SU1580036A1 - Method of stowing underground cavities in mining pilars of useful mineral - Google Patents

Method of stowing underground cavities in mining pilars of useful mineral Download PDF

Info

Publication number
SU1580036A1
SU1580036A1 SU884444886A SU4444886A SU1580036A1 SU 1580036 A1 SU1580036 A1 SU 1580036A1 SU 884444886 A SU884444886 A SU 884444886A SU 4444886 A SU4444886 A SU 4444886A SU 1580036 A1 SU1580036 A1 SU 1580036A1
Authority
SU
USSR - Soviet Union
Prior art keywords
laid
pipelines
section
initial
pit
Prior art date
Application number
SU884444886A
Other languages
Russian (ru)
Inventor
Виктор Иванович Осадчий
Original Assignee
Московский Горный Институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Московский Горный Институт filed Critical Московский Горный Институт
Priority to SU884444886A priority Critical patent/SU1580036A1/en
Application granted granted Critical
Publication of SU1580036A1 publication Critical patent/SU1580036A1/en

Links

Landscapes

  • Paper (AREA)

Abstract

Изобретение относитс  к горной промышленности и предназначено дл  заполнени  подземных горных выработок. Цель - снижение затрат на закладочные работы. Пульпопроводы сооружают из отдельных укроченных трубопроводов (УТП) 4, укладываемых в горной выработке отдельно дл  каждого изолированного участка выработанного пространства (УВП). Укладывают УТП перпендикул рно линии простирани  борта карьера (БК) 10. Начальный участок каждого УТП с заглушкой 6 вывод т за пределы соседнего ближнего к БК изолированного УВП. По мере подвигани  БК начальные участки УТП вскрывают, к ним подключают узел пультообразовани  13 и при помощи пультонасоса 11 в УВП закачивают гидросмесь. Вместе с УТП в горной выработке прокладывают дренажный трубопровод 7, по которому насосом из водосборника 9 дренируемую из УВП воду перекачивают в ызел пультообразовани  13. 1 з.п. ф-лы, 2 ил.The invention relates to the mining industry and is intended to fill underground mines. The goal is to reduce the cost of backfilling. The pulp lines are constructed from separate strengthened pipelines (CTS) 4, which are laid in the mine workings separately for each isolated section of the open space (CIP). The UTP is laid perpendicularly to the line of the pit open-pit (BC) 10. The initial section of each UTP with plug 6 is taken out of the adjacent nearest to the BC of the isolated UVP. As the BC moves, the initial areas of the UTP are opened, a remote-forming unit 13 is connected to them, and a hydraulic mixture is pumped into the CIP with the help of a remote pump 11. Together with the USP, a drainage pipeline 7 is laid in the mine working, through which the water drained from the CWP is pumped by a pump from the sump 9 to the control panel 13. 1 Cp. f-ly, 2 ill.

Description

А-АAa

ЈJ

ёyo

Фаг. 2Phage. 2

Изобретение от1 оснтс  к горной промышленности и може: бьпь использовано при разработке месторожд нчй полезных ископаемых с закладкой выработанного пространства .The invention of ot1 osts to the mining industry and may be used in the development of mineral deposits with the laying of the goaf.

Цель изобретени  - снижение затрат на закладочные работы.The purpose of the invention is to reduce the cost of backfilling.

На фиг. 1 изображена схема закладки изолированных участков выработанного пространства; на фиг. 2 - разрез А-А на фиг. 1.FIG. 1 shows a diagram of the laying of isolated areas of the goaf; in fig. 2 shows section A-A in FIG. one.

Изолированные участки выработанного пространства 1 заполн ют гидросмесью 2. Дл  этого предварительно изолируют выработки с помощью бетонных перемычек 3, устанавливаемых в транспортных заездах в выработки. В подземных выработках заранее на безопасном рассто нии от борта карьера укладывают (перпендикул рно линии простирани  карьера) отрезки закладочного трубопровода 4. Длина каждого укороченного трубопровода равна опережению , с которым ведетс  закладка подземных пустот относительно добычного уступа карьера. Дальний от борта карьера конец (конечный участок) каждого укороченного трубопровода завод т в изолированные участки выработанного пространства 1 через наклонные скважины 5 или через восстающие - под кровлю. Ближний к борту карьера (начальный участок) каждого отрезка трубопровода вывод т за пределы соседнего ближнего к борту изолированного участка и закрывают заглушкой 6. Р дом с отрезками закладочного трубопровода укладывают дренажный трубопровод 7, конечный участок которого размещен у узла пульпо- образовани . Насосной станцией 8 откачивают обратно в карьер к месту пульпо- образовани  воду, дренирующую из заложенных выработок. Воду откачивают из подземного водосборника 9. По мере под- вигани  рабочих уступов карьера 10 вскрывают начальные участки (заглушенные концы ) отрезков трубопроводов, снимают заглушки 6, подключают к трубопроводу пуль- понасос 11.The isolated areas of the excavated space 1 are filled with slurry 2. For this purpose, the workings are pre-insulated using concrete bridges 3 installed in transport runs into the workings. In underground workings, segments of a filling pipeline 4 are laid (perpendicular to the stretch of the quarry) at a safe distance from the pit side. The length of each shortened pipeline is equal to the advance with which the underground cavities are laid relative to the mining ledge of the quarry. The end (end section) of each shortened pipeline furthest from the pit’s side is led into isolated areas of the open space 1 through inclined wells 5 or through rising walls under the roof. The pit closest to the board (the initial section) of each section of the pipeline is taken out of the neighboring section adjacent to the board of the isolated section and closed with a plug 6. A drainage pipeline 7 is placed near the filling pipeline segments, the end section of which is located at the slurry unit. Pump station 8 is pumped back into the quarry to the place of pulp formation, water draining from the laid excavations. Water is pumped out of the underground water collector 9. As the workers of the ledge of the open-pit 10 pry up, the initial sections (blocked ends) of pipeline sections are opened, plugs 6 are removed, connected to the submersible pump pipeline 11.

Доставл емый автотранспортом закладочный материал в зумпфе 13 (узле пуль- пообразовани ) преобразуют в пульпу и пульпонасосом перекачивают в подземную выработку (изолированный участок выработайного пространства), в которую выходит конечный участок закладочного трубопровода . Дл  приготовлени  пульпы используют воду, подаваемую от подземной насосной станции 8 по дренажному трубопроводу 7.The stowing material delivered by motor transport in the sump 13 (pulper formation unit) is transformed into pulp and pumped by the pulp pump into an underground excavation (an isolated section of the mining space), into which the end section of the filling pipeline goes. For pulp preparation, water supplied from the underground pumping station 8 through the drainage pipeline 7 is used.

Если угол наклона закладочного трубопровода большой, то пульпу подают в подземные выработки самотеком. По мере подвига ни  рабочих уступов карьера, переноса зумпфа 13 в карьере и водосборника 9 под землей дренажный трубопровод 7 укорачивают в карьере и наращивают под землей .If the angle of inclination of the filling pipeline is large, then the pulp is fed into the underground workings by gravity. As far as the working steps of the quarry, the transfer of the sump 13 in the quarry and the sump 9 under the ground, the drainage pipeline 7 is shortened in the quarry and increased underground.

Claims (2)

1.Способ закладки подземных пустот при выемке целиков полезного ископаемого, включающий сооружение пульпопроводов до изолированных участков выработанного пространства и поочередную их гидрозакладку путем подключени  начальных участков пульпопроводов к узлу пульпообразовани , расположенного на дневной поверхности за бортом карьера, отличающийс  тем, что, с целью снижени  затрат на закладочные работы, пульпопроводы сооружают в виде отд дельных отрезков трубопроводов, которые укладывают параллельно в подземном выработанном пространстве с выводом начальных участков за пределы соседнего ближнего к борту карьера изолированного участка выработанного пространства, а подклю5 чают начальные участки отрезков трубопроводов к узлу пульпообразовани  по мере их вскрыти  подвигающимс  бортом карьера.1. Method of laying underground voids during excavation of the entire mineral deposits, including the construction of slurry pipelines to isolated areas of exhausted space and their alternate hydraulic folding by connecting the initial sections of slurry pipelines to a slurry unit located on the surface of the open pit, which is designed to reduce costs for filling works, slurry pipelines are constructed in the form of individual sections of pipelines, which are laid in parallel in an underground mine anstve with terminal portions beyond the initial low adjacent to the side of the island portion career gob and podklyu5 chayut initial portions pipeline segments to node pulpoobrazovani as they podvigayuschims opening the pit walls. 2.Способ по п. 1, отличающийс  тем, что в подземной горной выработке р дом с отрезками трубопроводов укладывают дренажный трубопровод, конечный участок которого размещен у узла пульпообразовани , а начальный - ниже закладываемого участка выработанного пространства.2. A method according to claim 1, characterized in that a drainage pipeline is laid in an underground mine working near a section of pipelines, the final section of which is located at the pulping unit and the initial section below the laid section of the open space. Риг. 1Rig. one
SU884444886A 1988-06-20 1988-06-20 Method of stowing underground cavities in mining pilars of useful mineral SU1580036A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU884444886A SU1580036A1 (en) 1988-06-20 1988-06-20 Method of stowing underground cavities in mining pilars of useful mineral

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU884444886A SU1580036A1 (en) 1988-06-20 1988-06-20 Method of stowing underground cavities in mining pilars of useful mineral

Publications (1)

Publication Number Publication Date
SU1580036A1 true SU1580036A1 (en) 1990-07-23

Family

ID=21383119

Family Applications (1)

Application Number Title Priority Date Filing Date
SU884444886A SU1580036A1 (en) 1988-06-20 1988-06-20 Method of stowing underground cavities in mining pilars of useful mineral

Country Status (1)

Country Link
SU (1) SU1580036A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2513729C1 (en) * 2012-12-17 2014-04-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Национальный минерально-сырьевой университет "Горный" Method to develop thick steeply-dipping ore bodies

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 1051280, кл. Е 21 С 41/00, 1982. Авторское свидетельство СССР № 1452992, кл. Е 21 С 41/02, Е 21 С 41/06, 04.12.87. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2513729C1 (en) * 2012-12-17 2014-04-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Национальный минерально-сырьевой университет "Горный" Method to develop thick steeply-dipping ore bodies

Similar Documents

Publication Publication Date Title
RU2368733C2 (en) Method and device for construction of tunnel submerged to sea bottom ground
CN106121657A (en) A kind of multifunctional numerical control shaft sinking device and construction method
CN110924960A (en) Subway construction method for shield starting before constructing station structure
RU2439323C1 (en) Method to mine inclined ore deposits
SU1580036A1 (en) Method of stowing underground cavities in mining pilars of useful mineral
CN206071589U (en) A kind of multifunctional numerical control shaft sinking device
RU2059810C1 (en) Method for mining of steeply dipping mineral deposits
RU2059813C1 (en) Method for mining steeply dipping ore bodies
RU2059073C1 (en) Method for development of mineral deposits
RU2102592C1 (en) Method for development of strata deposits of minerals
RU2152473C1 (en) Method for erection of vehicular traffic tunnel of urban ring highway of megapolis
CN109736274A (en) A kind of semi-underground well shaft type workshop of hydroelectric project
SU1273611A1 (en) Method of filling-up chamber
SU1705572A1 (en) Protective layer
RU2536514C1 (en) Chamber method of mining heavy, valuable, comminuted ore deposits
SU1726766A1 (en) Method of erecting waterproofing dike in mine drifts
SU1682568A1 (en) Method for working thick steep and inclined fire hazardous coal seams
RU2231642C1 (en) Method of barring and development of elongated in width and gradient coal fields with flat dipping and inclined beds of big thickness
RU2111362C1 (en) Method of erection of underground structures in hollows of earth surface and artificial cuts
SU1065610A1 (en) Method of protecting entry workings
Cashman et al. Groundwater Control for Tunnelling Projects
RU2101498C1 (en) Method of underground mineral mining
RU2152470C1 (en) Method for erection of urban ring highway section megapolis
RU2114994C1 (en) Method for winning minerals in quarry side
SU756045A1 (en) Method of vertical mining in filling massif