SU1694902A1 - Method of recultivation of caving zone areas - Google Patents
Method of recultivation of caving zone areas Download PDFInfo
- Publication number
- SU1694902A1 SU1694902A1 SU884491455A SU4491455A SU1694902A1 SU 1694902 A1 SU1694902 A1 SU 1694902A1 SU 884491455 A SU884491455 A SU 884491455A SU 4491455 A SU4491455 A SU 4491455A SU 1694902 A1 SU1694902 A1 SU 1694902A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- rocks
- fertile
- collapse
- mineral
- formation
- Prior art date
Links
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
Изобретение относитс к горной промышленности и может быть использовано дл рекультивации поверхностей площадей зон обрушени горных пород. Цель - повышение безопасности рекультиеэционных работ при снижении трудозатрат. Предварительно ведут складирование скальных и плодородных пород при их выемке в границах зоны обрушени с образованием выработанного пространства до начала подземной разработки полезного ископаемого . При этом складирование скальных пород ведут в выработанное пространство с последующим перекрытием их слоем за- складированных плодородных пород и формированием единого насыпного массива. Заполнение зоны обрушени производ т по мере отработки полезного ископаемого проседанием в нее насыпного массива. Отсыпка скальных пород на неразработанное устойчивое основание исключает возможность возникновени деформаций массива и обеспечивает безопасность работ. 1 ил. w ёThe invention relates to the mining industry and can be used for the remediation of the surface areas of the zones of rockfall. The goal is to increase the safety of reclamation works while reducing labor costs. Preliminary conduct storage of rock and fertile rocks when they are excavated within the boundaries of the zone of collapse with the formation of the developed space before the start of underground mining of the mineral. At the same time, the storage of rocks leads to the developed space with their subsequent overlapping by a layer of stored fertile rocks and the formation of a single bulk mass. The collapse zone is filled as the mineral is mined by sinking a bulk mass into it. The dumping of rocks on an undeveloped stable base eliminates the possibility of the occurrence of mass deformations and ensures the safety of work. 1 il. w ё
Description
Изобретение относитс к горной промышленности и может быть использовано дл рекультивации поверхности площадей зон обрушени горных пород.The invention relates to the mining industry and can be used for the remediation of the surface areas of the zones of rockfall.
Целью изобретени вл етс повышение безопасности рекультивационных работ при снижении трудозатрат.The aim of the invention is to improve the safety of remediation work while reducing labor costs.
На чертеже представлена схема предлагаемого способа.The drawing shows the scheme of the proposed method.
Перед началом подземной отработки запасов полезного ископаемого 1 с территории , попадающей в зону подработки и обрушени массива, при помощи драглайна удал ют плодородные пригодные дл рекультивации породы 2 и предварительноBefore the beginning of the underground mining of mineral reserves 1 from the territory that falls into the zone of underworking and collapse of the massif, the fertile minerals suitable for recultivation of rocks 2 and
складируют их за пределами указанной зоны . Затем из скальных пород, доставл емых автотранспортом, в образовавшемс выработанном пространстве отсыпают слой 3 мощностью, соответствующей объему последующего обрушени . Отсыпка скальных пород на неподработанное устойчивое основание исключает возможность возникновени деформации массива и обеспечивает безопасность работ. Глубина зоны обрушени устанавливаетс по аналогии с соседними обрушенными участками. После этого слой скальных пород перекрывают слоем 4 плодородных пригодных дл рекультивации пород из накопительных складов 2 с формированием единого насыпного массива.store them outside the specified zone. Then, from the rocks, delivered by motor transport, in the resulting developed space, layer 3 is filled with a power corresponding to the volume of the subsequent collapse. The dumping of rocks on an untreated, stable foundation eliminates the possibility of an array deformation and ensures safety of work. The depth of the collapse zone is established by analogy with the neighboring collapsed areas. After that, the layer of rock is overlapped with a layer 4 of fertile rocks suitable for recultivation from storage depots 2 with the formation of a single bulk massif.
аbut
Ч)H)
SS
оabout
гоgo
Последующа выемка полезного ископаемого сопровождаетс обрушением горных пород и засыпкой зоны обрушени проседанием насыпного массива, что приводит к выравниванию земной поверхно- сти. Дл рекультивации площади зоны обрушени после отработки запасов полезного ископаемого требуетс лишь чистова планировка поверхности.The subsequent excavation of the mineral is accompanied by the collapse of rocks and backfilling of the zone of collapse by subsidence of the bulk mass, which leads to the leveling of the earth's surface. After reclamation of the area of the collapse after mining of mineral reserves, only a clean planning of the surface is required.
Таким образом, предлагаемый способ позвол ет создать безопасные услови отсыпки пород в границах зон обрушени , сократить продолжительность периода их рекультивации и исключить затраты на доставку пригодных дл рекультивации пород. Кроме того, устран етс возможность накоплени воды на подработанных территори х и опасность ее прорыва в горные выработки.Thus, the proposed method makes it possible to create safe conditions for dumping rocks within the boundaries of the zones of collapse, to reduce the duration of their recultivation period and to eliminate the costs for the delivery of rocks suitable for recultivation. In addition, the possibility of accumulating water in the underworked territories and the danger of its breakthrough into mine workings is eliminated.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU884491455A SU1694902A1 (en) | 1988-10-10 | 1988-10-10 | Method of recultivation of caving zone areas |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU884491455A SU1694902A1 (en) | 1988-10-10 | 1988-10-10 | Method of recultivation of caving zone areas |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1694902A1 true SU1694902A1 (en) | 1991-11-30 |
Family
ID=21403059
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU884491455A SU1694902A1 (en) | 1988-10-10 | 1988-10-10 | Method of recultivation of caving zone areas |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1694902A1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103616293A (en) * | 2013-12-02 | 2014-03-05 | 安徽理工大学 | Secondary deformation compaction simulation experiment device for fractured rocks in caving zone of old goaf of coal mine |
CN103741698B (en) * | 2014-01-23 | 2015-01-07 | 西安科技大学 | Loess hilly-and-gully area coal-mining subsidence and crevice treatment method |
CN103283335B (en) * | 2013-05-22 | 2015-05-06 | 中国矿业大学(北京) | Filling reclamation method for reclaiming coal mining subsidence lands by Yellow River sediment |
CN104652451A (en) * | 2015-01-17 | 2015-05-27 | 西安科技大学 | Coal mining subsidence area administration method for loess hilly-gully region |
-
1988
- 1988-10-10 SU SU884491455A patent/SU1694902A1/en active
Non-Patent Citations (1)
Title |
---|
Авторское свидетельство СССР № 899951, кл. Е 21 С 41/00, 1980. Авторское свидетельство СССР № 628310, кл. Е21 С 41/02, 1977. * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103283335B (en) * | 2013-05-22 | 2015-05-06 | 中国矿业大学(北京) | Filling reclamation method for reclaiming coal mining subsidence lands by Yellow River sediment |
CN103616293A (en) * | 2013-12-02 | 2014-03-05 | 安徽理工大学 | Secondary deformation compaction simulation experiment device for fractured rocks in caving zone of old goaf of coal mine |
CN103616293B (en) * | 2013-12-02 | 2015-10-28 | 安徽理工大学 | Colliery old gob caving band fragmented rock body secondary deformation compaction simulation experimental provision |
CN103741698B (en) * | 2014-01-23 | 2015-01-07 | 西安科技大学 | Loess hilly-and-gully area coal-mining subsidence and crevice treatment method |
CN104652451A (en) * | 2015-01-17 | 2015-05-27 | 西安科技大学 | Coal mining subsidence area administration method for loess hilly-gully region |
CN104652451B (en) * | 2015-01-17 | 2016-05-18 | 西安科技大学 | Coal mining subsidence area ground, Gullied Rolling Loess Region improvement method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108625856A (en) | A kind of mining methods in the two neighboring one ore removal lane of stope of underground mine | |
CN107975373B (en) | A kind of lower continuous digging hard-rock mine method of mechanization of liquid-gas phase transition induction | |
CN103437768B (en) | Pre-set space filling mining method without top column and bottom column | |
CN108915764A (en) | A kind of method of reserved tunnel consolidated fill recycling room formula coal column | |
CN109000525A (en) | A kind of shield driving upper-soft lower-hard ground presplit blasting construction method | |
CN114542069A (en) | Upper-breaking and lower-cutting gob-side entry retaining blasting method for huge thick top plate | |
SU1694902A1 (en) | Method of recultivation of caving zone areas | |
CN108952725B (en) | Low dilution mining method suitable for gentle dip thin ore body | |
RU2348808C2 (en) | Method of preparing bottom of block | |
GB2229747A (en) | A mining method | |
SU1310520A1 (en) | Method of developing salt deposits | |
RU2187646C2 (en) | Method of opencast mining of beded mineral deposits | |
SU1028847A1 (en) | Method of mining thick ore deposits | |
RU2102592C1 (en) | Method for development of strata deposits of minerals | |
RU2762170C1 (en) | Method for developing thin and low-powered steel-falling ore bodies | |
SU1104274A1 (en) | Method of working ore reserves behind controur in quarry near-edge areas | |
CN115183639B (en) | Three-face upper-breaking single-roadway down-cutting blasting construction method for roof-cutting retained roadway | |
SU810974A1 (en) | Ore body mining method | |
RU2118459C1 (en) | Method for burying toxic waste in mine workings | |
SU735804A1 (en) | Method of protecting preparatory mine working | |
Anfyorov et al. | Geotechnological structure of a combined opencast and underground mining method in the condition of integrated development of coal deposits | |
SU1602993A1 (en) | Method of mining mineral deposits | |
RU2164293C2 (en) | Process of working of coal seams | |
SU1701919A1 (en) | Method of opening and development of flat and sloping coal seams | |
SU715798A1 (en) | Method of mining gently sloping ore bodies |