SU1754862A1 - Method of installing floor slab in repairing building - Google Patents

Method of installing floor slab in repairing building Download PDF

Info

Publication number
SU1754862A1
SU1754862A1 SU904872319A SU4872319A SU1754862A1 SU 1754862 A1 SU1754862 A1 SU 1754862A1 SU 904872319 A SU904872319 A SU 904872319A SU 4872319 A SU4872319 A SU 4872319A SU 1754862 A1 SU1754862 A1 SU 1754862A1
Authority
SU
USSR - Soviet Union
Prior art keywords
wall
formwork
slab
gap
monolithic
Prior art date
Application number
SU904872319A
Other languages
Russian (ru)
Inventor
Валентин Давидович Аграновский
Олег Леонтьевич Кривов
Original Assignee
Центральный Научно-Исследовательский, Проектный Конструкторский И Технологический Институт Монолитного Домостроения Научно-Проектно-Строительного Объединения "Монолит"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Центральный Научно-Исследовательский, Проектный Конструкторский И Технологический Институт Монолитного Домостроения Научно-Проектно-Строительного Объединения "Монолит" filed Critical Центральный Научно-Исследовательский, Проектный Конструкторский И Технологический Институт Монолитного Домостроения Научно-Проектно-Строительного Объединения "Монолит"
Priority to SU904872319A priority Critical patent/SU1754862A1/en
Application granted granted Critical
Publication of SU1754862A1 publication Critical patent/SU1754862A1/en

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

Использование: область строительства, ремонт и реконструкци  перекрытий кирпичных и каменных зданий. Сущность: по всему периметру перекрываемого помещени  выставл ют опалубку и освобождают гнезда в стене от балок старого перекрыти , затем в гнезда и на опалубку 1 устанавливают арматуру. Бетонируют гнезда с одновре- менным образованием консольно выступающей из стены опорной площадки под перекрытие на уровне отметки низа перекрыти  с шириной, превышающей величину зазора между стенок и боковой поверхностью плиты перекрыти . После набора бетоном необходимой прочности на опорную площадку укладывают сборную панель перекрыти  и замоноличивают зазор между панелью и стеной. В стене в уровне опорной площадки или в гнезде пробивают глухие отверсти , в которые замоноличивают анкерные стержни 2 з.п. ф-лы, 6 ил.Use: construction, repair and reconstruction of the overlap of brick and stone buildings. Essence: around the entire perimeter of the overlapped space, formwork is exposed and the sockets in the wall are freed from the old overlapping beams, then the reinforcement is installed in the sockets and on the formwork 1. The nests are concreted with the simultaneous formation of a cantilever protruding from the wall of the supporting platform under the floor at the level of the bottom overlap with a width exceeding the gap between the walls and the side surface of the floor plate. After a set of necessary strength with concrete, a precast panel is laid on the supporting platform and the gap between the panel and the wall is monolithic. In the wall, in the level of the support platform or in the nest, blind holes are punched into which anchor rods are monolithic with 2 hp. f-ly, 6 ill.

Description

Изобретение относитс  к области строительства и может быть применено при капитальном ремонте кирпичных жилых, общественных и производственных зданий с полной заменой перекрытий.The invention relates to the field of construction and can be applied in the overhaul of brick residential, public and industrial buildings with full replacement of floors.

Известен способ реконструкции зданий и сооружений путем поэтажной сверху вниз разборки ремонтируемых междуэтажных перекрытий, удалений из зоны разборки строительных конструкций, размещени  на уровне верхнего этажа платформы с опалубкой , формовани  нового монолитного перекрыти  верхнего этажа с включением в его конструкцию оставл емых балок, поэтажного и поэтапного опускани  сверху вниз платформы с опалубкой и поочередного формовани  нижерасположенных новых перекрытий , причем после изготовлени  гТере- крытий платформу с опалубкой складываютThere is a method of reconstruction of buildings and structures by disassembling repaired interfloor floors, removing them from the dismantling zone of building structures, placing a platform with formwork at the upper floor level, forming a new monolithic ceiling of the upper floor with the addition of left beams, floor and stage lowering in its design. from top to bottom of the platform with formwork and alternately molding the downstream new floors, and after making the coverings the platform with formwork th stack

и пропускают между остающимис  балками нижерасположенного перекрыти  и вновь раскладывают, повтор   цикл по числу этажей сверху вниз.and pass between the remaining beams of the underlying ceiling and redeploy, repeat the cycle of the number of floors from top to bottom.

В качестве прототипа прин т способ реконструкции перекрытий с дерев нными балками. При реконструкции удал ют головки балок, заход щие в паз стены; при этом перекрытие опираетс  на временные опоры . В торцах балок делаетс  прорезь, в которую закладываетс  арматурный стержень , После монтажа поперечной арматуры пространство между стенок и торцами балок заполн етс  бетоном поверх съемной опалубки После набора бетоном необходимой прочности опоры и опалубка удал ютс . Описанный способ применим только в том случае, когда балки перекрыти  опираютс  на стену по всей ее длине. Кроме того, способ предусматривает укрепление, а не замену перекрыти  на новое, и поэтому имеет ограниченное применение.As a prototype, a method of reconstruction of floors with wooden beams was adopted. The reconstruction removes the heads of the beams that enter the wall groove; however, the overlap rests on temporary supports. After the installation of the transverse reinforcement, the space between the walls and the ends of the beams is filled with concrete over the removable formwork. After the concrete has reached the required strength, the formwork and the formwork are removed. The described method is applicable only in the case when the ceiling beams rest on the wall along its entire length. In addition, the method involves strengthening, rather than replacing the overlap with a new one, and therefore has limited use.

Целью изобретени   вл етс  сокращение трудоемкости монтажа панели перекрыти  при ремонте здани .The aim of the invention is to reduce the laboriousness of installing a ceiling panel during the repair of a building.

Эта цель достигаетс  тем, что сначала освобождают в стене гнезда от балок старого перекрыти , затем устанавливают по всему периметру перекрываемого помещени  опалубку, укладывают арматуру и перед установкой плиты перекрыти  осуществл ют бетонирование гнезд с одновременным образованием консольно выступающей из стены опорной площалки под перекрытие с шириной, превышающей величину зазора между стеной и боковой поверхностью плиты перекрыти , а после установки последней в проектное положение замоноли- чивают зазор между ней и стеной, В стене в уровне опорной площадки пробивают глухие отверсти , в которые устанавливают анкерные стержни, замоноличиваемые при соединении плиты перекрыти  со стеной. В стене могут быть пробиты глухие отверсти , в которые устанавливают анкерные стержни , замоноличиваемые при соединении плиты перекрыти  со стеной.This goal is achieved by first releasing the nests from the old overlapping beams in the wall, then installing the formwork around the entire perimeter of the overlapping room, placing the reinforcement and casting the nests before installing the floor slab with the simultaneous formation of a console supporting the floor under the ceiling, exceeding the gap between the wall and the side surface of the slab, and after the latter is installed in the design position, the gap between it and the wall is monitored, wall at the level of the support pad blind holes are punched, into which installed anchor rods zamonolichivaemye overlap when connecting plates with the wall. In the wall, blind holes can be punched into which the anchor rods are installed, which are embedded in the ceiling when connecting the slab to the wall.

На фиг. 1 изображен общий вид опира- ни  перекрыти  на опорную площадку; на фиг. 2 - то же, вид в плане; на фиг. 3 - установка опалубки и бетонирование опорной площадки; на фиг. 4 - установка плиты перекрыти  (карниз выполнен фигурным); на фиг. 5 - установка анкерного стержн  в гнезде; на фиг. 6 - установка анкерного стержн  в зоне замоноличивани  плиты перекрыти .FIG. 1 shows a general view of the overlap on the supporting platform; in fig. 2 - the same plan view; in fig. 3 - installation of formwork and concreting of the support site; in fig. 4 - installation of the slab (the eaves are made figured); in fig. 5 - installation of the anchor rod in the socket; in fig. 6 - installation of the anchor rod in the zone of monolithing the slab.

В кирпичной стене 1 имеютс  гнезда 2 от балок старого предварительно удаленного перекрыти  (не показано). По всему периметру перекрываемого помещени  на инвентарных стойках 3 установлена вплотную к стене опалубка 4. В гнездах смонтированы консольно арматурные каркасы 5, а на опалубке уложена продольна  арматура 6 опорной площадки 7, на которую установлена сборна  плита перекрыти  8. В тех случа х, когда плита перекрыти  выполнена многопустотной, в пустотах на некотором рассто нии от торца плиты установлены перегородки 9. Зазор между стеной и краем сборных плит перекрыти  заполнен монолитным бетоном 10. Дл  лучшей работы опорной площадки и ее консольной части 11 в стене пробиты глухие отверсти  12 и установлены анкерные стержни 13, причем эти стержни могут быть установлены либо в уровне гнезда, либо в уровне опорной площадки .In the brick wall 1 there are slots 2 from the beams of the old pre-removed slab (not shown). A formwork 4 is mounted close to the wall along the perimeter of the room to be locked on inventory racks 3. Console armatures 5 are mounted in the nests, and longitudinal reinforcement 6 of the supporting platform 7 is laid on the formwork. In those cases, the plate the overlaps are made hollow; in the voids at some distance from the plate end, partitions 9 are installed. The gap between the wall and the edge of the precast slabs is filled with monolithic concrete 10. For better work of the supporting platform and its The cantilever part 11 is pierced with blind holes 12 in the wall and anchor rods 13 are installed, and these rods can be installed either at the socket level or at the level of the supporting platform.

Перекрытие устраиваетс  в следующем пор дке,The overlap is arranged in the following order,

Вначале в стене 1 освобождаютс  от балок старого перекрыти  гнезда 2, затем вFirst, in wall 1 they are freed from the beams of the old overlapping nests 2, then in

них монтируютс  консольные арматурные каркасы 5, а на них укладываетс  продольна  арматура 6 опорных площадок 7. На инвентарных стойках 3 вплотную к стене 1 по всему периметру перекрываемого помещени  устанавливаетс  опалубка 4, котора  может иметь различную конфигурацию рабочей поверхности 14, например плоскую (фиг. 3) или объемную (фиг. 4), обеспечива  тем самым художественное разнообразиеthey are mounted cantilever reinforcement cages 5, and longitudinal reinforcement 6 support platforms 7 are laid on them. On inventory racks 3, formwork 4 is installed close to wall 1 along the entire perimeter of the enclosed room, which can have a different configuration of the working surface 14, for example flat (Fig. 3 ) or volumetric (Fig. 4), thereby providing artistic diversity

карнизов. Затем производ т замоноличи- вание гнезд 2 и опорного по са 7 на уровне отметки низа перекрыти  8 и по ширине, превышающей зазор между стеной 1 и боковой поверхностью плиты перекрыти  8.cornices. Then, the nests 2 and the base plate 7 are monolithic at the level of the bottom level of the overlap 8 and in width exceeding the gap between the wall 1 and the side surface of the slab of the overlap 8.

После набора бетоном опорного по са 7 необходимой прочности на него укладываетс  плита перекрыти  8, в которую предварительно устанавливаютс  заглушки 9.After the concrete has received a set of supporting cement 7 of necessary strength, a slab 8 is placed on it, into which the plugs 9 are pre-installed.

Зазор между стеной и краем плиты перекрыти  8 замоноличиваетс  по всему периметру стены 1 после чего инвентарные стойки 3 и опалубка 4 удал ютс . Пробивка глухих отверстий 12 и установка вниханкерных стержней 13 производитс  в необходимых случа х до замоноличивани  опорной площадки 7 и консольных выступов гнезд 2. Благодар  тому, что торцы плит перекрыти  замоноличены, эти плиты оказываютс  какThe gap between the wall and the edge of the slab 8 is monolithic around the entire perimeter of the wall 1, after which the inventory posts 3 and the formwork 4 are removed. The punching of blind holes 12 and the installation of non-anchor rod rods 13 is carried out in necessary cases prior to the embedding of the supporting platform 7 and the cantilever projections of the sockets 2. Due to the fact that the ends of the floor slabs are monolithic, these plates turn out to be

бы распертыми между стенами, а анкерные стержни 13 независимо оттого, в какой зоне они расположены, придают опорной площадке дополнительную прочность.would be unstressed between the walls, and the anchor rods 13, regardless of what zone they are located in, give the supporting platform additional strength.

Claims (3)

Формула изобретени Invention Formula Способ установки плиты перекрыти  при ремонте здани , включающий освобождение гнезд в стене от балок старого перекрыти , установку арматуры плитыThe method of installation of the slab during the repair of the building, including the release of nests in the wall from the beams of the old ceiling, the installation of reinforcement plates перекрыти , опалубки и бетонирование гнезд, отличающийс  тем, что, с целью сокращени  трудоемкости монтажа, опалубку устанавливают по всему периметру перекрываемого помещени  и перед установкой плиты перекрыти  осуществл ют бетонирование гнезд с одновременным образованием консольно выступающей из стены опорной площадки под перекрытие с шириной, превышающей величину зазора между стеной и боковой поверхностью плиты перекрыти , а после установки последней в проектное положение замоноли- чивают зазор между ней и стеной,blocking, formwork and nesting concreting, characterized in that, in order to reduce the laboriousness of the installation, formwork is installed around the entire perimeter of the room to be covered and, prior to installing the ceiling plate, the nests are concreted with the simultaneous formation of a cantilever extension of the wall the gap between the wall and the side surface of the slab is blocked, and after the latter is installed in the design position, the gap between it and the wall is monitored, 2, Способ по п. 1,отличающий- с   тем, что в стене в уровне опорной площадки пробивают глухие отверсти , в которые устанавливают анкерные стержни, за- моноличиваемые при соединении плиты перекрыти  со стеной.2, a method according to claim 1, characterized in that in the wall in the level of the supporting platform, blind holes are punched into which the anchor rods are installed, which are monolithic when the slab is connected to the wall. 3. Способ по п. 1, отличаю, щийс  тем, что в стене в гнезде пробивают глухие отверсти , в которые устанавливают анкерные стержни, замоно/1ичиваемые при соединении плиты перекрыти  со стеной.3. The method according to claim 1, characterized in that in the wall in the socket, blind holes are punched into which anchor rods are installed, which are fastened when connecting the slab to the wall. фаг 2phage 2 . . 4 o fcV .. 4 o fcV .. Фие.ЗFi.Z 1212 вat фе/гЛfe / hl 8eight
SU904872319A 1990-10-11 1990-10-11 Method of installing floor slab in repairing building SU1754862A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU904872319A SU1754862A1 (en) 1990-10-11 1990-10-11 Method of installing floor slab in repairing building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU904872319A SU1754862A1 (en) 1990-10-11 1990-10-11 Method of installing floor slab in repairing building

Publications (1)

Publication Number Publication Date
SU1754862A1 true SU1754862A1 (en) 1992-08-15

Family

ID=21539470

Family Applications (1)

Application Number Title Priority Date Filing Date
SU904872319A SU1754862A1 (en) 1990-10-11 1990-10-11 Method of installing floor slab in repairing building

Country Status (1)

Country Link
SU (1) SU1754862A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2527421C2 (en) * 2011-11-09 2014-08-27 Андрей Владимирович Мушкин Support element
RU173983U1 (en) * 2017-04-17 2017-09-25 ОАО институт "Ростовский Промстройниипроект" STRENGTHENING OF REINFORCED REINFORCED CONCRETE PLATE SUPPORT ZONE
RU2637006C1 (en) * 2016-12-07 2017-11-29 Акционерное общество Холдинговая компания "Главное всерегиональное строительное управление "Центр" Hollow-core floor slab
CN111719885A (en) * 2020-03-21 2020-09-29 东莞市大乘建筑工程技术有限公司 Laminated concrete reinforced floor and construction process

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство С6СР № 1229291, кл. Е 04 G 23/00, 1984. Патент DD № 270336, кл Е 04 G 23/02, 1988. *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2527421C2 (en) * 2011-11-09 2014-08-27 Андрей Владимирович Мушкин Support element
RU2637006C1 (en) * 2016-12-07 2017-11-29 Акционерное общество Холдинговая компания "Главное всерегиональное строительное управление "Центр" Hollow-core floor slab
RU173983U1 (en) * 2017-04-17 2017-09-25 ОАО институт "Ростовский Промстройниипроект" STRENGTHENING OF REINFORCED REINFORCED CONCRETE PLATE SUPPORT ZONE
CN111719885A (en) * 2020-03-21 2020-09-29 东莞市大乘建筑工程技术有限公司 Laminated concrete reinforced floor and construction process

Similar Documents

Publication Publication Date Title
US6223480B1 (en) Pre-cast concrete panels for construction of a building
US20190177964A1 (en) Precast concrete formwork, floor system and a method of construction
KR100893765B1 (en) Supporting structure of slab form
SU1754862A1 (en) Method of installing floor slab in repairing building
US5167842A (en) Installation for the fabrication of cells to be subsequently assembled side by side in order to constitute a construction unit
WO2017067912A1 (en) Building system
RU2484217C1 (en) Formwork for monolithic reinforced concrete floor slab
EP3828364A1 (en) Assembly kit and method for assembling a safety railing, as well as such a safety railing
RU47924U1 (en) ARM DECKING BLOCK
RU2043470C1 (en) Method for erecting monolithic elements of a building, preferentially floor, and concrete form to implement it
KR20200075599A (en) Precast concrete double wall for constructing multi-story of building and method for constructing multi-story of building
RU2285771C1 (en) Method for building and building structure erection, renewal and reconstruction
US2989794A (en) Shuttering system for cast concrete walls
US6009678A (en) Virtual block for prefabrication slabs
KR200193188Y1 (en) Beam padestal for temporary fixture
KR0145358B1 (en) Method of building slabs
RU1805193C (en) Method of erecting buildings and constructions
SU1682472A1 (en) Strip foundation
KR102028828B1 (en) Post tension flat slab sturcture construction method using rib type slab and waffle type drop
SU737600A1 (en) Method of making a floor in sliding form
JP3395088B2 (en) How to build stairs using frame scaffolding
JP2725022B2 (en) Casting method of slab concrete
JP3087196B2 (en) How to build stairs
KR200223188Y1 (en) kicker bracket
RU1783101C (en) Method of strengthening precast ferroconcrete multi-hollow panel floor