SU1689518A1 - Land restoring method for open pit mining fields - Google Patents
Land restoring method for open pit mining fields Download PDFInfo
- Publication number
- SU1689518A1 SU1689518A1 SU894705540A SU4705540A SU1689518A1 SU 1689518 A1 SU1689518 A1 SU 1689518A1 SU 894705540 A SU894705540 A SU 894705540A SU 4705540 A SU4705540 A SU 4705540A SU 1689518 A1 SU1689518 A1 SU 1689518A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- open pit
- land
- pit mining
- volume
- space
- Prior art date
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Description
Изобретение относится к горным работам, в частности к способу рекультивации территории, нарушенной открытыми горными работами. Цель изобретения - восстановление рельефа поверхности, наиболее близкого к первоначальному. В выработанном пространстве карьера строят в наземных условиях подземноеThe invention relates to mining, in particular to a method of reclamation of the territory disturbed by open-pit mining. The purpose of the invention is the restoration of the surface relief closest to the original. Underground conditions are built in the developed quarry
народнохозяйственное сооружение, объем которого равен объему тела извлеченного полезного ископаемого. Заполняют отвальными и селективно вскрышными породами выработанное пространство карьера и наносят плодородный слой. 1 ил.economic structure, the volume of which is equal to the volume of the body of the extracted mineral. Fill the developed space of the quarry with dumps and selectively overburden rocks and apply a fertile layer. 1 il.
ΌΌ
Изобретение относится к области открытых горных работ, в частности к способу рекультивации территории, нарушенной открытыми горными работами.The invention relates to the field of open pit mining, in particular to a method for reclaiming a territory disturbed by open pit mining.
Цель изобретения - восстановление рельефа поверхности, наиболее близкого к первоначальному.The purpose of the invention is the restoration of the surface relief closest to the original.
На чертеже представлен карьер, поперечное сечение.The drawing shows the pit, the cross section.
Поставленная цель достигается тем, что согласно предлагаемому способу перед заполнением выработанного пространства отвальными и вскрышными породами объем выработанного пространства, равный объему тела извлеченного полезного ископаемого, замещают конструкцией подземного сооружения, Нанесение на сооружение отвальных и вскрышных пород может быть осуществлено посредством рекультивации. При этом отвальными породами заполняют.This goal is achieved by the fact that according to the proposed method, before filling out the excavated space with waste and overburden, the volume of the exhausted space, equal to the volume of the body of the extracted mineral, is replaced by the structure of the underground structure. At the same time fill the rocks.
пространство между стенами сооружения и бортами карьера (разреза), а вскрышные породы и плодородный слой наносят селективно в соответствии со стратиграфической колонкой месторождения суметом коэффициента разрыхления на уплотнение массива.the space between the walls of the structure and the pit walls (cut), and the overburden rocks and the fertile layer are applied selectively in accordance with the stratigraphic column of the field with the coefficient of loosening on the compaction of the massif.
Способ осуществляется следующим образом.The method is as follows.
В выработанном пространстве карьера (разреза), ограниченном контуром 1, строят в наземных условиях подземное сооружение 2, объем которого по наружному контуру 3 равен объему тела извлеченного полезного ископаемого, заполняют отвальными породами пространство 4, оставшееся между бортами контура карьера (разреза) 1 и стенами сооружения 2, а затем наносят селективно в соответствии со стратиграфической колонкой месторождения вскрышные породы 5 и плодородный слой 6.In the open pit (cut) space bounded by circuit 1, an underground structure 2 is built on the ground, the volume of which along the outer contour 3 is equal to the volume of the body of the extracted mineral, is filled with space 4 with waste rocks between the edges of the pit and the walls structures 2, and then selectively apply overburden 5 and fertile layer 6 in accordance with the stratigraphic column of the deposit.
1689518А11689518A1
33
16895181689518
4four
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU894705540A SU1689518A1 (en) | 1989-05-10 | 1989-05-10 | Land restoring method for open pit mining fields |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU894705540A SU1689518A1 (en) | 1989-05-10 | 1989-05-10 | Land restoring method for open pit mining fields |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1689518A1 true SU1689518A1 (en) | 1991-11-07 |
Family
ID=21454334
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU894705540A SU1689518A1 (en) | 1989-05-10 | 1989-05-10 | Land restoring method for open pit mining fields |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1689518A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110616722A (en) * | 2019-09-23 | 2019-12-27 | 中南大学 | Slope safety design method and device for strip mine mining boundary and storage medium |
-
1989
- 1989-05-10 SU SU894705540A patent/SU1689518A1/en active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110616722A (en) * | 2019-09-23 | 2019-12-27 | 中南大学 | Slope safety design method and device for strip mine mining boundary and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2719894C1 (en) | Method of combining operations for extraction of minerals and restoration of lands during development of steep-dipping deposits | |
SU1689518A1 (en) | Land restoring method for open pit mining fields | |
SU926288A1 (en) | Method for hydraulically deposing muck in stock-piles and tail storage facilities | |
US3809430A (en) | Slope cave leaching of exposed or near-surface mineralized deposits | |
RU1838506C (en) | Method for recultivation of territory destroyed by opencast mining | |
SU1104273A1 (en) | Method of dump technical reclamation | |
Cheskidov et al. | Methodological basis for calculating parameters of direct dumping flowsheets in open pit mining of gently dipping coal beds | |
RU1808910C (en) | Method for reclamation of land damaged by open-pit mining | |
SU1723326A1 (en) | Method for recultivation of land broken by open-pit mining | |
CN109024539A (en) | Rainy band airport cliff of displacement area high roadbed construction method | |
RU2201949C2 (en) | Drilling reject burial method | |
SU1097793A1 (en) | Method of strip mining of horizontal and gently-sloping beds of minerals | |
RU2014453C1 (en) | Method for control of rock pressure | |
SU1254174A1 (en) | Method of controlling deformation processes in rock body | |
SU1162975A1 (en) | Method of excavating coal beds | |
SU1146450A1 (en) | Method of protecting undermined structures and natural objects when working suits of mineral beds | |
SU865144A1 (en) | Reclamation method | |
SU709811A1 (en) | Method of control of shifting of rock massive | |
RU1776310C (en) | Method of working of natural resources | |
RU95104482A (en) | Method for reclamation of slopes in open cutting | |
SU735804A1 (en) | Method of protecting preparatory mine working | |
Zagibalov et al. | Resilience Analysis of Face Slopes and Internal Dumps and Causes of their Instability at “Mugunsky” Opencast Coal Mine | |
RU1776309C (en) | Method for protective mine working while developing very deep mineral deposits | |
SU1745959A1 (en) | Method of holding swelling ground in working | |
SU1270332A1 (en) | Method of forming salt dumps |