SU1454905A1 - Method of constructing bridge span structure of prefabricated blocks by counterweight suspension assembling - Google Patents

Method of constructing bridge span structure of prefabricated blocks by counterweight suspension assembling Download PDF

Info

Publication number
SU1454905A1
SU1454905A1 SU874247717A SU4247717A SU1454905A1 SU 1454905 A1 SU1454905 A1 SU 1454905A1 SU 874247717 A SU874247717 A SU 874247717A SU 4247717 A SU4247717 A SU 4247717A SU 1454905 A1 SU1454905 A1 SU 1454905A1
Authority
SU
USSR - Soviet Union
Prior art keywords
span
superstructure
assembly
section
supporting
Prior art date
Application number
SU874247717A
Other languages
Russian (ru)
Inventor
Владимир Модестович Дацковский
Original Assignee
Государственный Проектно-Изыскательский Институт По Проектированию И Изысканиям Больших Мостов
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Государственный Проектно-Изыскательский Институт По Проектированию И Изысканиям Больших Мостов filed Critical Государственный Проектно-Изыскательский Институт По Проектированию И Изысканиям Больших Мостов
Priority to SU874247717A priority Critical patent/SU1454905A1/en
Application granted granted Critical
Publication of SU1454905A1 publication Critical patent/SU1454905A1/en

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

Изобретение относитс  к строительству , в частности к мостостроению , и может быть использовано при сооружении мостов неразрезных систем уравновешенной навесной сборкой. Целью изобретени   вл етс  уменьшение металлоемкости пролетного строени . Способ осуществл ют в следующей последовательности . Монтажный агрегат 1 устанавливают в положение дл  монтажа очередного участка пролетного строени  2. Он упираетс  на три опоры 3, 4, 5, на среднюю из которых 4 опираетс  монтируемый участок пролетного строени  2. Передн   по ходу монтажа консоль 9 в незаконченном монтажом пролете во врем  передвижки монтажного агрегата 1 и монтажа очередного участка пролетного строени  2 поддерживаетс  поддерживающим приспособлением 10. Производ т монтаж части очередного монтажного участка пролетного строени  2 подвеской и закреплением блоков с двух сторон от опоры 4, после чего подкрепл ют монтируемый участок пролетного строени  2 поддерживающими приспособлени ми 11 и 12 с двух сторон от опоры 4. После установки поддерживающих приспособлений 11, 12 довод т монтаж очередного участка пролетного строени  2 до конца и объедин ют его с ранее готовой частью моста 9. Затем нат гивают предварительно напр женную арматуру в законченном монтажом пролете и в этом пролете снимают поддерживающие приспособлени  10, 11. Затем готов т монтажный агрегат к перемещению в положение дл  монтажа следующего участка пролетного строени . После перемещени  монтажного агрегата 1 в новое положение его устанавливают на опорные элементы 6, 7, 8, которые опираютс  на опоры 4, 5, 17 и освобождают перекаточные устройства 15,1 6,после чего цикл повтор етс .Зил. S (Л ел 4 СО О сдThe invention relates to the construction, in particular to bridge construction, and can be used in the construction of bridges for continuous systems by a balanced outboard assembly. The aim of the invention is to reduce the metal consumption of the span. The method is carried out in the following sequence. The mounting unit 1 is installed in the mounting position of the next section of the span 2. It rests on three supports 3, 4, 5, on the middle of which 4 is the mounted section of the span 2. The mounting console 9 in the assembly that was not completed during assembly was mounted the assembly unit 1 and the assembly of the next section of the superstructure 2 are supported by the supporting device 10. A part of the next assembly section of the superstructure 2 is mounted; the suspension is fixed and the blocks from two from support 4, after which the mounted section of the superstructure 2 is supported by supporting devices 11 and 12 on both sides of support 4. After installing the supporting devices 11, 12, the installation of the next section of the superstructure 2 is completed and combined with the finished part of bridge 9. Then, the prestressed reinforcement is tensioned in the completed span and the supporting devices 10, 11 are removed in this span. Then the assembly unit is prepared for moving to the mounting position as follows first section of the span. After the assembly unit 1 is moved to a new position, it is mounted on supporting elements 6, 7, 8, which rest on supports 4, 5, 17 and release transfer devices 15.1 to 6, after which the cycle repeats. S (L ate 4 CO O sd

Description

Г R

1717

Фиг. гFIG. g

1В.1B.

11 t 111 t 1

-7 /J-7 / j

Claims (1)

Формула изобретени.яClaim Способ возведения сборного из блоков пролетного строения моста з 1454905 4 уравновешенной навесной сборкой, включающий установку монтажного агрегата с опиранием на три опоры, монтаж блоков очередного участка пролетного строения с установкой по мере монтажа поддерживающих пролетное строение приспособлений с продольно-подвижным закреплением их на монтажном агрегате, объединение смонтированного участка пролетного строения с ранее смонтированными участками или опирание его на опору, натяжение предварительно напряженной арматуры в законченном монтажем пролете,· снятие поддерживающих пролетное строение приспособлений и передвижку монтажного агрегата в положение для монтажа следующего участка пролетного строения, отличающийся тем, что, с целью умень шения металлоемкости пролетного строения, поддерживающие пролетное строение приспособления устанавливают с г двух сторон от соответствующей опоры оMethod of erection of prefabricated from blocks of the span of the bridge of 1454905 4 equilibrated hinged assembly comprising installing mounting assembly journalled on the three supports, installation of the next section of the blocks of the superstructure with the installation as the installation of supporting superstructure devices with a longitudinally-movable fixation of the mounting unit, the combination of the mounted section of the superstructure with previously mounted sections or resting it on a support, the tension of prestressed reinforcement in the end nnom montage span, lifting · supporting superstructure shifting devices and mounting the unit in position for installation of the next section of the superstructure, characterized in that, for the purpose of metal sheniya Decrease the superstructure supporting superstructure device mounted with r both sides of the corresponding leg of а после натяжения предварительно напряженной арматуры в законченном монтажем пролете снимают поддерживающие пролетное строение приспособленияand after tensioning the prestressed reinforcement in the span completed by the installation, spans supporting the span are removed 10 в этом пролете, причем оставшиеся поддерживающие приспособления жестко прикрепляют к смонтированному пролетному строению, при этом перед передвижкой монтажного агрегата в над15 опорной зоне смонтированного участка пролетного строения и на очередной по ходу монтажа опоре устанавливают перекаточные устройства, закрепляют их жестко относительно пролетного10 in this span, and the remaining supporting devices are rigidly attached to the mounted span, while before moving the assembly unit in the over 15 support area of the mounted section of the span and on the next support during installation, the transfer devices are fixed, they are fixed rigidly relative to the span 20 строения и опор и продольно-подвижно опирают на них монтажный агрегат,20 buildings and supports and longitudinally-movable support the mounting unit on them, Фиг. гFIG. g
SU874247717A 1987-05-21 1987-05-21 Method of constructing bridge span structure of prefabricated blocks by counterweight suspension assembling SU1454905A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU874247717A SU1454905A1 (en) 1987-05-21 1987-05-21 Method of constructing bridge span structure of prefabricated blocks by counterweight suspension assembling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU874247717A SU1454905A1 (en) 1987-05-21 1987-05-21 Method of constructing bridge span structure of prefabricated blocks by counterweight suspension assembling

Publications (1)

Publication Number Publication Date
SU1454905A1 true SU1454905A1 (en) 1989-01-30

Family

ID=21305323

Family Applications (1)

Application Number Title Priority Date Filing Date
SU874247717A SU1454905A1 (en) 1987-05-21 1987-05-21 Method of constructing bridge span structure of prefabricated blocks by counterweight suspension assembling

Country Status (1)

Country Link
SU (1) SU1454905A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5655243A (en) * 1995-07-14 1997-08-12 Kim; Sun Ja Method for connecting precast concrete beams

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Захаров Л.В. и др. Сборные неразрезные железобетонные пролетные строени мостов. М.: Транспорт, 1983, С.81, рис. 4.7. Авторское свидетельство СССР 538087, кл. Е 01 D 21/00, 1974. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5655243A (en) * 1995-07-14 1997-08-12 Kim; Sun Ja Method for connecting precast concrete beams

Similar Documents

Publication Publication Date Title
SU1454905A1 (en) Method of constructing bridge span structure of prefabricated blocks by counterweight suspension assembling
JP2001146718A (en) Bridge floor slab projection moving and supporting structure
DE59010427D1 (en) Support structure for slab formwork panels
SU950846A1 (en) Connection of above-pier block of bridge span structure with pier at assembly stage
DE3370501D1 (en) Apparatus for the section-by-section construction of a prestressed concrete superstructure of a bridge
SU1010175A1 (en) Mounting joint of unsplit span structure with bridge intermediate pier
SU887696A1 (en) Method of mounting a solid bridge span steel-ferroconcrete structure
SU1530656A1 (en) Method of constructing a bridge with unsplit span structure
SU606917A1 (en) Method of constructing near-substructure area of prefabricated reinforced concrete frame-cantilever span of bridge
SU727737A1 (en) Detachable sectional bridge
SU798255A1 (en) Method of erecting buildings with guy-rope roof
SU1090789A1 (en) Method of assembling ferroconcrete bridge span structure transversely divided into blocks
SU1204663A1 (en) Method of mounting unsplit metal span structures of double-track railway bridge with separate span structures for each track
SU1268699A1 (en) Method of assembling structures
JPS5845522B2 (en) How to build a bridge
SU672301A1 (en) Reinforced concrete framework of multi-storey building
SU881249A2 (en) Prestressed guy truss
SU1222739A1 (en) Construction of expansion with reinforcements of bridge span structure
SU1368421A1 (en) Flue and method of constructing same
SU1041657A1 (en) Apparatus for dismantling composite supports
SU1071680A1 (en) Method of erecting unsplit
SU1188083A1 (en) Arrangement for erecting travelling gantry crane span
SU1183629A1 (en) Slewing platform for construction machines
SU1293266A1 (en) Reinforcing structure of ballast-type span structure of railway bridge
RU1786235C (en) Method for erecting floor structures