SU1693227A1 - Device for lifting and lowering equipment in boreholes - Google Patents

Device for lifting and lowering equipment in boreholes Download PDF

Info

Publication number
SU1693227A1
SU1693227A1 SU894758530A SU4758530A SU1693227A1 SU 1693227 A1 SU1693227 A1 SU 1693227A1 SU 894758530 A SU894758530 A SU 894758530A SU 4758530 A SU4758530 A SU 4758530A SU 1693227 A1 SU1693227 A1 SU 1693227A1
Authority
SU
USSR - Soviet Union
Prior art keywords
centralizer
branches
rope
installation
rollers
Prior art date
Application number
SU894758530A
Other languages
Russian (ru)
Inventor
Вагиф Алекперович Али-Заде
Эльдар Тарик Оглы Зейналов
Павел Игоревич Новоженин
Original Assignee
Азербайджанский научно-исследовательский и проектно-конструкторский институт нефтяного машиностроения
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Азербайджанский научно-исследовательский и проектно-конструкторский институт нефтяного машиностроения filed Critical Азербайджанский научно-исследовательский и проектно-конструкторский институт нефтяного машиностроения
Priority to SU894758530A priority Critical patent/SU1693227A1/en
Application granted granted Critical
Publication of SU1693227A1 publication Critical patent/SU1693227A1/en

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

Изобретение относитс  к буровому оборудованию и предназначено дл  проведени  спуско-подъемных операций бурильных и насосно-компрессорных труб и насосных штанг при бурении и ремонт е скважин. Цель изобретени -ускорение спуско-подьемных операций на скважинах. На вышке 1 с балконом 2 установлен кронблок, св занный параллельными ветв ми талевого каната (ТК) 5 с раздвоенным талевым блоком. Ценсл с о о OJ ю ю VI The invention relates to drilling equipment and is intended for the tripping of drilling and tubing pipes and pump rods during drilling and repair of wells. The purpose of the invention is the acceleration of round-trip operations in wells. On tower 1 with balcony 2, a crown block is installed, connected by parallel branches of a pulley rope (TC) 5 with a forked pulley block. Tsensl with about about OJ yu VI

Description

Фиг.11

тратор 8 имеет вырез и проемы 15. В проемах 15 установлены ролики 10 и откидные ограничители с замками. Центратор 8 установлен с возможностью перемещени  по ветв м ТК 5 роликами 10 и жестким направл ющим 7, шарнирно подвешенным к крон- блоку. На вышке 1 установлен узел 13 фиксации центратора 8 в отведенном от оси скважины положении. Центратор 8 установлен с возможностью охвата проемами 15Trator 8 has a notch and openings 15. In openings 15 there are rollers 10 and folding stoppers with locks. The centralizer 8 is mounted for movement along the branches of the TC 5 with the rollers 10 and rigid guides 7 pivotally suspended from the crown block. On the tower 1 is installed node 13 fixation of the centralizer 8 in the designated from the axis of the well position. The centralizer 8 is installed with the possibility of coverage by openings 15

ветвей ТК 5 в своем рабочем положении и с возможностью взаимодействи  с узлом 13 при отклонении от оси скважины. Высота установки узла 13 на вышке соответствует исходному рабочему положению центратора 8. При выполнении работ, не св занных с вертикальной расстановкой труб, центра-, тор 8 и направл ющие 7 отвод тс  от оси скважины. 1 з.п.ф-лы, 4 ил.branches of TC 5 in its working position and with the ability to interact with the node 13 when deviating from the axis of the well. The height of installation of the assembly 13 on the rig corresponds to the initial working position of the centralizer 8. When performing work not related to the vertical placement of the pipes, the center-, torus 8 and guides 7 are retracted from the well axis. 1 hp ff, 4 ill.

Изобретение относитс  к буровому оборудованию и предназначено дл  использовани  при проведении спуско-подъемных операций бурильных и насосно-компрес- сорных труб и насосных штанг при бурении - и ремонте скважин,The invention relates to drilling equipment and is intended for use when carrying out tripping operations of drilling and suction pipes and sucker rods during drilling and well repair,

Цель изобретени  - ускорение спуско- подъемных операций.The purpose of the invention is to accelerate tripping operations.

На фиг.1 представлена предлагаема  установка, общий вид; на фиг,2 - центратор и фиксатор центратора, вид сверху; на фиг.З - ролик и ограничитель; на фиг.4 - установка, аксонометри .Figure 1 presents the proposed installation, the overall look; FIG. 2 shows a centralizer and a centralizer retainer, top view; on fig.Z - roller and limiter; figure 4 - installation, axonometric.

Установка содержит вышку 1 с балко- ном 2, в верхней части которой установлен кронблок 3, св занный с раздвоенным талевым блоком 4 параллельными ветв ми талевого каната 5. На талевом блоке 4 подвешен элеватор 6 с замкнутым контуром. К кронб- локу 3 подвешены жесткие направл ющие 7, нижние концы которых имеют возможность перемещени  в горизонтальной плоскости . На нижних концах направл ющих 7 размещен центратор 8, который благодар  наличию кареток 9 имеет возможность вертикального перемещени  по направл ющим 7, а наличию роликов 10 - по ветв м талевого каната 5. На корпусе центратора 8 установлены ограничители 11 талевого каната 5, выполненные откидными в виде разъемного блока (створки с роликом), который удерживаетс  в рабочем положении посредством замка 12, Корпус центратора 8 выполнен в форме огибающей ветви тале- вого каната 5. Дл  удержани  центратора 8 в отклоненном от оси скважины положени  на вышке 1 установлен узел 13 фиксации центратора 8, размещенный на высоте, соответствующей исходному (нижнему) рабочему положению центратора 8, размещенного на упорах вертикальных направл ющих 7. Узел 13 фиксации центратора 8 полуавтоматический: установка центратораThe installation contains a tower 1 with a balcony 2, in the upper part of which a crown block 3 is installed, connected with a forked traveling block 4 with parallel branches of a traveling rope 5. Elevator 6 with a closed contour is suspended on the traveling block 4. Rigid guides 7 are suspended from crown block 3, the lower ends of which have the ability to move in the horizontal plane. At the lower ends of the guides 7 there is a centralizer 8, which, due to the presence of the carriages 9, has the possibility of vertical movement along the guides 7, and the presence of the rollers 10 - along the branches of the talted rope 5. On the case of the centralizer 8, talanted stops 11 are installed. A detachable block (shutter with roller), which is held in working position by means of a lock 12, the body of the centralizer 8 is made in the form of an envelope branch of the hoop rope 5. To hold the centralizer 8 in the position deviated from the well axis 1 is shke fixing unit 13 centralizer 8 disposed at a height corresponding to the original (lower) operative position centralizer 8 disposed on the abutments of the vertical guide 7. Node 13 semiautomatic fixing centralizer 8: installation centralizer

8 в нем происходит автоматически, а освобождение - дистанционно с балкона 2 верхнего рабочего посредством рычажной системы и т ги 14.8 in it occurs automatically, and the release - remotely from the balcony 2 of the upper worker through a lever system and ta 14.

Центратор 8 выполнен с проемами 15, имеет центральное отверстие 16 и установлен с возможностью охвата этими проемами 15 ветвей талевого каната 5 в своем рабочем положении и с возможностью взаимодействи  с узлом 13 фиксации при отклонении от оси скважины. Ролики 10 и ограничители 11 установлены в проемах 15 центратора 8.The centralizer 8 is made with openings 15, has a central hole 16 and is installed with the possibility of covering these openings 15 branches of the pulley rope 5 in its working position and with the ability to interact with the fixing unit 13 when deviating from the axis of the well. The rollers 10 and the limiters 11 are installed in the openings 15 of the centralizer 8.

Установка работает следующим образом ,The installation works as follows

Осуществл етс  подъем колонны труб. Элеватор 6 подхватывает колонну труб под муфту и поднимает ее. При движении талевого блока 4 вверх он доходит до уровн  размещени  центратора 8, стыкуетс  с его приемным конусом. Стыковка обеспечиваетс  благодар  наличию посто нной св зи центратора 8 и талевого блока 4 посредством ветвей талевого каната 5 через ролики 10 и ограничители 11 талевого каната 5. Так как концы направл ющих 7, на которых.раз- мещен центратор 8, имеют возможность перемещени  в горизонтальной плоскости, то центратор 8 и талевый блок 4 посто нно соосны при любых перемещени х последнего , что гарантирует нормальную стыковку этих узлов и реализацию технологического процесса спуска - подъема с совмещением операций.The tubing is being lifted. Elevator 6 picks up the pipe string under the sleeve and lifts it. When the traveling block 4 is moving upwards, it reaches the level of the placement of the centralizer 8 and is joined to its receiving cone. Docking is ensured due to the presence of a permanent connection of the centralizer 8 and the traveling block 4 by means of the branches of the pulley rope 5 through the rollers 10 and the terminators 11 of the pulley rope 5. Since the ends of the guides 7 on which the centralizer 8 is placed, have the ability to move in horizontal then the centralizer 8 and the traveling block 4 are constantly coaxial with any movements of the latter, which guarantees the normal docking of these nodes and the implementation of the descent - ascent process with the combination of operations.

Талевый блок 4 поднимаетс  совместно с центратором 8 до тех пор, пока из скважины не по витс  очередное муфтовое соединение , колонна устанавливаетс  на специальном слайдере (не показан). После этого талевый блок 4 начинает движение вниз вместе с центратором 8, направлением при этом служит сама подн та  труба, замкнута  в элеваторе 6. Верхний конец колонны при этом проходит по талевому блоку 4 и попадает в отверстие центратора 8, где иThe traveling block 4 rises together with the centralizer 8 until the next coupling connection is received from the well, the column is mounted on a special slider (not shown). After this, the traveling block 4 begins to move down along with the centralizer 8, the direction itself is lifted by the pipe, closed in the elevator 6. The upper end of the column passes through the traveling block 4 and falls into the hole of the centralizer 8, where and

центрируетс  при последующих операци х. Спуска сь, центратор 8 каретками 9 садитс  на упоры направл ющих 7, где и остаетс , а талевый блок 4 продолжает движение вниз. Одновременно со спуском элеватора б про- изводитс  развинчивание резьбового соединени . По окончании развинчивани  элеватор 6 опускаетс  ниже муфты колонны, отвинченную трубу (свечу) посредством специального слайдера (трубодержател ) при- поднимают и, раскрыв защелку центратора 8, транспортируют в магазин. Осуществл етс  подъем колонны на длину следующей трубы (свечи) и ее отвинчивание. Процесс повтор етс .centered on subsequent operations. Descending, the centralizer 8 with carriages 9 sits on the stops of the guides 7, where it remains, and the traveling block 4 continues its downward movement. Simultaneously with the descent of the elevator b, the threaded connection is unscrewed. At the end of unscrewing, the elevator 6 is lowered below the column coupling, the unscrewed tube (candle) is lifted by means of a special slider (tube holder) and, opening the centralizer latch 8, is transported to the magazine. The column is lifted to the length of the next pipe (candle) and unscrewed. The process is repeated.

Спуск колонны производитс  в обратной последовательности....,The descent of the column is carried out in reverse order ....,

После окончани  рабогс трубами установка переналаживаетс  дл  работы со штангами либо дл  работ в скважине, либо на устье, т.е. дл  работ, не св занных с вертикальной расстановкой труб.After completion of the pipework, the installation is re-adjusted to work with rods, either for work in the well or at the wellhead, i.e. for works not related to vertical placement of pipes.

Переналадка заключаетс  в освобождении центратора 8 от св зи с ветв ми талевого каната 5 и отклонени  его от оси скважины вместе с направл ющими 7.The re-adjustment consists in releasing the centralizer 8 from communication with the branches of the hoist rope 5 and deviating it from the axis of the well with the guides 7.

Дл  этого талевый блок 4 опускаетс  ниже уровн  балкона 2, центратор 8 остаемс  установленным на нижних концах направл ющих 7. Св зь центратора 8 с ветв ми талевого каната осуществл етс  посредством роликов 10 и ограничителей 11 талевого каната 5. В закрытом положении ограничитель 11 удерживает замок 12. Дл  открыти  ограничител  11 необходимо от- крыть замок 12, а закрываетс  он автоматически . Количество роликов 10 и ограничителей 11 может быть различным в зависимости от оснастки талевой системы, массы центратора и талевого блока, дина- мических показателей талевой системы и так далее, но не менее двух.For this, the traveling block 4 descends below the level of the balcony 2, the centralizer 8 remains mounted on the lower ends of the guides 7. The connection of the centralizer 8 to the branches of the rope cable is carried out by means of the rollers 10 and the stops 11 of the roller cable 5. In the closed position, the stop 11 holds the lock 12. To open the limiter 11, it is necessary to open the lock 12, and it closes automatically. The number of rollers 10 and limiters 11 can vary depending on the equipment of the pulley system, the mass of the centralizer and the pulley block, the dynamic indicators of the pulley system, and so on, but not less than two.

Дл  открыти  ограничителей 11 открываетс  замок 12. Створки поворачиваютс  внутрь корпуса центратора, после чего цен- тратор 8, расположенный на нижних концах направл ющих 7, подвешенных к кронблоку 3, отклон етс  от оси скважины до попадани  в узел 13 фиксации центратора 8, где автоматически устанавливаетс  на защелку. В результате центратор 8 исключаетс  из технологического процесса и полностью освобождает рабочее пространство в проеме балкона верхнего рабочего. Дл  увеличени To open the stops 11, the lock 12 opens. The flaps turn inside the centralizer housing, after which the centering 8, located at the lower ends of the guides 7 suspended from the crown block 3, deviates from the borehole axis until it reaches the central fixation unit 13, where mounted on the latch. As a result, the centralizer 8 is excluded from the process and completely frees the working space in the opening of the upper working balcony. To increase

эффекта одновременно с отклонением центратора 8 и направл ющих 7 также убираютс  направл ющие пазы, размещенные в проеме балкона верхнего рабочего параллельно боковым гран м вышки, в которых в рабочем положении наход тс  нижние концы направл ющих 7.the effect simultaneously with the deviation of the centralizer 8 and the guides 7 also remove the guide grooves placed in the upper balcony opening of the working side parallel to the side faces of the tower in which the lower ends of the guides 7 are in working position.

При переходе к работам, св занным с вертикальной расстановкой труб при производстве СПО с совмещением операций центратор 8 и направл ющие 7 необходимо вернуть в рабочее положение на ось скважины . Дл  этого талевый блок 4 спускаетс  ниже уровн  балкона 2, с балкона 2 верхнего рабочего за т гу 14 через рычажную систему поднимаетс  упор узла 13 фиксации центратора 8, после чего центратор 8 с направл ющими 7 под собственным весом возвращаетс  в исходное положение. Верхний рабочий провер ет правильность установки центратора 8 относительно ветвей талевого каната 5, закрывает ограничители 11 (створки разъемных блоков) на центраторе 8, причем замки 12 закрываютс  автоматически . Центратор 8 готов к работеDuring the transition to works associated with vertical pipe placement during the production of open-area synthetic gas, the centralizer 8 and guide rails 7 must be returned to the working position on the well axis. For this, the traveling block 4 descends below the level of the balcony 2, from the balcony 2 of the upper workman, after thrust 14, the emphasis of the fixation unit 13 of the centralizer 8 rises through the lever system, after which the centralizer 8 with guides 7 returns to its original position under its own weight. The upper worker checks the installation of the centralizer 8 with respect to the branches of the pulley rope 5, closes the stops 11 (flaps of the separable blocks) on the centralizer 8, and the locks 12 are closed automatically. The centralizer 8 is ready for operation.

Claims (2)

Формула изобретени  1.Установка дл  проведени  спуско- подъемных операций на скважинах, содержаща  вышку с балконом, св занные параллельными ветв ми талевого каната кронблок и раздвоенный талевый блок с элеватором, центратор с центральным отверстием , вырезом, роликами и ограничител ми , установленный с возможностью перемещени  по ветв м талевого каната и жестким направл ющим, шарнирно подвешенным к кронблоку, отличающа с  тем, что, с целью ускорени  спуско-подъем- ных операций, она снабжена узлом фиксации центратора, установленным на вышке, центратор выполнен с проемами и установлен с возможностью охвата этими проемами ветвей талевого каната в своем рабочем положении и с возможностью взаимодействи  с узлом фиксации при отклонении от оси скважины, ролики и, ограничители установлены в проемах центратора, при этом ограничители выполнены откидными и имеют замки.Claim 1. An installation for running tripping operations on wells, comprising a tower with a balcony, connected with parallel branches of a tandem rope crownblock and a forked traveling block with an elevator, centralizer with a central hole, cut-out, rollers and restraints mounted for movement along the branches of the pulley rope and rigid guides hingedly mounted to the crown block, characterized in that, in order to accelerate the descent and lifting operations, it is equipped with a centralizer fixing unit mounted on rig, centralizer is made with openings and is installed with the possibility of covering these branches of the branches of the rope rope in its working position and with the ability to interact with the fixation unit when deviating from the axis of the well, rollers and limiters are installed in the centralizer openings, and . 2.Установка поп.1,отличающэ - с   тем, что высота установки фиксатора на вышке соответствует исходному рабочему положению центраторе)2. Installation pop. 1, distinguished by the fact that the installation height of the lock on the tower corresponds to the initial working position of the centralizer) 11eleven Фиг.ЗFig.Z ftft ФигЛFy Редактор И.Горна Editor I.Gorn Составитель А.СвистуновCompiled by A.Svistunov Техред М.МоргенталКорректор Н.КорольTehred M.MorgentalKorrektor N.Korol уat ЧH ролroll уat
SU894758530A 1989-11-13 1989-11-13 Device for lifting and lowering equipment in boreholes SU1693227A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU894758530A SU1693227A1 (en) 1989-11-13 1989-11-13 Device for lifting and lowering equipment in boreholes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU894758530A SU1693227A1 (en) 1989-11-13 1989-11-13 Device for lifting and lowering equipment in boreholes

Publications (1)

Publication Number Publication Date
SU1693227A1 true SU1693227A1 (en) 1991-11-23

Family

ID=21479309

Family Applications (1)

Application Number Title Priority Date Filing Date
SU894758530A SU1693227A1 (en) 1989-11-13 1989-11-13 Device for lifting and lowering equipment in boreholes

Country Status (1)

Country Link
SU (1) SU1693227A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2549650C2 (en) * 2013-06-03 2015-04-27 Открытое акционерное общество "Завод бурового оборудования" Drill rig

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР Ns1157203,кл. Е 21 В 19/00, 1984 Авторское свидетельство СССР № 945360, кл. Е 21 В 19/00, 1980. 7 А 13 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2549650C2 (en) * 2013-06-03 2015-04-27 Открытое акционерное общество "Завод бурового оборудования" Drill rig

Similar Documents

Publication Publication Date Title
US3791442A (en) Coupling means for a riser string run from a floating vessel to a subsea well
EP1354122B1 (en) Collar load support system and method
US3404741A (en) Automated system and drilling rig for continuously and automatically pulling and running a drill-pipe string
US7997333B2 (en) Segmented bottom guide for string elevator assembly
US3021909A (en) Means for offshore drilling
NO854520L (en) UNDERGROUND FAN
EA006004B1 (en) Method and arrangement for well completion by a workover riser connection
US3163217A (en) Method and apparatus for hanging pipe in an underwater well
US3047078A (en) Method and apparatus for offshore drilling
SU1693227A1 (en) Device for lifting and lowering equipment in boreholes
KR20010032980A (en) Floating installation
US4706757A (en) Wellhead supported subsea templates and methods
CN112096273A (en) Efficient operation drilling machine and method
CN217055061U (en) Equipment suitable for operation is pressed in shallow low pressure oil well area
CN112096274B (en) Efficient operation drilling machine and method
CN114673461A (en) Equipment suitable for operation is pressed in shallow low pressure oil well area
US3561535A (en) Method for simultaneously guiding at least two insertable mechanisms in a well tubing
SU1078025A1 (en) Apparatus for performing tripping operations with drilling stands
US5687793A (en) Apparatus for use in lowering a well pipe into alignment with a subsea conduit
US3050138A (en) Guide system for underwater wells
SU1667637A3 (en) Mechanical packer
RU2039205C1 (en) Oil well drilling packer
US3179178A (en) Method and apparatus for stripping well pipes
SU1645440A1 (en) Apparatus for centering traveling block and drill pipes
SU1740615A1 (en) Device for pipes transfer to rig rod receiver