Description
Предлагаемый полый бетонный камень , приготовл емый из гидравлических и воздушных растворов, снабжен сравнительно большим количеством параллельных цилиндрических пустот, замкнутых с одной стороны и площадью не превышающей кажда 4 кв. см. Величина рассто ни между пустотами находитс в зависимости от назначени камн и пред вл емых к нему механических и тепловых требований . Так, дл внутренних стен зданий изготовл ютс камни с равномерно распределенными вертикальными цилиндрами-пустотами, расположенными тем гуще, чем меньше этажей или нагрузок. В наружных стенах укладываетс камень, имеющий с наружной стороны плотный защитный слой от атмосферных вли ний и ударов, затем слой с густо расположенными пустота.ми, обеспечивающими нетеплопроводность, и с внутренней стороны снова плотный слой; возможно также располагать пустотыцилиндры , постепенно разрежа их к внутреннейстороне, чтобы передвинуть центр теплоемкости стены к внутренней поверхности ее. Вместе с тем, частое расположение тонких пустот трубок дает возможность притесывать камень на месте работ (например, около дверей и окон), класть перемычки и своды, и такой камень более поддаетс расчету на раздавливание по своему поперечному сечению, в зависимости от нагрузок и примен емого раствора. Предлагаемые камни с многими пустотами дают возможность применени воздущных, более дешевых растворов , благодар быстрому высущиванию камней при изготовлении и омыванию воздухом всей массы камн через пустоты. В кладке пустоты, снабжаемые с одной постели камн неполными диафрагмами, закрьюаютс вплотную раствором. Возможно также горизонтальное расположение пустот параллельно продольной оси стен. При изготовлении трубчато-пустотных камней возможно вести работу как на жидких растворах, заливаемых iB формы, снабженные вынимающимис соответственно расположенными металлическими или дерев нными стержн ми , так и при употреблении трамбованного бетона, обладающего большей прочностью, при чем последний способ работы требует меньших расходов на оборудование производства Изготовление предлагаемых полых камней из трамбованного бетона производитс в форме, изображенной на чертеже в вертикальном разрезе на фиг. 1 и в плане на фиг. 2. На вибрационной площадке J, обычной конструкции, закрепл етс семное металлическое основание 2, в которое заделаны наглухо металлические стержни 3, расположенные соответственно назначению камн . На основание 2 надеваетс дерев нна разборна форма 4 с металлическим дном 5 с просверленными отверсти ми , соответствующими расположению стержней. На форму насаживаетс семна воронка 6 из листового железа , в которую загружаетс раствор нормальной густоты, после чего вращением рычага 7, железна рама 1 с установленной на ней формой приводитс при помощи храповика 8 в сотр сательное движение. Вибраци формы заставл ет раствор зан ть все пустоты и равномерно уплотнитьс . После прекращени сотр сательных двил ений площадки / снимаетс воронка 6, заглаживаетс излишний раствор, а затем форма 4 поднимаетс и, так как стержни, зажатые уплотненным раствором, служат надежными направл ющими , то перекашивани при подеме не происходит; сам же раствор, не испытывает при освобождении пустот никаких боковых механических воздействий. Отставленна в сторону форма не тревожитс до того момента , когда раствор схватитс настолько , что можно приступить к разборке формы. В зависимости от состава раствора камень или высушиваетс , или поддерживаетс во влажном состо нии до полного затвердени . ное устройство станка с той разницей , что металлическое основание со стержн ми (щетка) конструируетс опускное. Тогда, после набивки, опускаютс стержни, а форма снимаетс с площадки без подема и отставл етс в сторону дл затвердевани . После этого основание со стержн ми снова поднимаетс , закрепл етс на уровне площадки и производитс набивка следующего камн . ческими, с одного конца диафрагмированными пустотами, отличающийс тем, что означенные пустоты имеют весьма малые размеры поперечного сечени (не свыше 4 кв. сантиметров), но устроены в гораздо большем, сравнительно с Обычным, количестве, будучи при этом или равномерно распределены в камне, или же размещены в одних част х камн чаще, чем в других . Возможно также вполне аналогичПРЕДМЕТ ПАТЕНТА. Бетонный полый камень с цилиндриThe proposed hollow concrete stone, prepared from hydraulic and air solutions, is provided with a relatively large number of parallel cylindrical voids, closed on one side and with an area not exceeding each 4 square meters. See. The distance between the voids depends on the purpose of the stone and the mechanical and thermal requirements proposed to it. Thus, for the interior walls of buildings, stones are made with evenly distributed vertical cylinders-voids, located in the thicker, the less floors or loads. A stone is laid in the outer walls, having a dense protective layer from the outside against atmospheric influences and impacts, then a layer with densely located voids that provide non-thermal conductivity, and from the inside again a dense layer; it is also possible to arrange hollow cylinders, gradually cutting them to the inner side in order to move the center of the heat capacity of the wall to its inner surface. At the same time, the frequent location of the thin voids of the tubes makes it possible to oppress the stone at the work site (for example, near the doors and windows), put lintels and arches, and this stone is more susceptible to crushing over its cross section, depending on the loads and solution. The proposed stones with many voids make it possible to use airborne, cheaper solutions, due to the rapid desiccation of stones in the manufacture and washing with air of the entire mass of stones through voids. In the masonry, voids supplied from one bed of stone with incomplete diaphragms are closed close with mortar. It is also possible horizontal arrangement of voids parallel to the longitudinal axis of the walls. In the manufacture of tubular-hollow stones, it is possible to work both on liquid solutions, poured iB forms, equipped with removable metal or wood rods, respectively, and when using tamped concrete, which has greater strength, and the latter method of operation requires less equipment costs Manufacturing The manufacture of the proposed hollow stones from tamped concrete is carried out in the form shown in the drawing in vertical section in FIG. 1 and in terms of FIG. 2. On the vibrating platform J, of a conventional construction, a seed metal base 2 is fixed, into which metal rods 3, arranged according to the purpose of the stone, are sealed tightly. A wooden folding mold 4 with a metal bottom 5 with drilled holes corresponding to the arrangement of the rods is put on the base 2. A seed iron 6 is placed on the mold, into which a solution of normal density is loaded, after which by rotation of the lever 7, the iron frame 1 with the form installed on it is driven with a ratchet 8. The mold vibration causes the solution to fill all voids and evenly compact. After the site motions have been discontinued / the funnel 6 is removed, the excess solution is smoothed, and then the form 4 rises and, since the rods clamped by the compacted solution serve as reliable guides, then skewing does not occur during lifting; the solution itself does not experience any lateral mechanical effects when emptying the voids. Putting the form aside does not worry until the moment when the solution is set so that you can begin disassembling the form. Depending on the composition of the mortar, the stone is either dried or kept wet until solidified. The machine is designed with the difference that the metal base with rods (brush) is designed to lower. Then, after packing, the rods are lowered, and the form is removed from the platform without lifting and put aside to solidify. After that, the base with the rods is raised again, fixed at the level of the platform, and the next stone is packed. diaphragmed voids at one end, characterized in that the said voids have very small cross-sectional dimensions (not more than 4 square centimeters), but are arranged in a much larger, comparatively to Normal, quantity, being at the same time or evenly distributed in the stone, or they are placed in some parts of the stone more often than in others. It may also be quite analogous to the subject matter of a patent. Concrete hollow stone with cylindrical
Ткпо-лвтогфафа сКрас ый Печапппс, Пэнинград, Шевдувароцный, 7S.Tkpo-Lvovka with the Red Pechapps, Paningrad, Shevduvarotsnyy, 7S.
фиг. I. FIG. I.
XX
..
f 5f 5
vV/vV /
фиг. 2.FIG. 2
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU2366T | 1925-01-21 |
Publications (1)
Publication Number | Publication Date |
---|---|
SU2366A1 true SU2366A1 (en) | 1927-02-28 |
Family
ID=50442759
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU1925A SU2366A1 (en) | 1925-01-21 | 1925-01-21 | Concrete hollow stone |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU2366A1 (en) |
-
1925
- 1925-01-21 SU SU1925A patent/SU2366A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3166871A (en) | Apparatus for setting a fence post in concrete | |
US2306107A (en) | Form for molding building members | |
US1945145A (en) | Method of and apparatus for compacting and dewatering cementitious mixtures | |
CN104631677B (en) | Super thick concrete hollow terrace gradation construction technology | |
CN106639349A (en) | Construction method for partial replacement of concrete column | |
US2248348A (en) | Wall construction | |
CN103276916A (en) | Constructing method and infill board for solidly sealed lightweight concrete board wall hole | |
SU2366A1 (en) | Concrete hollow stone | |
US4059376A (en) | Apparatus for moulding hydraulic cement or the like material | |
US1574565A (en) | Apparatus for molding building blocks | |
CN210791388U (en) | Cement product forming machine | |
JP6899563B2 (en) | Deterioration control method for concrete structures | |
HU206750B (en) | Method and apparatus for building the mud walls of building-structures | |
CN106393405B (en) | Make the mold of diaphragm wall and the method with the Mold Making diaphragm wall | |
RU2064410C1 (en) | Method of moulding lightened building blocks | |
US2313207A (en) | Process of molding concrete structures | |
CN108532985A (en) | Foundation beam board construction method | |
US2083593A (en) | Method of making protected piling | |
RU2766462C1 (en) | Method of erecting walls from blocks and installation for its implementation | |
CN114086561B (en) | Symmetrical backfilling and pouring method for rubble concrete on two sides of side wall of open cut tunnel | |
RU2097509C1 (en) | Shifted formwork mould for erection of wall blocks | |
US2133737A (en) | Multiple cement block forming machine and method of making hollow building blocks | |
SU392208A1 (en) | DEVICE FOR CONCRETING WELLS UNDER WATER | |
RU2064408C1 (en) | Method of moulding building blocks | |
CN115159919A (en) | Fair-faced concrete and construction process thereof |