SU498344A1 - Device for controlling the level of the charge in the bunker of the sintering machine - Google Patents

Device for controlling the level of the charge in the bunker of the sintering machine

Info

Publication number
SU498344A1
SU498344A1 SU2015263A SU2015263A SU498344A1 SU 498344 A1 SU498344 A1 SU 498344A1 SU 2015263 A SU2015263 A SU 2015263A SU 2015263 A SU2015263 A SU 2015263A SU 498344 A1 SU498344 A1 SU 498344A1
Authority
SU
USSR - Soviet Union
Prior art keywords
charge
bunker
level
sintering machine
controlling
Prior art date
Application number
SU2015263A
Other languages
Russian (ru)
Inventor
Владимир Михайлович Денисенко
Виктор Михайлович Громовенко
Всеволод Иванович Плескач
Кирилл Андреевич Шумилов
Original Assignee
Институт Автоматики
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Институт Автоматики filed Critical Институт Автоматики
Priority to SU2015263A priority Critical patent/SU498344A1/en
Application granted granted Critical
Publication of SU498344A1 publication Critical patent/SU498344A1/en

Links

Landscapes

  • Filling Or Emptying Of Bunkers, Hoppers, And Tanks (AREA)

Description

барабана-окомковател  на его вход. Соотношение между расходами шихты, поступающей на челноковый питате;1ь и возвращаемой на вход окомковател , устанавливают, нсход  из дианазона регул ировани , - нример} о 4:1.drum-pelletizer at its entrance. The ratio between the charge of the charge fed to the shuttle pitate; 1b and returned to the input of the pelletizer is determined from the adjustment of the dianazone, for example 4: 1.

Уровень шихты в бункере 9 измер етс  датчиком уровн  10, выходной сигнал которого сравниваетс  с сигналом задатчика 11, и разностный сигнал иодаетс  на вход регул тора 4 дл  соответствующего изменени  производительности питател  2, а также иа вход регул тора 16, который носредством иснолнительного механизма 15 унравл ет положением делител  потока 13. Дл  повышени  точности изменени  положени  органа распределени  применена обратна  св зь от преобразовател  14. Это позвол ет исключить транспортное запаздывание тракта питатель 2 - весоизмеритель 5 - барабан-окомкователь 7. Так, например, при уменьшении уровн  шнхты в бункере 9 разностный сигнал задатчика и датчика уровн  увеличиваетс  и регул тор 4 выдает команду на увеличение расхода шихты, выдаваемой питателем 2. Наличие , однако, значительного траиспортного запаздывани  приводит к тому, что расход окомкованной шихты на выходе барабанаокомковател  7, а следовательно, и на входе бункера 9 увеличитс  только спуст  врем  запаздывани . Это увеличивает врем  переходного процесса или делает систему полностью неработоспособной.The charge level in the hopper 9 is measured by a level sensor 10, the output signal of which is compared with the signal of the setting device 11, and the differential signal is fed to the input of the controller 4 for a corresponding change in the performance of the feeder 2, as well as the input of the controller 16, which is used as an additional mechanism 15 The position of the flow divider 13 is used. To improve the accuracy of the change in the position of the distribution body, feedback from the converter 14 is applied. This eliminates the transport delay of the path. Feeder 2 is a weight measure Tel 5 is a pelletizer 7. Thus, for example, when the level of the shnchta in the bunker 9 decreases, the differential signal of the setter and the level sensor increases and the regulator 4 issues a command to increase the charge flow supplied by the feeder 2. The presence of, however, significant transport lag leads to the fact that the consumption of the pelletized mixture at the outlet of the drum 7, and consequently, at the entrance of the bunker 9, will only increase after the delay time. This increases the transient time or makes the system completely inoperative.

Врем  транспортного запаздывани  полностью исключаетс  в предлагаемом устройстве , так как при уменьшении уровн  шихты по вл етс  сигнал ,на входе регул тора 16,The transport lag time is completely eliminated in the proposed device, since as the charge level decreases, a signal appears at the input of the controller 16,

который носредством исполнительного механизма 15 измен ет положение делител  потока 13 двухрукавного бункера шихты 12 таким образом, чтобы увеличить расход шихты подаваемой в бункер 9 посредством питател  8. При этом расход шихты, подаваемый устройством траиспортировани , имеющим значительно меньшее транспортное запаздывание, на вход барабана-окомковател , соответствующим образом уменьшаетс , что обеспечивает стабилизацию степени заполнени  барабана-окомковател .which, by means of the actuator 15, changes the position of the flow divider 13 of the two-arm hopper of charge 12 in such a way as to increase the charge consumption supplied to the bunker 9 by means of feeder 8. At the same time, the charge flow supplied by the transporting device, which has a much smaller transport delay, to the input of the drum-pellet machine , is reduced accordingly, which ensures stabilization of the degree of filling of the drum-pelletizer.

Применение нредлагаемого устройства в агломерационном производстве позволит повысить точность стабилизации уровн  шихты в бункере агломашины, обеспечива  ее бесперебойную загрузку качественной шихтой.The use of the proposed device in sinter production will improve the accuracy of stabilization of the charge level in the sintering machine bunker, ensuring its uninterrupted loading with a high-quality charge.

Фор;мула изобретени Fore; Mule Invention

Устройство дл  регулировани  уровн  шихты в бункере агломерационной машины, содержащее приводной питатель с регул тором , весоизмеритель, расположенный в загрузочной части, барабан-окомкователь и челноковый питатель бункера, отличающийс  тем, что, с целью повышени  точности и улучшени  качества регулировани , между разгрузочной частью барабана-окомковател  иA device for adjusting the level of the charge in the sintering machine's hopper, comprising a drive feeder with a regulator, a weighing device located in the loading part, a drum-pelletizer and a shuttle hopper feeder, characterized in that, in order to improve the accuracy and improve the quality of regulation, between the discharge part of the drum -combuster and

Челноковым питателем установлен двухрукавный бункер шихты, снабженный делителем потока материала, соединенным через исполнительный механизм с регул торо.м, при этом под одним из рукавов распределител  размещен конвейер питани  барабана-окомковател .The shuttle feeder is equipped with a two-arm charge bunker, equipped with a material flow divider connected through an actuator to the regulator, while the feed drum of the pelletizer is placed under one of the distributor sleeves.

/7/ 7

УгUg

Г2G2

SU2015263A 1974-04-12 1974-04-12 Device for controlling the level of the charge in the bunker of the sintering machine SU498344A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU2015263A SU498344A1 (en) 1974-04-12 1974-04-12 Device for controlling the level of the charge in the bunker of the sintering machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU2015263A SU498344A1 (en) 1974-04-12 1974-04-12 Device for controlling the level of the charge in the bunker of the sintering machine

Publications (1)

Publication Number Publication Date
SU498344A1 true SU498344A1 (en) 1976-01-05

Family

ID=20581722

Family Applications (1)

Application Number Title Priority Date Filing Date
SU2015263A SU498344A1 (en) 1974-04-12 1974-04-12 Device for controlling the level of the charge in the bunker of the sintering machine

Country Status (1)

Country Link
SU (1) SU498344A1 (en)

Similar Documents

Publication Publication Date Title
JPS6428123A (en) Closed loop regulator for powder flow rate
GB1183083A (en) Simplified Automatic Charging System for Blast Furnaces
SU498344A1 (en) Device for controlling the level of the charge in the bunker of the sintering machine
US4029365A (en) Method for feeding powdered material
US3113576A (en) Cigarette making machine
SU421365A1 (en)
SU831690A1 (en) Device for automatic distribution of loose materials among apparatus
SU908701A1 (en) Method of control of loading belt conveyer
SU451745A2 (en) The method of regulating the production of pellets
SU876758A1 (en) Device for automatic composing of agglomeration charge
SU656660A1 (en) Method of automatic control of loading a mill with ore
SU932265A1 (en) Method of weighing-batching of loose material and loose material weigher-batcher
SU850586A1 (en) Method and device for automatic control of soda monohydrate production process in drum crystallizer
SU527600A1 (en) Continuous dosing method
SU1102749A1 (en) Method of filling the hoppers of milling units with ore
SU777464A1 (en) Continuous-action mass batchmeter
SU870468A2 (en) Device for control of charge level in bunker of agglomeration machine
SU954421A1 (en) Apparatus for batching charge materials
SU657850A1 (en) Apparatus for automatic control of disintegration process in cement mill,including introduction of surfactant
SU996481A2 (en) Apparatus for controlling batch level in hopper of sintering machine
SU1225508A1 (en) Method of fodder distributor
SU1655573A1 (en) Loading control device for crusher
SU929720A1 (en) Control system for charge loading onto agglomeration belt
SU942861A1 (en) System for automatic controlling mouldability of moulding sands
SU81051A1 (en) Belt weigher for bulk materials