SU1749387A1 - Method of pile installation - Google Patents

Method of pile installation Download PDF

Info

Publication number
SU1749387A1
SU1749387A1 SU904874203A SU4874203A SU1749387A1 SU 1749387 A1 SU1749387 A1 SU 1749387A1 SU 904874203 A SU904874203 A SU 904874203A SU 4874203 A SU4874203 A SU 4874203A SU 1749387 A1 SU1749387 A1 SU 1749387A1
Authority
SU
USSR - Soviet Union
Prior art keywords
section
pile
well
broadening
trunk
Prior art date
Application number
SU904874203A
Other languages
Russian (ru)
Inventor
Юрий Давидович Шамес
Яков Аншелевич Глуховский
Original Assignee
Киевский Отдел Комплексного Проектирования Украинского Отделения Всесоюзного Государственного Проектно-Изыскательского И Научно-Исследовательского Института "Энергосетьпроект"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Киевский Отдел Комплексного Проектирования Украинского Отделения Всесоюзного Государственного Проектно-Изыскательского И Научно-Исследовательского Института "Энергосетьпроект" filed Critical Киевский Отдел Комплексного Проектирования Украинского Отделения Всесоюзного Государственного Проектно-Изыскательского И Научно-Исследовательского Института "Энергосетьпроект"
Priority to SU904874203A priority Critical patent/SU1749387A1/en
Application granted granted Critical
Publication of SU1749387A1 publication Critical patent/SU1749387A1/en

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

Сущность изобретени : сваю возвод т путем забивки в сыпучий грунт ствола с уши- рени ми, причем ствол состоит из телескопических секций, первую секцию ствола забивают до упора ее уширени  в Дно скважины , каждую последующую забивают до упора ее нижнего торца в уширение предыдущей секции, 6 ил.SUMMARY OF THE INVENTION: The pile is erected by driving into the loose ground of the trunk with widening, the trunk consisting of telescopic sections, the first section of the trunk is hammered all the way to its broadening into the bottom of the well, each succeeding hammering the previous section to the stops 6 Il.

Description

Изобретение относитс  к области строительства фундаментов под опоры башенного типа, в частности под опоры ЛЭП.The invention relates to the field of construction of foundations for tower type supports, in particular for power transmission lines.

Известен способ забивки свай в слабые основани , состо щий в заполнении заранее пробуренной скважины в жущей смесью и забивки в нее сваи .There is a known method of driving piles into weak bases, which consists in filling a previously drilled well into the grinding mixture and driving piles into it.

Недостатками данного решени   вл ютс  The disadvantages of this solution are

-недостаточна  несуща  способность, обусловленна  отсутствием уплотнени  околоствольного грунта:- insufficient bearing capacity due to the lack of compaction of the near-barrel soil:

-недостаточна  индустриальность возведени , обусловленна  необходимостью выполнени  мокрого процесса- insufficient industrialization due to the need to perform a wet process

Целью изобретени   вл етс  повышение несущей способности возводимой сваи за счет вдавливани  сыпучего материала в окружающий грунт.The aim of the invention is to increase the bearing capacity of the pile being raised due to the indentation of the bulk material into the surrounding soil.

На фиг.1 изображено погружение 1-й секции свай (1-й этап); на фиг.2 - погружение 1-й секции (окончательное положение); на фиг 3 - установка последующей секции дл  погружени ; на фиг.4 - погружение последующей секции (окончательное положение);Figure 1 shows the immersion of the 1st section of the pile (1st stage); figure 2 - immersion of the 1st section (final position); Fig. 3 shows the installation of a subsequent submersible section; figure 4 - immersion of the subsequent section (final position);

на фиг 5 - узел I на фиг.4; на фиг 6 - разрез А-А на фиг.5.Fig 5 - node I in Fig.4; FIG. 6 is a section A-A in FIG. 5.

Способ включает установку в заранее пробуренную скважину 1 сваи 2, состо щей из первой секции 3, снабженной в верхнем торце анкерными болтами 4 и вышележа- щей трубчатой секции 5 с отверсти ми б дл  анкерных болтов. Секции снабжены кольцевыми уширени ми 7, имеетс  обсыпка из сыпучего материала 8 и грунтова  засыпка 9The method includes installation in the pre-drilled well 1 of the pile 2, consisting of the first section 3, provided in the upper end with anchor bolts 4 and an overlying tubular section 5 with holes b for the anchor bolts. The sections are provided with annular widening 7, there is a sprinkling of bulk material 8 and a soil backfill 9

Возведение фундамента осуществл ют следующим образом.The construction of the foundation is carried out as follows.

В заранее пробуренную скважину 1 устанавливают с начальной забивкой в дно первую секцию 3 таким образом, чтобы принадлежащее ей кольцевое уширение 7 возвышалось над устьем скважины 1 не менее, чем на 0,5-0,6 м. Затем производ т засыпку в скважину 1 сыпучего материала 8. С помощью сваебойного агрегата производитс  дальнейшее погружение секции 3, в процессе которого с помощью кольцевого уширени  7 происходит вдавливание сыпучего материала 8 в дно и частично в стенки сква (ЛThe pre-drilled well 1 is installed with the initial driving into the bottom of the first section 3 in such a way that the ring broadening 7 belonging to it rises above the wellhead 1 not less than 0.5-0.6 m. Then it is filled into the well 1 friable of the material 8. With the help of the pile-driving unit, the section 3 is further immersed, during which the granular material 8 is pressed into the bottom by means of the ring broadening 7 and partially into the walls of the borehole (L

СWITH

х|x |

ЈwЈw

00

СА) 00 VISA) 00 VI

жины 1. Погружение осуществл ют до упора кольцевого уширени  7 в дно скважины 1.1. The immersion is carried out up to the stop of the ring broadening 7 in the bottom of the well 1.

На ствол первой секции 2 надевают наход щуюс  в подвешенном состо нии вышележащую секцию Ъ таким образом, чтобы принадлежащее ей кольцевое уширение 7 находилосГна высоте 0,5-0,6 м над уровнем усть  скважины 1. Затем производ т подсыпку сыпучего материала 8 в полость сква- жины 1. После этого производ т погружение последующей секции 5, котора  скользит по поверхности первой секции 3 до упора своим нижним концом в принадлежащее первой секции 3 кольцевое уширение 7. В процессе данного погружени  происходит вдавливание в стены скважины 1 сыпучего материала 8. В процессе достижени  секцией 5 проектного положени  анкерные бол-гы А, принадлежащие секции 3, проход т в отверсти  6, имеющиес  в торце секции 5, где они фиксируютс  путем электросварки .Overburdening overlying section b is suspended on the trunk of the first section 2 so that the ring broadening 7 belonging to it is located at a height of 0.5-0.6 m above the wellhead 1. Then the bulk material 8 is poured into the well cavity - gins 1. Thereafter, the subsequent section 5 is immersed, which slides along the surface of the first section 3 up to the stop with its lower end into the annular broadening 7 belonging to the first section 3. In the process of this immersion, a friable 8. In the process of achieving the design position by section 5, anchor bolts A belonging to section 3 pass into holes 6 located at the end of section 5, where they are fixed by electric welding.

В результате осуществлени  описанного способа в околоскважинном простран т- ве образуетс  массив уплотненного грунта, который обеспечивает совместную работу сваи 2 с окружающим грунтом. Пространство скважины 1 наход щеес  в пределах отAs a result of the implementation of the described method, an array of compacted soil is formed in the near-wellbore space, which ensures the joint operation of pile 2 with the surrounding soil. Well space 1 is between

ее усть  до кольцевого уширени  7, заполн ют грунтовой засыпкой 9 с уплотнением. Описанное техническое решение создает следующий технико-экономический эффект:its mouth is up to annular broadening 7; it is filled with earth filling 9 with compaction. The described technical solution creates the following technical and economic effect:

-повышение несущей способности за счет обеспечени  совместной работы сваи с окружающим грунтом;- increased bearing capacity due to the joint work of the pile with the surrounding soil;

-снижение деформативности за счет предварительного обжати  стенок скважины;-reduction of deformability due to pre-compression of the walls of the well;

-повышение надежности за счет обеспечени  заполнени  зазора между сваей и стенками скважины с высокой степенью уплотнени .- increased reliability by ensuring the filling of the gap between the pile and the walls of the well with a high degree of compaction.

Claims (1)

Формула изобретени  Способ возведени  сваи, включающий образование скважины, заполнение ее сыпучим материалом и забивку через нее в грунт ствола с уширени ми по высоте, отличающийс  тем, что, с целью повышени  несущей спос9бности возводимой сваи за счет вдавливани  сыпучего материала в окружающий грунт, используют составной из те- лескопических секций ствол, первую секцию которого забивают до упора ее уширени  в дно скважины, а каждую последующую секцию забивают до упора ее нижнего торца в уширение предыдущей секцииClaims The method of raising a pile, including the formation of a well, filling it with loose material and driving through it into the ground with a broadening height, characterized in that, in order to increase the bearing capacity of the pile being erected due to the indentation of the bulk material into the surrounding soil, the composite is used from the telescopic sections, the trunk, the first section of which is hammered all the way to its widening in the bottom of the well, and each subsequent section is hammered all the way to its lower end in the broadening of the previous section VV ././ from WM WM &и&2&and 2
SU904874203A 1990-10-16 1990-10-16 Method of pile installation SU1749387A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU904874203A SU1749387A1 (en) 1990-10-16 1990-10-16 Method of pile installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU904874203A SU1749387A1 (en) 1990-10-16 1990-10-16 Method of pile installation

Publications (1)

Publication Number Publication Date
SU1749387A1 true SU1749387A1 (en) 1992-07-23

Family

ID=21540552

Family Applications (1)

Application Number Title Priority Date Filing Date
SU904874203A SU1749387A1 (en) 1990-10-16 1990-10-16 Method of pile installation

Country Status (1)

Country Link
SU (1) SU1749387A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2510441C1 (en) * 2012-08-07 2014-03-27 Александр Григорьевич Леонтьев Erection method of pile of shallow embedding

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
За вка JP № 47-28451, кл Е 02 D 3/12, опублик 1972. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2510441C1 (en) * 2012-08-07 2014-03-27 Александр Григорьевич Леонтьев Erection method of pile of shallow embedding

Similar Documents

Publication Publication Date Title
US4730954A (en) Ground treatment
US10941534B2 (en) Methods and apparatuses for compacting soil and granular materials
US4293242A (en) Piles
US11773555B2 (en) Methods and apparatuses for compacting soil and granular materials
SU1749387A1 (en) Method of pile installation
JPS55159024A (en) Construction method for structure foundation
US3429129A (en) Method for producing foundations for columns and the like
CN209243733U (en) A kind of compound gravity retaining wall structure of soft clay area ultra-deep foundation pit
KR960003748B1 (en) Working method of concrete pile or sand pile for a soft-soil foundation
SU1418397A1 (en) Method of constructing hydraulic engineering structure
US20240026625A1 (en) Methods and apparatuses for compacting soil and granular materials
RU2139974C1 (en) Cast-in-place pile
SU1728382A1 (en) Foundation construction method
SU887733A1 (en) Method of constructing a foundation
RU32137U1 (en) EXPLOSIVE PILED PILED BASE
SU1765299A1 (en) Method of erecting bored piles
RU51638U1 (en) BOARD WALL IN SOIL
SU1548340A1 (en) Method of installing anchor inventory pile
SU654759A1 (en) Method of erecting foundation
JPS63315721A (en) Foundation pile driving method as well as ground compaction
KR900005913B1 (en) Base stake inflated in bump state at lower end there of and its construction
CN1035205C (en) Job practice of prefabricated pile
CN2775136Y (en) Cap type small diameter steel reinforced concrete expanding head pile
SU1700185A1 (en) Device for forming wells
SU1760018A1 (en) Method for erection of foundation