SU1560689A1 - Water-supply system of hydromechanized work section - Google Patents

Water-supply system of hydromechanized work section Download PDF

Info

Publication number
SU1560689A1
SU1560689A1 SU874303879A SU4303879A SU1560689A1 SU 1560689 A1 SU1560689 A1 SU 1560689A1 SU 874303879 A SU874303879 A SU 874303879A SU 4303879 A SU4303879 A SU 4303879A SU 1560689 A1 SU1560689 A1 SU 1560689A1
Authority
SU
USSR - Soviet Union
Prior art keywords
water
flexible
float
reservoir
pipeline
Prior art date
Application number
SU874303879A
Other languages
Russian (ru)
Inventor
Борис Леонидович Тальгамер
Александр Николаевич Махнев
Касим Ибрагимович Яфаров
Original Assignee
Иркутский политехнический институт
Якутский Научно-Исследовательский И Проектный Институт Алмазодобывающей Промышленности
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Иркутский политехнический институт, Якутский Научно-Исследовательский И Проектный Институт Алмазодобывающей Промышленности filed Critical Иркутский политехнический институт
Priority to SU874303879A priority Critical patent/SU1560689A1/en
Application granted granted Critical
Publication of SU1560689A1 publication Critical patent/SU1560689A1/en

Links

Landscapes

  • Sewage (AREA)

Abstract

Изобретение относитс  к водоснабжению и касаетс  конструктивного выполнени  системы водоснабжени  участка гидромеханизированных работ, осуществл емых в водоеме с водоподпорным сооружением. Цель - снижение распространени  загр знений посредством перераспределени  потока подаваемой воды в водоеме. Система водоснабжени  содержит трубопровод 9 дл  подачи воды, выполненный по длине с выпусками и соединенный с гибкой перемычкой 11, соединенной в свою очередь с балластом 12 и поплавком 13, и отдел ющей участок гидромеханизированных работ от водоподпорного сооружени . Трубопровод 9 может быть установлен выпусками вверх, при этом он размещен с зазором в кольцах, соединенных с гибкой перемычкой 11, и закреплен посредством хомутов 15 на поплавке 13, которые установлены на нем с зазором. Трубопровод дл  подачи воды может быть установлен выпусками вверх и размещен в узле соединени  гибкой перемычки с дополнительной гибкой перемычкой, имеющей дополнительный поплавок. 2 з.п.ф-лы. 6 ил.The invention relates to water supply and concerns the constructive implementation of a water supply system for a section of hydro-mechanized work carried out in a pond with a water supporting structure. The goal is to reduce the spread of contaminants by redistributing the flow of water supplied in the reservoir. The water supply system comprises a pipeline 9 for supplying water, made along the length of the outlets and connected to a flexible bridge 11, in turn connected to ballast 12 and a float 13, and separating a portion of the hydromechanized works from the water supporting structure. The pipe 9 can be installed upwards, while it is placed with a gap in the rings connected to the flexible jumper 11, and secured by clamps 15 on the float 13, which are installed on it with a gap. The pipeline for supplying water can be installed by slots upwards and placed in the node connecting the flexible lintel with an additional flexible lintel having an additional float. 2 hp ff. 6 Il.

Description

11eleven

SPSP

Ь NSS CON4 VB NSS CON4 V

Фиг.ЗFig.Z

подачи воды, выполненный по длине с выпусками и соединенный с гибкой перемычкой 11, соединенной в свою очередь с балластом 12 и поплавком 13 и , отдел ющей участок гидромеханизированных работ от водоподпорного сооружени . Трубопровод 9 может быть установлен выпусками вверх, при этом он размещен с зазором в кольцах, соедиИзобретение относитс  к водоснабжению и касаетс  конструктивного выполнени  системы водоснабжени  участка гидромеханизированных работ, осуществл емых в водоеме с водоподпор- ным сооружениемwater supply, made in length with outlets and connected to a flexible bridge 11, which in turn is connected to ballast 12 and float 13 and separating the part of the hydromechanized works from the water supporting structure. Pipeline 9 can be installed upwards, while it is placed with a gap in the rings, the invention relates to water supply and concerns the constructive implementation of the water supply system of a hydromechanized section of work carried out in a reservoir with a water supporting structure.

Цель - снижение распространени  загр знений посредством перераспределени  потока подаваемой воды в водоеме .The goal is to reduce the spread of contaminants by redistributing the flow of water supplied in the reservoir.

На фиг. 1 изображена система водоснабжени  участка гидромеханизированных работ при дражной разработке россыпных месторождений; на фиг. 2 - то же, при обогащении полезных ископае- мых на промывочных приборах; на фиг.З- положение элементов системы при установившемс  водопотреблении в обеих зонах водоема; на фиг. k - положение элементов системы при увеличении во- допотреблени  в одной из зон водоема; на фиг„ 5 узел соединени  элементов системы, вид сбоку; на фиг. 6 - вариант выполнени  системы с двум  гибкими перемычками и двум  поплавками. FIG. 1 depicts a water supply system for a plot of hydro-mechanized operations in the dredging of placer deposits; in fig. 2 - the same, with the enrichment of minerals on washing devices; FIG. 3 shows the position of the elements of the system at steady water consumption in both zones of the reservoir; in fig. k - position of the system elements with increasing water consumption in one of the zones of the reservoir; Fig. 5 is a side view of the connection system components; in fig. 6 shows an embodiment of a system with two flexible bridges and two floats.

При дражной разработке россыпных месторождений поверхностный сток с помощью дамбы 1 отвод т от дражного полигона по руслоотводному каналу 2, а на полигоне с помощью водоподпорно- го сооружени  3 создают водоем , в котором работает драга 5 и который  вл етс  участком гидромеханизированных работ оIn dredging of alluvial deposits, surface runoff using dam 1 is diverted from the dredging site through the channel 2, and at the landfill using a water supporting structure 3 a reservoir is created in which the dredge 5 operates and which is a section of hydromechanized works

II

При обогащении полезных ископаемых на промывочных приборах 6 предусматриваетс  оборотное водоснабжение, при котором происходит осветление использованной воды в водоеме , созданном водоподпорным сооружением 3. Осветленна  в результате осаждени  загр знений вода насосной станцией 7 вновь подаетс  из водоема на промыWhen enrichment of minerals on flushing devices 6, a circulating water supply is provided, at which the clarification of the used water in the reservoir created by the water-supporting structure 3. Clarified as a result of sedimentation of pollution, the water is pumped from the reservoir 7

ненных с гибкой перемычкой 1 1 , и закреплен посредством хомутов 15 на поплавке 13, которые установлены на нем с зазором. Трубопровод дл  подачи воды может быть установлен выпусками вверх и размещен в узле соединени  гибкой перемычки с дополнительной гибкой перемычкой, имеющей дополнительный поплавок. 2 з.п. ф-лы, 6 ил.with a flexible jumper 1 1, and secured by clamps 15 on the float 13, which are installed on it with a gap. The pipeline for supplying water can be installed by slots upwards and placed in the node connecting the flexible lintel with an additional flexible lintel having an additional float. 2 hp f-ly, 6 ill.

0 0

5five

0 5 00 5 0

5 five

00

5five

вочный прибор 6. Дл  увеличени  длины транзитного потока, а соответственно и времени отстаивани  воды в водоеме Ц сооружают струенаправл ющую дамбу 8о Потребности в притоке воды дл  технологических нужд, а также восполнени  естественных потерь на фильтрацию через водоподпорное сооружение и испарение удолетвор ютс  посредством подачи свежей воды из русло- отводного канала 2 на участок гидромеханизированных работ системой водоснабжени  .Spanning device 6. To increase the length of the transit flow and, accordingly, the time of water settling in the reservoir C, a dam 8o is constructed. Requirements for water flow for process needs, as well as to compensate for natural filtration losses through the water supporting structure and evaporation are satisfied by supplying fresh water from the channel-branch channel 2 to the section of hydro-mechanized works with the water supply system.

Система водоснабжени  содержит трубопровод 9 дл  подачи воды, выполненный с выпусками 10 вдоль отдел ющей участок гидромеханизированных работ от водоподпорного сооружени  3 гибкой перемычки 11, к которой он крепитс , и котора  соединена концами с балластом 12 и поплавком 13оThe water supply system comprises a pipeline 9 for supplying water, made with outlets 10 along the separating portion of the hydro-mechanized works from the water supporting structure 3 of the flexible web 11, to which it is attached, and which is connected to the ends with ballast 12 and float 13o.

Трубопровод 9 дл  подачи воды может быть установлен выпусками 10 вниз с зазором в кольцах , соединенных с гибкой перемычкой 11, и закреплен с зазором на поплавке 13, посредством хомутов 15.The pipeline 9 for supplying water can be installed by the outlets 10 downwards with a gap in the rings connected to the flexible bridge 11 and fixed with a gap to the float 13 by means of clamps 15.

Дл  повышени  остойчивости поплавка 13 он снабжен ребрами 16, установленными на уровне ватерлинии. Зазор между поплавком 13 и трубопроводом 6, а также жесткое соединение последних обеспечиваетс  болтами 17. Поплавок ТЗ может быть выполнен из отдельных элементов, соедин емых между собой металлическими ст жками 18.To increase the stability of the float 13, it is provided with ribs 16 mounted at the waterline level. The gap between the float 13 and the pipeline 6, as well as the rigid connection of the latter, is ensured by the bolts 17. The float TK can be made of separate elements interconnected by metal straps 18.

При установившемс  равном уровне воды в обеих зонах водоема гибка  перемычка 11 находитс  в вертикальном положении. При этом вода, поступающа  по трубопроводу 9, через выпуски 10 равномерно распредел етс  по обеим зонам водоема.With a steady water level in both zones of the reservoir, the bend 11 is flexible in an upright position. At the same time, the water entering through the pipeline 9 through the outlets 10 is evenly distributed over both zones of the reservoir.

5156068951560689

При существенной разнице в водопотреблении в разделенных зонах водоема выпуски могут быть смещены относительно вертикального положени  гибкой перемычки настолько, чтобы соотношени площадей сечени  выпусков со стороны обеих зон было равно соотношению водо потреблени  в нихо Дл  обеспечени  равномерного распределени  расхода воды по длине трубопровода размер выпусков по мере удалени  от насоса 19 следует увеличивать пропорционально падению давлени .If there is a significant difference in water consumption in the separated areas of the reservoir, the outlets can be shifted relative to the vertical position of the flexible lintel so that the ratios of discharge areas from both zones are equal to the water consumption in them. To ensure uniform distribution of water flow along the length of the pipeline, the size of the outflows from pump 19 should be increased in proportion to the pressure drop.

При увеличении водопотреблени  в одной из зон водоема уровень воды в ней понижаетс  и поплавок 13 за счет образовани  некоторого напора со стороны соседней зоны перемещаетс  в зону с повышенным расходом воды. В результате перемещени  поплавка 13 перемычка 11 отклон етс  от вертикального положени ,кольца 14 поворачиваютс  вокруг трубопровода 9 и площадь сечени  выпусков в трубопроводе со стороны зоны с пониженным уровнем воды увеличиваетс  до тех пор, пока не установитс  равновесие между расходом и водопотреблением в обеих зонах. В результате этого уровни воды в разделенных зонах уравниваютс  и под действием силы т жести перемычки поплавок возвращаетс  в первоначальное положение .With an increase in water consumption in one of the zones of the reservoir, the water level in it decreases and the float 13 due to the formation of a certain pressure from the side of the adjacent zone moves to the zone with increased water flow. As a result of the float 13 moving, the bridge 11 deviates from the vertical position, the rings 14 rotate around the pipeline 9 and the outlet area in the pipeline from the low water level zone increases until the balance between flow and water consumption in both zones is established. As a result, the water levels in the divided zones are equalized, and under the action of gravity of the web, the float returns to its original position.

Трубопровод 9 Дл  подачи воды может быть установлен выпусками вверх и размещен в узле соединени  с балластом и дополнительной гибкой перемычкой 19, имеющей дополнительный поплавок 20.Pipeline 9 for supplying water can be installed with the outlet facing up and placed in the connection unit with the ballast and an additional flexible jumper 19 having an additional float 20.

I I

Такое конструктивное выполнение целесообразно использовать дл  отделени  рабочей зоны водоема, загр зненной большим количеством взвесей. При равном уровне воды в обеих зонах водоема вода в них поступает в одинаковом количестве. С понижением уровн  воды в одной из зон водоема, граничащий с ней поплавок отклон етс  в ее сторону, тем самым увеличива  высоту порога слива и расход поступающей воды. Одновременно слив воды в противоположную зону водоема пропорционально сокращаетс  вплоть до полного его прекращени  После восстановлени  пониженного уровн  воды в первой зоне водоема подача воды вновь выравниваетс .Such constructive implementation is advisable to use to separate the working area of the reservoir contaminated with a large number of suspensions. With an equal water level in both zones of the reservoir, water enters them in the same amount. With a decrease in the water level in one of the zones of the reservoir, the float bordering it deviates in its direction, thereby increasing the height of the discharge threshold and the flow rate of the incoming water. At the same time, water discharge to the opposite zone of the reservoir is proportionally reduced up to its complete cessation. After restoring the lowered water level in the first zone of the reservoir, the water supply is again leveled.

Подача воды по трубопроводу можетThe water supply through the pipeline can

00

5five

автоматически регулироватьс  с использованием известных устройств в зависимости от уровн  воды в водоеме или его зонах и величины водопотреблени .automatically adjusted using known devices depending on the water level in the pond or its zones and the magnitude of water consumption.

Поплавок может быть выполнен из крупного лесоматериала, а в качестве ст жек - крючь  и отрезки цепи. В качестве балласта могут быть использованы горные породы (камни). Однако дл  упрощени  монтажа более удобно использовать в качестве балласта трос, цепь или отрезки труб. Гибка  перемычка может быть изготовлена из отрезков полотна, длина которых должна быть не менее максимальной глубины водоема . Длинные стороны отрезков полотна соедин ют между собой внахлест, например с помощью шнуровки или водостойкого кле , а две коротких стороны креп тс  к поплавкам и балласту. Дл  подачи воды в водоем используют насосы известных марок. Трубопровод дл  по- 5 дачи воды до водоема может быть выполнен металлическим, а в водоеме - в виде резинового рукава, с выполненными по его длине выпусками. При значительном весе последний может быть использован в качестве балласта.The float can be made of coarse timber, and as straps - hook and chain pieces. Rocks (stones) can be used as ballast. However, to simplify installation, it is more convenient to use cable, chain, or pipe lengths as ballast. Bending the jumper can be made of pieces of web, the length of which must be at least the maximum depth of the reservoir. The long sides of the pieces of fabric are overlapped with each other, for example, with lacing or waterproof glue, and the two short sides are attached to the floats and the ballast. For the supply of water in the reservoir use pumps of famous brands. The pipeline for supplying water to the reservoir can be made of metal, and in the reservoir - as a rubber sleeve, with discharges along its length. With considerable weight, the latter can be used as a ballast.

00

00

Монтаж перемычки может производитьс  до затоплени  полигона в намеченном створе, на берегу, с последующей установкой его в водоеме с помощью горной техники или на воде с доставкой отдельных секций на лодке. Намеченный дл  установки перемычки створ предварительно, до затоплени  полигона , должен быть спланирован бульдозером .The installation of the lintel can be carried out before the landfill is flooded in the target area, on the coast, with its subsequent installation in the reservoir with the help of mining equipment or on the water with delivery of separate sections by boat. The target intended for the installation of a jumper, before flooding the landfill, must be planned with a bulldozer.

Claims (3)

Формула изобретени Invention Formula ii 1 Система водоснабжени  участка гидромеханизированных работ, осуществл емых в водоеме с водоподпорным сооружением, содержаща  трубопровод дл  подачи воды, отличающа с   тем, что, с цель снижени  распространени  загр знений посредством перераспределени  потока подаваемой воды в водоеме, она снабжена отдел ющей участок производства гидромеханизированных работ от водоподпорного сооружени  гибкой перемычкой с поплавком и балластом, к которым прикреплены концы перемычки, при этом трубопровод дл  подачи воды соединен с гибкои перемычкой и выполнен по длине1 A water supply system for a section of hydro-mechanized operations carried out in a reservoir with a water supporting structure, comprising a pipeline for supplying water, characterized in that, in order to reduce the spread of contaminants by redistributing the flow of the supplied water in the reservoir, it is equipped with a separating section for the production of hydro-mechanized works from water supporting structure with a flexible jumper with a float and ballast to which the ends of the jumper are attached, while the water supply pipe is connected to the flexible bridge and is made in length перемычки с выпусками.jumpers with releases. тt 2. Система по п. отличающа  с   тем, что трубопрбвод дл  подачи воды установлен выпусками вниз, жестко соединен с поплавком и установлен с зазором в кольцах, соединенных с гибкой перемычкой.2. The system according to claim 2, in which the pipe unit for supplying water is installed with outlets down, rigidly connected to the float and installed with a gap in the rings connected to a flexible jumper. 1one Фиг. 1FIG. one 3. Система по п. 1, отличающа с  тем, что она снабжена соединенной с балластом и гибкой перемычкой дополнительной гибкой перемычкой и дополнительным поплавком, при этом трубопровод дл  подачи воды размещен выпусками вверх и установлен в узле соединени  гибких перемычек и балласта .3. The system of claim 1, characterized in that it is provided with an additional flexible jumper and an additional float connected to the ballast and flexible jumper, the pipeline for supplying water is arranged upwards and installed in the node connecting the flexible jumpers and ballast. Фиг.гFigg .X..X. Фиг. ЧFIG. H 1b //////////////// Фл.5FL.5 Цfta 5Hfta 5
SU874303879A 1987-09-10 1987-09-10 Water-supply system of hydromechanized work section SU1560689A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU874303879A SU1560689A1 (en) 1987-09-10 1987-09-10 Water-supply system of hydromechanized work section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU874303879A SU1560689A1 (en) 1987-09-10 1987-09-10 Water-supply system of hydromechanized work section

Publications (1)

Publication Number Publication Date
SU1560689A1 true SU1560689A1 (en) 1990-04-30

Family

ID=21326921

Family Applications (1)

Application Number Title Priority Date Filing Date
SU874303879A SU1560689A1 (en) 1987-09-10 1987-09-10 Water-supply system of hydromechanized work section

Country Status (1)

Country Link
SU (1) SU1560689A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2524828C2 (en) * 2012-10-08 2014-08-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Иркутский государственный технический университет" (ФГБОУ ВПО "ИрГТУ") Water supply for dredging
CN105401615A (en) * 2015-12-21 2016-03-16 浦华环保股份有限公司 Water distribution device and water distribution system
RU2788671C1 (en) * 2022-07-13 2023-01-24 Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" Water supply method for dredging works

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Лешков В.Г Теори и практика разработки россыпей многочерпаковыми драгами„М.: Недра, 1980, с, 99-100. ( СИСТЕМА ВОДОСНАБЖЕНИЯ УЧАСТКА ГИДРОМЕХАНИЗИРОВАННЫХ РАБОТ *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2524828C2 (en) * 2012-10-08 2014-08-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Иркутский государственный технический университет" (ФГБОУ ВПО "ИрГТУ") Water supply for dredging
CN105401615A (en) * 2015-12-21 2016-03-16 浦华环保股份有限公司 Water distribution device and water distribution system
RU2788671C1 (en) * 2022-07-13 2023-01-24 Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" Water supply method for dredging works

Similar Documents

Publication Publication Date Title
US4207191A (en) Anti-pollution boom
US7226242B2 (en) Catch basin for salt water sand
SU1560689A1 (en) Water-supply system of hydromechanized work section
US4189253A (en) Process and apparatus for maintaining a desired depth of a waterway
JP2005030070A (en) Flowing-down promoting dam structure and flowing-down promoting method of deposit sediment in dam water reservoir
RU2627504C1 (en) Mine drainage in flat and pitching mining of coal deposits with combined method
SU1201433A1 (en) Method of increasing service stores of subsoil water
US4051038A (en) Flow control vane for a skimmer-type oil boom
US6547486B1 (en) Method for coastal protection
KR100625746B1 (en) Suspended Material Auto-draw Chamber
SU1043233A1 (en) Method of controlling river outflow
KR20100069524A (en) Submerged beam structure to prevent sediment deposition
SU1301911A1 (en) Constructing tails storage
SU935554A1 (en) Method for controlling glacial mud streams
Imbertson Automatic rubber diversion dam in the Los Angeles River
RU2732106C1 (en) Under-channel filter water intake of bucket structure
KR101606592B1 (en) Storage water purification equipment for rivers
SU1046397A1 (en) Method for clearing open bed from bottom deposits
US20060018716A1 (en) Catch basin for salt water sand
SU1470849A1 (en) Method of enhancing water impermeability of blustdeposited dam of large-lump soil
RU1783062C (en) Hydraulic system for preventing water reservoir against silting
SU1117364A1 (en) Method of working a canal bed
CN113336346A (en) Communication roadway type underground transfer sewage treatment system and construction method thereof
SU1498882A1 (en) Method of hydraulic deposition of narrow-profile structure
SU1213125A1 (en) Method of determining drain-depositing depth