Device for manufacturing building material for winter highways Download PDFInfo
- Publication number
- SU1723232A1 SU1723232A1 SU904805846A SU4805846A SU1723232A1 SU 1723232 A1 SU1723232 A1 SU 1723232A1 SU 904805846 A SU904805846 A SU 904805846A SU 4805846 A SU4805846 A SU 4805846A SU 1723232 A1 SU1723232 A1 SU 1723232A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- snow
- saw blades
- supporting
- conveyor
- building material
- Prior art date
Links
Landscapes
- Road Repair (AREA)
Abstract
Изобретение относитс к дорожному строительству и может быть использовано дл производства строительного материала при сооружении зимних автодорог. Цель изобретени - изготовление снеголедового щебн и упрощение технологии строительства и ремонта дорог. Устройство содержит смонтированные на раме бункер дл снега с увлажнением, основной скребковый конвейер с приводным барабаном, расположенный под разгрузочным окном бункера, механизмы предварительного и окончательного уплотнени снега, установленные под основным скребковым конвейером. Устройство дополнительно оснащено механизмом распиловки, включающим два блока пил, поддерживающие и направл ющие элементы , закрепленные на раме, причем блоки пил установлены последовательно один за другим, пилы в первом блоке установлены перпендикул рно пилам во втором блоке, а поддерживающие и направл ющие элементы выполнены в виде вальцов. 1 з.п.ф-лы, 3 ил. сл СThe invention relates to road construction and can be used for the production of building material in the construction of winter roads. The purpose of the invention is to manufacture snow-covered rubble and simplify the technology of road construction and repair. The device contains a moistened snow bunker mounted on the frame, a main scraper conveyor with a driving drum located under the bunker discharge window, mechanisms for preliminary and final compaction of snow mounted under the main scraper conveyor. The device is additionally equipped with a sawing mechanism that includes two saw blades, supporting and guiding elements mounted on the frame, the saw blades are installed sequentially one after the other, the saw blades are installed perpendicular to the saw blades in the second block, and the supporting blades are made in form of rollers. 1 hp ff, 3 ill. sl C
Description
Изобретение относитс к дорожному строительству и может быть использовано дл производства строительного материала , используемого при сооружении зимних автодорог.The invention relates to road construction and can be used for the production of building material used in the construction of winter roads.
Известно устройство дл изготовлени смежных блоков дл дорожного покрыти , содержащее смонтированные на раме бункер дл снега с увлажнителем, основной скребковый конвейер с приводным барабаном , расположенный под разгрузочным окном бункера, механизмы предварительного и окончательного уплотнени снега, установленные над основным скребковым конвейером .A device for the manufacture of adjacent pavement blocks, comprising a snow-mounted hopper with a humidifier mounted on the frame, a main scraper conveyor with a drive drum located under the hopper discharge window, and mechanisms for preliminary and final snow compaction mounted above the main scraper conveyor are known.
Известное устройство изготовл ет габаритные снежные блоки, укладка которых наThe known device manufactures dimensional snow blocks, the laying of which on
полотно дороги трудоемка и требует допол- нительных механизмов.the roadbed is laborious and requires additional mechanisms.
Цель изобретени - изготовление снеголедового щебн и упрощение технологии строительства и ремонта дорог.The purpose of the invention is to manufacture snow-covered rubble and simplify the technology of road construction and repair.
Цель достигаетс дополнительным оснащением устройства, изготавливающего снежные блоки, механизмом распиловки, включающим два блока пил, поддерживающие и направл ющие элементы, закрепленные на раме устройства, причем блоки пил установлены последовательно один за другим , пилы в первом блоке установлены перпендикул рно пилам во втором блоке, а поддерживающие и направл ющие элементы выполнены в виде вальцов.The goal is achieved by additional equipment of the device making snow blocks with a sawing mechanism, including two saw blades, supporting and guiding elements mounted on the frame of the device, the saw blades being installed sequentially one after the other, the saw blades in the first block perpendicular to the saw blades in the second block, and the supporting and guiding elements are in the form of rollers.
На фиг. 1 изображено устройство дл изготовлени строительного материала дл зимних автодорог, общий вид; на фиг. 2 - вид А на фиг. 1; на фиг. 3 - вид по стрелке Б на фиг. 1.FIG. 1 shows a device for making a building material for winter roads, a general view; in fig. 2 is a view A of FIG. one; in fig. 3 is a view along arrow B in FIG. one.
Устройство дл изготовлени строительного материала дл зимних автодорог содержит бункер 1 дл снега, под разгрузочным окном которого установлен основной скребковый конвейер 2 с приводным барабаном 3 и нат жным барабаном 4, выполненный с возможностью регулировани скорости движени . Рабоча 5 и нижн 6 ветви основного конвейера 2 имеют скребки 7, шарнирно присоединенные к ним.A device for making construction material for winter roads comprises a snow bunker 1, under the discharge window of which a main scraper conveyor 2 with a driving drum 3 and a tension drum 4 is installed, adapted to control the speed of movement. Work 5 and bottom 6 branches of the main conveyor 2 have scrapers 7 pivotally attached to them.
Внутри бункера 1 установлен механизм предварительного уплотнени снега, выполненный в виде дополнительного приводного скребкового конвейера 8, рабоча ветвь 9 которого установлена под углом к вертикали. Нижн ветвь 10 дополнительного конвейера 8 расположена в плоскости, параллельной рабочей плоскости 5 основного конвейера 2. Механизм окончательного уплотнени снега выполнен в виде ленточного конвейера 11, устновленного над основным конвейером 2 с регулируемым зазором, величиной которого задают толщину формируемых блоков. Конструкци скребков 12, установленных на дополнительном конвейере 8, аналогична конструкции скребков 7 основного конвейера 2. Направление движени скребков 12 нижней ветви 10 конвейера 8 совпадает с направлением движени скребков 7 верхней ветви 5 конвейера 2. В бункере 1 установлен увлажнитель 13 дл снежной массы. На раме основного конвейера 2 установлен первый блок пил 14 на валу 15 с поддерживающими 16 и 17 и направл ющими 18 вальцами . Направление вращени вальцов показано стрелками на фиг. 1. В торце рамы основного конвейера 2 установлен второй блок пил 19 дл распиловки брусьев 20 с направл ющим 21 и поддерживающим 22 устройствами. Направл ющее устройство 21 включает два кулачковых валика 23. На раме 2 основного скребкового конвейера за механизмом 11 окончательного уплотнени укреплен охлаждающий кожух 24, который охватывает поверхности конвейера с технологически готовыми снеголедовыми блоками 25 и механизм распиловки. В верхней части кожуха 24 установлен вентил тор 26. Под вторым распиловочным блоком установлен транспортер 27 дл удалени готовой продукции.Inside the bunker 1, a snow pre-compaction mechanism is installed, made in the form of an additional driving scraper conveyor 8, the working branch 9 of which is set at an angle to the vertical. The lower branch 10 of the additional conveyor 8 is located in a plane parallel to the working plane 5 of the main conveyor 2. The final snow compaction mechanism is designed as a belt conveyor 11 installed above the main conveyor 2 with an adjustable gap, the size of which determines the thickness of the blocks being formed. The design of the scrapers 12 installed on the additional conveyor 8 is similar to the design of the scrapers 7 of the main conveyor 2. The direction of movement of the scrapers 12 of the lower branch 10 of the conveyor 8 coincides with the direction of movement of the scrapers 7 of the upper branch 5 of the conveyor 2. In the bunker 1 a humidifier 13 for snow mass is installed. On the frame of the main conveyor 2, the first block of saws 14 is mounted on the shaft 15 with supporting 16 and 17 and guiding rollers 18. The direction of rotation of the rollers is shown by arrows in FIG. 1. At the end of the frame of the main conveyor 2, a second block of saws 19 is installed for sawing bars 20 with guide 21 and supporting 22 devices. The guide device 21 includes two cam rollers 23. On the frame 2 of the main scraper conveyor, after the final compaction mechanism 11, a cooling casing 24 is fastened, which covers the surfaces of the conveyor with technologically ready snow-ice blocks 25 and the sawing mechanism. A fan 26 is installed in the upper part of the casing 24. A conveyor 27 is installed under the second sawing unit to remove the finished product.
Устройство монтируют на тракторных сан х, агрегатируемых с трактором типа Т- 130.The device is mounted on tractor San x, aggregated with a T-130 tractor.
Устройство работает следующим образом .The device works as follows.
Рыхлый промороженный снег, поступающий в бункер 1, увлажн ют паром или водой , захватывают скребками 12 движущейс ленты 9 конвейера 8, выполн 0 ющего роль прессовател -набивател , и транспортируют, постепенно уплотн .Loose frostbite snow entering the bunker 1 is moistened with steam or water, is grabbed by scrapers 12 of the moving belt 9 of the conveyor 8, which plays the role of a press-rammer, and is transported, gradually compacted.
Транспортер конвейера 2 с прессуемым блоком перемещаетс по направлению движени прессуемой массы. ОкончательноThe conveyor of the conveyor 2 with the compression unit is moved in the direction of movement of the compression mass. Finally
5 блок25 допрессовывают ленточным конвейером 11. При принудительном охлаждении снеголедовые блоки 25 подают пилам 14 и распиливают на брусь 20, которые дополнительно охлаждают и направл ющим ме0 ханизмом 21 укладывают в поддерживающий механизм 22, где распиливают на снеголедовый щебень пилами 19 при одновременном принудительном охлаждении . Готовый щебень подают на5 block 25 are pressed by a belt conveyor 11. With forced cooling, the snow-ice blocks 25 are fed to the saws 14 and sawn into bars 20, which are further cooled and guided by the mechanism 21 and placed into the supporting mechanism 22, where they are sawed into snow-iced rubble by saws 19 while simultaneously cooling. Ready crushed stone is served on
5 транспортер 27 и далее на площадку готовой продукции.5 conveyor 27 and further to the site of finished products.
Устройство дл изготовлени строительного материала дл зимних автодорог производит снеголедовый щебень, которыйA device for the manufacture of building material for winter roads produces snow-iced crushed stone, which
0 обеспечивает плотную поверхность дороги, чем увеличивает прочность и долговечность ее, значительно упрощает технологию строительства и ремонта дорог.0 provides a dense road surface, which increases its strength and durability, greatly simplifies the technology of construction and repair of roads.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU904805846A SU1723232A1 (en) | 1990-03-26 | 1990-03-26 | Device for manufacturing building material for winter highways |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU904805846A SU1723232A1 (en) | 1990-03-26 | 1990-03-26 | Device for manufacturing building material for winter highways |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1723232A1 true SU1723232A1 (en) | 1992-03-30 |
Family
ID=21503738
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU904805846A SU1723232A1 (en) | 1990-03-26 | 1990-03-26 | Device for manufacturing building material for winter highways |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1723232A1 (en) |
-
1990
- 1990-03-26 SU SU904805846A patent/SU1723232A1/en active
Non-Patent Citations (1)
Title |
---|
Авторское свидетельство СССР № 1307010, кл. Е 01 Н 4/00, 1985. * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3605579A (en) | Anti-skid surface texturing and groove forming equipment for use in concrete roads | |
JPH1060813A (en) | Paving method with asphalt mixture | |
CN113073517A (en) | Asphalt laying reciprocating type compacting device for highway engineering construction and implementation method thereof | |
US2473961A (en) | Machine or apparatus for surfacing roads | |
SU1723232A1 (en) | Device for manufacturing building material for winter highways | |
CN118065207A (en) | Road construction process and construction equipment for reinforced cement stabilized macadam foundation | |
CN114345462A (en) | Movable crushing and screening equipment for asphalt milling material of integrated equipment | |
US2032205A (en) | Method of and apparatus for finishing concrete pavements | |
US3392641A (en) | Concrete spreading machines | |
US4043398A (en) | Mobile ballast cleaning machine | |
CN114197279B (en) | Asphalt concrete pavement paving construction method | |
US1683292A (en) | Method of and means for grooving plastic material | |
CN115369700A (en) | High-stability road subgrade construction device and construction method | |
CN211104697U (en) | Composite water permeable brick press forming device | |
CN209194445U (en) | Small crawler snow-clearing car can be driven | |
CN212735348U (en) | Device for grinding aerated concrete blocks | |
SU1307010A1 (en) | Device for making snow blocks for road paving | |
CN221681560U (en) | Highway rubble laying device | |
RU2147516C1 (en) | Material plastic working apparatus | |
CN216474370U (en) | Device is used in asphalt concrete surface course construction of road surface engineering | |
CN212292073U (en) | Special belt conveyor of grit aggregate | |
US3319544A (en) | Continuous wire mesh installer and process for installing wire mesh in plastic concrete | |
RU2207427C1 (en) | Snow removal machine | |
CN219099742U (en) | Asphalt pavement corner compaction device | |
CN108405121B (en) | Irregular broken recovery plant of abandonment brick and tile guardrail for road bridge |