SU417630A1 - - Google Patents

Info

Publication number
SU417630A1
SU417630A1 SU1618882A SU1618882A SU417630A1 SU 417630 A1 SU417630 A1 SU 417630A1 SU 1618882 A SU1618882 A SU 1618882A SU 1618882 A SU1618882 A SU 1618882A SU 417630 A1 SU417630 A1 SU 417630A1
Authority
SU
USSR - Soviet Union
Prior art keywords
arch
excavation
metal
invert
carrying
Prior art date
Application number
SU1618882A
Other languages
Russian (ru)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to SU1618882A priority Critical patent/SU417630A1/ru
Application granted granted Critical
Publication of SU417630A1 publication Critical patent/SU417630A1/ru

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Description

1one

Способ предназначен дл  проведений горизонтальных И «ажлонных (до 18°) горных -выработок с обратным СВОДОМ, закрепленных лгеталлобетонной или металлической крепью.The method is intended for carrying out horizontal and "ajlone (up to 18 °) mining operations with inverse ARCH fixed with metal-concrete or metal support.

Известны способы проведени  горных выработок с обратнЫМ -сводом, которые осуществл ют полным и неполным сечением с последующей 1подрьгвкой пород обратного свода и возведением посто нной Крепи участками или по всей длине выработки.Methods are known for carrying out mine workings with reverse arch, which are carried out with a complete and incomplete cross-section, followed by 1 podrgvkoy rocks of the reverse arch and the construction of a permanent Crepe sections or along the entire length of the excavation.

При этом ПО существующей технологии работы по разрущению забо , уборке породы и сооружению обратного свода (установке металлического элемента обратного свода, его бетонированию и засыпке котлована обратного свода породой) выполн ютс  последовательно . Уборка породы из обратного свода и дальнейща  засыпка породы в «отловаи не механизированы. Скорости проведени  выработок низкие, а стои мость и трудоемкость работ высокие.At the same time, the software of the existing technology for the destruction of the slaughter, the cleaning of the rock and the construction of the return arch (the installation of the metal element of the reverse arch, its concreting and backfilling of the excavation arch of the reverse arch) are performed sequentially. Harvesting of the rock from the inverse and further backfilling of the rock in “trapped and not mechanized. The speed of workings is low, and the cost and laboriousness of work is high.

Предлагаемый способ проведени  горных выработок с обратным сводом, включающий операции разрушени  забо , уборки породы с помощью погрузочной машины и образование обратного свода выработки, отличаетс  от известного тем, что в процессе разрушени  забо  1почв у выработки выполн ют .плоской, а обратный свод возвод т с отставанием от забо  за погрузочной -манппюй одновременно с работами в забое.The proposed method of carrying out mine workings with the inverse arch, including the operations of downhole excavation, harvesting with the help of a loading machine and the formation of a reverse arch of excavation, differs from the known one in that during the destruction process the inlet mine is excavated and the reverse arch is erected lagging behind the bottom of the loading-manpuyu simultaneously with the work in the face.

Это способствует увеличенню скорости, снижению сгоимостн и трудоемкости ироходки.This contributes to an increase in speed, a decrease in the alignment and labor intensity of an irohodka.

На че1)теже 1Ю1{азано сечение выработки после закреплени  обратного свода (металлобетонной крепью.On stage 1), 1U1 {azano section of the excavation after fixing the invert (metal concrete lining).

Описываемый способ проведени  горной выработки с обратным сводом, закрепленной, например , металлобетонной или металлической крепью, заключаетс  в том, что первоначально выработку проход т с двусторонней расиэской 1 обратного свода. При этом крепь выполн ют с удлиненными металлическими стойками 2, опираюн имис  на плоскую почву 3. Соединение металлического элемента обратного свода 4 со стойками 2, бетонирование обратного свода с раскоской 1 и подсыпку котлована обратного свода породой 5 из забо  с применением погрузочной машины и перегружател  6 нроизвод т с отставанием от забо , одновременно с выполнением забойных процессов.The described method of carrying out a mine working with an invert, fixed, for example, by metal concrete or metal lining, is that the original production takes place from a two-sided rasia 1 invert. In this case, the support is made with elongated metal posts 2, resting on flat soil 3. Connecting the metal element of the invert 4 with the uprights 2, concreting the invert with the boom 1 and filling the excavation pit with the loading machine and reloader 6 production lagging behind the bottom, simultaneously with the implementation of downhole processes.

TaiKoe penienne при незначительном увеличении сечени  выработки позвол ет перейти к обычному способу проходки без сооружении обратного свода в забое. пол}1остыо механизировать погруз1;у породы из забои и засыпку котлована за счет применени  иогрузочиых машин и перегрулсателей, а также перевестиThe TaiKoe penienne, with a slight increase in the production cross section, allows one to go over to the usual method of penetration without constructing a return arch at the bottomhole. floor} means to mechanize loading1; for rock from the bottom of the hole and to fill the pit by using loading machines and reloading machines, and also to translate

выраоотки с ооратным сводом из категории трудоемких в категорию обычных выработок с улучшением технико-экономических показателей проходки.Variations with ooratovnom from the category of labor-intensive in the category of conventional workings with improved technical and economic indicators of penetration.

Предмет изобретени Subject invention

Способ Проведени  гориых выработок с обратным сводом, включающий операции разрушени  забо , уборки породы с помощью погрузочной машины и образование обратного свода выработки, отличающийс  тем, что, с целью увеличени  скорости и снижени  стоимости и трудоемкости проходки в процессе разрушени  забо , почву выра ботки выполн ют ллоской, а обратный свод возвод т с отставанием от забо  за погрузочной машиной одновременно с работами в забое.The method of carrying out excavation workings with a reverse arch, including the operations of downhole excavation, harvesting with the help of a loading machine and the formation of a reverse arch of excavation, characterized in that, in order to increase the speed and reduce the cost and laboriousness of the excavation during the destruction of the bottom, and the return arch was erected with a lag from the bottom of the loader while working in the bottomhole.

J J

SU1618882A 1971-02-12 1971-02-12 SU417630A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU1618882A SU417630A1 (en) 1971-02-12 1971-02-12

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU1618882A SU417630A1 (en) 1971-02-12 1971-02-12

Publications (1)

Publication Number Publication Date
SU417630A1 true SU417630A1 (en) 1974-02-28

Family

ID=20465254

Family Applications (1)

Application Number Title Priority Date Filing Date
SU1618882A SU417630A1 (en) 1971-02-12 1971-02-12

Country Status (1)

Country Link
SU (1) SU417630A1 (en)

Similar Documents

Publication Publication Date Title
SU417630A1 (en)
SU1472673A1 (en) Method of mining a thick steep mineral bed with goaf-filling
SU629347A1 (en) Mine working roof support
SU711292A1 (en) Method of working thick gently sloping coal beds
SU1266988A1 (en) Method of working pillars
SU989083A1 (en) Method of driving large-section workings
SU715795A1 (en) Method of mining thick sloping coal beds
RU2764510C1 (en) Method for constructing a single-vault deep-level metro station
RU2327036C2 (en) Excavation method of thick formations of mineral resources
RU2068962C1 (en) Method for vibration-borehole effect on rock to decrease the danger of release
SU887809A1 (en) Method of mining sloping and gently sloping coal beds
SU617601A1 (en) Method of drawing pillars at chamber-and-pillar system of mining minerals
SU727852A1 (en) Method of mining thick gently sloping coal seams
SU1707200A1 (en) Method of mining flat stratified deposits
SU727851A1 (en) Method of mining thick gently sloping coal seams
SU1209872A1 (en) Method of roof control in mining in gently-sloping coal seams
RU2055209C1 (en) Method for creating underground drifts such as tunnels
SU732533A1 (en) Method for mining ore deposits
SU1049666A1 (en) Method of baring and securing chamber-type workings
SU883447A1 (en) Method of working mineral deposits
SU1710763A1 (en) Method of sinking vertical shaft siding
RU2083833C1 (en) Method for development of steep coal seams with backing worked-out area
SU573596A1 (en) Method of mining ores
SU398747A1 (en) METHOD FOR DEVELOPING THE USEFUL PURCHASED
SU1362828A1 (en) Method of mining ore bodies with rock interlayers