SU522759A1 - Способ образовани м.и.циферова выработок в земной поверхности - Google Patents
Способ образовани м.и.циферова выработок в земной поверхностиInfo
- Publication number
- SU522759A1 SU522759A1 SU1920252A SU1920252A SU522759A1 SU 522759 A1 SU522759 A1 SU 522759A1 SU 1920252 A SU1920252 A SU 1920252A SU 1920252 A SU1920252 A SU 1920252A SU 522759 A1 SU522759 A1 SU 522759A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- rocket
- force
- earth
- workings
- mine
- Prior art date
Links
- 238000000034 method Methods 0.000 title description 4
- 230000015572 biosynthetic process Effects 0.000 title 1
- 230000003245 working effect Effects 0.000 title 1
- 239000000446 fuel Substances 0.000 description 6
- 239000011435 rock Substances 0.000 description 3
- 239000007789 gas Substances 0.000 description 2
- 235000015842 Hesperis Nutrition 0.000 description 1
- 235000012633 Iberis amara Nutrition 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000005273 aeration Methods 0.000 description 1
- 230000001174 ascending effect Effects 0.000 description 1
- 238000002485 combustion reaction Methods 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 230000001902 propagating effect Effects 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 239000004449 solid propellant Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000002912 waste gas Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/88—Dredgers; Soil-shifting machines mechanically-driven with arrangements acting by a sucking or forcing effect, e.g. suction dredgers
- E02F3/90—Component parts, e.g. arrangement or adaptation of pumps
- E02F3/92—Digging elements, e.g. suction heads
- E02F3/9206—Digging devices using blowing effect only, like jets or propellers
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/14—Drilling by use of heat, e.g. flame drilling
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Physics & Mathematics (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
- Earth Drilling (AREA)
Description
стенками ракеты и выработкой должен составл ть приблизительно половину наибольшего диаметра ракеты.
При небольшом весе ракеты и ее горючего относительно реактивной струи, дерютвующей на забой, целесообразно сформировать дополнительную газодинамическую струю, истекающую в направлении, противоположном движению ракеты и увеличивающую усилие прижати ракеты к забою.
При большом весе ракеты и ее горючего относительно силы струи, действующей на забой , целесообразно сформировать дополиительную газодинамическую струю, распростран ющуюс в наиравлеиии, совпадающем с движением ракеты, дл создани дополнительного усили , способствующего удержанию ракеты над забоем.
Па фиг. 1 схематически изображена ракета дл бурени скважим в земной поверхности; на фиг. 2 - приспособление дл определени рассто ни от сопла до забо ; иа фиг. 3 - полон ение ракеты в скважине при проходке; на фиг. 4 - положение ракеты в начале работы при горизоитальной проходке; на фиг. 5 - разрез по А-А на фиг. 4.
Предлагаемый способ может быть реализован с использованием любой, известной в насто щее врем , твердотопливной ракеты.
Однако дл обеспечени наилучших условий дл осуществлени способа целесообразно использовать специальную ракету, изображенную на фиг. 1.
Ракета / имеет корпус 2 с камерой 3 сгорани , в которой расположены топливные элементы 4.
Ракета / имеет рабочий орган 5, снабженный соплом 6, под действием истекающей из которого газодинамической струи происходит разрушение забо .
Перед запуском ракету / устанавливают на некотором рассто нии от поверхности 7 забо , как показано на фиг. 1, и удерншвают с иомощью зажимов 8. Соило 6 должно быть расположено ка таком рассто нии от поверхности забо , ири котором в процессе работы ракеты сумма внешних сил, действующих на нее, равна иулю. Теоретически величииа / может быть оиределеиа из следующих соображений . В момент запуска на рабочий орган 5 ракеты / воздействуют усили PI веса, веса р.) ее топлива, реактивной силы РЗ газодинамической струи, истекающей из сопла ракеты /, силы Р противодавлени , возникающего между носовой частью ракеты и забоем. Таким образом, должио соблюдатьс условие:
Pi-ffa-/о-/ 0.
В этом равгпстве
зел;1Ч1;;1ы силы иротиоорассто ии /. а остальдавлени завис т от ные величины - от класса ракеты, т. е. имеюцих одинаковое усилие т ги и собственный обе. Следовательно, дл соблюдени указанного равенства необходимо выбрать раесто ние таким, чтобы сопло находилось на таком рассто нии от поверхности забо , при котором во врем работы ракеты сумма реактивной силы газодинамической струи и силы противодавлени , возникающего между носовой частью ракеты и забоем, уравновещивалась силами иермещени ракеты к поверхности забо , в данном случае силами Pi + P.
В каждом конкретном случае дл ракет задаиного класса величииа / может быть определена экспериментально с помощью нрисиособлени , показанного на фиг. 2.
Это приспособление имеет масивиое стальное основание 9, на котором вертикально размещена металлическа труба 10, имитирующа скважину. На ракете / закреплен стержень //, а на трубе 10 - рейка 12. Ракету / устанавливают иа некотором рассто нии от основани 9 и заиускают. После вхождени двигател ракеты в расчетный режим ракета стабилизируете в некотором положении. По положению стержн // относительно рейки 12 определить рассто ние от сопла 6 ракеты до основани 9. Это рассто ние ири использовании других ракет этого класса может быть прин то за эталонное. Проведенные экеперимеиты показывают, что это рассто ние / должно сотавл ть не менее четырех диаметров среза забойного сопла 6 ракеты.
Таким образом, при соблюдении указанного услови в первый момент после запуска ракета / будет находитьс во взвенюином состо нии относительно забо . Под действием газодинамической струи, истекающий из сопла 6 и воздействующей иа забой, происходит разрушение породы и формирование скважииы . Движеиие ракеты / в сторону забо , как это видно на фиг. 3, нри проходке скважины в нап)авлении к центру Земли, происходит под действием сил прижати ракеты в иаиравлеиии к забою, тогда как реактивна сила газодинамической струи стремитс вынести ракету из сквал ины. Поэтому необходимо, чтобы сила прижати ракеты к забою несколько превышала реактивную силу газодинамической струи. Этой си;10Й пpижaтн i ракеты / к забою вл етс сумма веса l() ракеты и топлива, котора должна превышать т гу ракеты.
При движении ракеты в скважиие по вл етс дополнительное усилие, стрем щеес вытолкнуть ракету из скважины. Это усилие возникает за счет сил трени о корпус ракеты / частиц породы и потока отработаиного газа газодинамической струи. Поэтому иеобходимо силз переме1цени ракеты к забою, в данном случае всей ракеты и горючего, выбрать такими, чтобы их сумма превышала сумму реактивной силы и сил трени о кориус восход щего иотока, содержащего частииы породы и отработанный газ, отход шие в зазор между корпусом ракеты и выработкой. Дл обеспечени устойчивой работы ракеты в скважиие целесообразно, чтобы зазор между корпусом ракеты и стенкой скважины был . , .ov noro a ..eftvve ь в „ ,еВьУ n 0, 5Si-r 3 P« poS5;; - O- ..p.ccsa- - ,.,, ;««, ,У 1V-, йен. f ...... .:Ss:;.s ... F2 .„«ettVift . npo%o -W,,г-геет g vyj -„ rnV30 tsTOO № „пОТЙОШ. . ,,, ее O врабо - o° ..ttU Lnact, ro- „гл ботта , 423..-,„.::;.: от%оЯ5 «u to кКей из tU I;olьзoв f /v..eeт в .енно i..:cr г .S. . s s- - Pi - 6bV : i-mtii . s/ Ра,« , ог , п носовое . в .vn, -еко 5бо;о, «W, 5 « ™S «lero . 2: Sri5aS ъ 1. t/j rf йс5 ;-sr;« чгс:; «0% , оеГ о.: «30 S;«f f-f ос«:- Ро.„ ;„-Г«5. ЯОГ( ОДйЛйсь в асгд .,«д о г;л- х . aS ра;,е,, с особ „7° «а р., сос то . Резе Jsij J „7 ..i7««,,coc.,-;2.. с со;, ;г :5-- «о„7п « ал ,/, ijfa . Х555 Ь 3т .е . УВелиг йад 5 T-if. OJO и Сп п, .... Фоп,.:.- -(-З, , со1..РУ;о, e.-, -tsfFs .
Priority Applications (10)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU1920252A SU522759A1 (ru) | 1973-06-07 | 1973-06-07 | Способ образовани м.и.циферова выработок в земной поверхности |
DE19732350422 DE2350422C3 (de) | 1973-06-07 | 1973-10-08 | Verfahren zur Herstellung von Bohrungen im Erdreich |
US404911A US3917007A (en) | 1973-06-07 | 1973-10-10 | Method of sinking holes in earth{3 s surface |
CA183,236A CA1004663A (en) | 1973-06-07 | 1973-10-12 | Method of sinking holes in earth's surface |
IT41664/73A IT997412B (it) | 1973-06-07 | 1973-10-15 | Procedimento per la trivellazione di fori nella superficie del terre no |
ZA738005A ZA738005B (en) | 1973-06-07 | 1973-10-15 | Method of sinking holes in earth's surface |
AU61663/73A AU478555B2 (en) | 1973-10-22 | Method of sinking holes in earths surface | |
GB5313673A GB1443343A (en) | 1973-06-07 | 1973-11-15 | Method of sinking holes in the earths surface |
DD176807A DD114846A1 (ru) | 1973-06-07 | 1974-02-26 | |
FR7410351A FR2232670B1 (ru) | 1973-06-07 | 1974-03-26 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU1920252A SU522759A1 (ru) | 1973-06-07 | 1973-06-07 | Способ образовани м.и.циферова выработок в земной поверхности |
Publications (1)
Publication Number | Publication Date |
---|---|
SU522759A1 true SU522759A1 (ru) | 1977-03-05 |
Family
ID=20553113
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU1920252A SU522759A1 (ru) | 1973-06-07 | 1973-06-07 | Способ образовани м.и.циферова выработок в земной поверхности |
Country Status (8)
Country | Link |
---|---|
US (1) | US3917007A (ru) |
CA (1) | CA1004663A (ru) |
DD (1) | DD114846A1 (ru) |
FR (1) | FR2232670B1 (ru) |
GB (1) | GB1443343A (ru) |
IT (1) | IT997412B (ru) |
SU (1) | SU522759A1 (ru) |
ZA (1) | ZA738005B (ru) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2593504C1 (ru) * | 2015-03-04 | 2016-08-10 | Николай Евгеньевич Староверов | Окопокопатель |
RU2822246C2 (ru) * | 2022-12-05 | 2024-07-03 | Игорь Владимирович Догадкин | Способ уничтожения воздушно-подземной цели ракетой |
Families Citing this family (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2307118A1 (fr) * | 1975-04-11 | 1976-11-05 | Ts Geofizichesky Trest | Dispositif pour le percement du sol |
DE2709437C2 (de) * | 1977-03-04 | 1982-09-09 | Messerschmitt-Bölkow-Blohm GmbH, 8000 München | Verfahren zum Herstellen von Bohrungen in Kohleflözen |
FR2600373B1 (fr) * | 1986-06-23 | 1989-04-28 | Briggs Technology Inc | Procede et appareil pour creuser le sol et analogue, utilisant un gaz envoye a une vitesse supersonique |
US4923019A (en) * | 1989-02-28 | 1990-05-08 | Arctic Systems Limited | Thermochemical penetrator for ice and frozen soils |
US5022470A (en) * | 1989-06-28 | 1991-06-11 | Ocean Systems Research, Inc. | Autonomous rapid thermal ice penetrating method and system |
AUPN703195A0 (en) * | 1995-12-08 | 1996-01-04 | Bhp Australia Coal Pty Ltd | Fluid drilling system |
US20020043404A1 (en) * | 1997-06-06 | 2002-04-18 | Robert Trueman | Erectable arm assembly for use in boreholes |
US6231270B1 (en) * | 1999-05-27 | 2001-05-15 | Frank Cacossa | Apparatus and method of installing piles |
AU5440401A (en) * | 2000-04-13 | 2001-10-30 | Kayoshi Tsujimoto | Equipments for excavating the underground |
AUPR886401A0 (en) * | 2001-11-14 | 2001-12-06 | Cmte Development Limited | Fluid drilling head |
AU2002952176A0 (en) | 2002-10-18 | 2002-10-31 | Cmte Development Limited | Drill head steering |
RU2457311C1 (ru) * | 2011-02-15 | 2012-07-27 | Общество с ограниченной ответственностью "Реактивное бурение" | Способ образования скважин и выработок в горных породах |
RU2455449C1 (ru) * | 2011-02-15 | 2012-07-10 | Общество с ограниченной ответственностью "Реактивное бурение" | Способ разработки месторождения полезного ископаемого |
US9169695B1 (en) * | 2015-04-22 | 2015-10-27 | OEP Associates, Trustee for Oil exploration probe CRT Trust | Oil exploration probe |
US10955264B2 (en) | 2018-01-24 | 2021-03-23 | Saudi Arabian Oil Company | Fiber optic line for monitoring of well operations |
US10883810B2 (en) | 2019-04-24 | 2021-01-05 | Saudi Arabian Oil Company | Subterranean well torpedo system |
US10995574B2 (en) | 2019-04-24 | 2021-05-04 | Saudi Arabian Oil Company | Subterranean well thrust-propelled torpedo deployment system and method |
US11365958B2 (en) | 2019-04-24 | 2022-06-21 | Saudi Arabian Oil Company | Subterranean well torpedo distributed acoustic sensing system and method |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2882016A (en) * | 1953-05-19 | 1959-04-14 | Union Carbide Corp | Thermal mineral piercing employing a free suspension blowpipe |
US2935303A (en) * | 1957-01-15 | 1960-05-03 | Union Carbide Corp | Thermal rock piercing control apparatus |
US3093197A (en) * | 1958-12-09 | 1963-06-11 | Union Carbide Corp | Method and apparatus for thermally working minerals and mineral-like materials |
US3216320A (en) * | 1962-07-09 | 1965-11-09 | Harvey Aluminum Inc | Apparatus for excavating by means of explosives |
US3207238A (en) * | 1962-08-06 | 1965-09-21 | Bucyrus Erie Co | Thermal piercing control |
US3482640A (en) * | 1968-04-29 | 1969-12-09 | Browning Eng Corp | Blast hole drilling method |
US3620313A (en) * | 1969-10-27 | 1971-11-16 | Pulsepower Systems | Pulsed high-pressure liquid propellant combustion-powered liquid jet drills |
-
1973
- 1973-06-07 SU SU1920252A patent/SU522759A1/ru active
- 1973-10-10 US US404911A patent/US3917007A/en not_active Expired - Lifetime
- 1973-10-12 CA CA183,236A patent/CA1004663A/en not_active Expired
- 1973-10-15 ZA ZA738005A patent/ZA738005B/xx unknown
- 1973-10-15 IT IT41664/73A patent/IT997412B/it active
- 1973-11-15 GB GB5313673A patent/GB1443343A/en not_active Expired
-
1974
- 1974-02-26 DD DD176807A patent/DD114846A1/xx unknown
- 1974-03-26 FR FR7410351A patent/FR2232670B1/fr not_active Expired
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2593504C1 (ru) * | 2015-03-04 | 2016-08-10 | Николай Евгеньевич Староверов | Окопокопатель |
RU2822246C2 (ru) * | 2022-12-05 | 2024-07-03 | Игорь Владимирович Догадкин | Способ уничтожения воздушно-подземной цели ракетой |
RU2822247C2 (ru) * | 2022-12-05 | 2024-07-03 | Игорь Владимирович Догадкин | Способ уничтожения воздушно-подземных целей ракетами, отделяемыми от ракеты-носителя |
RU2822245C2 (ru) * | 2022-12-05 | 2024-07-03 | Игорь Владимирович Догадкин | Способ уничтожения подземных целей ракетами, отделяемыми от ракеты-носителя |
RU2822289C2 (ru) * | 2022-12-05 | 2024-07-03 | Игорь Владимирович Догадкин | Способ уничтожения подземной цели ракетой |
RU2824408C1 (ru) * | 2023-10-02 | 2024-08-07 | Игорь Владимирович Догадкин | Способ уничтожения цели ракетой |
Also Published As
Publication number | Publication date |
---|---|
CA1004663A (en) | 1977-02-01 |
FR2232670A1 (ru) | 1975-01-03 |
US3917007A (en) | 1975-11-04 |
DE2350422B2 (de) | 1976-02-26 |
ZA738005B (en) | 1974-09-25 |
DD114846A1 (ru) | 1975-08-20 |
IT997412B (it) | 1975-12-30 |
DE2350422A1 (de) | 1975-01-02 |
GB1443343A (en) | 1976-07-21 |
FR2232670B1 (ru) | 1976-12-17 |
AU6166373A (en) | 1975-04-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU522759A1 (ru) | Способ образовани м.и.циферова выработок в земной поверхности | |
US4123975A (en) | Penetrating projectile system and apparatus | |
US10180030B2 (en) | Ram accelerator system | |
AP880A (en) | Method and apparatus for controlled small-charge blasting of hard rock and concrete by explosive pressurisation of the bottom of a drill hole. | |
RU2427707C2 (ru) | Способ увеличения добычи метана из угленосной свиты посредством быстрого окисления (варианты) | |
DE69125010T2 (de) | Verfahren und gerät zum kontrollierten zerbrechen von hartem kompakten gestein und von betonmaterialien | |
GB1534663A (en) | Method and device for breaking a hard compact material | |
US3318395A (en) | Method and apparatus for cutting a hole in the wall of a well | |
CA3020652C (en) | Ram accelerator system with baffles | |
AU2020101246A4 (en) | A Flexible Energy-Gathered Blasting Cutting Pipe Device and Its Application Method | |
US7681504B2 (en) | Method and apparatus for displacing material and projectile thereof | |
Blomshield et al. | High pressure pulsed motor firing combustion instability investigations | |
CN2276559Y (zh) | 射孔—高能气体压裂装置 | |
Dally et al. | Fracture control in construction blasting | |
GB1275264A (en) | Drilling short bore-holes | |
Schmidt et al. | In Situ Testing of Well-Shooting Concepts | |
RU2001268C1 (ru) | Скважинный скалолом | |
SU1051184A1 (ru) | Устройство дл бестраншейной прокладки трубопроводов | |
Lu et al. | Optimization of the contour blasting during rock slope excavation at the Three Gorges Project | |
Blomshield et al. | Pulsed motor firings-Pulse amplitude, formulation, and enhanced instrumentation | |
CN209556989U (zh) | 一种高孔密射孔弹 | |
RU2060446C1 (ru) | Скважинный заряд | |
SU1470972A1 (ru) | Способ предотвращени выбросов угл и газа в подготовительных выработках | |
RU2077649C1 (ru) | Устройство для бурения сопряженных шпуров | |
Nakamura et al. | 18 FRACTURE CONTROL TECHNIQUES FOR PARTIAL DEMOLITION OF CONCRETE BY BLASTING |