SU1560930A1 - Bench for testing refriregeration machine of air-condition plant - Google Patents

Bench for testing refriregeration machine of air-condition plant Download PDF

Info

Publication number
SU1560930A1
SU1560930A1 SU884421899A SU4421899A SU1560930A1 SU 1560930 A1 SU1560930 A1 SU 1560930A1 SU 884421899 A SU884421899 A SU 884421899A SU 4421899 A SU4421899 A SU 4421899A SU 1560930 A1 SU1560930 A1 SU 1560930A1
Authority
SU
USSR - Soviet Union
Prior art keywords
heat exchanger
condenser
evaporator
pipeline
additional heat
Prior art date
Application number
SU884421899A
Other languages
Russian (ru)
Inventor
Фатим Абдулович Набиулин
Игорь Давидович Квят
Елена Ивановна Выстороп
Original Assignee
Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Институт По Оборудованию Для Кондиционирования Воздуха И Вентиляции
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Институт По Оборудованию Для Кондиционирования Воздуха И Вентиляции filed Critical Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Институт По Оборудованию Для Кондиционирования Воздуха И Вентиляции
Priority to SU884421899A priority Critical patent/SU1560930A1/en
Application granted granted Critical
Publication of SU1560930A1 publication Critical patent/SU1560930A1/en

Links

Landscapes

  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

Изобретение относитс  к технике вентил ции и кондиционировани  воздуха. Целью изобретени   вл етс  снижение энергетических затрат. Стенд содержит корпус 1 с двум  проточными камерами 2 и 3, в которых установлены испаритель 4 и конденсатор 5 холодильной машины. На входе 6 камеры 2 испарител  4 установлен теплообменник 7. На выходе 8 камеры 3 конденсатора 5 установлен дополнительный теплообменник 9, сообщенный при помощи трубопровода 10 с нижней частью основного теплообменника 7, который установлен выше дополнительного теплообменника 9 с образованием между ними термосифона. Трубопровод 10 может иметь установленный в нем переключаемый вентиль 11. 1 з.п. ф-лы, 1 ил.The invention relates to a technique of ventilation and air conditioning. The aim of the invention is to reduce energy costs. The stand includes a housing 1 with two flow chambers 2 and 3, in which an evaporator 4 and a condenser 5 of a refrigerating machine are installed. At the inlet 6 of the chamber 2 of the evaporator 4, a heat exchanger 7 is installed. At the exit 8 of the chamber 3 of the condenser 5, an additional heat exchanger 9 is installed, communicated by means of a pipe 10 with the lower part of the main heat exchanger 7, which is installed above the additional heat exchanger 9 to form a thermosyphon between them. Pipeline 10 may have a switch valve 11 installed therein. 1Cp f-ly, 1 ill.

Description

Стенд дл  испытаний холодильной возДУ у, поступающему затем в испари15Test bench for refrigeration AIR y, then coming to vapor

пины кондиционера содержит установленный на основании (не показано) кор- iyc 1 с двум  проточными камерами 2 и 3, в которых установлены испари- ,тель 4 и конденсатор 5 холодильной машины и которые разобщены между собой перегородкой (не показано). На входе 6 камеры 2 испарител  4 установлен теплообменник 7. На выходе 8 камеры 3 конденсатор 5 установлен до- 20 полнительный теплообменник 9, сообщенный при помощи трубопровода 10 с нижней частью основного теплообменника 7, который установлен выше дополнительного теплообменника 9 с образованием 25 между ними термосифона. Трубопровод 10 может иметь установленный в нем переключаемый вентиль 1 1 . На входах 6 и 12 соответственно камер 2 и 3 испарител  4 и конденсатора 5 могут быть од установлены подогреватели 13 и 14,ко- торые располагаютс  в подготовительных камерах 15 и 16. Камера 2 испарител  имеет выход 17, через который она сообщена с подготовительной камерой 15.The pins of the air conditioner contain a cording-mounted Iyc 1 installed on a base (not shown) with two flow-through chambers 2 and 3 in which the evaporator 4 and the condenser 5 of the refrigerating machine are installed and which are separated by a partition (not shown). At the inlet 6 of the chamber 2 of the evaporator 4, a heat exchanger 7 is installed. At the exit 8 of the chamber 3, the condenser 5 has an additional heat exchanger 9, communicated via pipe 10 to the bottom of the main heat exchanger 7, which is installed above the additional heat exchanger 9 to form 25 between them . The pipeline 10 may have a switch valve 1 1 installed therein. At inputs 6 and 12, respectively, chambers 2 and 3 of the evaporator 4 and condenser 5, heaters 13 and 14 can be installed, which are located in preparatory chambers 15 and 16. Chamber 2 of the evaporator has an outlet 17 through which it is connected to the preparatory chamber 15 .

Стенд дл  испытаний холодильной машины кондиционера работает следующим образом.The test stand for the chiller of the air conditioner operates as follows.

При подготовке стенда к испытани м осуществл ют обработку воздуха в подготовительных камерах 15 и 16 до необходимых параметров с использованием при этом по необходимости основного теплообменника 7 и подогревателей 13 и 14.In preparing the test bench, air treatment is carried out in preparatory chambers 15 and 16 to the required parameters, using the main heat exchanger 7 and heaters 13 and 14 as necessary.

Нагрев воздуха в основном теплообменнике 7 осуществл етс  с использованием дополнительного теплообменника 3 и трубопровода, заполненных рабочимAir heating in the main heat exchanger 7 is carried out using an additional heat exchanger 3 and the pipeline, filled with working

3535

4040

4545

5050

тель 4.body 4.

В результате охлаждени  хладагента в теплообменнике 7 происходит его конденсаци  и последующее перемещение по трубопроводу 10 снова в дополнительный теплообменник 9. Дл  ускорени  перемещени  хладагента между теплообменниками 7 и 9, основной теплообменник 7 расположен выше дополнительного теплообменника 9 с образованием между ними термосифона.As a result of cooling the refrigerant in the heat exchanger 7, it condenses and then moves along the pipeline 10 back into the additional heat exchanger 9. To accelerate the movement of the refrigerant between the heat exchangers 7 and 9, the main heat exchanger 7 is located above the additional heat exchanger 9 to form a thermosyphon between them.

Claims (2)

1.Стенд дл  испытаний холодильной машины кондиционера, содержащий установленный на основании корпус с двум  проточными камерами, в которых расположены испаритель и конденсатор холодильной машины, и теплообменник, размещенный на входе камеры испарител , отличающий с  тем, что, с целью снижени  энергетических затрат, стенд снабжен дополнительным теплообменником, установленным на выходе проточной камеры конденсатора и сообщенным при помощи трубопровода1. A stand for testing an air conditioner refrigeration unit containing a base-mounted housing with two flow chambers in which an evaporator and a condenser of the refrigeration machine are located, and a heat exchanger placed at the inlet of the evaporator chamber, so as to reduce energy costs, equipped with an additional heat exchanger installed at the outlet of the flow chamber of the condenser and communicated by means of a pipeline с нижней частью основного теплообменника , причем последний установлен выше дополнительного теплообменника с образованием между ними термосифона.with the lower part of the main heat exchanger, the latter being installed above the additional heat exchanger with the formation of a thermosyphon between them. 2.Стенд по п.1, отличаю- щ и и с   тем, что трубопровод снабжен установленным в нем переключаемым вентилем. ,2. The stand according to claim 1, differs from the fact that the pipeline is equipped with a switchable valve installed in it. , хладагента,refrigerant 5050 2.С щ и и с жен уст мым вен2. With u and from the lips of the veins Составитель М.Ращепкин Техред Л.СердюковаCompiled by M.Rashepkin Tehred L. Serdyukova возДУ у, поступающему затем в испари5I will arrive at, arriving then in 0 5 д 0 5 d 5five 00 4545 5050 тель 4.body 4. В результате охлаждени  хладагента в теплообменнике 7 происходит его конденсаци  и последующее перемещение по трубопроводу 10 снова в дополнительный теплообменник 9. Дл  ускорени  перемещени  хладагента между теплообменниками 7 и 9, основной теплообменник 7 расположен выше дополнительного теплообменника 9 с образованием между ними термосифона.As a result of cooling the refrigerant in the heat exchanger 7, it condenses and then moves along the pipeline 10 back into the additional heat exchanger 9. To accelerate the movement of the refrigerant between the heat exchangers 7 and 9, the main heat exchanger 7 is located above the additional heat exchanger 9 to form a thermosyphon between them. Измерение тепловлажностных параметров воздуха на входе 6, 12 и выходах 17,8 испарител  4 и конденсатора 5 производитс  известными психрометрическими способами, а определение холодопроизводительности кондиционера - по известным расчетным зависимост м . Формула изобретени The measurement of the heat and humidity parameters of the air inlet 6, 12 and outlets 17.8 of the evaporator 4 and condenser 5 is carried out using well-known psychrometric methods, and the determination of the cooling capacity of the air conditioner is based on known calculated dependencies. Invention Formula 1.Стенд дл  испытаний холодильной машины кондиционера, содержащий установленный на основании корпус с двум  проточными камерами, в которых расположены испаритель и конденсатор холодильной машины, и теплообменник, размещенный на входе камеры испарител , отличающий с  тем, что, с целью снижени  энергетических затрат, стенд снабжен дополнительным теплообменником, установленным на выходе проточной камеры конденсатора и сообщенным при помощи трубопровода1. A stand for testing an air conditioner refrigeration unit containing a base-mounted housing with two flow chambers in which an evaporator and a condenser of the refrigeration machine are located, and a heat exchanger placed at the inlet of the evaporator chamber, so as to reduce energy costs, equipped with an additional heat exchanger installed at the outlet of the flow chamber of the condenser and communicated by means of a pipeline с нижней частью основного теплообменника , причем последний установлен выше дополнительного теплообменника с образованием между ними термосифона.with the lower part of the main heat exchanger, the latter being installed above the additional heat exchanger with the formation of a thermosyphon between them. 2.Стенд по п.1, отличаю- щ и и с   тем, что трубопровод снабжен установленным в нем переключаемым вентилем. ,2. The stand according to claim 1, differs from the fact that the pipeline is equipped with a switchable valve installed in it. , Корректор Л. БескидProofreader L. Beskid
SU884421899A 1988-04-05 1988-04-05 Bench for testing refriregeration machine of air-condition plant SU1560930A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU884421899A SU1560930A1 (en) 1988-04-05 1988-04-05 Bench for testing refriregeration machine of air-condition plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU884421899A SU1560930A1 (en) 1988-04-05 1988-04-05 Bench for testing refriregeration machine of air-condition plant

Publications (1)

Publication Number Publication Date
SU1560930A1 true SU1560930A1 (en) 1990-04-30

Family

ID=21373538

Family Applications (1)

Application Number Title Priority Date Filing Date
SU884421899A SU1560930A1 (en) 1988-04-05 1988-04-05 Bench for testing refriregeration machine of air-condition plant

Country Status (1)

Country Link
SU (1) SU1560930A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6301776B1 (en) 1998-05-15 2001-10-16 Samsung Electronics Co., Ltd. System and method for assembling an outdoor unit of a dual-unit type air conditioner

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР ff 1302109, кл. F 25 В 49/00, 1985. *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6301776B1 (en) 1998-05-15 2001-10-16 Samsung Electronics Co., Ltd. System and method for assembling an outdoor unit of a dual-unit type air conditioner
US6374492B1 (en) 1998-05-15 2002-04-23 Samsung Electronics Co., Ltd. Method for assembling an outdoor unit of a dual-unit type air conditioner

Similar Documents

Publication Publication Date Title
US2682758A (en) Dehumidifying apparatus
US5634353A (en) Air dehumidifier
CA2053297A1 (en) Hot gas defrost refrigeration system
EP0339267A3 (en) Air conditioning apparatus
US3635046A (en) Air-conditioning apparatus
CN111895518A (en) Integrated air conditioner
EP0541324A1 (en) Refrigeration systems
GB1460450A (en) Vapour cycle refrigeration systems
SU1560930A1 (en) Bench for testing refriregeration machine of air-condition plant
US1825731A (en) Refrigerating apparatus
CN111043676B (en) Fresh air dehumidifying air conditioner and fresh air dehumidifying method
KR20050102065A (en) Mobile heat pump capable of spot cooling and spot heating
EP0541328A1 (en) Refrigeration systems
US8726679B2 (en) Dedicated pulsing valve for compressor cylinder
US2169900A (en) Air conditioning system
JPS5916177B2 (en) air conditioner
ES248128U (en) Single-compressor refrigerator and freezer
US2482753A (en) Stratosphere chamber
US2522458A (en) Freezing machine
SU1689725A1 (en) Method and air-conditioner for cooling incoming air
JPS57178939A (en) Car refrigerator
JPS59115282U (en) Device for supplying refrigerant to the evaporator in a compression refrigerator
FR2453374A1 (en) Domestic heat pump with separate hot water and hot air circuits - has single compressor and condenser and separate evaporator for each circuit
JPS574415A (en) Car air conditioner
US2321137A (en) Refrigerating apparatus