SU1500747A1 - Support of power transmission line - Google Patents

Support of power transmission line Download PDF

Info

Publication number
SU1500747A1
SU1500747A1 SU874349238A SU4349238A SU1500747A1 SU 1500747 A1 SU1500747 A1 SU 1500747A1 SU 874349238 A SU874349238 A SU 874349238A SU 4349238 A SU4349238 A SU 4349238A SU 1500747 A1 SU1500747 A1 SU 1500747A1
Authority
SU
USSR - Soviet Union
Prior art keywords
slope
traverse
support
anchor
cable
Prior art date
Application number
SU874349238A
Other languages
Russian (ru)
Inventor
Davlat Rakhmatullaev
Gennadij F Vishnyakov
Iosif I Rojtman
Original Assignee
Sred Az Otdel Vg Proektno Izys
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sred Az Otdel Vg Proektno Izys filed Critical Sred Az Otdel Vg Proektno Izys
Priority to SU874349238A priority Critical patent/SU1500747A1/en
Application granted granted Critical
Publication of SU1500747A1 publication Critical patent/SU1500747A1/en

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Description

Изобретение относится к энергетическому строительству. Цель изобретения - обеспечение возможности установки опоры линии электропередачи в ущельях при снижении материалоемкости. Траверса выполнена с дополнительными шарнирными разъемами 3 и снабжена анкером 14, установленным на противоположном откосе, подкосом 6 и гибкими тягами 7,9,10. Трособлочная система траверсы снабжена грузом 15, причем один из концов трособлочной системы прикреплен к анкеру 14, а другой - к концу траверсы и пропущен через блок 12. 5 ил.The invention relates to energy construction. The purpose of the invention is the provision of the possibility of installing the support of the transmission line in the gorges while reducing the material intensity. The traverse is made with additional articulated connectors 3 and is equipped with an anchor 14 mounted on the opposite slope, a brace 6 and flexible rods 7,9,10. The cable block system is equipped with a weight of 15, one of the ends of the cable block system attached to the anchor 14, and the other to the end of the beam and passed through block 12. 5 Il.

(19)(nineteen)

з 1500747 4 s 1500747 4

Изобретение относится к строительству, а именно к электросетевому строительству, связанному с сооружением воздушных линий электропередач 5 чи в горной местности.The invention relates to the construction, namely to power grid construction associated with the construction of overhead power lines 5 Chi in mountainous areas.

Цель изобретения - обеспечение возможности установки в ущельях при снижении материалоемкости.The purpose of the invention is the provision of the possibility of installation in the gorges with a decrease in material intensity.

На фиг. 1 показана опора, общий 10 вид; на фиг. 2 - то же, вид сверху; на фиг. 3 - опора при установке в ущелье с пологими откосами, общий вид; на фиг. 4 - то же, вид сверху; на фиг. 5 - опора при подвеске бал- 15 ласта на натяжном тросе, связывающего траверсу с противоположным откосом, общий вид.FIG. 1 shows a support, a general 10 view; in fig. 2 - the same, top view; in fig. 3 - support when installed in a canyon with gentle slopes, general view; in fig. 4 - the same, top view; in fig. 5 - support for suspension of the ball- 15 area on the tension cable connecting the traverse with the opposite slope, general view.

Опора содержит опорную заделку 1, траверсу, состоящую из элементов 2, 20The support contains the support seal 1, the traverse, consisting of elements 2, 20

соединенных между собой пространственными шарнирами 3 в местах подвески фаз проводов 4. К Опорной заделке 1 траверса присоединяется при помощи пространственного шарнира 5. К перво-25 му со стороны опорной заделки элементу 2 траверсы при помощи цилиндрического шарнира, обеспечивающего поворот в вертикальной плоскости, присоединяется подкос 6, другой конце которого 30 с помощью тяги 7 прикрепляется к анкеру 8. К этому же анкеру 8 присоеди-, няется тяга 9, поддерживающая «точку подвески к траверсе фазы проводов 4, ближайшей к опорной заделке 1. Две 35 другие точки подвески фаз проводов к траверсе поддерживаются при помощи тяг 10, прикрепленных другим концом к подкосу 6. Трособлочная система . состоит из троса 11, пропущенного 40 через блок 12, который при помощи оттяжки 13 прикреплен к анкеру 14, заделанному в противоположный откос ущелья. Одним концом трос 11 прикреплен к свободному концу траверсы, а к дд его другому концу подвешен груз 15, выполняемый из арматурных стержней и местных материалов.interconnected by spatial hinges 3 at the points of suspension of the wires 4 wires. To the Support embedment 1, the crosshead is attached using a spatial hinge 5. To the first 25 from the support embedment to the element 2, the crosshead, by means of a cylindrical hinge, providing rotation in a vertical plane, is attached 6, the other end of which 30 is attached by means of a thrust 7 to the anchor 8. To the same anchor 8 is attached a thrust 9 supporting the “suspension point to the traverse of the phase of the wires 4 closest to the supporting termination 1. Two 35 THER suspension wires phases point to traverse supported by means of rods 10, the other end attached to the canting 6. Trosoblochnaya system. consists of a cable 11, passed 40 through the block 12, which with the help of a harness 13 is attached to the anchor 14, embedded in the opposite slope of the gorge. One end of the cable 11 is attached to the free end of the traverse, and to the dd of its other end is suspended cargo 15, made of rebars and local materials.

На фиг. 5 показана натяжная система, выполненная при помощи натяжного троса 16.со свободной подвеской на нем груза 15 через ролик 12. Вес груза подбирается таким образом, чтобы во всех расчетных режимах работу опоры в элементах 2 траверсы возникали только растягивающие усилия. В этом случае предлагаемая конструкция опоры в виде шарнирно-стержневой системы будет устойчива на все виды воздействия как в нормальных, так и в аварийном режимах работы.FIG. 5 shows the tensioning system, made with the help of a tensioning cable 16. with a free suspension of the load 15 on it through the roller 12. The weight of the load is chosen so that in all design modes the operation of the support in the elements 2 traverse only tensile forces arise. In this case, the proposed design of the support in the form of a hinge-rod system will be resistant to all types of impact in both normal and emergency operation modes.

Причем при обрыве провода (аварийный режим работы) под воздействием одностороннего тяжения в оборванном проводе, направленном перпендикулярно плоскости траверсы, элементы траверсы получат горизонтальное перемещение до тех пор, пока сила тяжения в оборванном проводе не уравновесится работой необорванных поддерживающих проводов и усилием в тросе 11.Moreover, when a wire is broken (emergency operation) under the influence of one-sided tension in a broken wire directed perpendicular to the plane of the cross member, the elements of the cross arm will receive horizontal movement until the tension force in the broken wire is balanced by the work of the unbroken supporting wires and the force in the cable 11.

Если откос ущелья, в который закрепляется опорная заделка 1 пологий, т.е. шарнир 5 и точка прикрепления тяг 7 и 9 к анкеру 8 лежат на прямой, имеющей с вертикалью угол более 10°, то при горизонтальном перемещении элементов 2 траверсы произойдет опускание точек подвески фаз проводов, что неблагоприятно'сказывается на работе данной конструкции. Для предотвращения этого опускания предусматривается тяги 7 и 9 выполнять расщепленными на две ветви каждая и прикреплять каждую ветвь к своему анкеру 8 (фиг. 3 и 4), которые отнесены на равные расстояния от вертикальной плоскости траверсы.If the slope of the gorge, in which the supporting seal is fixed 1 is gentle, i.e. the hinge 5 and the point of attachment of the 7 and 9 to the anchor 8 lie on a straight line that has an angle of more than 10 ° with the vertical, then when the elements 2 are traversed horizontally, the suspension points of the wire phases will lower, which is unfavorable for the design. To prevent this lowering, thrust 7 and 9 are provided to be split into two branches each and attach each branch to its anchor 8 (Fig. 3 and 4), which are equally spaced from the vertical plane of the traverse.

Claims (1)

Формула изобретенияClaim Опора линии электропередачи, установленная в стенке откоса, включающая консольно заделанную в стенке откоса траверсу, подкол, трособлочную систему, натяжное устройство, анкер, од-, ним концом заделанный в откос, а дру’гим соединенный с тр<аверсой ^ерез трособлочную систему, и провода фаз, отличающаяся тем, что,· с целью обеспечения установки в ущельях при снижении материалоемкости, траверса выполнена с установленными по ее длине в местах крепления проводов дополнительными шарнирными разъемами и снабжена анкером, установленным на противоположном откосе, и гибкими тягами, при этом трособлочная система снабжена грузом, один -из тросов прикреплен к анкеру, установленному на противоположном откосе, а другой - к концу траверсы и пропущен через блок.The power line support, installed in the wall of the slope, includes a traverse, which is cantilever-embedded in the wall of the slope, a splitting, a cable-block system, a tension device, an anchor, one end of which is embedded in a slope, and another connected to the trunk <aperture ^ through the cable-block system, and phase wires, characterized in that, in order to ensure installation in gorges while reducing material consumption, the traverse is made with additional hinged connectors installed along its length at the points of fastening of wires and provided with an anchor mounted on olozhnom slope and flexible rods, wherein the system is provided with a load trosoblochnaya one -from ropes fastened to an anchor mounted on the opposite slope and the other - to the end of the traverse and passed through the block. 1414 15007471500747 99 4-Ζ114-Ζ11 ~ g 1one νηπνηπ Фаз.2Phase 2 тt 11eleven 1515 // Фае. 4Faye. four 15007471500747
SU874349238A 1987-11-04 1987-11-04 Support of power transmission line SU1500747A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU874349238A SU1500747A1 (en) 1987-11-04 1987-11-04 Support of power transmission line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU874349238A SU1500747A1 (en) 1987-11-04 1987-11-04 Support of power transmission line

Publications (1)

Publication Number Publication Date
SU1500747A1 true SU1500747A1 (en) 1989-08-15

Family

ID=21344563

Family Applications (1)

Application Number Title Priority Date Filing Date
SU874349238A SU1500747A1 (en) 1987-11-04 1987-11-04 Support of power transmission line

Country Status (1)

Country Link
SU (1) SU1500747A1 (en)

Similar Documents

Publication Publication Date Title
SU1500747A1 (en) Support of power transmission line
RU202294U1 (en) TWO-CHAIN INCREASED ANCHOR-ANGULAR MULTI-FACE SUPPORT OF POWER LINE
SU1617513A1 (en) Overpass of power transmission line
SU1010240A1 (en) Power transmission line support
SU141281A1 (en) Building flooring with construction truss girders having a sloped bottom along
SU1038459A1 (en) Power transmission line support
SU1276789A1 (en) Anchored corner support of three-phase power transmission line
SU1008157A1 (en) Method of lifting long structures
SU936145A1 (en) Device for suspending wires of overhead power transmission line
SU1059106A1 (en) Power transmission line support
SU1219771A1 (en) Corner support for power transmission line
SU1323687A1 (en) Crossbeam of single-post power transmission line mast
SU1578302A1 (en) Power transmission line support
SU1733607A1 (en) Traverse of power line mast
SU920151A1 (en) Suspended system
SU1458542A1 (en) Power line support
SU1231191A1 (en) Versions of support of three-phase power transmission line
SU1025825A1 (en) Suspended roof for buildings and structures
SU1016465A1 (en) Corner support for power transmission line
SU1209809A1 (en) Versions of anchorage corner support of power transmission line
SU483510A1 (en) High voltage line support
SU1323688A1 (en) Anchored corner support of three-phase power transmission line
SU746068A1 (en) Power transmission line intermediate support
SU1352028A1 (en) Anchorage corner support of power transmission line
RU2169242C1 (en) Trussed beam