SU1546635A1 - Method and apparatus for recultivating slopes of hard rock dumps - Google Patents

Method and apparatus for recultivating slopes of hard rock dumps Download PDF

Info

Publication number
SU1546635A1
SU1546635A1 SU874351949A SU4351949A SU1546635A1 SU 1546635 A1 SU1546635 A1 SU 1546635A1 SU 874351949 A SU874351949 A SU 874351949A SU 4351949 A SU4351949 A SU 4351949A SU 1546635 A1 SU1546635 A1 SU 1546635A1
Authority
SU
USSR - Soviet Union
Prior art keywords
text
bucket
slopes
slope
terraces
Prior art date
Application number
SU874351949A
Other languages
Russian (ru)
Inventor
Aleksandr D Dodatko
Anatolij Yu Drizhenko
Natalya A Drizhenko
Vyacheslav Ya Mikhajlets
Sergej V Kuzmenkov
Boris M Osipov
Original Assignee
Dn Gornyj I Im Artema
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dn Gornyj I Im Artema filed Critical Dn Gornyj I Im Artema
Priority to SU874351949A priority Critical patent/SU1546635A1/en
Application granted granted Critical
Publication of SU1546635A1 publication Critical patent/SU1546635A1/en

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

<p>Изобретение относится к горной промышленности и может быть использовано при рекультивации отвалов. Цель изобретения - повышение устой- .</p></li></ul> <p>Изобретение относится к горной промышленности и может быть использовано при рекультивации стволов.</p> <p>Цель изобретения - повышение устойчивости рекультивируемого слоя на склонах отвала при снижении затрат на профилактические работы пр его поддержанию»</p> <p>На фиг.I изображено в плане расположение оборудования на склоне отвала; на фиг»2 - то же, поперечный разрез; на фиг.З - конструкция</p> <p>2</p> <p>чивости рекультивируемого слоя на склонах отвала при снижении затрат на профилактические работы по его поддержанию. После отсыпки яруса отвальных скальных пород на его склон отсыпают почвообразующие породы. По отсыпанным почвообразующим породам формируют, по склону яруса, продольные террасы. Для этого на нижней и верхней площадках яруса устанавли- вают бульдозеры и соединяют их между собой системой несущих, тяговых и регулировочных канатов. На несущем канате подвешен ковш с возможностью перемещения вдоль каната по склону отвала. Для нарезания продольных а</p> <p>террас по склону отвала дно ковша выполнено трапециевидной формы, симметрично расширяющимся от передней части к задней стенке. Расширение составляет (1,1:1) - (2:1). Боковые стенки выполнены вогнутыми, переменной кривизны, которая увеличивается от задней стенки. 2с и 1 з.п.ф-лы, 6 ил.</p> <p>ковша, вид сверху; на фиг.4 - разрез А-А на фиг.З; на фиг.З - сечение Б-Б на фиг.З; на фиг.6 - положение ковша при формировании террасы.</p> <p>Способ реализуется следующим образом.</p> <p>Скальные вскрышные породы 1 складируют во внешние отвальные ярусы высотой Н до 60 м. При отсыпке пос- ледней заходки к отвальному экскаватору доставляются потенциально пло</p> <p>зи. ,.&gt;-1546635 А1</p> <p>3</p> <p>1546635</p> <p>4</p> <p>дородные породы (в качестве которых можно использовать суглинки, смесь глины с песком, карбонатные породы), которым укладывают их вдоль верхней части откоса со стороны верхней площадки 2. Для этой же цели могут быть использованы и автосамосвалы с разгрузкой их на верхней части откоса 3 и образованием навала 4 определенной мощности (по объему не менее объема, требуемого для рекультивационных работ). На верхней 2 и нижней 5 площадках размещают два бульдозера 6, соединяют их между собой системой тяговых канатов 7 и несущим канатом 8, на который подвешивают ковш 9 заявляемой конструкции. Ковш перемещают на верхнюю площадку 2, заводя за навал 4 потенциально плодородных пород, затем, перемещая ковш 9 по откосу 3 вниз, распределяют породу по плоскости откоса слоем мощностью в пределах 0,20,3 м. По достижении ковшом 9 нижней бровки 10 откоса уступа его возвращают назад на верхнюю площадку 2^ после чего верхний и нижний бульдозеры 6 перемещают вдоль верхней бровки 11 откоса на ширину ковша 9 и, -захватив очередную порцию почвообразующей породы 4, перемещают ковш 9 по несущему канату 8 к нижней бровке 10 . откоса уступа. Данную операцию повторяют до тех пор, пока весь откос 3 не покроют равномерным слоем породы. Затем ковш 9 перемещают по откосу и устанавливают на линии формирования промежуточной террасы. 12, приподняв с помощью несущего каната 8 и регулировочных канатов 13 переднюю часть ковша 9 настолько, чтобы его дно заняло горизонтальное положение, и утопив его заднюю часть в насыпанную породу. Ковш 9 фикси-, руют в указанном месте и положении. После этого, перемещая синхронно бульдозеры'6 по верхней 2 и нижней 5 площадкам, боковой стенкой 14 ковша 9 нарезают вдоль всего откоса промежуточную террасу 12. При нарезании террасы 12 ковш 9, движущийся боком, срезает часть насыпанного предварительно слоя породы, которая смещает’ся, направляясь боковой направляющей стенкой к Передней части ковша. Таким образом формируется терраса 12, ширина которой* за счет перераспределения почвенной массы будет шире.</p> <p>чем толщина наносимого слоя, что будет способствовать лучшему задержанию ливневых и паводковых вод и практически уменьшать размыв рекультивационного слоя, В случае необходимости нарезают таким же образом вторую, третью и т.д. террасы.</p> <p>Предлагаемый способ рекультивации реализуется с помощью устройства, в состав которого входят: бульдозеры 6, являющиеся приводными устройствами, установленные на верхней 2 и нижней 5 площадках, ковш 9, несущий канат 8, тяговые канаты 7 и регулировочные канаты 13. .Канат 8 натянут между двумя бульдозерами 6, а на нем подвешен ковш 9 с возможностью перемещения вдоль каната 8. Кроме того, на канате установлена система блоков, через которую пропущен регулировочный канат 13, соединенный с передней частью ковша 9. Тяговые канаты 7 также соединены с ковшом 9, с передней и задней его стороны.</p> <p>Основными узлами ковша 9 являются: боковые стенки 14, задняя стенка 15, дно 16 и элементы крепления ковша 17 к канатам. Дно 16 ковша 9 выполнено трапециевидной формы, симметрично расширяющимся от-передней части к задней стенке 15. Расширение составляет (1,1:1) - (2:1), Боковые стенки 14 ковша выполнены вогнутыми, переменной кривизны. При этом кривизна грани, соединяющей боковую стенку 14 с задней стенкой; выполняется наибольшим радиусом, а у передней кромки ковша - наименьшим радиусом, обеспечивающим распределение породы, снятой при формировании террасы с наименьшими усилиями.</p><p> The invention relates to the mining industry and can be used in the reclamation of dumps. The purpose of the invention is to increase the sustainability. </ P> </ li> </ ul> <p> The invention relates to the mining industry and can be used in the rehabilitation of trunks. </ p> <p> The purpose of the invention is to increase the sustainability of the recultivated layer on the slopes of the dump while reducing the cost of preventive work to its maintenance "</ p> <p> FIG. I shows in plan the location of the equipment on the slope of the blade; Fig 2 - the same cross section; on fig.Z - design </ p> <p> 2 </ p> <p> reclamation layer on the slopes of the dump while reducing the cost of preventive work to maintain it. After dumping the tier of dump rocks, soil-forming rocks are poured onto its slope. On dumped soil-forming rocks form, on the slope of the tier, longitudinal terraces. For this purpose, bulldozers are installed on the lower and upper platforms of the longline and connected to each other by a system of carrying, hauling and adjusting ropes. A bucket is suspended on the carrying rope with the ability to move along the rope along the slope of the blade. For cutting longitudinal a </ p> <p> terraces along the slope of the dump the bottom of the bucket is made of a trapezoidal shape, symmetrically expanding from the front to the rear wall. The expansion is (1.1: 1) - (2: 1). The side walls are made concave, variable curvature, which increases from the rear wall. 2c and 1 z.p. f-ly, 6 ill. </ P> <p> bucket, top view; figure 4 - section aa on fig.Z; fig.Z - section BB on fig.Z; figure 6 - the position of the bucket in the formation of the terrace. </ p> <p> The method is implemented as follows. </ p> <p> Overburden rocks 1 are stored in external dump layers of height H up to 60 m. When dumping the last run-in to the dump excavator, they are delivered potentially to the area </ p> <p> zi. . &gt; -1546635 A1 </ p> <p> 3 </ p> <p> 1546635 </ p> <p> 4 </ p> <p> burly rocks (which can be used as loams, a mixture of clay and sand, carbonate rocks), which are placed along the upper part of the slope from the top platform 2. For the same purpose dump trucks can be used with their unloading on the upper part slope 3 and the formation of bulk 4 of a certain capacity (by volume not less than the volume required for remediation). On the upper 2 and lower 5 platforms, two bulldozers 6 are placed, they are interconnected by a system of traction ropes 7 and a carrying cable 8, on which the bucket 9 of the claimed design is suspended. The bucket is moved to the upper platform 2, setting 4 potentially fertile rocks behind the pile, then moving the bucket 9 along slope 3 downward, distributing the rock along the slope plane with a layer of thickness within 0.20.3 m. When the bucket 9 reaches the lower edge, 10 slope of the ledge it is returned back to the upper platform 2 ^ after which the upper and lower bulldozers 6 are moved along the upper edge 11 of the slope by the width of the bucket 9 and, grasping the next portion of the soil-forming rock 4, move the bucket 9 along the carrying cable 8 to the lower edge 10. slope of the ledge. This operation is repeated until the entire slope 3 is covered with a uniform layer of rock. Then the bucket 9 is moved along the slope and set on the line forming the intermediate terrace. 12, having raised the front part of the bucket 9 with the help of the carrying rope 8 and the adjusting ropes 13 so that its bottom took up a horizontal position, and sinking its rear part into the poured rock. The bucket 9 is fixed in the indicated place and position. After that, moving synchronously bulldozers' 6 along the upper 2 and lower 5 pads, the side wall 14 of the bucket 9 cuts the intermediate terrace 12 along the entire slope. When cutting the terrace 12, the bucket 9, moving sideways, cuts off a part of the previously laid rock layer that shifts heading towards the front of the bucket. Thus, a terrace 12 is formed, the width of which * due to the redistribution of the soil mass will be wider. </ P> <p> than the thickness of the applied layer, which will contribute to a better retention of storm and flood waters and practically reduce the erosion of the recultivation layer. If necessary, the second, third, etc. are cut in the same way. terraces. </ p> <p> The proposed reclamation method is implemented using a device consisting of: bulldozers 6, which are drive devices, installed on the top 2 and bottom 5 platforms, bucket 9, carrying rope 8, hauling ropes 7 and adjusting ropes 13.. stretched between two bulldozers 6, and a bucket 9 is suspended on it to move along the rope 8. In addition, a system of blocks is installed on the rope, through which an adjusting rope 13 is connected, connected to the front part of the bucket 9. The traction ropes 7 are also connected to the bucket 9, from the front and back of his side. </ P> <p> The main components of the bucket 9 are: the side walls 14, the rear wall 15, the bottom 16 and the fixing elements of the bucket 17 to the ropes. The bottom 16 of the bucket 9 is made of a trapezoidal shape, symmetrically expanding from the front to the rear wall 15. The expansion is (1.1: 1) - (2: 1). The side walls 14 of the bucket are concave, of variable curvature. While the curvature of the face connecting the side wall 14 with the rear wall; is performed by the largest radius, and at the leading edge of the bucket - by the smallest radius, ensuring the distribution of the rock, removed during the formation of the terrace with the least effort. </ p>

Claims (3)

Формула изобрет.енияClaim 1, Способ рекультивации склонов отвалов скальных пород, включающий формирование террас и нанесение почвенного слоя на поверхность отвала, отличающийся. тем, что, с целью повышения устойчивости рекультивируемого слоя на склонах отвала при снижении затрат на профилактические работы по его поддержанию, после нанесения почвенного, слоя на поверхность склона на этой поверхности формируют продольные террасы;1, The method of reclamation of the slopes of rock dumps, including the formation of terraces and the application of a soil layer on the surface of the blade, which is different. the fact that, in order to increase the sustainability of the recultivated layer on the slopes of the dump while reducing the cost of preventive work to maintain it, after applying the soil layer on the surface of the slope on this surface form longitudinal terraces; 5 15466355 1546635 66 <claim-text>2. Устройство для рекультивации склонов отвалов скальных пород, включающее тяговые и несущие канаты, ковш с дном, задней и боковыми стенками, отличающееся тем, что, дно ковша выполнено трапецеидальной формы, симметрично расширяющимся к'задней стенке, а боковые</claim-text> <claim-text>стенки выполнены вогнутыми переменной кривизны, увеличивающейся от</claim-text> <claim-text>задней стенки,</claim-text> <ul style="list-style:none;"><li> <claim-text> 2. A device for reclaiming the slopes of rock dumps, including traction and carrying ropes, a bucket with a bottom, rear and side walls, characterized in that the bottom of the bucket is made of trapezoidal shape, symmetrically expanding to the back wall, and the lateral </ claim-text> <claim-text> walls are made of concave variable curvature, increasing from </ claim-text> <claim-text> back wall, </ claim-text> <ul style = "list-style: none;"> <li> <claim-text>3. Устройство по п.2, отличающееся тем, что расширение .задней.части дна ковша по отношению к передней составляет (Ι,ΐΐ!) (2:1).</claim-text></li></ul> <claim-text>Фиг Л</claim-text> <claim-text>1546635</claim-text><claim-text> 3. A device according to claim 2, characterized in that the extension of the rear parts of the bottom of the bucket relative to the front is (Ι, ΐΐ!) (2: 1). </ Claim-text> </ li> </ ul> <claim-text> Fig L </ claim-text> <claim-text> 1546635 </ claim-text>
SU874351949A 1987-12-28 1987-12-28 Method and apparatus for recultivating slopes of hard rock dumps SU1546635A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU874351949A SU1546635A1 (en) 1987-12-28 1987-12-28 Method and apparatus for recultivating slopes of hard rock dumps

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU874351949A SU1546635A1 (en) 1987-12-28 1987-12-28 Method and apparatus for recultivating slopes of hard rock dumps

Publications (1)

Publication Number Publication Date
SU1546635A1 true SU1546635A1 (en) 1990-02-28

Family

ID=21345684

Family Applications (1)

Application Number Title Priority Date Filing Date
SU874351949A SU1546635A1 (en) 1987-12-28 1987-12-28 Method and apparatus for recultivating slopes of hard rock dumps

Country Status (1)

Country Link
SU (1) SU1546635A1 (en)

Similar Documents

Publication Publication Date Title
US4125970A (en) Bulk storage facility
GB1595290A (en) Embankments construction
US8366201B2 (en) Method for open pit bench mining
RU2629187C1 (en) Method for dredge work of placer deposits
SU1546635A1 (en) Method and apparatus for recultivating slopes of hard rock dumps
RU2064582C1 (en) Method for openpit mining of minerals
US4133581A (en) Method of strip mining with cable supported conveyor
US2164536A (en) Garbage, ash, and refuse disposal, and land reclamation process
US3182460A (en) Apparatus for making permeable conduits in subterranean lines of drainage
SU793442A1 (en) Method of recultivating slopes of rock spoil heap
RU2039151C1 (en) Washed-up hydraulic structure
RU2088760C1 (en) Method for recultivation of slopes in opencast mining of mineral deposits
RU2283957C1 (en) Method for refuse stacking during open-pit mineral mining
CN1217407A (en) Bucket-wheel excavator
SU1645523A1 (en) Method and apparatus for reclamation of land disturbed by dredge mining of mineral deposits
SU1409717A1 (en) Method of constructing water removal ditch
US3191387A (en) Method for making permeable conduits in subterranean lines of drainage
RU2652038C1 (en) Method for storing overburden in burrow cut
SU1086083A1 (en) Scraper bucket
SU1113546A1 (en) Method of dumping overburden rock under flooding conditions
SU1035217A1 (en) Method of producing motion path of drag-line along dump when making multilevel damps
SU1507972A1 (en) Method of shaping dumps in controlled deformation duty
SU1113547A1 (en) Method of dumping under controlled deformation conditions
SU985289A1 (en) Method of open-cast mining of gently sloping and sloping mineral deposit
SU1434105A1 (en) Method of sloping spoil heaps