SU1469134A1 - Method of working soil on water reservoir bottom - Google Patents
Method of working soil on water reservoir bottom Download PDFInfo
- Publication number
- SU1469134A1 SU1469134A1 SU864165778A SU4165778A SU1469134A1 SU 1469134 A1 SU1469134 A1 SU 1469134A1 SU 864165778 A SU864165778 A SU 864165778A SU 4165778 A SU4165778 A SU 4165778A SU 1469134 A1 SU1469134 A1 SU 1469134A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- zone
- soil
- insulation
- talik
- reservoir
- Prior art date
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
Изобретение относитс к строительству и касаетс разработки песчаных карьеров, расположенных под водоемами в районах Крайнего Севера. Цель - повышение эффективности ра:,ра- ботки грунтов таликовой зонь: небольших водоемов в многолетнемерзлых водонепроницаемых грунтах за счет упрощени технологии ведени работ. Дл этого в период положительных температур с береговой части срезают мохорастительный покров и слой торфа на глубину его сезонного оттаивани и перемещают в водоем. Указанные операции начинают с верховой стороны, где мелкие ручейки впадают в водоем,, а с низовой стороны предва-. рительно образуют водоотводную траншею по руслу наиболее крупного ручь . Вытесн ют воду срезанным мохорасти-чл тельным покровом и торфом с формированием площадок, одновременным осу шением и утеплением грунта таликовой зоны. На сформированных площадках размещают иглофильтрационные установки , через которые производ т осзга1ение таликорой зоны. Разработку грунта ведут посредством экскава- ционного оборудовани . С опережением (до нескольких суток) в зависимости от погодных условий утеплитель удал ют с поверхности карьера на- участке забо , избега попадани снега и утеплител в забой и нарушени целостности изол ции на соседних участках карьера. 3 ил. § 4;: О) ;о 00 4;The invention relates to the construction and development of sand pits, located under the reservoirs in the regions of the Far North. The goal is to increase the efficiency of the following: working the soils of the talik zone: small reservoirs in permafrost waterproof soils by simplifying the technology of work. To do this, during the period of positive temperatures, the vegetative cover and the peat layer are cut from the coastal part to the depth of its seasonal thawing and transferred to the reservoir. These operations begin from the upper side, where small streams flow into the reservoir, and from the lower side, the prefabricated. efficiently form a drainage trench along the channel of the largest stream. The water is displaced by cut-off morast-concrete cover and peat with the formation of platforms, simultaneous drainage and warming of the soil of the talik zone. Acupuncture installations are placed on the formed sites through which the talicore zone is produced. Soil development is carried out by means of excavation equipment. In advance (up to several days), depending on weather conditions, the insulation is removed from the surface of the quarry in the area of the bottom, avoiding snow and insulation in the face and disturbing the integrity of the insulation in the adjacent areas of the quarry. 3 il. § 4 ;: O); o 00 4;
Description
,1,one
Изобретение относитс к строитель-- ству и,касаетс разработки песчаных карьеров, расположенных под водоемами в районах Крайнего Севера.The invention relates to the construction and relates to the development of sand pits located under water bodies in the regions of the Far North.
Цель изобретени - повышение эффективности разработки грунтов таликовой зоны небольших водоемов в многолетнемерзлых водонепроницаемых грунтах за счет упрощени технологии ведени работ.The purpose of the invention is to increase the efficiency of the development of soils of the talik zone of small reservoirs in permafrost waterproof soils by simplifying the technology of operations.
На фиг. 1 изображен подготавливав- мый к. разработке грунта карьер, расположенный под водоемом, вид в плане; на фиг.2 - разрез А-А на фиг. 1; на фиг. 3 - разработка карьера, поперечный разрез.FIG. 1 is a plan view of the quarry prepared under the pond; FIG. 2 is a section A-A in FIG. one; in fig. 3 - career development, cross-section.
Способ разработки грунтов включает следующие операции.The method of excavation includes the following operations.
В период положительных температур с помощью механических средств, наример бульдозера, с береговой части резают мохорастительньй покров и нижележащий талый слой торфа с приегающей к перемерзающему в зимнее врем замкнутому водоему (озеру) 1 территории. Образующуюс в результате срезки смесь 2 перемещают в вооем . При этом указанные операции начинают с верховой стороны, где Q мелкие ручейки 3 впадают в водоем 1, а с низовой стороны предварительно образуют водоотводную траншею 4 по руслу наиболее крупного ручь . По контуру водоема перед полосой срезки t5 грунта разрабатывают нагорные водоотводные канавы. Вытесн ют воду срезанным мохорастительным покровом и торфом, с формированием площадок, одновременным осушением водоема и утеплением грунта тал1|ковой зоны. После формировани площадок из смеси 2 погружают иглофильтры 5, например , с помощью вибропогружател или гидроразмьшом, на всю глубину таликовой зоны 6 (ее граница с веч- номерзлым грунтом 7 обозначена позицией 8). Затем производ т осушение таликовой ; зоны б откачкой воды из иглофильтров 5 (крива депрессии от- 30 мечена позицией 9). Количество иглофильтров 5, места их размещени и режимы откачки определ ютс заранее по известным зависимост м и правилам гидрогеологии в зависимости,от раз- 35 меров таликовой зоны, коэффиидента фильтрации песчаного грунта к заданных сроков осушени .During the period of positive temperatures, using a mechanical means, such as a bulldozer, from the coastal part the mossification cover and the underlying thawed peat layer are cut from the territory of the closed reservoir (lake) of the territory that freezes in winter. The resultant cut-off mixture 2 is transferred to the boom. Moreover, these operations start from the upstream side, where Q small streams 3 flow into the reservoir 1, and from the downstream side pre-form a drainage trench 4 along the channel of the largest creek. Along the contour of the reservoir, in front of the cut-off strip t5 of the soil, upland drainage ditches are being developed. The water is displaced by cut-off morale and vegetation cover and peat, with the formation of platforms, simultaneous drainage of the reservoir and warming of the soil of the high-pressure zone. After the formation of pads from a mixture of 2, the needle filters 5 are immersed, for example, by means of a vibrator or hydrofluid, for the entire depth of the talik zone 6 (its boundary with permafrost 7 is indicated by the position 8). Then the talic drainage is performed; zones b by pumping out water from the needle filters 5 (the depression curve is marked 30 by the position 9). The number of needle filters 5, their locations and pumping modes are determined in advance by known dependencies and rules of hydrogeology, depending on the size of the talik zone, the filtration coefficient of sandy soil for a given drainage time.
Разработку грунта ведут посредством экскаваторного оборудовани . При 40 необходимости разработка грунта может производитьс после полного осушени таликовой зоны 6, демонтажа иглофильтров 5 и другого насосногоSoil development is carried out by means of excavator equipment. When 40 is necessary, the development of the soil can be done after complete drying of the talik zone 6, dismantling the needle filters 5 and another pump
2020
2525
5 five
0 0
5 five
0 0
00
5five
оборудовани . Окружающие талую зону вечномерзлые грунты 7 исключают попадание подземных вод в осушенную талую зону. Обводнение ее поверхностными водами с окружающей территории предотвращают нагорные водоотводные канавы. С опережением (до нескольких суток) в зависимости от погодных условий, утеплитель удал ют с поверхности карьера на участке 10 забо , избега попадани снега и утеплител в забой и нарушени целостности изол ции на соседних участках карьера.equipment. The permafrost soils 7 surrounding the thawed zone exclude the ingress of groundwater into the drained thawed zone. Watering it with surface waters from the surrounding area prevents highland drainage ditches. In advance (up to several days), depending on weather conditions, the insulation is removed from the surface of the quarry at section 10, avoiding snow and insulation in the face and disturbing the integrity of the insulation in the adjacent areas of the quarry.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU864165778A SU1469134A1 (en) | 1986-12-22 | 1986-12-22 | Method of working soil on water reservoir bottom |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU864165778A SU1469134A1 (en) | 1986-12-22 | 1986-12-22 | Method of working soil on water reservoir bottom |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1469134A1 true SU1469134A1 (en) | 1989-03-30 |
Family
ID=21274571
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU864165778A SU1469134A1 (en) | 1986-12-22 | 1986-12-22 | Method of working soil on water reservoir bottom |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1469134A1 (en) |
-
1986
- 1986-12-22 SU SU864165778A patent/SU1469134A1/en active
Non-Patent Citations (1)
Title |
---|
Лешков В.Г. Разработка россып ных месторождений. М.: Недра, 1985, с. 175-179. Технические указани по производ- - ству работ спосо-бом гидромеханизации при сооружении земл ного полотна в зимних услови х (проект). М.:ЦНИИС, 1974, с. 17-21. * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Brown | Man shapes the earth | |
Heede | Gully development and control: the status of our knowledge | |
SU1469134A1 (en) | Method of working soil on water reservoir bottom | |
RU2416692C1 (en) | Water engineering system on permafrost soils | |
CN106115922B (en) | A kind of construction method of the clean water treatment for Landscape Park | |
CN111962480B (en) | Water-saving irrigation construction method for high-standard farmland | |
KR100582875B1 (en) | A drain and drying method for dredged soils surface | |
JPH1136262A (en) | Vegetation method for edge of bulkhead | |
RU2785656C1 (en) | Thaw-type embankment dam on a permafrost foundation | |
RU2393293C1 (en) | Arrangement method of drying system with narrow enclosure ploughing of drained soils | |
RU2816530C1 (en) | Method of drying flooded closed depressions | |
SU1047402A1 (en) | Method of reclamation of erosive slopings | |
KR100305773B1 (en) | Civil nonwoven soil brick and construction method using it | |
RU2176700C1 (en) | Method for protecting territory from flooding | |
CN113045139B (en) | Ecological restoration method for lugu lake big grass sea degraded wetland | |
CN212294536U (en) | River crab culture area ecological drainage ditch slope protection structure | |
RU2753329C2 (en) | Method for protection of frozen base of embankment from negative impact of flooding | |
RU2687820C1 (en) | Method for waterlogging of peat bogs, mainly worked-out peatlands | |
RU2249072C1 (en) | Method for complex multilayer engineering protection of territory to be developed against underflooding | |
SU1613007A1 (en) | Method of erosion control on slopes | |
SU1762768A1 (en) | Counter-erosion relief protection method | |
Orev | A practical handbook on desert range improvement techniques. | |
Clark | Stream improvements in Michigan | |
Lessard et al. | Southwestern pine tip moth damage to ponderosa pine reproduction | |
JPH0241605B2 (en) |