SU1678963A1 - Drain spoil bank - Google Patents

Drain spoil bank Download PDF

Info

Publication number
SU1678963A1
SU1678963A1 SU894755903A SU4755903A SU1678963A1 SU 1678963 A1 SU1678963 A1 SU 1678963A1 SU 894755903 A SU894755903 A SU 894755903A SU 4755903 A SU4755903 A SU 4755903A SU 1678963 A1 SU1678963 A1 SU 1678963A1
Authority
SU
USSR - Soviet Union
Prior art keywords
drainage
dump
hydraulic
layers
hydraulic dump
Prior art date
Application number
SU894755903A
Other languages
Russian (ru)
Inventor
Георгий Иванович Кузнецов
Татьяна Раймондовна Кондратьева
Original Assignee
Сибирский филиал Всесоюзного научно-исследовательского института гидротехники им.Б.Е.Веденеева
Сибирское Отделение Внипиэнергопрома
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Сибирский филиал Всесоюзного научно-исследовательского института гидротехники им.Б.Е.Веденеева, Сибирское Отделение Внипиэнергопрома filed Critical Сибирский филиал Всесоюзного научно-исследовательского института гидротехники им.Б.Е.Веденеева
Priority to SU894755903A priority Critical patent/SU1678963A1/en
Application granted granted Critical
Publication of SU1678963A1 publication Critical patent/SU1678963A1/en

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

Изобретение относитс  к гидротехническому строительству, в частности к конструкци м гидроотвалов. Цель изобретени  - повышение надежности гидроотвала путем улучшени  режима работы его дренажной системы. Дренированный гидроотвал включает первичную дамбу 1, дамбочки 4 наращивани  и массив 2 намывных отложений с горизонтальными дренирующими прослойками 3. Дренирующие прослойки 3 соединены с наклонным дренирующим слоем 5 на откосе намывного массива, выведенным в основной горизонтальный дренаж 6. Фильтрат по теплоизолированному коллектору 7 отводитс  в сборную емкость 8, а все элементы дренажной системы защищены от промерзани  теплоизол ционной грунтовой призмой 9. 2 з.п. ф-лы, 1 ил. (Л сFIELD OF THE INVENTION The invention relates to hydraulic construction, in particular to the construction of water dumps. The purpose of the invention is to increase the reliability of the hydraulic mine dump by improving the mode of operation of its drainage system. The drained hydraulic dump includes the primary dam 1, dams 4 building and an array of 2 alluvial deposits with horizontal drainage layers 3. Drainage layers 3 are connected with an inclined drainage layer 5 on the drainage array that is brought into the main horizontal drainage 6. The filtrate through the heat-insulated collector 7 is removed. capacity 8, and all elements of the drainage system are protected from frostbite by thermal insulating soil prism 9. 2 Cp f-ly, 1 ill. (L with

Description

Изобретение относится к гидротехническому строительству, в частности к конструкциям гидроотвалов (золоотвалов, хвостохранилищ и т.п.) в суровых климатических условиях.The invention relates to hydraulic engineering, in particular to the construction of hydraulic dumps (ash dumps, tailings, etc.) in harsh climatic conditions.

Целью изобретения является повышение надежности гидроотвала путем улучшения режима работы его дренажной системы.The aim of the invention is to increase the reliability of the hydraulic dump by improving the operating mode of its drainage system.

На чертеже показано поперечное сечение гидроотвала.The drawing shows a cross section of a hydraulic dump.

Гидроотвал включает первичную дамбу 1, выполненную из местных грунтов. На поверхность каждого яруса 2 намывных отложений отсыпаны горизонтальные дренирующие прослойки 3 и дамбочки 4 наращивания, а на поверхность откоса, сформированную при отсыпке дамбочек наращивания, отсыпан наклонный дренирующий слой 5, соединенный с основным перехватывающим горизонтальным дренажом 6, из которого фильтрационные воды отведены по теплоизолированному коллектору 7 в теплоизолированную водосборную емкость 8. Ярусы теплоизоляционной призмы 9 возведены одновременно с соответствующими ярусами основного массива гидроотвала. Положение кривой 10 депрессии показано для последнего этапа наращивания гидроотвала,The hydraulic dump includes a primary dam 1 made of local soil. On the surface of each tier 2 of alluvial deposits, horizontal drainage layers 3 and building dams 4 are poured, and an inclined drainage layer 5 connected to the main intercepting horizontal drainage 6, from which filtration water is diverted to a heat-insulated collector, is poured onto the slope surface formed when the building dams are poured. 7 into a heat-insulated drainage tank 8. The tiers of the heat-insulating prism 9 are erected simultaneously with the corresponding tiers of the main array of the hydraulic dump. The position of curve 10 of the depression is shown for the last stage of building the hydraulic dump,

Гидроотвал возводят и эксплуатируют следующим образом.The hydraulic dump is constructed and operated as follows.

На подготовленное известными способами основание отсыпают первичную дамбу 1, располагают горизонтальный дренаж 6, отводящий коллектор 7 и водосборную емкость 8, после чего осуществляют намыв первого яруса 2 гидроотвала. Затем на поверхность намывных отложений первого яруса 2 отсыпают дренирующую прослойку 3 (эту операцию целесообразно выполнять в зимний период, используя более высокую несущую способность сезонно-мерзлого слоя намывных отложений первого яруса 2.On the base prepared by known methods, the primary dam 1 is poured, a horizontal drainage 6, a discharge collector 7 and a drainage tank 8 are placed, after which the first tier 2 of the hydraulic dump is washed. Then, drainage layer 3 is poured onto the surface of the alluvial deposits of the first tier 2 (this operation is advisable to perform in the winter, using the higher bearing capacity of the seasonally frozen layer of alluvial deposits of the first tier 2.

Далее известными способами отсыпают дамбочку 4 наращивания и ведут намыв второго яруса 2 гидроотвала, в аналогичной последовательности возводят все осталь ные ярусы 2. На низовой откос, сформированный при отсыпке первичной дамбы 1 и дамбочек 4 наращивания, по мере возведения каждого яруса 2 гидроотвала отсыпают наклонный дренирующий слой 5, пригружая его с низовой стороны отсыпкой грунта соответствующего яруса теплоизоляционной призмы 9. При такой последовательности выполнения технологических операций по намыву и наращиванию гидроотвала, устройству дренажной системы и отсыпке теплоизоляционной призмы 9 обеспечивается надежное дренирование гидроотвала с начала его эксплуатации и постепенное включение новых дренирующих элементов дамбочек 4 наращивания и дренирующих слоев 5 по мере роста высоты сооружения.Then, by known methods, fill the ramp 4 of the building and wash the second tier 2 of the hydraulic dump, erect the remaining tiers 2 in the same sequence. On the lower slope formed during the filling of the primary dam 1 and dams 4 of the ramp, the inclined drainage is dumped as each tier 2 of the hydraulic dump is erected. layer 5, loading it from the bottom side by filling the soil with the corresponding tier of the heat-insulating prism 9. With this sequence of technological operations for washing and building a hydraulic dump The device of the drainage system and the dumping of the heat-insulating prism 9 ensure reliable drainage of the hydraulic dump from the beginning of its operation and the gradual inclusion of new drainage elements of the dam dams 4 and drainage layers 5 as the height of the structure increases.

Claims (3)

Формула изобретенияClaim 1. Дренированный гидроотвал, включающий первичную дамбу, дамбочки наращивания и массив намывных отложений с горизонтальными дренирующими прослойками, отсыпанными с интервалом по высоте относительно друг друга, отличающийс я тем, что, с целью повышения надежности гидроотвала путем улучшения режима его дренажной системы, он снабжен наклонным дренирующим слоем и основным перехватывающим горизонтальным дренажем, при этом дренирующие прослойки соединены с наклонным дренирующим слоем, отсыпанным на низовой откос намывного массива гидроотвала и выведенным в основной перехватывающий горизонтальный дренаж, а все дренирующие элементы защищены от промерзания грунтовой теплоизоляционной призмой.1. Drained hydraulic dump, including a primary dam, building dams and an array of alluvial deposits with horizontal drainage layers sprinkled at intervals in height relative to each other, characterized in that, in order to increase the reliability of the hydraulic dump by improving its drainage system, it is equipped with an inclined drainage layer and the main intercepting horizontal drainage, while the drainage layers are connected to an inclined drainage layer, sprinkled on the lower slope of the alluvial massif ala and derived in the main intercepting horizontal drainage, and draining all the elements are protected from freezing ground insulating prism. 2. Г идроотвал поп. 1, отл и ча ю щийс я тем, что горизонтальный дренаж соединен теплоизолированным отводящим коллектором с теплоизолированной водосборной емкостью, размещенной за пределами гидроотвала.2. Mr. Hydro dump pop. 1, distinguished by the fact that the horizontal drainage is connected by a thermally insulated outlet collector to a thermally insulated drainage tank located outside the hydraulic dump. 3. Г идроотвал поп. 1, о тл и ч а ю щ и йс я тем, что теплоизоляционная призма размещена по обе стороны от границы промерзания откоса.3. G ido dump pop. 1, due to the fact that the heat-insulating prism is placed on both sides of the freezing boundary of the slope.
SU894755903A 1989-09-12 1989-09-12 Drain spoil bank SU1678963A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU894755903A SU1678963A1 (en) 1989-09-12 1989-09-12 Drain spoil bank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU894755903A SU1678963A1 (en) 1989-09-12 1989-09-12 Drain spoil bank

Publications (1)

Publication Number Publication Date
SU1678963A1 true SU1678963A1 (en) 1991-09-23

Family

ID=21477929

Family Applications (1)

Application Number Title Priority Date Filing Date
SU894755903A SU1678963A1 (en) 1989-09-12 1989-09-12 Drain spoil bank

Country Status (1)

Country Link
SU (1) SU1678963A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1297713C (en) * 2004-07-15 2007-01-31 国家电力公司华东勘测设计研究院 Back ward water draining system of face plate rock-fill dam dam body and its construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Трунков Т.Т. Изучение вли ни дренажных устройств на устойчивость хвостохра- нилищ. - В кн. Транспорт и складирование отходов производства в услови х повышени требований к защите окружающей среды. - Л., 1980, с. 55-59 (Междуведомств, сборник научных трудов (Механобр). Гальперин A.M. Управление состо нием намывных массивов на горных предпри ти х. - М.: Недра, 1988, с. 126. 127, рис. 42. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1297713C (en) * 2004-07-15 2007-01-31 国家电力公司华东勘测设计研究院 Back ward water draining system of face plate rock-fill dam dam body and its construction method

Similar Documents

Publication Publication Date Title
US4877350A (en) Foundation waterproofing method
SU1678963A1 (en) Drain spoil bank
RU2742145C1 (en) Alluvial hydraulic structure
SU1778218A1 (en) Method for erection of hydraulic mine dump
SU1528845A1 (en) Method of storing hydraulically deposited rock
RU2026122C1 (en) Method of storing industrial waste
SU1167254A1 (en) Method of erecting earth dam by hydraulic mechanisation techniques
SU1684405A1 (en) Method for erecting fill-up dike of hydraulic dump
RU2382847C1 (en) Method for stocking of granular waste in sludge pond section and into body of conservation over section
SU1698354A1 (en) Method of erecting weirs
SU1049662A1 (en) Method of internal dumping of water-saturated rock
SU1701796A1 (en) Guarding dike of water accumulator on frozen base
SU1576639A1 (en) Dam of hydraulic filling
RU2385988C1 (en) Compartment of sludge pond of industrial enterprises wastes
RU1778219C (en) Method for screening of hydraulic mine-dump bed
Newman Earthwork Slips and Subsidences Upon Public Works: Their Causes, Prevention, and Reparation. Especially Written to Assist Those Engaged in the Construction Or Maintenance of Railways, Docks, Canals, Roads, Waterworks, River-banks, Reclamation Embankments, Drainage Works, Etc
RU2039151C1 (en) Washed-up hydraulic structure
SU1581806A1 (en) Bridge pier
SU1738900A1 (en) Method of screen wash-up on accumulator skirting
SU1020578A1 (en) Method of developing hydraulic mining pits when working frozen soil
RU2037008C1 (en) Tailings dump fencing embankment
SU1772312A1 (en) Hydraulic structure built by hydraulic filling
RU1816861C (en) Method for production of sapropel
SU1372015A1 (en) Method of emptying old silted water reservoirs
SU1234512A1 (en) Method of constructing earth-fill dam