Prior art keywords
stand
support
crane
self
hinges
Prior art date
Application number
SU1610185A
Other languages
Russian (ru)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to SU1610185A priority Critical patent/SU411028A1/ru
Application granted granted Critical
Publication of SU411028A1 publication Critical patent/SU411028A1/ru

Links

Description

1one

Крепление может найти применение при изготовлении и реконструкции самоходных самомонтирующихс  козловых кранов, используемых в строительстве на приобъектных складах, особенно при укрупнительной сборке металлоконструкций.Fastening can be used in the manufacture and reconstruction of self-propelled self-erecting gantry cranes used in construction at on-site warehouses, especially in the pre-assembly of metal structures.

Известны креплени  пролетной балки самоходного козлового крана, содержапдие шарнирное соединение балки с жесткой опорой, смонтированной на самоходной тележке, и с опорной стойкой. Шарнирное соединение пролетной балки с опорами обеспечивает балке возможность поворота в двух взаимно перпендикул рных , вертикальной и горизонтальной , плоскост х. Такие креплени  металлоемки; конструкци  крана в целом сравнительно сложна, в частности, требует две самоходные тележки, ее монтаж и демонтаж сложен.Known attachment of the span beam of a self-propelled gantry crane, content of the hinged connection of the beam with a rigid support, mounted on a self-propelled carriage, and with the support leg. The hinge connection of the flight beam with supports provides the beam with the ability to rotate in two mutually perpendicular, vertical and horizontal planes. Such fastenings are metal consuming; The design of the crane as a whole is relatively complex, in particular, requires two self-propelled carts, its installation and dismantling is complicated.

В цел х устранени  указанных недостатков пролетна  балка предлагаемого креплени  соединена с опорной стойкой через промежуточный элемент, выполненный в виде треугольной пирамиды, вершины которой снабжены попарно взаимно перпендикул рными шарнирами. Одной из пар шарниров пирамида соединена с балкой, другой - с опорной стойкой, причем втора  пара шарниров имеет возможность перемещени  относительно стойки , имеющей пазы дл  фиксации ее в заданном положении.In order to eliminate these drawbacks, the flying beam of the proposed mount is connected to the support post through an intermediate element made in the form of a triangular pyramid, the vertices of which are provided with pairs of mutually perpendicular hinges. One of the pairs of hinges is connected to a pyramid with a beam, the other with a support post, with the second pair of joints able to move relative to the stand having slots for fixing it in a predetermined position.

Кроме того, стойка снабжена подвижной относительно нее Н-образной обоймой, верхние плечи которой св заны с шарнирной парой пирамиды.In addition, the stand is equipped with an N-shaped slide that is movable relative to it, the upper shoulders of which are connected to the hinge pair of the pyramid.

Обойма имеет возможность фиксации относительно стойки посредством поворотной стопорной планки, смонтированной на обойме и взаимодействующей с соответствующими пазами опорной стойки.The yoke has the possibility of fixation relative to the stand by means of a swivel locking bar mounted on the holder and cooperating with the corresponding grooves of the supporting stand.

На фиг. 1 схематически изображепо предлагаемое крепление, вид со стороны торца пролетной балки; на фиг. 2 - разрез по А-А на фиг. 1; на фиг. 3 - вид по стрелке Б на фиг. 1 с частичным вырывом; на фиг. 4 изображен самоходный козловой кран в транспортном положении; на фиг. 5 - кран в момент монтажа опорной стойки; иа фиг. 6 показана завершающа  стади  моитажа крана. Описываемое крепление пролетной балки 1FIG. 1 shows a schematic representation of the proposed mounting, view from the end of the span beam; in fig. 2 is a section along A-A in FIG. one; in fig. 3 is a view along arrow B in FIG. 1 with partial digging; in fig. 4 shows a self-propelled gantry crane in the transport position; in fig. 5 - crane at the time of mounting the support; FIG. Figure 6 shows the final stage of the crane motive. The described attachment of the span beam 1

самоходного козлового крана к стойке 2 содерл ит промежуточный элемент, выполненный в виде треугольной пирамиды 3, вершины которой снабжены шарнирами 4 и 5. Пирамида выполнена в виде решетчатой конструкции , а шарниры попарно взаимно перпендикул рны . Шарнирами 4 пирамида соединена с пролетной балкой, шарнирами 5 через П-образпую обойму 6 - со стойкой 2. Обойма имеет возможность перемещени  вдоль стойки и фиксации в заданном положении, дл self-propelled gantry crane to the rack 2 contains an intermediate element made in the form of a triangular pyramid 3, the tops of which are equipped with hinges 4 and 5. The pyramid is made in the form of a lattice structure, and the hinges are mutually perpendicular in pairs. The hinges 4 of the pyramid are connected to the span beam, the hinges 5 through the U-shaped clip 6 - to the stand 2. The clip has the ability to move along the stand and fix in a predetermined position, for

чего на обойме смонтирована поворотна  стопорна  планка 7, а в стойке выполнены пазы 8, с которыми взаимодействует планка 7. Свободный конец стойки снабжен ходовыми колесами 9, которые в рабочем положении крана установлены на рельсовый путь 10.which on the holder is mounted a turning stop bar 7, and in the rack there are grooves 8, with which the bar 7 interacts. The free end of the rack is equipped with running wheels 9, which are mounted on the track 10 in the operating position of the crane.

Второй конец пролетной балки 1 соединен шарниром II с жесткой опорой 12, смонтированной на раме самоходной тележки 13.The second end of the passage beam 1 is connected by a hinge II with a rigid support 12 mounted on the frame of the self-propelled trolley 13.

Дл  перевода крана из транспортного положени  в рабочее вначале планируют площадку дл  укладки одной нитки рельсового пути (при наличии складских железнодорожных путей может быть использован один рельс железнодорожной колеи), а также площадку необходимой .ширины дл  движени  самоходной тележки. Рассто ние рельсового пути до оси тележки задаетс  длиной пролетной балки крана.To transfer the crane from the transport position to the working one, first plan a site for laying one line of a railway track (if there are warehouse tracks, one rail of a railway track can be used), as well as a platform of necessary width for moving a self-propelled bogie. The distance of the track to the bogie axis is specified by the length of the crane span.

После укладки рельсового пути и разметки траектории движени  тележки 13 последнюю устанавливают в направлении движени  крана и с помощью поворотной площадки разворачивают на 90° опору 12 вместе со сложенными пролетной балкой и стойкой 2. Опору фиксируют в этом положении и затем опускают конец пролетной балки. После этого устанавливает временную тросовую т гу 14 между концом стойки 2 и верхом опоры 12 и производ т выдвигание из обоймы стойки 2 до тех пор, пока колеса 9 не подойдут к рельсу и монтажна  т га 14 не будет нат нута. В этом положении фиксируют обойму 6 на стойке введением планки 7 в соответствующий паз стойки.After laying the track and marking the trajectory of movement of the trolley 13, the latter is installed in the direction of movement of the crane and using the rotary platform the support 12 with the folded beam and the support 2 is folded 90 °. The support is fixed in this position and then the end of the span is lowered. After that, it installs a temporary cable harness 14 between the end of the pillar 2 and the top of the support 12 and the rack 2 is pulled out of the cage until the wheels 9 fit the rail and the mounting cable 14 is tensioned. In this position, fix the holder 6 on the rack by inserting the strip 7 into the corresponding slot of the rack.

Затем посредством приводного винта 15 поднимают опору 12 до требуемого положени  и фиксируют ее. При этом одновременно происходит и параллельный подъем стойки 2 также до вертикального положени . После этого производ т опробование механизмов подъема груза, передвижени  грузовой тележки и хода крана.Then, by means of the driving screw 15, lift the support 12 to the desired position and fix it. At the same time, a parallel rise of the pillar 2 also occurs to the vertical position. After that, testing of the mechanisms for lifting the load, moving the trolley and moving the crane is performed.

Двойной шарнир в узле креплени  пролетной балки 1 со стойкой 2 и горизонтальный щарнир 11 в опоре балки 1 на жесткую опоруDouble hinge in the mount assembly of the span beam 1 with the stand 2 and the horizontal joint 11 in the support of the beam 1 on a rigid support

12 (над самоходной тележкой 13) уничтожают крут щие моменты, возникающие в элементах конструкции крана при его движении по неровной площадке. Это позвол ет упростить конструкцию и снизить металлоемкость крана.12 (above the self-propelled trolley 13) destroys the torques arising in the structural elements of the crane as it moves along an uneven ground. This allows to simplify the design and reduce the metal intensity of the crane.

Монтаж и демонтаж крана облегчен не только за счет соединени  стойки 2 с пролетной балкой посредством обоймы 6 и пирамиды 3, но и щарнирным соединением балки с опорой 12.Installation and disassembly of the crane is facilitated not only by connecting the rack 2 with the span beam by means of the holder 6 and the pyramid 3, but also by the hinged connection of the beam with the support 12.

Демонтаж крана и перевод его в транспортное положение осуществл етс  в обратном пор дке.The dismantling of the crane and its transfer to the transport position is carried out in the reverse order.

Предмет изобретени Subject invention

Claims (3)

1.Крепление пролетной балки самоходного козлового крана, содержащее шарнирное соединение балки с жесткой опорой, смонтированной на самоходной тележке, и с опорной стойкой, отличающеес  тем, что, с целью упрощени  конструкции и облегчени  монтажа и демонтажа крана, пролетна  балка соединена с опорной стойкой через промежуточный элемент, выполненный в виде треугольной пирамиды, верщины которой снабжены попарно взаимно перпендикул рными щарнирами , одной из пар которых она соединена с балкой, а другой - с опорной стойкой, причем втора  пара шарниров имеет возможность перемещени  относительно стойки, имеющей пазы дл  фиксации ее в заданном положении .1. The attachment of the span beam of a self-propelled gantry crane, containing a hinged beam with a rigid support mounted on a self-propelled trolley and with a support stand, characterized in that, in order to simplify the design and facilitate the installation and disassembly of the crane, the span beam is connected to the support stand through an intermediate element, made in the form of a triangular pyramid, the vertices of which are provided with mutually perpendicular pairs of hinges, one of which is connected to the beam, and the other to the support leg, the second The arra of the hinges has the ability to move relative to the rack having grooves for fixing it in a predetermined position. 2.Крепление по п. 1, отличающеес  тем, что стойка снабжена подвижной относительно нее Н-образной обоймой, верхние плечи которой св заны с шарнирной парой пираМИДЫ .2. The anchoring according to claim 1, characterized in that the stand is provided with an N-shaped slide that is movable relative to it, the upper arms of which are connected to the hinge pair of pyramids. 3.Крепление по пп. 1 и 2, отличающеес  тем, что дл  обеспечени  возможности фиксации обоймы относительно стойки на обойме смонтирована поворотна  стопорна  планка, взаимодействующа  с соответствующими пазами опорной стойки.3. Fastening on PP. 1 and 2, characterized in that in order to enable the fixing of the cage relative to the stand on the cage, a pivot lock bar is mounted cooperating with the corresponding grooves of the support stand. . : J. : J / -./ (. )../ -. / (.) .. I / 1 4J ..Xi.:.-...L.xI / 1 4J ..Xi.:.-... L.x аbut в ид Бin id B /////////- /// /// ////// /////   ///////// - /// /// //// // ///// Фиг. 4FIG. four 15721572 ГЕ31GE31
SU1610185A 1971-01-11 1971-01-11 SU411028A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU1610185A SU411028A1 (en) 1971-01-11 1971-01-11

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU1610185A SU411028A1 (en) 1971-01-11 1971-01-11

Publications (1)

Publication Number Publication Date
SU411028A1 true SU411028A1 (en) 1974-01-15

Family

ID=20463407

Family Applications (1)

Application Number Title Priority Date Filing Date
SU1610185A SU411028A1 (en) 1971-01-11 1971-01-11

Country Status (1)

Country Link
SU (1) SU411028A1 (en)

Similar Documents

Publication Publication Date Title
US20160344330A1 (en) Portable Solar Power System with Prefabricated Solar Racking
US2781108A (en) Self-erecting derrick
DE2002781A1 (en) System for transporting vehicles
US3685223A (en) Operable wall panel
DE1255902B (en) Process for erecting buildings from prefabricated space boxes
SU411028A1 (en)
US3863771A (en) Gantry cranes
CN210856954U (en) Support-free cable hoisting construction structure of steel arch center for deck arch bridge
DD244274A3 (en) GERUEST FOR REPAIR WORK ON FACADES AND ROOF ROOFS
CN109205475B (en) Device and method for assembling and disassembling girder type gantry crane in tunnel through connection of trusses
DE19704967C2 (en) Gantry crane, in particular for the construction of buildings
US3261550A (en) Tracks for railed transport systems
JPH0348247Y2 (en)
CN218759129U (en) Electric telescopic awning support and electric telescopic awning
CN217028759U (en) Turnover ladder combined type contact net overhaul ladder car
CN220747242U (en) Rail-mounted steel structure factory building
CN217924790U (en) Ladder car inspection platform
RU2806378C2 (en) Prefabricated support for power lines and method of its construction
RU2023843C1 (en) Folding shelter
CN217997830U (en) Rail mounted translation frame roof beam device
CN216866158U (en) Rainproof structure and assembly structure of rainproof structure and boiler
RU2385980C1 (en) Power-assisted bridge complex
SU765475A2 (en) Collapsible fragment of a building
DE2544631C3 (en) Stand time with roof racks movably arranged on lateral supports and a roof skin
SU408897A1 (en) TRUCK CRANE