.
US4503649A (en) Modular block structures for breakwaters, harbor dams and the like
GB1417352A (en) Foundations
SU1178847A1 (en) Pile foundation
DE3176958D1 (en) Multi-purpose precast concrete panels, and methods of constructing concrete structures employing the same
SU711237A1 (en) Foundation
SU1435710A1 (en) Foundation of building or structure
SU796316A1 (en) Foundation
SU903484A1 (en) Method of reinforcing foundation
GB2018854A (en) Block foundations for brick walls
ES2021033B3 (en) STRUCTURE AND METHOD TO STABILIZE LAND IN SLOPE.
SU937617A1 (en) Pile foundation
SU1663127A1 (en) Device for stabilizing of slopes
SU876859A1 (en) Foundation
SU1747608A2 (en) Landslide protection structure
SU1395734A1 (en) Block for construction of hydraulic structures of pier,jetty,weir types
SU1395767A1 (en) Pile foundation
SU1236064A1 (en) Base under foundation of earthquake-proof building or structure
SU1234523A1 (en) Driven block of strip foundation
SU375348A1 (en) FOUNDATION FOR BUILDINGS AND CONSTRUCTIONS
SU1745818A1 (en) Landslide-protection construction
SU720095A1 (en) Slope consolidation lining
SU1247445A1 (en) Gravity structure
SU601351A1 (en) Composite pile
SU653340A1 (en) Pile foundation