SU2366A1 - Concrete hollow stone - Google Patents

Concrete hollow stone

Info

Publication number
SU2366A1
SU2366A1 SU1925A SU2366DA SU2366A1 SU 2366 A1 SU2366 A1 SU 2366A1 SU 1925 A SU1925 A SU 1925A SU 2366D A SU2366D A SU 2366DA SU 2366 A1 SU2366 A1 SU 2366A1
Authority
SU
USSR - Soviet Union
Prior art keywords
stone
voids
concrete hollow
hollow stone
rods
Prior art date
Application number
SU1925A
Other languages
Russian (ru)
Inventor
О.А. Вутке
А.М. Щепетов
Original Assignee
О.А. Вутке
А.М. Щепетов
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by О.А. Вутке, А.М. Щепетов filed Critical О.А. Вутке
Application granted granted Critical
Publication of SU2366A1 publication Critical patent/SU2366A1/en

Links

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Description

Предлагаемый полый бетонный камень , приготовл емый из гидравлических и воздушных растворов, снабжен сравнительно большим количеством параллельных цилиндрических пустот, замкнутых с одной стороны и площадью не превышающей кажда  4 кв. см. Величина рассто ни  между пустотами находитс  в зависимости от назначени  камн  и пред вл емых к нему механических и тепловых требований . Так, дл  внутренних стен зданий изготовл ютс  камни с равномерно распределенными вертикальными цилиндрами-пустотами, расположенными тем гуще, чем меньше этажей или нагрузок. В наружных стенах укладываетс  камень, имеющий с наружной стороны плотный защитный слой от атмосферных вли ний и ударов, затем слой с густо расположенными пустота.ми, обеспечивающими нетеплопроводность, и с внутренней стороны снова плотный слой; возможно также располагать пустотыцилиндры , постепенно разрежа  их к внутреннейстороне, чтобы передвинуть центр теплоемкости стены к внутренней поверхности ее. Вместе с тем, частое расположение тонких пустот трубок дает возможность притесывать камень на месте работ (например, около дверей и окон), класть перемычки и своды, и такой камень более поддаетс  расчету на раздавливание по своему поперечному сечению, в зависимости от нагрузок и примен емого раствора. Предлагаемые камни с многими пустотами дают возможность применени  воздущных, более дешевых растворов , благодар  быстрому высущиванию камней при изготовлении и омыванию воздухом всей массы камн  через пустоты. В кладке пустоты, снабжаемые с одной постели камн  неполными диафрагмами, закрьюаютс  вплотную раствором. Возможно также горизонтальное расположение пустот параллельно продольной оси стен. При изготовлении трубчато-пустотных камней возможно вести работу как на жидких растворах, заливаемых iB формы, снабженные вынимающимис  соответственно расположенными металлическими или дерев нными стержн ми , так и при употреблении трамбованного бетона, обладающего большей прочностью, при чем последний способ работы требует меньших расходов на оборудование производства Изготовление предлагаемых полых камней из трамбованного бетона производитс  в форме, изображенной на чертеже в вертикальном разрезе на фиг. 1 и в плане на фиг. 2. На вибрационной площадке J, обычной конструкции, закрепл етс  семное металлическое основание 2, в которое заделаны наглухо металлические стержни 3, расположенные соответственно назначению камн . На основание 2 надеваетс  дерев нна  разборна  форма 4 с металлическим дном 5 с просверленными отверсти ми , соответствующими расположению стержней. На форму насаживаетс  семна  воронка 6 из листового железа , в которую загружаетс  раствор нормальной густоты, после чего вращением рычага 7, железна  рама 1 с установленной на ней формой приводитс  при помощи храповика 8 в сотр сательное движение. Вибраци  формы заставл ет раствор зан ть все пустоты и равномерно уплотнитьс . После прекращени  сотр сательных двил ений площадки / снимаетс  воронка 6, заглаживаетс  излишний раствор, а затем форма 4 поднимаетс  и, так как стержни, зажатые уплотненным раствором, служат надежными направл ющими , то перекашивани  при подеме не происходит; сам же раствор, не испытывает при освобождении пустот никаких боковых механических воздействий. Отставленна  в сторону форма не тревожитс  до того момента , когда раствор схватитс  настолько , что можно приступить к разборке формы. В зависимости от состава раствора камень или высушиваетс , или поддерживаетс  во влажном состо нии до полного затвердени . ное устройство станка с той разницей , что металлическое основание со стержн ми (щетка) конструируетс  опускное. Тогда, после набивки, опускаютс  стержни, а форма снимаетс  с площадки без подема и отставл етс  в сторону дл  затвердевани . После этого основание со стержн ми снова поднимаетс , закрепл етс  на уровне площадки и производитс  набивка следующего камн . ческими, с одного конца диафрагмированными пустотами, отличающийс  тем, что означенные пустоты имеют весьма малые размеры поперечного сечени  (не свыше 4 кв. сантиметров), но устроены в гораздо большем, сравнительно с Обычным, количестве, будучи при этом или равномерно распределены в камне, или же размещены в одних част х камн  чаще, чем в других . Возможно также вполне аналогичПРЕДМЕТ ПАТЕНТА. Бетонный полый камень с цилиндриThe proposed hollow concrete stone, prepared from hydraulic and air solutions, is provided with a relatively large number of parallel cylindrical voids, closed on one side and with an area not exceeding each 4 square meters. See. The distance between the voids depends on the purpose of the stone and the mechanical and thermal requirements proposed to it. Thus, for the interior walls of buildings, stones are made with evenly distributed vertical cylinders-voids, located in the thicker, the less floors or loads. A stone is laid in the outer walls, having a dense protective layer from the outside against atmospheric influences and impacts, then a layer with densely located voids that provide non-thermal conductivity, and from the inside again a dense layer; it is also possible to arrange hollow cylinders, gradually cutting them to the inner side in order to move the center of the heat capacity of the wall to its inner surface. At the same time, the frequent location of the thin voids of the tubes makes it possible to oppress the stone at the work site (for example, near the doors and windows), put lintels and arches, and this stone is more susceptible to crushing over its cross section, depending on the loads and solution. The proposed stones with many voids make it possible to use airborne, cheaper solutions, due to the rapid desiccation of stones in the manufacture and washing with air of the entire mass of stones through voids. In the masonry, voids supplied from one bed of stone with incomplete diaphragms are closed close with mortar. It is also possible horizontal arrangement of voids parallel to the longitudinal axis of the walls. In the manufacture of tubular-hollow stones, it is possible to work both on liquid solutions, poured iB forms, equipped with removable metal or wood rods, respectively, and when using tamped concrete, which has greater strength, and the latter method of operation requires less equipment costs Manufacturing The manufacture of the proposed hollow stones from tamped concrete is carried out in the form shown in the drawing in vertical section in FIG. 1 and in terms of FIG. 2. On the vibrating platform J, of a conventional construction, a seed metal base 2 is fixed, into which metal rods 3, arranged according to the purpose of the stone, are sealed tightly. A wooden folding mold 4 with a metal bottom 5 with drilled holes corresponding to the arrangement of the rods is put on the base 2. A seed iron 6 is placed on the mold, into which a solution of normal density is loaded, after which by rotation of the lever 7, the iron frame 1 with the form installed on it is driven with a ratchet 8. The mold vibration causes the solution to fill all voids and evenly compact. After the site motions have been discontinued / the funnel 6 is removed, the excess solution is smoothed, and then the form 4 rises and, since the rods clamped by the compacted solution serve as reliable guides, then skewing does not occur during lifting; the solution itself does not experience any lateral mechanical effects when emptying the voids. Putting the form aside does not worry until the moment when the solution is set so that you can begin disassembling the form. Depending on the composition of the mortar, the stone is either dried or kept wet until solidified. The machine is designed with the difference that the metal base with rods (brush) is designed to lower. Then, after packing, the rods are lowered, and the form is removed from the platform without lifting and put aside to solidify. After that, the base with the rods is raised again, fixed at the level of the platform, and the next stone is packed. diaphragmed voids at one end, characterized in that the said voids have very small cross-sectional dimensions (not more than 4 square centimeters), but are arranged in a much larger, comparatively to Normal, quantity, being at the same time or evenly distributed in the stone, or they are placed in some parts of the stone more often than in others. It may also be quite analogous to the subject matter of a patent. Concrete hollow stone with cylindrical

Ткпо-лвтогфафа  сКрас ый Печапппс, Пэнинград, Шевдувароцный, 7S.Tkpo-Lvovka with the Red Pechapps, Paningrad, Shevduvarotsnyy, 7S.

фиг. I. FIG. I.

XX

..

f 5f 5

vV/vV /

фиг. 2.FIG. 2

SU1925A 1925-01-21 1925-01-21 Concrete hollow stone SU2366A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU2366T 1925-01-21

Publications (1)

Publication Number Publication Date
SU2366A1 true SU2366A1 (en) 1927-02-28

Family

ID=50442759

Family Applications (1)

Application Number Title Priority Date Filing Date
SU1925A SU2366A1 (en) 1925-01-21 1925-01-21 Concrete hollow stone

Country Status (1)

Country Link
SU (1) SU2366A1 (en)

Similar Documents

Publication Publication Date Title
US3166871A (en) Apparatus for setting a fence post in concrete
US2306107A (en) Form for molding building members
US1945145A (en) Method of and apparatus for compacting and dewatering cementitious mixtures
CN104631677B (en) Super thick concrete hollow terrace gradation construction technology
CN106639349A (en) Construction method for partial replacement of concrete column
US2248348A (en) Wall construction
CN103276916A (en) Constructing method and infill board for solidly sealed lightweight concrete board wall hole
SU2366A1 (en) Concrete hollow stone
US4059376A (en) Apparatus for moulding hydraulic cement or the like material
US1574565A (en) Apparatus for molding building blocks
CN210791388U (en) Cement product forming machine
JP6899563B2 (en) Deterioration control method for concrete structures
HU206750B (en) Method and apparatus for building the mud walls of building-structures
CN106393405B (en) Make the mold of diaphragm wall and the method with the Mold Making diaphragm wall
RU2064410C1 (en) Method of moulding lightened building blocks
US2313207A (en) Process of molding concrete structures
CN108532985A (en) Foundation beam board construction method
US2083593A (en) Method of making protected piling
RU2766462C1 (en) Method of erecting walls from blocks and installation for its implementation
CN114086561B (en) Symmetrical backfilling and pouring method for rubble concrete on two sides of side wall of open cut tunnel
RU2097509C1 (en) Shifted formwork mould for erection of wall blocks
US2133737A (en) Multiple cement block forming machine and method of making hollow building blocks
SU392208A1 (en) DEVICE FOR CONCRETING WELLS UNDER WATER
RU2064408C1 (en) Method of moulding building blocks
CN115159919A (en) Fair-faced concrete and construction process thereof