SU1469134A1 - Method of working soil on water reservoir bottom - Google Patents

Method of working soil on water reservoir bottom Download PDF

Info

Publication number
SU1469134A1
SU1469134A1 SU864165778A SU4165778A SU1469134A1 SU 1469134 A1 SU1469134 A1 SU 1469134A1 SU 864165778 A SU864165778 A SU 864165778A SU 4165778 A SU4165778 A SU 4165778A SU 1469134 A1 SU1469134 A1 SU 1469134A1
Authority
SU
USSR - Soviet Union
Prior art keywords
zone
soil
insulation
talik
reservoir
Prior art date
Application number
SU864165778A
Other languages
Russian (ru)
Inventor
Юрий Григорьевич Ефимов
Вячеслав Платонович Казаков
Original Assignee
Новосибирский филиал Всесоюзного научно-исследовательского института транспортного строительства
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Новосибирский филиал Всесоюзного научно-исследовательского института транспортного строительства filed Critical Новосибирский филиал Всесоюзного научно-исследовательского института транспортного строительства
Priority to SU864165778A priority Critical patent/SU1469134A1/en
Application granted granted Critical
Publication of SU1469134A1 publication Critical patent/SU1469134A1/en

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

Изобретение относитс  к строительству и касаетс  разработки песчаных карьеров, расположенных под водоемами в районах Крайнего Севера. Цель - повышение эффективности ра:,ра- ботки грунтов таликовой зонь: небольших водоемов в многолетнемерзлых водонепроницаемых грунтах за счет упрощени  технологии ведени  работ. Дл  этого в период положительных температур с береговой части срезают мохорастительный покров и слой торфа на глубину его сезонного оттаивани  и перемещают в водоем. Указанные операции начинают с верховой стороны, где мелкие ручейки впадают в водоем,, а с низовой стороны предва-. рительно образуют водоотводную траншею по руслу наиболее крупного ручь . Вытесн ют воду срезанным мохорасти-чл тельным покровом и торфом с формированием площадок, одновременным осу шением и утеплением грунта таликовой зоны. На сформированных площадках размещают иглофильтрационные установки , через которые производ т осзга1ение таликорой зоны. Разработку грунта ведут посредством экскава- ционного оборудовани . С опережением (до нескольких суток) в зависимости от погодных условий утеплитель удал ют с поверхности карьера на- участке забо , избега  попадани  снега и утеплител  в забой и нарушени  целостности изол ции на соседних участках карьера. 3 ил. § 4;: О) ;о 00 4;The invention relates to the construction and development of sand pits, located under the reservoirs in the regions of the Far North. The goal is to increase the efficiency of the following: working the soils of the talik zone: small reservoirs in permafrost waterproof soils by simplifying the technology of work. To do this, during the period of positive temperatures, the vegetative cover and the peat layer are cut from the coastal part to the depth of its seasonal thawing and transferred to the reservoir. These operations begin from the upper side, where small streams flow into the reservoir, and from the lower side, the prefabricated. efficiently form a drainage trench along the channel of the largest stream. The water is displaced by cut-off morast-concrete cover and peat with the formation of platforms, simultaneous drainage and warming of the soil of the talik zone. Acupuncture installations are placed on the formed sites through which the talicore zone is produced. Soil development is carried out by means of excavation equipment. In advance (up to several days), depending on weather conditions, the insulation is removed from the surface of the quarry in the area of the bottom, avoiding snow and insulation in the face and disturbing the integrity of the insulation in the adjacent areas of the quarry. 3 il. § 4 ;: O); o 00 4;

Description

,1,one

Изобретение относитс  к строитель-- ству и,касаетс  разработки песчаных карьеров, расположенных под водоемами в районах Крайнего Севера.The invention relates to the construction and relates to the development of sand pits located under water bodies in the regions of the Far North.

Цель изобретени  - повышение эффективности разработки грунтов таликовой зоны небольших водоемов в многолетнемерзлых водонепроницаемых грунтах за счет упрощени  технологии ведени  работ.The purpose of the invention is to increase the efficiency of the development of soils of the talik zone of small reservoirs in permafrost waterproof soils by simplifying the technology of operations.

На фиг. 1 изображен подготавливав- мый к. разработке грунта карьер, расположенный под водоемом, вид в плане; на фиг.2 - разрез А-А на фиг. 1; на фиг. 3 - разработка карьера, поперечный разрез.FIG. 1 is a plan view of the quarry prepared under the pond; FIG. 2 is a section A-A in FIG. one; in fig. 3 - career development, cross-section.

Способ разработки грунтов включает следующие операции.The method of excavation includes the following operations.

В период положительных температур с помощью механических средств, наример бульдозера, с береговой части резают мохорастительньй покров и нижележащий талый слой торфа с приегающей к перемерзающему в зимнее врем  замкнутому водоему (озеру) 1 территории. Образующуюс  в результате срезки смесь 2 перемещают в вооем . При этом указанные операции начинают с верховой стороны, где Q мелкие ручейки 3 впадают в водоем 1, а с низовой стороны предварительно образуют водоотводную траншею 4 по руслу наиболее крупного ручь . По контуру водоема перед полосой срезки t5 грунта разрабатывают нагорные водоотводные канавы. Вытесн ют воду срезанным мохорастительным покровом и торфом, с формированием площадок, одновременным осушением водоема и утеплением грунта тал1|ковой зоны. После формировани  площадок из смеси 2 погружают иглофильтры 5, например , с помощью вибропогружател  или гидроразмьшом, на всю глубину таликовой зоны 6 (ее граница с веч- номерзлым грунтом 7 обозначена позицией 8). Затем производ т осушение таликовой ; зоны б откачкой воды из иглофильтров 5 (крива  депрессии от- 30 мечена позицией 9). Количество иглофильтров 5, места их размещени  и режимы откачки определ ютс  заранее по известным зависимост м и правилам гидрогеологии в зависимости,от раз- 35 меров таликовой зоны, коэффиидента фильтрации песчаного грунта к заданных сроков осушени .During the period of positive temperatures, using a mechanical means, such as a bulldozer, from the coastal part the mossification cover and the underlying thawed peat layer are cut from the territory of the closed reservoir (lake) of the territory that freezes in winter. The resultant cut-off mixture 2 is transferred to the boom. Moreover, these operations start from the upstream side, where Q small streams 3 flow into the reservoir 1, and from the downstream side pre-form a drainage trench 4 along the channel of the largest creek. Along the contour of the reservoir, in front of the cut-off strip t5 of the soil, upland drainage ditches are being developed. The water is displaced by cut-off morale and vegetation cover and peat, with the formation of platforms, simultaneous drainage of the reservoir and warming of the soil of the high-pressure zone. After the formation of pads from a mixture of 2, the needle filters 5 are immersed, for example, by means of a vibrator or hydrofluid, for the entire depth of the talik zone 6 (its boundary with permafrost 7 is indicated by the position 8). Then the talic drainage is performed; zones b by pumping out water from the needle filters 5 (the depression curve is marked 30 by the position 9). The number of needle filters 5, their locations and pumping modes are determined in advance by known dependencies and rules of hydrogeology, depending on the size of the talik zone, the filtration coefficient of sandy soil for a given drainage time.

Разработку грунта ведут посредством экскаваторного оборудовани . При 40 необходимости разработка грунта может производитьс  после полного осушени  таликовой зоны 6, демонтажа иглофильтров 5 и другого насосногоSoil development is carried out by means of excavator equipment. When 40 is necessary, the development of the soil can be done after complete drying of the talik zone 6, dismantling the needle filters 5 and another pump

2020

2525

5 five

0 0

5 five

0 0

00

5five

оборудовани . Окружающие талую зону вечномерзлые грунты 7 исключают попадание подземных вод в осушенную талую зону. Обводнение ее поверхностными водами с окружающей территории предотвращают нагорные водоотводные канавы. С опережением (до нескольких суток) в зависимости от погодных условий, утеплитель удал ют с поверхности карьера на участке 10 забо , избега  попадани  снега и утеплител  в забой и нарушени  целостности изол ции на соседних участках карьера.equipment. The permafrost soils 7 surrounding the thawed zone exclude the ingress of groundwater into the drained thawed zone. Watering it with surface waters from the surrounding area prevents highland drainage ditches. In advance (up to several days), depending on weather conditions, the insulation is removed from the surface of the quarry at section 10, avoiding snow and insulation in the face and disturbing the integrity of the insulation in the adjacent areas of the quarry.

Claims (1)

Формула изобретени  Способ разработки грунтов со дна водоемов, включающий осушение и утепление поверхности разрабатываемого участка в период положительных тем- перат-1Ф, удаление утеплител  и разработку грунта на участке в период отрицательных температур, о т л и - ч а ю щ и и с-  тем, что, с целью повышени  эффективности разработки грунтов таликовой зоны небольших водоемов в многолетнемерзлых водо- непронецаемых грунтах за счет упрощени  технологии ведени  работ в период положительных температур с береговой части, срезают мохорасти- тельный покров и слой торфа на глубину его сезонного оттаивани  и перемещают в водоем, вьгг сн   воду срезанным мохорастительным покровом и торфом, с формированием площадок, одновременньсм осушением водоема и утеплением грунта таликовой зоны, ёатем на сформированных площадках размещают иглофильтрационные установки , через которые производ т осушение указанных зон, а разрабатывают посредством экскавационного оборудовани .The invention method of excavation of soil from the bottom of reservoirs, including the drainage and warming of the surface of the developed area during the period of positive temperatures-1F, removal of insulation and the development of soil on the site during the period of negative temperatures, about l and h by the fact that, in order to increase the efficiency of the development of soils of the talik zone of small reservoirs in permafrost water-impermeable soils by simplifying the technology of conducting works during the period of positive temperatures from the coastal part, The flax cover and the peat layer to the depth of its seasonal thawing and transferred to the reservoir, cut off the water by cutting vegetation cover and peat, with the formation of sites, simultaneous drainage of the reservoir and the warming of the soil of the talik zone, needle filters are placed at the formed sites. These zones are being developed by means of excavation equipment. te.fte.f 7 7 S. X. T C tW , к if v VS. X. T C tW, if v v .-.- 2 2 1р|1|1|1)1|МЧ 1Ц111| «1Ч1| 11| 1Ч 1 1 | 1 1 | 1 1p | 1 | 1 | 1) 1 | MCh 1TS111 | “1Ч1 | 11 | 1H 1 1 | 1 1 | one 7 7 X. T C tW , к if v V X. T C tW, if v v -p-jrv-p-jrv .. .. «г.з"Gz
SU864165778A 1986-12-22 1986-12-22 Method of working soil on water reservoir bottom SU1469134A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU864165778A SU1469134A1 (en) 1986-12-22 1986-12-22 Method of working soil on water reservoir bottom

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU864165778A SU1469134A1 (en) 1986-12-22 1986-12-22 Method of working soil on water reservoir bottom

Publications (1)

Publication Number Publication Date
SU1469134A1 true SU1469134A1 (en) 1989-03-30

Family

ID=21274571

Family Applications (1)

Application Number Title Priority Date Filing Date
SU864165778A SU1469134A1 (en) 1986-12-22 1986-12-22 Method of working soil on water reservoir bottom

Country Status (1)

Country Link
SU (1) SU1469134A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Лешков В.Г. Разработка россып ных месторождений. М.: Недра, 1985, с. 175-179. Технические указани по производ- - ству работ спосо-бом гидромеханизации при сооружении земл ного полотна в зимних услови х (проект). М.:ЦНИИС, 1974, с. 17-21. *

Similar Documents

Publication Publication Date Title
Brown Man shapes the earth
Heede Gully development and control: the status of our knowledge
SU1469134A1 (en) Method of working soil on water reservoir bottom
RU2416692C1 (en) Water engineering system on permafrost soils
CN106115922B (en) A kind of construction method of the clean water treatment for Landscape Park
CN111962480B (en) Water-saving irrigation construction method for high-standard farmland
KR100582875B1 (en) A drain and drying method for dredged soils surface
JPH1136262A (en) Vegetation method for edge of bulkhead
RU2785656C1 (en) Thaw-type embankment dam on a permafrost foundation
RU2393293C1 (en) Arrangement method of drying system with narrow enclosure ploughing of drained soils
RU2816530C1 (en) Method of drying flooded closed depressions
SU1047402A1 (en) Method of reclamation of erosive slopings
KR100305773B1 (en) Civil nonwoven soil brick and construction method using it
RU2176700C1 (en) Method for protecting territory from flooding
CN113045139B (en) Ecological restoration method for lugu lake big grass sea degraded wetland
CN212294536U (en) River crab culture area ecological drainage ditch slope protection structure
RU2753329C2 (en) Method for protection of frozen base of embankment from negative impact of flooding
RU2687820C1 (en) Method for waterlogging of peat bogs, mainly worked-out peatlands
RU2249072C1 (en) Method for complex multilayer engineering protection of territory to be developed against underflooding
SU1613007A1 (en) Method of erosion control on slopes
SU1762768A1 (en) Counter-erosion relief protection method
Orev A practical handbook on desert range improvement techniques.
Clark Stream improvements in Michigan
Lessard et al. Southwestern pine tip moth damage to ponderosa pine reproduction
JPH0241605B2 (en)