SU1573080A1 - Method of erecting ground dam on soft slit foundation - Google Patents

Method of erecting ground dam on soft slit foundation Download PDF

Info

Publication number
SU1573080A1
SU1573080A1 SU884477835A SU4477835A SU1573080A1 SU 1573080 A1 SU1573080 A1 SU 1573080A1 SU 884477835 A SU884477835 A SU 884477835A SU 4477835 A SU4477835 A SU 4477835A SU 1573080 A1 SU1573080 A1 SU 1573080A1
Authority
SU
USSR - Soviet Union
Prior art keywords
dam
base
slopes
embankment
reduce
Prior art date
Application number
SU884477835A
Other languages
Russian (ru)
Inventor
Леонид Семенович Свашенко
Original Assignee
Украинское отделение Всесоюзного проектно-изыскательского и научно-исследовательского института "Гидропроект" им.С.Я.Жука
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Украинское отделение Всесоюзного проектно-изыскательского и научно-исследовательского института "Гидропроект" им.С.Я.Жука filed Critical Украинское отделение Всесоюзного проектно-изыскательского и научно-исследовательского института "Гидропроект" им.С.Я.Жука
Priority to SU884477835A priority Critical patent/SU1573080A1/en
Application granted granted Critical
Publication of SU1573080A1 publication Critical patent/SU1573080A1/en

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

Изобретение относитс  к гидротехническому строительству. Цель изобретени  - сокращение объема работ и снижение стоимости подготовки основани  плотины при одновременном повышении ее эксплуатационной надежности за счет обеспечени  устойчивости откосов и основани . Перед отсыпкой плотны 1 выполн ют выемку илистых грунтов 4 под верховым 5 и низовым 6 откосами на участках, ограниченных наиболее опасными поверхност ми скольжени  7. В это врем  происходит частичное обезвоживание илистых грунтов, оставленных в средней части основани  плотины 1. Котлован под верховым 5 и низовым 6 откосами заполн ют грунтом насыпи тела плотины 1. Затем устраивают пластовые дренажи 3 из песчаного грунта и возвод т первичную насыпь 2, под весом которой завершаетс  консолидаци  илистых грунтов 4 в средней части основани  плотины 1. Дальнейшую насыпь тела плотины производ т обычным способом. 1 з.п. ф-лы, 1 ил.FIELD OF THE INVENTION The invention relates to hydraulic engineering. The purpose of the invention is to reduce the scope of work and reduce the cost of preparing the base of the dam while increasing its operational reliability by ensuring the stability of the slopes and the base. Before dumping, the dense soil 1 excavates the silty soils 4 under the upper 5 and lower 6 slopes in areas limited by the most dangerous sliding surfaces 7. At this time, the partial dehydration of the silty soils left in the middle part of the base of the dam 1 occurs. Downstream 6 slopes are filled with the soil of the embankment of the body of the dam 1. Then, reservoir drains 3 are made of sandy soil and the primary embankment 2 is erected, under the weight of which consolidation of the silty soils 4 in the middle part of the dam base is completed 1. Further embankment of the dam body is carried out in the usual way. 1 hp f-ly, 1 ill.

Description

x.  x.

Изобретение относитс  к гидротехническому строительству и может быть использовано при возведении грунтовых плотин на илистом основании с низки ми-несу щи ми свойствами .The invention relates to hydraulic construction and can be used in the construction of earth dams on a silt base with low mine-carrying properties.

Цель изобретени  - сокращение объема работ и снижение стоимости подготовки основани  плотины при одновременном повышении ее эксплуатационной надежности за счет обеспечени  устойчивости откосов и основани .The purpose of the invention is to reduce the scope of work and reduce the cost of preparing the base of the dam while increasing its operational reliability by ensuring the stability of the slopes and the base.

На чертеже показана расположенна  на слабых илистых грунтах плотина, поперечный разрез.The drawing shows a dam located on weak silt soils, a transverse section.

Плотину 1, расположенную на слабых илистых грунтах, возвод т путем отсыпки первичной насыпи 2 на пластовый дренаж 3. При этом вынимают участки илистых грунтов 4 в основании верхового 5 и низового 6 откосов плотины, ограниченные наиболее опасными поверхност ми скольжени  7. The dam 1, located on weak silty soils, is erected by dumping the primary embankment 2 onto the reservoir drainage 3. At the same time, the areas of silty soils 4 are removed at the base of the upper 5 and lower 6 slopes of the dam, limited by the most dangerous sliding surfaces 7.

Способ осуществл ют следующим образом .The method is carried out as follows.

Перед отсыпкой плотины 1 выполн ют выемку илистых грунтов 4 под верховым 5 и низовым 6 откосами на участках, ограниченных наиболее опасными поверхност ми скольжени  7, определ емыми расчетами устойчивости откосов. В этот период происходит частичное обезвоживание илистых грунтов 4, оставленных в средней части основани  плотины 1. Котлован под верховым 5 и низовым 6 откосами заполн ют грунтомBefore dumping, the dam 1 performs the excavation of silt soils 4 under the upper 5 and lower 6 slopes in areas limited by the most dangerous sliding surfaces 7, determined by calculations of the stability of the slopes. During this period, partial dehydration of silt soils 4, left in the middle part of the base of the dam 1, occurs. The pit under the top 5 and bottom 6 slopes is filled with soil

0 0

пP

5 five

00

насыпи тела плотины 1. Затем устраивают пластовые дренажи 3 из песчаного грунта и возвод т первичную насыпь 2, под весом которой практически завершаетс  консолидаци  илистых грунтов 4 в средней части основани  плотины 1. Дальнейшую насыпь тела плотины 1 производ т обычным способом.embankment of dam body 1. Then reservoir drainage 3 is made from sandy soil and a primary embankment 2 is erected, under which the consolidation of silt soil 4 in the middle part of the dam 1 is completed. The further embankment of dam 1 body is carried out in the usual way.

Claims (2)

1. Способ возведени  грунтовой плотины на слабом илистом основании, включающий выемку грунта в основании в пределах расположенного под водой верхового откоса и последующую отсыпку тела плотины , отличающийс  тем, что, с целью сокращени  объема работ и снижени  стоимости подготовки основани  плотины при одновременном повышении ее эксплуатационной надежности за счет обеспечени  устойчивости откосов и основани , выемку слабых илистых отложений выполн ют также и под низовым откосом плотины, при этом выемку осуществл ют в зонах, ограниченных поверхност ми скольжени  откосов, а насыпь центральной части плотины производ т на пластовые дренажи из песчаных грунтов, предварительно укладываемые на поверхность илистых отложений.1. A method of erecting a soil dam on a weak silty foundation, including excavation at the base within the upper slope located under water and subsequent dumping of the dam body, characterized in that, in order to reduce the workload and reduce the cost of preparing the base of the dam while simultaneously increasing its operational reliability due to the stability of slopes and base, the excavation of weak silty sediments is also carried out under the lower slope of the dam, while the excavation is carried out in areas limited ennyh surfaces sliding slopes, embankments and central portion produced on a dam reservoir drains of sandy soils previously stacked on the surface of the sludge. 2. Способ по п. 1, отличающийс  тем, что пластовые дренажи устраивают под откосами первичной насыпи, не смыка  друг с другом.2. A method according to claim 1, characterized in that the reservoir drains are arranged under the slopes of the primary embankment, not closed with each other.
SU884477835A 1988-08-23 1988-08-23 Method of erecting ground dam on soft slit foundation SU1573080A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU884477835A SU1573080A1 (en) 1988-08-23 1988-08-23 Method of erecting ground dam on soft slit foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU884477835A SU1573080A1 (en) 1988-08-23 1988-08-23 Method of erecting ground dam on soft slit foundation

Publications (1)

Publication Number Publication Date
SU1573080A1 true SU1573080A1 (en) 1990-06-23

Family

ID=21397166

Family Applications (1)

Application Number Title Priority Date Filing Date
SU884477835A SU1573080A1 (en) 1988-08-23 1988-08-23 Method of erecting ground dam on soft slit foundation

Country Status (1)

Country Link
SU (1) SU1573080A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Айрапет н Р. А. Проектирование ка- менно-земл ных и каменно-набросных плотин. - М.: Энерги , 1975, с. 14 и 15. Авторское свидетельство СССР № 897924, кл. Е 02 В 7/06, 1982. *

Similar Documents

Publication Publication Date Title
US3465530A (en) Dam construction
SU1573080A1 (en) Method of erecting ground dam on soft slit foundation
CN110080234A (en) A method of it is excavated in the secondary central island of deep foundation pit of soft soil foundation
JP2612763B2 (en) Basic structure of structure
Zeevaert Foundation problems related to ground surface subsidence in Mexico City
KR100305773B1 (en) Civil nonwoven soil brick and construction method using it
SU1463857A1 (en) Method of constructing trenchless drainage system
SU1273436A1 (en) Method of constructing dams on weak foundation
CN210684601U (en) Sluice draws port retaining wall outward
SU910938A1 (en) Method of erecting earth-fill structure of weak foundation
SU821655A1 (en) Method of erecting pile foundation on earth-fill areas
RU2019623C1 (en) Method for erection of hydraulically filled structure on slumping grounds
SU1081283A1 (en) Embankment
SU897924A1 (en) Method of constructing dam of locally available materials
SU896188A1 (en) Method of constructing pile foundation in sagging and bulging soils
KR950006158A (en) Hollow Block Block Foundation Method
SU1555418A1 (en) Method of constructing spillway in the body of earth dam
SU1451210A1 (en) Method of erecting a weir in a water reservoir
SU1125329A1 (en) Structure base
RU2219313C1 (en) Gear to smooth out and compact ground
JPH02136419A (en) Ground improvement of artificial island
Arita et al. Three dams, one reservoir
Hughes et al. Small diameter sand drains
SU1368373A1 (en) Method of hydraulic filling of earth structure
SU1393872A1 (en) Method of constructing water spillway in the body of earth dam